Operating system update with ProSave. ProSave. FAQ July Service & Support. Answers for industry.

Similar documents

Cover. IP Address Assignment Using Primary Setup Tool (PST) Electrical Lean Switch. FAQ June Service & Support. Answers for industry.

Siemens Distributor SIMATIC. WinAC MP for MP370 V3.1. Preface, Contents. Product Overview. Transferring WinAC MP to the Multi Panel

Service & Support. How can you transfer a WinCC (TIA Portal) project to an operator panel using Ethernet? WinCC (TIA Portal) FAQ February 2012

How can you display error messages and warnings of a frequency converter on a panel? WinCC flexible RT and Panels FAQ

Why can you not transfer the HMI configuration to the panel? - PROFIBUS Connection - FAQ 03/2014

Service & Support. Installation guide for PCS 7 Basis Library V7.1 SP1 UPDATE 1 SIMATIC PCS 7 V7.1 SP1. SIMATIC Updates July 2010

Micro Application Example

www. ElectricalPartManuals. com SIMATIC HMI WinCC flexible 2005 Communication Part 1 Preface Working with connections 1

SIMATIC OP 73, OP 77A/B

Set on Human Machine Interface


SCE Training Curriculum For Integrated Automation Solutions Totally Integrated Automation (TIA)

Application for Process Automation

Cover. Configuration of an IM 308-C as DP Slave to a CP as DP Master PROFIBUS DP. FAQ July Service & Support. Answers for industry.

Drive System Application

FAQ 03/2014. How do I go online? SIMOTION & SINAMICS.

Central processing units CPU 221, CPU 222, CPU 224, CPU 224 XP, CPU 224 XPsi, CPU 226

1 What's new in SIMATIC imap STEP 7 AddOn?

How Do You Replace a CPU 41x with the CPU 410-5H Process Automation? SIMATIC PCS 7 FAQ 01/2016

Quick Start Guide NETL ink Ethernet Gateways

SIMATIC. Windows Logic Controller (WinLC) Preface, Contents. Product Overview 1. Setting Up WinLC Software 2

SCE Training Curriculum for Integrated Automation Solutions Totally Integrated Automation (TIA)

FAQ Communication over IE

Getting Started - Startdrive. Startdrive SINAMICS. Introduction 1. Connecting the drive unit to the PC. Creating a project 3

SINAMICS V: Simple Speed Control of a V20 with S7-1200/1500 Using the USS Protocol

General information Customer-specific configuration

Drive System Application

Notes on Installation and Use

Process automation with the SIMATIC PCS 7 CPU 410-5H controller

SITRAIN. Introduction TIA Portal. Siemens AG All rights reserved. Unrestricted

Cover sheet. Software Update from PCS 7 V7.1 SP2 to PCS 7 V7.1 SP3 SIMATIC PCS 7. FAQ July Service & Support. Answers for industry.

General information. Display. Control elements

SIMATIC HMI. HMI device KTP400 Basic, KTP600 Basic, KTP1000 Basic, TP1500 Basic. Preface. Overview 1. Safety instructions and general notes

Panels 270 series SIMATIC TP 277 6" 2/131. Overview

Short Description. Version

SIMOTION P PC-based SIMOTION P350-3

I-Device Function in Standard PN Communication SIMATIC S7-CPU, CP, SIMOTION, SINUMERIK. Configuration Example 08/2015

SCE Training Curriculum

SINUMERIK Integrate Create MyHMI / WinCC V13 SP1 SINUMERIK. SINUMERIK 840D sl SINUMERIK Integrate Create MyHMI / WinCC V13 SP1. Preface.

