Optimizing PON architectures maximizes electronics efficiencies. White paper

Similar documents
FiberGuide Optical Raceway Solutions. Comprehensive, long-term management for your growing fiber network

Miniature outside plant plug-and-play solutions. White paper

White paper. Interleaved MIMO: Near-full MIMO performance, nearly half the costs

Introducing the NG4access ODF Platform

The changing route to the last mile

Fiber backbone cabling in buildings

Outside plant solutions for multisystem operators

IN-BUILDING WIRELESS BEST PRACTICES CHAPTER 5

CommScope standard density fiber optic panels

Passive optical LAN explained

Your network s path to its fiber future. Grow confidently with fiber solutions from an experienced partner

Passive Optical LAN Executive Summary. Overview

Data center cabling design fundamentals

Flexible wireless connectivity solutions

MA R K E TING R E PORT. The Future of Passive Optical Networking is Here NG-PON2

Bonding and grounding NETCONNECT copper cabling systems

GPON Gigabit Passive Optical Network

Deployment & Operations Committee. FTTH Basics Architecture, Topology and Technology

FTTX NETWORKS. Application Notes. Author John Peter & Timo Perttunen. Issued June 2014

INTRODUCTION OUR SERVICES

Checklist for building an edge data center

The virtualized and converged central office/cable headend

High Speed Migration: Choosing the right multimode multi-fiber push on (MPO) system for your data center

FTTP Shootout Active Ethernet vs PON

FTTH Technology Considerations

RFTS to Reduce OPEX Costs for FTTH Deployments

Next Generation Architecture s Readiness for the Next Generation Broadband

CommScope Multi-Tenant Data Center Solutions: A solid advantage from the critical infrastructure experts. Data Center Solutions

Passive Optical Networks: Fundamental Deployment Considerations

FDH Sealed fiber distribution hub and integrated splitter module solution

Introduction. Figure 1 - AFS Applicability in CORD Use Cases

Powering Change in the Data Center. A White Paper from the Experts in Business-Critical Continuity TM

point-to-multipoint deep fiber access

Uniprise Structured Cabling Solutions Guide

R O I C a s e S t u d i e s

Next-generation OTE portfolio. Optical termination enclosures for FTTX deployment

Network Access Technology Consideration in Europe. By Helge Tiainen of InCoax and Chair of the MoCA Access Work Group

Addressing issues in the local area network

All rights reserved 2006, Alcatel. The Role of GPON. November 29, Globecom 06. Ralph Ballart. In Supporting Triple Play Services

5G: Advancing the World of Connectivity

Navigating the Pros and Cons of Structured Cabling vs. Top of Rack in the Data Center

SYSTIMAX structured cabling systems. High-performance infrastructure built on the science of innovation

Fiber Management Considerations for Optical Components. By: Tom Warren

Modeling Advanced Optical Broadband Architectures

TENIO. Fiber Closures

The SYSTIMAX GigaSPEED X10D solution. The infrastructure modern enterprises and data centers depend on

The Green Advantage of 10G Optical Fiber

How You Can Optimize Passive Optical LAN Through Structured Cabling

DATA CENTER COLOCATION BUILD VS. BUY

LSX Optical Distribution Frames

Powered fiber cable system technical overview: Hybrid optical fiber system for extending Power over Ethernet (PoE)

Fiber Backbone Cabling in Buildings

Fiber to the home solutions. To migrate to FTTH with agility and ease, count on CommScope. Europe, Middle East and Africa reference guide

New Same-Band Combining Technology Improves LTE Deployment

Laying the groundwork for a new level of Power over Ethernet

Passive Optics for the MSO: Coherent Solutions for Reliable Service. By: Tom Warren Clearfield Application Engineer

Name of Course : E1-E2 CFA. Chapter 16. Topic : FTTH(NGPN)

SDN and NFV gaining traction: is your infrastructure ready? White paper

The next-generation access network : transition from copper to fiber optics

NETWORK TECHNOLOGIES, WHOLESALE ACCESS PRODUCTS AND INVESTMENT

Total Cost of Ownership: Benefits of the OpenText Cloud

CommScope harnesses the power of PoE in Madrid

Passive Optical Components. Service providers and MSOs, get more from your existing fiber infrastructure with integrated passive optical components

Data center applications standards reference guide

MUNICIPALITY OWNED BROADBAND NETWORKS

Leverage Data Center Innovation for Greater Efficiency and Profitability

INSIDE: Enterprise Migrations to Collocation Sites See page 12.

