MARKET PROCESS DESIGN. MPD 04 Supplier of Last Resort (SoLR)

Similar documents
MARKET PROCESS DESIGN. MPD 02 Change of Supplier QH

MARKET PROCESS DESIGN. MPD 19 Market Process for Terminate Connection

MARKET PROCESS DESIGN. MPD 03 - Market Process for Objection & Cancellation

MARKET PROCESS DESIGN. MPD 01 CoS NQH

MARKET PROCESS DESIGN. MPD 10 - Market Process for Re-Energisation

MARKET PROCESS DESIGN. MPD 09 - Market Process for De-energisation

MARKET PROCESS DESIGN. MPD 05 - Market Process for New NQH Metered Connection

MARKET PROCESS DESIGN. MPD 24 - Market Process for Change to Customer Details

MARKET PROCESS DESIGN. MPD Change of Group MPRN_CoS

MARKET PROCESS DESIGN. MPD New Distribution Connected Participant Generator

MARKET PROCESS DESIGN. MPD Change of Group MPRN_no_CoS

MARKET PROCESS DESIGN. MPD New Unmetered Single Point Connection

MARKET PROCESS DESIGN. MPD 15 - Market Process for Data Processing for QH Meters

MARKET PROCESS DESIGN. MPD New Unmetered Grouped Connection

Co-Ordinated Retail Market Message Guide

Discussion Request 1145 Market Design Process Diagrams conversion from ARIS to document format

Discussion Request 1173

ESB Networks Market Release. Meeting of the IGG, 11 th March 2010

Co-Ordinated Retail Market Message Guide

Co-Ordinated Retail Market Message Guide

Co-Ordinated Retail Market Message Guide

RMDS Working Practice 24 Guidelines for Handling Objections to Change of Supplier

ESB Networks Market Release. Meeting of the IGG, 12 th October 2010

Downloadable Meter Point Details Files

Discussion Request 1173

Scheduled NQH Meter Readings Message

Authority Public Lighting

Date Change Request. To allow for future flexibility in the values used in the SSAC field, all codified valid values for this field have been removed.

Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST. RoI Request Originator Name. Theresa O Neill Date Raised 02/03/2015

117R Meter Point Status Request Rejection

Authority Public Lighting

Date: 27 th July, 2016 Time & Location 3pm - Conference Call

Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST. RoI Request Originator Name. Theresa O Neill Date Raised 01/09/2015

Data Migration Plan (40) Fingrid Oyj

Alice Mooney, Aileen O Connor

BEEDS portal Bank of England Electronic Data Submission portal. User guide. New PRA Authorisations Version 1.1

Terms of Use or the SMS Notification Service

RFM Procedure 3: Certification Body Approval for Chain of Custody Standard. Alaska Responsible Fisheries Management (RFM) Certification Program 17065

131 Work Status. Message. Message Specific. Information. Message Header. MPRN Level. Information

Date Version Reason for Change Version Status 02/03/ Issued to Market Final. Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST

Grower Priority Database User Guide

Procurer User Manual

8 Registering for a Call

Employer User Guide. Getting Started. Daily Processing. Maintenance. Reporting

FCC FORM 499-A FILING USER GUIDE

Timber Products Inspection, Inc.

Error Handling Strategy

Error Handling Strategy. DCC Guidance Document

Help for Suppliers. (UK Public Sector)

Questions on IARD? Call Regulatory User Support at A.M. - 5 P.M., ET, Monday through Friday

Procedure 9 Suspension, Withdrawal and Scope Reduction

1- How do you register for an account with Alberta Transportation s Online Services?

Notification Form AP50 Minor Update to Risk Management Programme Details

Certification. Causes of Reduction of Scope of Certification

Implementation Date for Reporting Trade-for-Trade Extended Failed Trades

Responding to an RFP/RFQ/RFI in The Global Fund Sourcing Application Supplier Instructions

BEEDS portal Bank of England Electronic Data Submission portal. User guide. Credit unions Version 1.2

Message exchange with. Finnish Customs

Smart Metering Implementation Programme. Consultation on transitional arrangements in the Smart Energy Code

REGULATORY DIVISION BOURSE DE MONTRÉAL INC.