SIMATIC S7-200 PRICE LIST

Training Document for Comprehensive Automation Solutions Totally Integrated Automation (T I A) MODULE E09. PROFINET with 2x CPU 315F-2 PN/DP


Description of the Simotion D4xx Firmware update

Applications & Tools. Service Concept: Auto Backup for the Comfort Panels. WinCC (TIA Portal) V12. Application Description May 2013

FAQ about S7 communication via IE

SIMATIC. Component based Automation - WinLC PN Addendum to WinAC Basis V3.0. Foreword. Introduction to CBA and WinAC PN 2. Routing with WinLC PN 3

Training Document for Integrated Automation Solutions Totally Integrated Automation (TIA)

Monitoring of 24 V load circuits

Operator panels Basic HMI Basic Panels

BẢNG GIÁ PLC SIEMENS S7-200 Áp dụng từ 01/11/ Giá chưa bao gồm thuế VAT

General information. Display. Control elements

SCE Training Curriculum

SCE Training Curriculum for the end-to-end automation solution Totally Integrated Automation (TIA)

48-Port 10/100Mbps + 4 Gigabit TP / 2 SFP. Managed Switch WGSW Quick Installation Guide

SIMATIC S plus TIA Portal

Training Manual for Integrated Automation Solutions Totally Integrated Automation (TIA) MODULE E13

SCE Training Curriculum for Integrated Automation Solutions Totally Integrated Automation (TIA)

SIMATIC. Windows Logic Controller WinLC RTX 3.1. Preface, Contents. Product Overview 1. Setting Up the WinLC RTX Software

Applications & Tools. Communication between WinAC MP and a SIMATIC S7. Application for the PUT and GET Function Blocks of the S7 Communication

Service & Support. Replacing the Parent Hardware Module with the Successor Hardware Module (Migration) CP443-1 (Advanced) FAQ July 2012

SIMATIC. Process Control System PCS 7 PCS 7 Documentation (V8.1) Options for Accessing Documentation 1. Documentation for the Planning Phase 2

SIMATIC NET. S7-CPs for Industrial Ethernet. Gateway IWLAN/PB Link PN IO. Manual Part BL2. Release 11/2006 C79000 G8976 C200 03

Document: S7 Driver Configuration. Setting up the S7 driver to communicate with Siemens Hardware (S7-300/400 Series) using CP

Commissioning PC Stations - Manual. and Quick Start SIMATIC NET. PC software Commissioning PC Stations - Manual and Quick Start.

General information. Display. Control elements


Service & Support. Data Communication between S7 Station and PC Station, using SIMATIC NET OPC Server SIMATIC S7. Function description March 2013

1 What's new in SIMATIC imap STEP 7 AddOn?

48-Port 10/100/1000Base-T with 4 Shared SFP. Managed Gigabit Switch WGSW Quick Installation Guide

SINAMICS. SINAMICS G120 Control Units CU240S CU240S DP CU240S DP-F CU240S PN. Getting Started. Warnings and Cautions 1. Installation 2.

Configuration Control with the S and ET 200SP

SIMATIC S Central processing units

Operator panels SIMATIC HMI Basic Panels

SIMATIC PC. Panel PC 577 Installation Using the Docu & Drivers CD 10/2005. Preface, Table of Contents. Introduction 1.

House Control with Touch Panel

LAN-505 Ethernet Communication

Product type designation. General information. CiR - Configuration in RUN. Supply voltage. Input current. Power loss. Memory

SIMATIC PC. Panel PC 677 and PC 877 Installation Using the Docu & Drivers CD 04/2005. Preface, Table of Contents. Introduction 1.

SIMATIC. Industrial software WinAC RTX F Introduction 1. Selecting suitable hardware 2. Installing/removing the WinAC RTX F 2009 software

Cover sheet. Application Operations Diary. WinCC Flexible 2008 SP1. Application Description June Applications & Tools. Answers for industry.