Cisco Prisma D-PON: Your DOCSIS-Based Fiber-to-the-Home Solution

Smart building connectivity

Universal connectivity grid design guide

Broadband Backhaul Asymmetric Wireless Transmission

The 5G consumer business case. An economic study of enhanced mobile broadband

WITH RELIABLE, AFFORDABLE ENTERPRISE PRI

Total Cost of Ownership: Benefits of ECM in the OpenText Cloud

Nokia Passive Optical LAN solution

How CORD will impact your central office

AllWave FIBER BENEFITS EXECUTIVE SUMMARY. Metropolitan Interoffice Transport Networks

Leyden Broadband Committee Presentation by MBI s Todd Corcoran and John Furey August 3, 2016 at 10:00 am Leyden Town Hall

Passive Optical LAN - Game Changer: An Integrator s Perspective. Para Munaweera BSc,MSc,MBA

Delivering next-generation fibre throughout every building

Bob Matthews Technical Manager CommScope Canada

ADC CORPORATE CAPABILITIES

Hybrid Cloud for Business Communications

Rack-Level I/O Consolidation with Cisco Nexus 5000 Series Switches

OPTICAL EXPRESS The Key to Facilitating Cost-Effective and Efficient Network Growth

Dell EMC Hyper-Converged Infrastructure

Optical MSAN. For active and passive optical Ethernet

Discover the Hidden Cost Savings of Cloud Computing

Reaping the Benefits of Managed Services

BROADBAND AND DIGITALISATION IN SWEDEN

DIVERS DEPLOYMENT CHALLENGES. Gigabit in the MDU. Greg Luhman, Business Development Manager. May General Business

Deploying All-Optical Access Networks

Maximizing Efficiency. In Data Centers

Passive Optical LAN: Determine If It's Suitable for Your LAN Infrastructure

NG- PON2 & XGS- PON: Lowering the Cost of Consolida<ng Residen<al and Business Services

A Ready Business rises above infrastructure limitations. Vodacom Power to you

Optical Transport Platform

THE RISE OF FIBER INFRASTRUCTURE

Executive Summary Advanced Broadband Business Case Fiber Build-out in Morgantown, WV

Alcatel-Lucent 1850 TSS Product Family. Seamlessly migrate from SDH/SONET to packet

Transcription:

