Similar documents
RESTORATION PLANNING. Integrated Report Format and Content PROJECTS. U.S. Army Corps of Engineers Jacksonville District.

North Atlantic Coast Comprehensive Study

Summary Project Summary. External Tasks External Milestone. Page 1

, us Army Corps ~----,- 1 ' of Engineers Nashville District

Building Better Dam and Levee Safety Programs in the US Army Corps of Engineers Briefing for American Council of Engineering Companies

Integration of Business Continuity, Emergency Preparedness, and Emergency Response

ENGINEERING AND CONSTRUCTION BULLETIN

US Army Corps of Engineers USACE Roadmap to Resiliency

NASA Policy Directive

DELTA LTMS ALTERNATIVES DEVELOPMENT WORK GROUP MEETING. U.S. Army Corps of Engineers 1325 J Street Sacramento, CA MEETING NOTES

Lanier Environmental Consultants

INLAND NAVIGATION DESIGN CENTER- SAME Rock Island

INLAND NAVIGATION DESIGN CENTER

SEAWALL EARTHQUAKE SAFETY & DISASTER PREVENTION PROGRAM

North Atlantic Coast Comprehensive Study: New Jersey Back Bays Focus Area Analysis

FUDSChem. Brian Jordan With the assistance of Deb Walker. Formerly Used Defense Site Chemistry Database. USACE-Albuquerque District.

Information Processing and Synthesis Tool (IPAST) Abstract

Environmental Impact Questionnaire

U.S. Army Corps of Engineers Huntington District

ENGINEERING AND CONSTRUCTION BULLETIN

Ada L. Benavides, Deputy Chief South Pacific Division Regional Integration Team. May 5, US Army Corps of Engineers BUILDING STRONG

Industry Standards Utilities Engineering Technician

ATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n

KENYA ACCREDITATION SERVICE

Compliance Program Design Lessons learned from a COSO framework

Program Management Office January, 2012

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED DECEMBER 12, 2016

75th Air Base Wing. Effective Data Stewarding Measures in Support of EESOH-MIS

HEC-FDA Flood Damage Reduction Analysis

2014 AWRA Annual Water Resources Conference November 5, 2014 Tysons Corner, VA

Defense Acquisition Workforce Improvements Act - Update

NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES

DoD IH Forum Critical Incident Stress Management USACE Haiti Recovery Response

CHAPTER 7 FLOOD HYDRAULICS & HYDROLOGIC VIVEK VERMA

Downtown Boise Multimodal Center

Kodagu District Disaster Management Plan

SAME SPACE COAST POST ANNUAL SMALL BUSINESS & NETWORKING EVENT

2015 HDR, all rights reserved.

UNCONTROLLED WHEN PRINTED

Model Certification Review Plan Survey Model

SUMMARY OF SITE USE AUTHORIZATION REQUIREMENTS FOR WASHINGTON DEPARTMENT OF NATURAL RESOURCES DREDGED MATERIAL MANAGEMENT PROGRAM OFFICE

Emergency Support Function #12 Energy Annex. ESF Coordinator: Support Agencies:

ANRC II. Eligibility requirements Authority Requirements for accreditation Review of application...

1. Significant Changes

Audit and Compliance Committee - Agenda

Recertification Application

The Texas A&M University System. Internal Audit Department. Fiscal Year 2014 Audit Plan

Accuracy of Computed Water Surface Profiles

IWR Planning Suite II

Records Management in the Formerly Used Sites Remedial Action Program (FUSRAP)

STREET EVENT PERMIT APPLICATION FORM LOW & HIGH IMPACT EVENTS

SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS

USACE OMAHA DISTRICT PROGRAM

Prepared for CIVE 401 Hydraulic Engineering By Kennard Lai, Patrick Ndolo Goy & Dr. Pierre Julien Fall 2015

Outreach and Mitigation: A Convenient Partnership in Loss Reduction. Scott Schelling and Carver Struve, CFM

Qualification Specification Level 4 Award in Food Safety Management for Manufacturing

OF 301 Volunteer Service Application - Natural & Cultural Resources OMB # INSTRUCTIONS

The U.S. Government s Role in Standards and Conformity Assessment

Project Management Professional Exam Prep Plus

Charter for the System Interoperability and Data Synchronization Requirements Team

Advisory Circular. Subject: INTERNET COMMUNICATIONS OF Date: 11/1/02 AC No.: AVIATION WEATHER AND NOTAMS Initiated by: ARS-100

Contents. 1. Routing and Siting Process Routing and Siting Process Highlights Timeline Constraints Map

RSF1 COMMUNITY PLANNING AND CAPACITY BUILDING 2016 FLOODS

SRS Overview. Dave Hepner. Looking toward the future of the Savannah River Site

ACCREDITATION: A BRIEFING FOR GOVERNMENTS AND REGULATORS

HEC-SSP. Statistical Software Package. Release Notes. Version June US Army Corps of Engineers Hydrologic Engineering Center

APPENDIX F: PUBLIC AGENCY INTEREST REVIEW (Copy of Notice of Availability, Copies of comment letters and responses, Copies of compliance

NERC Staff Organization Chart Budget

Supersedes Division Name Revision No. 00 Export Division Page No. 1 of 5

The HEC-RAS Model Refresher

ELECTRICAL ENGINEERING & INSTRUMENTATION MECHANICAL ENGINEERING BIOLOGICAL & INDUSTRIAL ENGINEERING NUCLEAR ENGINEERING STRUCTURAL & CIVIL

2 ESF 2 Communications

MID-SOUTH RECLAMATION INDUSTRIES

STUDENT AND ACADEMIC SERVICES

01.0 Policy Responsibilities and Oversight

If you have any questions regarding this survey, please contact Marcell Reid at or Thank you for your support!