It s never been so easy to get started! usa.siemens.com/automation

SIMATIC. S7 SIMATIC Automation Tool V2.1.1 user guide. Preface. SIMATIC Automation Tool overview. Prerequisites and communication setup

Application on Communication

Siemens AG /9 Key Panels 2/9 SIMATIC HMI KP8/KP8F 2/12 SIMATIC PP7 2/15 SIMATIC PP17 2/19 SIPLUS Push Button Panels 2/19 SIPLUS PP17

SIMATIC. Windows Automation Center RTX WinAC RTX Introduction 1. Product overview 2. Installation 3. Getting started 4

Primary Setup Tool (PST) SIMATIC NET. Industrial Ethernet / PROFINET Primary Setup Tool (PST) Preface. Description. Software installation 2

Applications & Tools. Brief instructions on the communication connection of the MSS 3RK3 to the S via AS-Interface.

How-To-Do. Hardware Configuration SLIO CPU 015

Service & Support. How do you create a weekly timer with WinCC flexible? WinCC flexible 2008 SP2. FAQ October Answers for industry.

24-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch

SIMATIC. Component Based Automation SIMATIC imap STEP 7 AddOn Creating PROFINET components. Preface. Creating PROFINET components in STEP 7

28-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch WGSW / WGSW-28040P. Quick Installation Guide

General information. Display. Control elements

efesotomasyon.com - Lenze EDBDRS3!P</ Ä!P</ä Handbuch/Manual Global Drive Busserver S7 Ers te S c h ri tte/getti ng Started

WinAC RTX 2010 Getting Started. Getting-started. Edition ( )

Training Document for Integrated Automation Solutions Totally Integrated Automation (TIA) MODULE M2. SIMATIC S Block Types

Set 11 - Building Automation: House Control with LOGO! 8 and Weather Sensors Task

High-response valve with integrated digital axis controller (IAC-R) and clocksynchronized PROFIBUS DP/V2 (PROFIdrive profile)

Transcription:

Operating system update with ProSave ProSave FAQ July 2008 Service & Support Answers for industry.

Question This entry is from the Service&Support portal of Siemens AG, Sector Industry, Industry Automation and Drive Technologies. The conditions of use specified there apply (www.siemens.com/nutzungsbedingungen). Go to the following link to download this document. http://support.automation.siemens.com/ww/view/de/19701610 Question How do you do an operating system update (OS update) on operator panels with ProSave? Answer Follow the instructions and notes listed in this document for a detailed answer to the above question. 2 V2.1, Entry ID: 19701610

Contents Contents 1 Operating system update with ProSave... 4 1.1 Operating system update (OS update)... 4 1.2 Resetting the operating system to the factory settings via the "Reset to factory settings" function and PPI Multi Master cable... 5 1.3 Resetting the operating system to the factory settings via Ethernet connection7 2 Additional Information... 12 2.1 Cable connection between PC and operator panel... 12 2.1.1 Operating system update... 12 2.1.2 Resetting the operating system to the factory settings (booting)... 12 2.2 Set the image path / file in ProSave... 14 2.3 Determining the MAC address... 15 3 Problem Analysis... 16 3.1 Disconnected connection when using the RS232/PPI multi-master cable... 16 3.2 Check box not available in ProSave... 16 3.3 Error message during transfer of the configuration... 16 3.4 MP 377 "Reset to factory settings" (booting)... 16 3.5 A connection to the operator panel cannot be established... 17 3.5.1 Check transfer type and address on the operator panel and in ProSave... 17 3.6 Check cable connection and connector... 18 3.6.1 Check the PG/PC interface on the configuration computer... 19 4 History... 20 V2.1, Entry ID: 19701610 3