MARKET PROCEDURE: METER DATA SUBMISSIONS

NI Market Message Implementation Guide Meter Works

COORDINATOR GUIDE TECHNICAL STANDARDS. Technical Standards Managers

Respondent Help Guide

Supplier Contract Management for Agencies Core-CT Finance Upgrade Implementation

Web Trade Services. Achieving more together. Quick Guide: Export collection. Mittelstandsbank

NZX Participant Compliance

MERCERSPECTRUM EMPLOYER USER GUIDE

User Guide Product Design Version 1.7

eport Seller User Guide

Viewing Organization Direct Owners/Executive Officers or Indirect Owners (pg. 9)

9 February 2017 Part 6 distributed generation applications. Ron Beatty Principal advisor

QuickSuper. Entering contributions.

STCP 18-3 Issue 006 TEC Changes

e-lms Electronic Lodgement of Mailing Statements User Guide Version 4.5

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT

As ESS allows for customisation of certain screens, the client will be able to extract other information from the ESS system too.

CHEP Portfolio+Plus 1.3. User Guide V March 2010

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT

Online Reliance System FAQs

Track Enhancement #2

MSATS PROCEDURES: PROCEDURE FOR THE MANAGEMENT OF WHOLESALE, INTERCONNECTOR, GENERATOR AND SAMPLE (WIGS) NMIS

Notify Metering Point Characteristics

User Guide. Trade Finance Global. For customers using Guarantees. October nordea.com/cm OR tradefinance Name of document 5/8 2015/V1

web po user guide Supplier

This instruction will guide you through all the procedures and activities, necessary for your participation in the trading.

MSATS PROCEDURES: CATS PROCEDURE PRINCIPLES AND OBLIGATIONS

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

File Names and Formats

Business Requirements Specification For the. Network Code

KANBANA TERMS OF SERVICE

Status report of TF-CS/OTA

Balancing and Settlement Code BSC PROCEDURE

SCI QUAL INTERNATIONAL PTY LTD ENQUIRY & APPLICATION/RENEWAL FORM FOR CERTIFICATION

Information paper on the registry

Data Migration Plan Updated (57) Fingrid Datahub Oy

How to Use EDGAR to Submit Draft Registration Statements and Amendments and File Them in Accordance with the Requirements of the JOBS Act

Market Participant Test Kit Version 5.3

Implementation of the Minor Ailment Service Produced by NES Pharmacy

DUBAI CUSTOMS SMART Workspace DC Tablet User s Manual

Transcription:

MARKET PROCESS DESIGN MPD 04 of Last Resort (SoLR)

TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION... 9 3. SUPPLEMENTARY INFORMATION... 13 Page 2 of 14

1. Introduction 1.1 Scope This Procedure describes the process for the of Last Resort. 1.2 History of Changes This Procedure includes the following changes:- ersion in which Source of Change Description of Change last change Implemented Draft MIG September 17 th Standardised on use of QH/NQH Terminology Change applied since ersion 3.1 Draft MIG September 17 th Updated diagram to show 210 flow (already included in text) Updates arising from Clarification sessions Draft Clarification 1 Update to scope of process. Draft Written Clarifications All references to Profile/Non profile replaced by QH/NQH ersion 4.2 MCR 0021 Addition of New Market Message 105L sent to the Old ersion 5.0 DRR 0087 Amendments to text to cater for Single Point Unmetered & QH Sites ersion 6.0 MCR 0116 Amendments to satisfy a new requirement of SEM implementation to inform the SEMO where there is a reversion to of Last Resort for a Trading Site. This will necessitate changes to:- ARIS Process Flow Diagram Supplementary Information ersion 8.0 RMDS QA No business changes applied. MPD clean-up: objects enlarged to make text readable, swimlane actors shifted left, swimlanes tightened. ersion 9.0 Non-Conformance (AIQ- 1768 - Non-conformities MPD 04 updated to align with MCR 162 and also to reflect recent (March '11) discussions with MRSO on how the process actually operates. Page 3 of 14

ersion in which last change Implemented ersion 10.5 Source of Change relating to MCR 162) MCR 1155 Conversion of MPDs from ARIS to document format. Description of Change ARIS Process flow converted to isio format and Step Table included. Swimlane name amended from Alternative to Alternative s. Changed from SMO to SEMO. Page 4 of 14