Optimizing PON architectures maximizes electronics efficiencies White paper

When deploying a passive optical network (PON), the FTTH architecture chosen directly affects the cost of active equipment. Placement of optical splitters in the architecture plays a particularly important role. The size of the customer base served from the last splitter point influences the utilization rate of the optical line terminal (OLT) equipment in the central office or POP house. Utilization rate is the percentage of active customers on the port per total number of customers that could potentially be served from that OLT port. Why is this important? OLT ports are expensive. Not using equipment s maximum capacity drains CAPEX when take rates are low. Active equipment occupies expensive floor space and requires power and cooling even when not serving a revenue-generating customer. Finally, active ports become obsolete every three to five years. When migrating to the latest generation active equipment, unused capacity will be replaced with new unused capacity, further wasting CAPEX. When deploying FTTH networks, operators pay attention to network take rates to define the breakeven point between network construction and revenue generated by the total number of customers paying for service. Take rate is calculated by dividing the number of active customers ( homes connected ) on the FTTH network by the total number of potential customers ( homes passed ). TAKE RATE = % number of homes connected number of homes passed In general, FTTH network deployments with take rates between 25 and 40-percent are considered profitable. Many factors determine profitability, but it is mainly driven by the CAPEX spent to build the network, which in turn depends on factors such as: Population density SFU versus MDU Aerial versus buried infrastructure Distances from central office Ability to reuse existing infrastructure such as ducts and poles Required amount of new civil works and the related hourly labor rates Right of way costs Etcetera When deploying a PON architecture, several active customers will be grouped on a single fiber that is in turn connected to a fiber coming from the central office. This happens by using passive splitters that separate traffic from the CO (downstream traffic) to individual connected customers and merge all upstream traffic from different customers into the single fiber leading back to the central office. All this traffic is managed through time domain multiplexing technology, whereby up and downstream time slots are dedicated to each customer. In the central office/pop site an OLT manages the traffic to and from the customers connected to this OLT port. Typically these ports can manage data traffic to and from 64 customers. At the customer side, typically inside the premises, an ONT (Optical Network Terminal) receives the downstream traffic from and sends the upstream traffic to the OLT. With this in mind, let s consider a term much less defined in literature and architecture descriptions the Utilization Rate (UR) of the transmission equipment. The utilization rate can be defined as the number of active customers per number of OLT ports multiplied by the OLT s capacity to serve different customers from a single port (typically 64). UTILIZATION RATE = % number of paying customers number of OLT ports x 64 In most cases, utilization rate and take rate are not the same and, as a percentage, can be very close or very remote. This has a significant impact on the network s total cost of ownership. Currently, an OLT line card costs between $2000 and $3200 (USD), and serves 64 customers. The variation arises from the generation of transmission equipment (PON, GPON, XGPON) used, the class of laser integrated, the services integrated to run over the network, the competitive landscape of the market space, etc. If the utilization rate is 100-percent, i.e. all customers connected to an OLT port are active/paying customers, the investment runs at the highest possible rate of return. This means that the operator invested CAPEX for the equipment of $30 to $50 (USD) per customer (the port price / 64). If the utilization rate is 10-percent, i.e. only 6 customers are active on an OLT port, the relative cost per customer will be eight times higher -- ranging between $240 and $400 (USD) per customer. This significantly impacts the total CAPEX spend per customer in a deployment. And for that reason should more often be a topic for optimization. Though rarely considered, the payback times of the network deployment can be substantially influenced by low utilization rates. It is tempting to blame low utilization rates on lower take rates but the outside plant architecture, and in particular the placement of splitters in that network, actually drives the utilization rate of the electronics in central offices and POP locations. To better understand this, let us examine two extreme examples. commscope.com 2

Example 1: In this architecture, the operator chose to optimize the cost of the network build by reducing the amount of fiber deployed in the access network and reducing the number of splices. An eight-port terminal (secondary splitter point) was situated close to a grouping of eight houses. To minimize the number of splices, the operator integrated a 1:8 splitter in this last terminal. This terminal was connected to a node (primary splitter point) which grouped eight similar terminals. This node contained the primary 1:8 splitter. The overall split ratio is 1:64 and the node required only nine splices to link 64 homes. This architecture greatly reduced the cost of splice labor (assuming a rate of $10 USD per splice). The utilization rate achieved by this architecture and take rate is shown below. Cluster Size = 8 1x8 splitter per cluster TR = 12,5% UR = TR = 12,5% This network had a 10 to 15-percent take rate (TR). If for this example we assume a fixed TR of 12.5-percent; for every eight-port terminal, one customer is taking and paying for service. The seven other ports remain unused. When the first customer in this cluster of eight takes service, all the fibers back to the CO are connected and both the primary and secondary splitters are in place. This locks the OLT capacity in the central office and as a consequence, in this example, the take rate equals the utilization rate (12.5-percent). This means that 77.5-percent of the active equipment is switched on but not serving active customers. When the network s take rate and utilization rate are the same, the effective OLT cost per customer is eight times higher than if the utilization rate would equal 100-percent. In this example, then, with a low take rate (and limited revenues), the cost invested in OLTs must be written off ($240 to 400 USD per customer). Splitters close to customer reduce the UR Splitters close to the customer optimize fiber utilization (includes effects of digging distance, amount of splices,...) OLT port investment is a regularly recurring cost (replaced every 2 to 5 years) Take rate 10-15% (PON) Splitters placed close to the customer resulting in: Minimized splicing and fiber requirements Decreased utilization rate of active OLT ports in CO and poor utilization of power, cooling and real estate OLT @ $2000 1:8 Primary splitter point serving overall cluster of 64 homes 1:8 Secondary splitter point serving individual sub-clusters of 8 homes commscope.com 3