1 Operating system update with ProSave 1 Operating system update with ProSave Below is a summary of how to do an operating system update with ProSave. The operating system of the operator panel depends on the version of WinCC flexible and ProTool used. You should do an operating system update whenever the operating system of the operator panel does not match the software version used. Information on this is available in section 1.1. If no operable operator panel image exists on the operator panel, you can only update the operating system by means of a reset to factory settings. Information on this is available in section 1.2 and section 1.3. If you have questions on establishing the connection or problems with the operating system update, please refer to chapter 2 and chapter 3 respectively. 1.1 Operating system update (OS update) Please proceed as follows to perform an operating system update. Table 1-1 No. Procedure 1. Setting the PG/PC interface In the SIMATIC Manager, you select the menu command Tools > Set PG/PC Interface... and set interface parameter assignment used, for example, CP 5512 (PROFIBUS). 2. Make transfer settings on the operator panel Make the corresponding transfer settings on the operator panel and then switch the operator panel to Transfer mode. 3. Establish cable connection Connect the operator panel to the PG/PC with an appropriate connection cable (according to the transfer setting selected). 4. ProSave Start ProSave via "Start > SIMATIC > ProSave > ProSave". 5. In the ProSave menu bar you select the General menu and define the device type and connection. 6. Switch to the "OS Update" menu in the menu bar. Now, by default, an Image version appropriate for your operator panel is displayed. Note: Make sure that the correct Image path is set. This applies, in particular, if WinCC flexible and ProTool are installed jointly on your computer (see also section 2.2). 7. Click on the "Device status" button. 4 V2.1, Entry ID: 19701610

1 Operating system update with ProSave No. Procedure A connection is established between "ProSave" and the "operator panel". 8. After the connection has been established successfully, the current image version of the operator panel is displayed. Click on the "Update OS" button. The operating system update is started. 9. Transfer the project After the installation is complete, the "Control Panel" is displayed on the operator panel. For a subsequent project transfer, you first make the required transfer settings. For Touch operator panels, you should calibrate the screen beforehand under "Control Panel > OP > Touch". 10. Now you can transfer the configuration. 1.2 Resetting the operating system to the factory settings via the "Reset to factory settings" function and PPI Multi Master cable Proceed as follows to reset an operator panel to the factory settings. Table 1-2 No. Procedure 1. Backup of licenses and authorizations Before resetting your operator panel to the factory settings, make sure that there are no licenses or authorizations on the operator panel. Information on this is available in Entry ID: 27005215 2. Make transfer settings on the operator panel No transfer settings need to be made on the operator panel. 2. Switch off the power supply for the operator panel. 3. Establish cable connection Connect the operator panel to the PG/PC using an appropriate RS232/PPI multi-master cable or USB/PPI multi-master cable. Settings on the USB/PPI multi-master cable The USB/PPI multi-master cable ("E-Stand 05") does not have any DIP switches and can be used for project transfer as from WinCC flexible 2005 SP1. Settings on the RS232/PPI multi-master cable For the operating system update you must set the fifth DIP switch to the ZERO position (PPI/Freeport). All other DIP switches are not relevant for operating system updates on an operator panel. V2.1, Entry ID: 19701610 5

1 Operating system update with ProSave No. Procedure The DIP switch settings are marked with 0 and 1 on the cable housing. Note: If you reset the operating system to the factory settings, you cannot use all the communication connections and cables. Information on which cable you can use for which operator panel is available in section 2.1.2. 4. ProSave Start ProSave via "Start > SIMATIC > ProSave > ProSave". 5. In the ProSave menu bar you select the General menu and define the device type and connection. For a PPI connection you select "Serial" as the connection type. You do not have to set the baud rate on the multi-master cable for an operating system update. 6. Switch to the "OS Update" menu in the menu bar. Now, by default, an Image version appropriate for your operator panel is displayed. Note: Make sure that the correct Image path is set. This applies in particular if WinCC flexible and ProTool are installed jointly on your computer (see also section 2.2). 7. Check the "Reset to factory settings" check box or the "Boot" check box (in earlier versions of ProSave). Note: If the "Reset to factory settings" check box is not displayed, refer to section 3.2. 8. Click on the "Update OS" button and switch the operator panel back on. A connection is established between "ProSave" and the operator panel and the operating system update is started. 9. After transfer of the data, "ProSave" requests you to reboot the operator panel (switch off and on). The operator panel then performs additional installation steps. 10. Transfer the project 6 V2.1, Entry ID: 19701610