2. Process Map MPD 04 SoLR ESB Networks SoLR Alternative s Defaulting 6 MRSO updates SAP with details of Defaulting SoLR workflow to be initiated 7 Receive SoLR direction 8 MRSO given 1 day to calculate the % market share of the Defaulting To step 10 Details of % of Market Share of Defaulting received by SoLR 9 MRSO forward the % market share of the Defaulting to SoLR TSO SEMO Defaulting identified 1 SEMO contact Regulatory Authority about Defaulting 2 Suspension order is issued by SEMO to Defaulting Suspension order issued 4 Terminates the Defaulting 5 Alert MRSO of termination REG AUTHORITY Regulatory Authority informed about defaulting 3 Regulatory Authority suspends the Defaulting from trading SoLR Direction issued Page 5 of 14

MPD 04 SoLR SoLR Notification received by ESB Networks SoLR Alternative s Defaulting From step 7 11 Alternative s receive the list of MPRNs of affected s 10 Send list of affected customers to SoLR and Alternative s 12 SoLR receives a list of MPRNs affected by the MPRN event 13 provided with relevant SoLR information within 5 working days 15 Review and update incomplete Service Orders 14 Request DSO to review incomplete Service Orders All incomplete Service Orders dealt with In Progress Switches for the Defaulting cancelled 16 Cancel in Progress Switches for Defaulting De-energised sties of the Defaulting deregistered 17 Identify and deregister De-energised sites of the Defaulting Notification of potential need for special read for MD sites received 18 Notify DSO that a special read is required for MD s To step 19 REG AUTHORIT Y SEMO TSO Page 6 of 14

MPD 04 SoLR wishes to register with Alternative ITERATED PROCESS ESB Networks SoLR Alternative s Defaulting From step 11 Daily checks of inprogress switches from Defaulting 19 Register 22 Check whether QH or NQH 20 Register MPRNs and provide Read where appropriate x QH NQH 23 Determine if MD x 210 010 Not MD MD 24 Estimate Readings 25 Request DSO to take a special read 19 days after SoRL direction 26 Take a special read for MD sites 28 Send Non- Registered MPRNs to SoLR 29 Register MPRNs and provide customer read where appropriate 27 alidate Reading (MRSO) 210 010 21 Receive Registration and Reading Messages from Alternative Reading available 30 Receive Registration and Reading messages from SoLR To step 31 SEMO TSO REG AUTHORITY Page 7 of 14

MPD 04 SoLR ITERATED PROCESS ESB Networks SoLR Alternative s Defaulting Reading available 31 Register MPRNs to SoLR/alternative 32 Send confirmation of CoS and readings to Defaulting 105L 310 33 Receive CoS confirmation and readings 34 Send Confirmation of CoS and readings to SoLR 105 320 331 700 35 Receive CoS confirmation and readings 36 Send confirmation of CoS to TSO if QH metered 105 331 38 Determine if CoS was for a Trading site x CoS for Trading site CoS not for Trading site 39 Notify SEMO of CoS TSO 37 Receive CoS confirmation SEMO 40 Receive confirmation REG AUTHORITY Page 8 of 14