Example 2: Taking the same network cluster size and take rate as in Example 1, let s examine the results of changing splitter location in the architecture. In this new example, a 1:4 splitter is placed in the central office close to the OLT, and a primary 1:16 splitter resides in place of the primary 1:8 splitter in Example 1. The 1:16 splitter serves eight terminals, each supporting a cluster of eight homes. The overall split ratio is 1:64, and no additional splitter is required in the terminal serving the cluster of eight homes. With a 12.5-percent take rate, eight customers taking service are connected through the single 1:16 splitter back to the 1:4 splitter in the central office, and thus to the OLT. The utilization rate achieved by this architecture and take rate is shown below. The utilization rate in Example 2 shows an increase over that of Example 1: UR = 50% = 4x TR [with TR = 12.5%] Compared to Example 1, the utilization of active equipment improves by a factor of four (400-percent). Therefore, the real cost of electronics per customer drops from $240 to $400 USD, to $60 to $100 USD. Of course, in this architecture, more splice work is required and balances the savings on the active equipment. However, even assuming a total splicing cost of between $30 and $63 (USD, per line/per customer), the savings for the electronics is still significant. Central Office 1:4 1:16 OLT @ $2000 Overall cluster size = 64 TR = 12,5% UR = 50% 1:16 splitter per sub-cluster Splitters closer to CO increases the UR Splitters closer to CO decreases fiber utilization (includes effects of digging distance, amount of splices,...) Improves OLT port investment as a regularly recurring cost (replaced every 2 to 5 years) Splitters moved backwards towards the CO resulting in: Increased number of fibers (cables) and splices These examples clearly demonstrate that the OSP architecture significantly influences central office costs and in the initial planning phases of PON deployments, operators should balance both costs carefully. Obviously the take rate is critical in the overall business case of a network deployment as this will determine the overall revenue stream generated, but optimizing the utilization rate will reduce CAPEX and improve payback time. Greatly increased utilization rate of active OLT ports in CO commscope.com 4