1 Operating system update with ProSave No. Procedure After the installation is complete, the "Control Panel" is displayed on the operator panel. For a subsequent project transfer, you first make the required transfer settings. For Touch operator panels, you should calibrate the screen beforehand under "Control Panel > OP > Touch". 11. Now you can transfer the configuration. 1.3 Resetting the operating system to the factory settings via Ethernet connection Below we take the example of an MP 377 Touch to show how to reset an operator panel to the factory settings via Ethernet. Note MP 377 operator panels with the Image version installed for WinCC flexible 2008 and higher (Image version as from V01.00.02.00_01.83) have the new parameter "Prepare for Reset". More information on this is available in Entry ID: 35677293 Table 1-3 No. Procedure 1. Backup of licenses and authorizations Before resetting your operator panel to the factory settings, make sure that there are no licenses or authorizations on the operator panel. Information on this is available in Entry ID: 27005215 V2.1, Entry ID: 19701610 7

1 Operating system update with ProSave No. Procedure 2. Assign IP address Assign a unique IP address to your PG/PC and your operator panel. Make sure that the IP addresses are in the same subnetwork. Sample PG/PC IP: 192.168.0.200 Subnetwork: 255.255.255.0 Sample operator panel IP: 192.168.0.210 Subnetwork: 255.255.255.0 More information on how to establish an Ethernet connection between a PG/PC and an operator panel is available in Entry ID: 23800567 3. Set the PG/PC interface In the SIMATIC Manager you select the menu command "Tools > Set PG/PC Interface...". Set the interface parameters used to "TCP/IP -> Your network card". 4. Make transfer settings on the operator panel No transfer settings need to be made on the operator panel. 5. Keep a record of the operator panel's MAC address. Refer to section 2.3 for how to determine the MAC address. 6. Switch off the power supply for the operator panel. 8 V2.1, Entry ID: 19701610

1 Operating system update with ProSave No. Procedure 7. Establish cable connection Connect the operator panel and the PG/PC using an Ethernet cable (cross-over or patch cable). 8. ProSave Start ProSave via "Start > SIMATIC > ProSave > ProSave". 9. Switch to the "General" menu in the ProSave menu bar. Select the appropriate device type and define "Ethernet" as connection. For "Connection parameters" you enter the IP address of the operator panel. V2.1, Entry ID: 19701610 9

1 Operating system update with ProSave No. Procedure 10. Switch to the "OS Update" menu in the menu bar. Now, by default, an Image version appropriate for your operator panel is displayed. Note: Make sure that the correct Image path is set. This applies, in particular, if WinCC flexible and ProTool are installed jointly on your computer (see also section 2.2). 11. Check the "Reset to factory settings" check box or "Boot" check box (in earlier versions of ProSave). The "MAC address" option field is then displayed. Enter the operator panel's "MAC address" here. Note: If the "Reset to factory settings" check box is not displayed, refer to section 3.2. Click on the "Update OS" button and switch the operator panel back on. A connection is established between "ProSave" and the "operator panel". 10 V2.1, Entry ID: 19701610

1 Operating system update with ProSave No. Procedure 12. You will then receive a security warning. Acknowledge it with "Yes" if you have no licenses installed on the panel. If you acknowledge with "Yes", the process continues. The memory is deleted and the selected data is transferred. 13. Transfer the project After the installation is complete, the "Control Panel" is displayed on the operator panel. For a subsequent project transfer, you first make the required transfer settings. In the case of Touch operator panels, you should calibrate the screen beforehand under "Control Panel > OP > Touch". 14. Now you can transfer the configuration. V2.1, Entry ID: 19701610 11

