Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Similar documents
Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

~m"ifir ~ ~ ~1~ItI~UI ~ ~ ~ 4~~lut"11 ~iif>"f ~ ~~. ~ltt9l~i~~'1! ~ W "ip".~.: 26/10/2009-~. m. ti. ~/, l( b -(59 ~:

List of members of TCC

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Distribution List : Sterlite Energy Ltd. Jindal India Thermal Power Ltd. Navabharat Power Private Limited GMR Kamalanga Energy Ltd.

Tower-C, DLF Cyber City, Phase-II Gurgaon Phone : , ,

Distribution List R.K.M. Powergen Pvt. Ltd. Jindal Power Ltd. Athena Chhattisgarh Power Pvt Ltd SKS Power Generation (Chhattisgarh) Ltd.

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Summary record of discussions of the Standing Committee Meeting on Power System Planning in Eastern Region held on at NRPC, New Delhi.

Advanced Ultra Power Transmission Consultancy

2. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafi Marg New Delhi FAX No

A summary on the deliberations on each application is as under:

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Applications Granted Medium Term Open Access (MTOA) by POWERGRID

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

Indian Power Grid Developments

Structure & Functions of POWERGRID. Dr. S. K. Agrawal General Manager (POWRGRID) AUGUST 2008 SKA 1

Q3 FY Press & Analysts Meet Mumbai January 28, 2016

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

Tamil Nadu: Current Power scenario and projects in pipeline

National Load Despatch Centre Power System Operation Corporation

"'-- :...:. ~ ~ ~ '''''tlr'

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon

Reliance Infrastructure Limited

FY PRESS MEET

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

Memorandum. This memorandum requires Committee action.

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

MSETCL- AN OVERVIEW Zalte UG Director (Operations) M.E. Elect.

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi.

POWER TRANSMISSION IN INDIA 2018

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

STCP22-1 Issue 003 Production of Models for GB System Planning

ENGINEERING SOLUTIONS INDIA PVT. LTD.

Distribution list 1. The Director (Operation), OHPC, Bhubaneswar 2. The CGM (O&M), OPTCL, Bhubaneswar. 3. The CGM (Const.), OPTCL Bhubaneswar. 4.

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Network Configuration Document Selection for New Substations Framework

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Copy: with a request to kindly make it convenient to attend the above meeting

Feasibility Study on Load Flow and Short Circuit Project

World Bank. Regional Interconnections in South Asia. Anjum Ahmad Senior Energy Specialist World Bank, Islamabad

BEFORE THE ODISHA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

2. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, New Delhi- (Fax )

Studies Overview and Data Requirements. Robert Pan

Manual: Distribution Substation Manual (DSM) Section 4: Equipment Installation Guide

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook)

INDIAN POWER SYSTEM. Generation Central, State & Private sector

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

FORUM LOAD DESPATCHERS (FOLD)

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

INTERNATIONAL TELECOMMUNICATION UNION

Generation Interconnection Impact Study Report. For. Interconnection Customer Q0022

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

TSR A & B - FACILITIES STUDY REPORT

Overview of Bangladesh Preparation for Interconnection with India. Arun Kumar Saha DGM Planning ( In Charge) PGCB

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

Generation Interconnection Feasibility Study Report

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

ITC HOLDINGS, CORP. Edison Electric Institute 9

Summary of ARR & BSP Filings. Submitted by. For FY

Gumeni Substation 132kV loop in lines. Northern Ngwedi Substation Ngwedi Substation Build new 400kV substation and install 2 x 500 MVA Transformers

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

In 2013 we are completing 25 years of activity, in which period we participate in the implementation of important projects in the area of electric

Modernisation of Transmission System In MSETCL

NEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

2. Pradhan Mantri Gram Sadak Yojana (PMGSY)

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

Minutes of the 2 nd Sector Learning Group Meeting of the Aluminium Sector. 16 th December, 2016, Hirakud, Odisha

North Gila-Imperial Valley #2 Transmission Project

INTERCONNECTION FACILITIES STUDY REPORT

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

From: Laura Manz, Vice President of Market & Infrastructure Development

Implementation of projects to increase energy efficiency in high-voltage power transmission systems

BEMIP implementation WG. Interconnectors Market development

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

(Islamabad, March 2015) MEDIUM TERM VISION FOR ENERGY CONNECTIVITY IN THE SAARC REGION

Dominion Supplemental Projects

Transmission Infrastructure Investment & Development in Vietnam

Manual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018

The SLG discussion was initiated with opening remarks by Chairman, Shri Vivek Agrawal, Chief Operating Officer, Godawari Power & Ispat Limited.