ADDENDUM NO. 02 INVITATION NUMBER:

HEC-FFA Flood Frequency Analysis

Construction and Property

NON STRUCTURAL STORMWATER STRATEGIES (NJAC 7:8-5.3) - ATTACHMENT G

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD ( W)

Park Ranger Mobile App

Version 10.0 Updated 12_16_09

POSITION DESCRIPTION

Defense Logistics Agency Environmental Management System

ti BMW, Adidas, Milliken New price for 2010 Market

Numerical Hydraulics

Distribution Restriction Statement Approved for public release; distribution is unlimited.

European Aviation Safety Agency

Headquarters U.S. Air Force. EMS Play-by-Play: Using Air Force Playbooks to Standardize EMS

Construction Engineering

Section Qualifications of Audit teams Qualifications of Auditors Maintenance and Improvement of Competence...

Postal Inspection Service Mail Covers Program

Balancing energy and environmental demands

Technology Performance Verification Testing Through the U.S. EPA Environmental Technology Verification (ETV) Program

NORTH COUNTY CORRIDOR EXPRESSWAY TRANSPORTATION AUTHORITY. SUBJECT: Jacobs Engineering Contract; Task Order #2 and Task Order #3 Acceptance

Integrated Water Resources Science and Services (IWRSS)

Forensic analysis with leading technology: the intelligent connection Fraud Investigation & Dispute Services

Fort Rucker Master Record List

APPENDIX E COMMENTS AND RESPONSES

Transcription:

ATTACHMENT 1: TEAM ROSTERS TABLE 1 PROJECT DELIVERY TEAM RESOURCE NAME RESOURCE CODE LEAD TEAM MEMBERS PHONE NUMBER Project Manager Program Management Plan Formulator Hydrology & Hydraulic Design (PAE) Economic Analysis Inland Environmental Inland Environmental (Cultural Res) Hazardous, Toxic Radioactive Waste (HTRW) Cost Engineering Real Estate Planning Real Estate Appraisal Sponsor Support CESAM-PD-FP CESAM-PM-C CH2M Hill CESAM-EN-HH CESAM-PD-FE CESAM-PD-EI CESAS-PD-EM CESAM-EN-GE TBD CESAM-RE-P CESAM-RE-A Cobb County Water System TABLE 2 AGENCY TECHNICAL REVIEW TEAM RESOURCE NAME RESOURCE CODE LEAD TEAM MEMBERS PHONE NUMBER ATR Lead TBD TBD TBD Planning TBD TBD TBD Economics TBD TBD TBD Environmental Resources TBD TBD TBD Hydrology & Hydraulic TBD TBD TBD Engineering Cost Engineering TBD TBD TBD Real Estate TBD TBD TBD 12

ATTACHMENT 2: SAMPLE STATEMENT OF TECHNICAL REVIEW FOR DECSION DOCUMENTS COMPLETION OF AGENCY TECHNICAL REVIEW The Agency Technical Review (ATR) has been completed for the Aquatic Ecosystem Restoration Review Plan for Proctor Creek, Cobb County, Georgia. The ATR was conducted as defined in the project s Review Plan to comply with the requirements of EC 1165-2-209. During the ATR, compliance with established policy principles and procedures, utilizing justified and valid assumptions, was verified. This included review of: assumptions, methods, procedures, and material used in analyses, alternatives evaluated, the appropriateness of data used and level obtained, and reasonableness of the results, including whether the product meets the customer s needs consistent with law and existing US Army Corps of Engineers policy. The ATR also assessed the District Quality Control (DQC) documentation and made the determination that the DQC activities employed appear to be appropriate and effective. All comments resulting from the ATR have been resolved and the comments have been closed in DrChecks sm. TBD ATR Team Leader Office Symbol Date Project Manager PD-FP Date Project Architect Engineer EN-HH Date TBD Review Management Office Representative Office Symbol Date CERTIFICATION OF AGENCY TECHNICAL REVIEW Significant concerns and the explanation of the resolution are as follows: None at this time. As noted above, all concerns resulting from the ATR of the project have been fully resolved. SIGNATURE Chief, CESAM-EN Date SIGNATURE Chief, CESAM-PD PD Date 13

ATTACHMENT 3: REVIEW PLAN MINOR REVISIONS Revision Date Description of Change Page / Paragraph Number 14

ATTACHMENT 4: ACRONYMS AND ABBREVIATIONS Term Definition Term Definition AFB Alternatives Formulation Briefing IWR Institute of Water Resources ATR Agency Technical Review ITR Independent Technical Review CAP Continuing Authorities Program MCACES Micro Computer Aided Cost Estimating System CE/ICA Cost Effective/Incremental Cost Analysis NEPA National Environmental Policy Act DQC District Quality Control/Quality Assurance OMRR&R Operation, Maintenance, Repair, Replacement and Rehabilitation DX Directory of Expertise PCX Planning Center of Expertise EA Environmental Assessment PDT Project Delivery Team EC Engineer Circular PED Pre Construction Engineering & Design ECO PCX Ecosystem Planning Center of Expertise PMP Project Management Plan EIS Environmental Impact Statement RMO Review Management Organization ER Engineering Regulation SAD USACE South Atlantic Division ERR Ecosystem Restoration Report SAR Safety Assurance Review HEC RAS Hydrologic Engineering Center River SIAM Sedimentation Impact Analysis Analysis System HQUSACE Headquarters, U.S. Army Corps of USACE U.S. Army Corps of Engineers Engineers IEPR Independent External Peer Review WCS Watershed Characterization System 15