2.1 Process Description Process Step Role Process Step Description Interface 1 SEMO contact Regulatory Authority SEMO Where a Default is identified the Single Electricity Market Operator (SEMO) contacts the Regulatory Authority regarding the Defaulting. about Defaulting 2 Suspension order issued by SEMO to SEMO Suspension Order issued by SEMO to Defaulting. Defaulting 3 Regulatory Authority suspends the Defaulting from trading 4 Terminates the Defaulting 5 Alert MRSO of termination 6 MRSO updates SAP with details of Defaulting 7 Receive SoLR direction 8 MRSO given 1 day to calculate the % market share of the Defaulting 9 MRSO forward the % market share of the Defaulting to SoLR 10 Send list of affected s to SoLR and Alternative 11 Alternative s receives the list of MPRNs of affected s Regulatory Authority SEMO SEMO Alternative s The Regulatory Authority suspends the Defaulting from trading and the SoLR direction is issued. SEMO will terminate the Defaulting. SEMO will alert Meter Registration Services Operator (MRSO) of termination. MRSO will update SAP (SAP application for Utilities business) with details of Defaulting supplier. The SoLR workflow is initiated MRSO receives SoLR direction from the Regulatory Authority. MRSO calculates the % market share of the Defaulting. MRSO advises the SoLR of the % market share of the Defaulting. MRSO sends list of affected s to the SoLR and Alternative s. The Alternative s receives a.cs file containing a list of MPRN s of affected s Register - next step 19 Page 9 of 14

Process Step Role Process Step Description Interface 12 SoLR receives a list of SoLR The SoLR receives a.cs file containing a list of MPRN s of affected s. MPRNs affected by the MPRN event 13 provided with relevant SoLR information within 5 working days SoLR The SoLR informs the affected s by letter, of the various CoS options (including list of alternative, active s in the market) within 5 working days of receiving the.cs file. 14 Request Meter Operations to review incomplete Service Orders 15 Review and update incomplete Service Orders 16 Cancel in Progress Switches for Defaulting 17 Identify and deregister de-energised sites of the Defaulting 18 Notify DSO that a special read is required for MD s 19 Register Alternative s 20 Register MPRNs and Alternative provide s Read where appropriate MRSO will request Distribution Service Operator (DSO) to review all incomplete Service Orders for the MPRN s on the.cs file. DSO will review and update incomplete Service Orders. [See Supplementary Information Incomplete Service Orders]. MRSO will cancel all In-Progress Change of (CoS) switches to the Defaulting. MRSO will identify and de-register all de-energised sites of the Defaulting. MRSO will notify the DSO that special reads will be required for the Maximum Demand sites. of Defaulting wishes to register with Alternative. The Alternative provides a registration application, completed in accordance with the applicable rules, to MRSO. The Alternative may provide a reading to MRSO. The is responsible for the validity of all information provided for the purposes of registering a Meter Point. 210 010 21 Receive Registration and Reading Messages from Alternative 22 Check whether QH or NQH Page 10 of 14 ESB Networks () Receive Change of (CoS) Registration Requests. MRSO will carry out daily checks of In-Progress CoS switches from Defaulting to determine if they are QH or NQH sites.

Process Step Role Process Step Description Interface 23 Determine if MD MRSO will determine if In-Progress CoS is for a MD. Not MD - Next Step 24 MD - Next Step 25 24 Estimate Readings MRSO will provide estimate reading for NHQ site if required. 25 Request DSO to take MRSO will request the DSO to take a special reading for MD sites. a special read 26 Take a special read for MD sites 27 alidate Reading (MRSO) 28 Send Non-Registered MPRNs to SoLR 29 Register MPRN and provide ready where appropriate 30 Receive registration and reading messages from SoLR 31 Register MPRNs to SoLR/Alternative 32 Send confirmation of CoS and readings to Defaulting 33 Receive CoS confirmation and readings 34 Send Confirmation of CoS and readings to SoLR 35 Receive CoS confirmation and readings 36 Send confirmation of CoS to TSO if QH metered Defaulting s SoLR The DSO arranges for the collection of readings for the affected Maximum Demand Meter Points. In exceptional circumstances, such as a high volume of meter points affected, the DSO may opt to provide estimates. MRSO will validate readings. 19 days after the SoLR Direction MRSO will send a.cs file containing the list of MPRN s which remain registered to the Defaulting. The SoLR provides a registration application, completed in accordance with the applicable rules, to MRSO. The SoLR may provide a reading to MRSO. The is responsible for the validity of all information provided for the purposes of registering a Meter Point. ESB Networks () Receive Change of (CoS) Registration Requests. MRSO will complete the CoS process for both the SoLR and the Alternative s. MRSO will confirm the Completion of the CoS to the Defaulting and will send CoS readings. The Defaulting will receive Confirmation of CoS and readings. MRSO will confirm the Completion of the CoS to the SoLR and will send CoS readings. The SoLR will receive confirmation of CoS and readings. MRSO will send confirmation of CoS to TSO if site is QH metered. 210 010 105L 310 105 320 331 700 Page 11 of 14