2 Additional Information 2 Additional Information 2.1 Cable connection between PC and operator panel 2.1.1 Operating system update When performing an operating system update, you can use all the communication connections supported by your operator panel. 2.1.2 Resetting the operating system to the factory settings (booting) If you reset the operating system to the factory settings, you cannot use all the communication connections and cables. Information on which cable you can use for which operator panel is available in the table below. Table 2-1 Operator Panel RS 232 Zero modem cable RS232/PPI Multi-master cable USB/PPI Multi-master cable PN PtP Cross PN Ethernet 6ES7 901-1BF00-0XA0 6ES7 901-3CB30-0XA0 6ES7 901-3DB30-0XA0 6XV1 870-3RH20 *) Standard Ethernet CAT5 OP 73 micro -- X X -- -- TP 170 micro -- X -- -- -- TP 177 micro -- X X -- -- C7-635 OP / TP X -- -- -- -- C7-636 Key / Touch X -- -- -- -- OP 73 -- X X -- -- OP 77A -- X X -- -- OP 77B X -- -- -- -- TP 170A X -- -- -- -- TP 177A -- X X -- -- OP 170B X -- -- -- -- OP 177B -- X -- -- -- TP 170B X -- -- -- -- TP 177B -- X -- -- -- OP 270 X -- -- -- -- OP 277 -- X -- -- -- TP 270 X -- -- -- -- TP 277 -- X -- -- -- MP 270 X -- -- -- -- MP 277 -- X -- -- -- MP 370 X -- -- -- -- MP 377 -- -- -- X X Mobile Panel 170 X -- -- -- -- 12 V2.1, Entry ID: 19701610

2 Additional Information Operator Panel RS 232 Zero modem cable RS232/PPI Multi-master cable USB/PPI Multi-master cable PN PtP Cross PN Ethernet Mobile Panel 177 Mobile Panel 277 KTP400 Basic mono ON KTP600 Basic color DP KTP600 Basic color PN KTP600 Basic mono PN KTP1000 Basic DP KTP1000 Basic PN TP1500 Basic PN 6ES7 901-1BF00-0XA0 6ES7 901-3CB30-0XA0 6ES7 901-3DB30-0XA0 6XV1 870-3RH20 *) Standard Ethernet CAT5 -- X -- -- -- -- X -- -- -- -- -- -- X X -- X X -- -- -- -- -- X X -- -- -- X X -- X X -- -- -- -- -- X X -- -- -- X X *) For the RS232/PPI multi-master cable, you set DIP switches 1 to 3 according to the baud rate selected in ProSave. DIP switches 4 to 8 must all be set to ZERO. V2.1, Entry ID: 19701610 13

2 Additional Information 2.2 Set the image path / file in ProSave In the following cases, you must change the image path or the image file accordingly: 1. After you have set the ProTool image path for the operator panel displayed, you must set the image path for WinCC flexible if you now wish to use the same operator panel in WinCC flexible. 2. If you need an earlier version of Image than the one currently displayed. Note The image path setting is device-related. The setting is retained for the selected panel type after ProSave is closed. Beforehand, make sure that the correct Image path is set. This applies in particular if WinCC flexible and ProTool are installed jointly on your computer. In order to set the image path in ProSave, click the button to the right of the image path and browse through the folder tree to specify the folder path in which the image files are located. In the folders you find the image files required for the respective operator panel. Figure 2-1 14 V2.1, Entry ID: 19701610

Sample image path in WinCC flexible 2 Additional Information Sample image path in WinCC flexible C:\Program Files\Siemens\SIMATIC WinCC flexible\wincc flexible Images\Operator panel... Note The Image version of the operator panels depends on the version of WinCC flexible and ProTool used. More information on this is available at the following links. ProTool: http://support.automation.siemens.com/ww/view/de/21742389 WinCC flexible: http://support.automation.siemens.com/ww/view/de/28263711 2.3 Determining the MAC address Operator panels that use "Ethernet" as a connection for executing the "Reset to factory settings" function need to have the MAC address specified in order to execute the function. You can determine the operator panel's MAC address as follows. The MAC address is printed on the back of the operator panel (e.g. MAC-ADD.: 00-0E-8C-84-1F-87). When you switch on the operator panel, the MAC address is displayed during startup. Via the "Control Panel" of the operator panel. TP/OP/MP/Mobile Panel: Control Panel > OP > Device KTP/TP1500 Basic Panels: Control Panel > Profinet > Device V2.1, Entry ID: 19701610 15