Optimizing the utilization rate means optimizing the location of the splitters in a defined cluster size. Take rate targets are important for an overall business case, but market success, indicated by take rate, should not be fixed in a physical architecture. The architecture must be flexible enough to readily adapt to new technologies, new services and customer churn. We recommend a fully loaded OLT port at a take rate of 10- to 20-percent only. When the take rate grows above this level, a second group of OLTs and secondary splitters are introduced to serve the next group of active customers. In the United States, network architects recommend a centralized splitter topology. Unlike the decentralized architectures examined in examples 1 and 2, the main area of focus in a centralized architecture is the overall cluster size, rather than that of the sub-clusters. In the US, a centralized splitter cabinet serves on average 200 homes passed and contains mainly 1:32 splitters (with a 1:2 splitter in the CO or POP). In this scenario, at a take rate of 12.5-percent as in examples 1 and 2, this would mean 25 active customers in a cluster of 200 households. These 25 active lines are served through the 1x32 splitter. In this example, we assume a second 1x32 splitter in a different cabinet and also serving 25 active lines in a second cluster of 200. Both 1:32 splitters link back through the 1:2 splitter in the CO or POP to the OLT card. This OLT port is then loaded at a level of 78-percent (25 active customers/ 32 ports). This example shows the optimization of the UR based on this choice of architecture. As demonstrated, the FTTH OSP architecture has a significant influence on the utilization rate and drives the amount of electronics in the CO/POP. Costs in the CO/POP are driven by more than the initial price of the equipment Transmission equipment has an average life time of 2.5 to 5 years before it needs replacement and should be regarded as a recurring cost. The lower the utilization rate, the less that equipment is used and the lower the return on the initial investment. By improving the network architecture and increasing the take rate by perhaps 4 times, the operator can save as much as 400-percent at each active equipment upgrade. As a result of careful architecture planning at the start, the savings made Day 1 will be recurring savings in the future. Central office and POP space is expensive. Typically, the cost of floor space for each rack is around $1000 (USD) (depending, of course, on the location). By maximizing the use of active equipment, operators can reduce the amount of space required for passive equipment racks used to connect active ports to outside plant ports. This reduces the cost and complexity of these interconnection sites. Less active equipment results in lower power and cooling requirements. Relatively speaking, equipment running at medium 200 home cluster 1 Central Office 1-25 25 200 home cluster 1:2 1:32 26-200 26 200 OLT @ $2000 However this increased utilization rate must be considered along with the larger investment required in civil works and cable installation. The cluster sizes are larger and the distance between splitting point and end customer greater in centralized splitter architectures. In Europe, deployment of centralized splitters in (often obtrusive) cabinets is rarely allowed in large cities. Network architects, therefore, must design around the issue using the distributed architectures described in examples 1 and 2. If well planned, distributed splitter architectures deliver utilization rates as well as centralized architectures. In planning any network deployment, the network architect must carefully examine the particular circumstances for each section and neighborhood, weighing multiple factors, not least of which are the overall business objectives, and the acceptable expenditures to meet those objectives. load consumes more energy than equipment running at full load. As power costs continuously increase, additional cost are avoided. There is also the green aspect of power consumption and the related CO2 emissions. For example, all data centers in the US consume energy of thirty-four 500-megawatt power plants and that number is growing rapidly (to 51 by 2020). While today s fiber networks power consumption represents a small fraction of the total power consumption, seen as part of the same food chain, the communications industry as a whole comes under increasingly negative attention as data centers are the new polluters. 1 It appears that about one third of the equipment in the data center does not even add value in the network. As explained in the examples above, a similar low rate of efficiency is seen in many FTTH network deployments today - with a resulting low return on investment and recurring wasted energy costs. 1 Patrick Thibodeau, Data centers are the new polluters. Computer World, 26 August 2014 commscope.com 5

The outside plant fiber network architecture has an important impact on the total cost of the deployment. This paper focused on the impact on the central office and POP sites. Utilizing transmission equipment efficiently lowers initial capital investment and minimizes operational expenses that keep the network operational. Further, it reduces upgrade costs. Communications networks grow dynamically through increasing take rates. Careful initial planning of the architecture, anticipating that future growth, will provide a competitive advantage and bring better long-term profitability. commscope.com 6

Everyone communicates. It s the essence of the human experience. How we communicate is evolving. Technology is reshaping the way we live, learn and thrive. The epicenter of this transformation is the network our passion. Our experts are rethinking the purpose, role and usage of networks to help our customers increase bandwidth, expand capacity, enhance efficiency, speed deployment and simplify migration. From remote cell sites to massive sports arenas, from busy airports to state-ofthe-art data centers we provide the essential expertise and vital infrastructure your business needs to succeed. The world s most advanced networks rely on CommScope connectivity. commscope.com Visit our website or contact your local CommScope representative for more information. 2017 CommScope, Inc. All rights reserved. All trademarks identified by or are registered trademarks or trademarks, respectively, of CommScope, Inc. This document is for planning purposes only and is not intended to modify or supplement any specifications or warranties relating to CommScope products or services. CommScope is committed to the highest standards of business integrity and environmental sustainability, with a number of CommScope s facilities across the globe certified in accordance with international standards, including ISO 9001, TL 9000, and ISO 14001. Further information regarding CommScope s commitment can be found at www.commscope.com/about-us/corporate-responsibility-and-sustainability. WP-110888-EN (02/17)