Process Step Role Process Step Description Interface 37 Receive CoS confirmation The TSO receive CoS confirmation of QH site. 105 331 38 Determine if CoS was for a Trading site MRSO will determine if CoS was for a trading site:- Not for trading site - no further action For Trading site - Next Step 39 39 Notify SEMO of CoS Where CoS is for trading site MRSO will notify SEMO. 40 Receive notification SEMO SEMO receive notification of CoS for trading site. Page 12 of 14

3. Supplementary Information of Last Resort Instructions The of Last Resort need not initially provide a registration request to MRSO. After day 19 however, they must send in 010 s to register any remaining s. Alternative Instructions An alternative should provide a registration request to MRSO using the appropriate interface by using the 010. The use of a scheduled read should not be requested. The alternative may provide a read using the 210 or the 010. Non-Participant Generator Export This section is being added as a placeholder pending further discussions regarding the treatment of of Last Resort for the Export Arrangements on a Non Participant Generator. SoLR Assumptions This SoLR process is for a Defaulting only and cannot be initiated by a Defaulting Unit. On day 1 all MPRNS are to be reviewed by MRSO / for any outstanding service orders. Two.CS data files are to be issued by MRSO on Day 1. o The first.cs file is for the SoLR and will consist of the following: MPRN Level Details, the Meter Point Address, Name, Contact Details, Notification Address, Technical Contact Details, Technical Contract Address, Medical Equipment Special Needs, Service Special Needs where applicable o The second.cs file is for the alternative s and will consist of the following:- MPRN Level Details, the Meter Point Address, and the Name where applicable. o MRSO will issue a revised.cs data file by close of business on day 19 to the SoLR. This revised file will exclude any MPRNS that have since been registered to alternative s. Existing CoS to the exiting are to be cancelled and notified by MRSO. A letter is to be issued to the Defaulting s s explaining the various CoS options. The designated of Last Resort is responsible for informing the affected s by letter, of the alternative active suppliers1 in the electricity market within 5 working days. Page 13 of 14

Existing CoS to alternative s are processed to the SoLR event date and procedures. Alternative s are obliged to cancel 010 CoS messages for any MPRN on the day 1.CS file if the message is submitted after day 19. Alternative s will not receive a Name for domestic MPRNS (which is in line with existing market rules). Meter Work service orders should be analysed on case by case basis. 010 s received from alternative s for SoLR MPRNs are required to contain the new SoLR Read Arrangement Code. MRSO will lock down for 3 months any MPRN that has not transferred to an alternative within the 19 day SoLR window. Registrations for NQH s will be processed to estimated reads as of Day 1. Incomplete Service Orders The following analysis work and actions will be carried out by MRSO and with the statuses identified in the table below. MPRN Status Service Order Status MRSO / Action De-energised MPRNS Completed De-register the MPRN De-energised MPRNS In Progress Complete the Service Order and de-register the MPRN De-energised MPRNS Completed not Updated Update Central Market System and de-register the MPRN Existing Re-energisation Service orders Existing Re-energisation Service orders Meter Works In Progress Completed not Updated Meter Works physically complete awaiting paper work Complete the Service Order Update Central Market System Complete by day 19 Meter Works Meter Works scheduled and underway Suspend Meter Works and review Meter Works Meter Works not scheduled. Suspend Meter Works and review Page 14 of 14