3 Problem Analysis 3 Problem Analysis 3.1 Disconnected connection when using the RS232/PPI multimaster cable If the connection is disconnected when updating the operating system, set a lower bit rate. If you are using high bit rates, then you must implement the RS232/PPI multi-master cable with "E-Stand 03" (development status 03) or higher. 3.2 Check box not available in ProSave If the "Reset to factory settings" check box is not displayed, then recheck the connection settings made in ProSave. It is possible that the operator panel does not support the transfer type required for this option. Refer here to Table 2-1 in section 2.1.2. 3.3 Error message during transfer of the configuration You have changed the operating system of your operator panel and during transfer of the configuration you receive the message that the operating system version of the operator panel does not match the software version used. In this case, prior to updating the operating system, check that the image path has been set correctly and that you have selected the correct image file. Refer here to section 2.2. Example of an error message in WinCC flexible 2008. Figure 3-1 3.4 MP 377 "Reset to factory settings" (booting) If the MP 377 operator panel cannot be reset to the factory settings, then check the Image version of the MP 377. MP 377 operator panels with Image version as from WinCC flexible 2008 (Image version as from V01.00.02.00_01.83) installed have the new parameter "Prepare for Reset". In this case refer to Entry ID: 35677293. 16 V2.1, Entry ID: 19701610

Some points are given below, which you should check if no connection is established b t th t l d P S 3 P bl A l i 3.5 A connection to the operator panel cannot be established Some points are given below, which you should check if no connection is established between the operator panel and ProSave. 3.5.1 Check transfer type and address on the operator panel and in ProSave Compare the transfer settings on the operator panel with those in ProSave. Example: ProSave specification Transfer via PROFIBUS; Panel address 10 Make sure that "Panel is the only master on the bus" is checked for the transfer settings on the operator panel. Figure 3-2 More information on the topic of "transfer settings" is available at the following link. http://support.automation.siemens.com/ww/view/de/23802404 V2.1, Entry ID: 19701610 17

3 Problem Analysis 3.6 Check cable connection and connector MPI/PROFIBUS cable Please check the following points: Cable connection between the operator panel and the configuration computer. Check the cable for damage. Bus connector especially the connection of the terminating resistors. Terminating resistors ON/OFF. The following guideline value applies: Bus terminating resistor OFF: Bus connector with "two" cables connected. Bus terminating resistor ON: Bus connector with "one" cable connected. More information on the topic of "bus terminating resistors" is available at the following link. http://support.automation.siemens.com/ww/view/de/187276 RS232/PPI multi-master cable When using an RS232/PPI multi-master cable, please note the switch settings. Refer here to the entry at the following link: http://support.automation.siemens.com/ww/view/de/16532946 Ethernet cable Use a "crossed" Ethernet cable for the connection between a PG/PC and an operator panel. If you use a "patch" cable, you need a switch in addition. 18 V2.1, Entry ID: 19701610

Check the PG/PC interface on your configuration computer. 3 Problem Analysis 3.6.1 Check the PG/PC interface on the configuration computer Check the PG/PC interface on your configuration computer. In Windows XP "Start > SIMATIC > SIMATIC NET > Set PG/PC interface". In STEP 7 "Menu bar: Tools > Set PG/PC interface..." Make sure that the node address is set to "0". We also recommend that you check the "PG/PC is the only master on the bus" option. Figure 3-3 V2.1, Entry ID: 19701610 19

4 History 4 History Table 4-1 Version Date Amendments V1.0 20.09.2008 First edition V1.1 07.01.2009 Addition inserted V1.2 09.07.2009 Additions to MP 377 and KTPs inserted. Tables changed. V1.3 26.08.2010 Section 1.2 updated 20 V2.1, Entry ID: 19701610