UNDERGROUND HV SUBSTATION DESIGN

Group Corporate Presentation. June 2014

Substation Workshop. 7 th February 2018

Generation Interconnection Feasibility Study Report

MCImetro Access Transmission Services Corp. New York Tariff No. 1 d/b/a Verizon Access Transmission Services Original Page No. 10 ACCESS SERVICES

Transcription:

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Transmission System for IPPs located in Orissa 1.1 The transmission system for evacuating power from IPPs in Orrissa to their targeted beneficiaries in WR and SR was agreed during the 29 th meeting of SCM of WR. The agreed transmission system was as under: System strengthening common for WR and NR associated with Orissa IPPs. Establishment of 765kV switching substation at Dharamjaygarh Establishment of 2x1500 MVA, 765/400kV Jabalpur Pooling Station Jharsuguda Pooling Station Dharamjaygarh (WR) 765kV D/c LILO of Ranchi Sipat (Bilaspur) PS 765kV S/c line at Dharamjaygarh Dharamjaygarh Jabalpur Pool 765kV D/c line (vi) Jabalpur Pooling station Jabalpur 400 kv D/c (high capacity) (vii) Jabalpur Pooling station Bina 765kV D/c line (viii) Bina Gwalior 765kV S/c (3rd circuit) System strengthening in WR associated with Orissa IPPs. Establishment of 2x1500MVA, 765/400kV Bhopal Pooling Station. ( Implementation by private sector through tariff based competitive bidding route) Jabalpur Pooling station Bhopal 765kV S/c ( Implementation by private sector through tariff based competitive bidding route) Bhopal Indore 765kV S/c (Implementation by private sector through tariff based competitive bidding route) Bhopal New substation Bhopal (M.P.) 400kV D/c (high capacity) ( Implementation by private sector through tariff based competitive bidding route) System strengthening in NR associated with Orissa IPP. Gwalior - Jaipur 765kV S/c line Jaipur - Bhiwani 765kV S/c line Pooling Stations along with their interconnections for IPPs in Orissa (vi) Establishment of 765/400kV Pooling Station at Jharsuguda Establishment of 765/400kV Pooling Station at Angul Angul Pooling Station Jharsuguda Pooling Station 765kV 2xS/c LILO of Rourkela Raigarh 400kV 1xD/c at Jharsuguda Pooling station *LILO of Meramundali Jeypore 400kV S/c line at Angul pooling station *LILO of one ckt of Talcher - Meramundali 400kV D/c line at Angul pooling station. * Interim arrangement. LILO to be removed after establishment of 765 kv pooling station at Angul Dedicated transmission System up to pooling point under the scope of Project Developer for Orissa IPPs Sterlite (2400 MW) Ind- Barath(700 MW) Jindal Thermal (1200 MW) Sterlite- Jharsuguda Pooling station 400 kv D/C line with associated bays Ind-Barath- Jharsuguda Pooling station 400 kv D/C line with associated bays Jindal Thermal- Angul Pooling station 400 kv D/C line with associated bays -Page 1-

Monnet (1050 MW) GMR (1050 MW) Lanco Babandh (2640 MW) Navbharat Phase-I (1050 MW) Monet- Angul Pooling station 400 kv D/C line with associated bays GMR- Angul Pooling station 400 kv D/C line with associated bays Lanco Babandh- Angul Pooling station 400 kv 2XD/C line with associated bays 3X1500 MVA, 765/400 kv transformers at Angul along with associated bays Navbharat - Angul Pooling station 400 kv D/C line with associated bays 1.2 The elements of the above transmission system to be implemented through private sector are in the process of bidding through PFC Consulting Engineers. For the other elements to be implemented by PGCIL, for ease of implementation PGCIL has divided them in to three parts - Part A, Part B and Part C as given below: Transmission System for Phase-I generation projects in Orissa Part-A Pooling stations along with their interconnections Establishment of 2x1500 MVA, 765/400kV Pooling Station at Jharsuguda Establishment of 4x1500MVA, 765/400kV Pooling Station at Angul Angul Pooling Station Jharsuguda Pooling Station 765kV 2xS/c LILO of Rourkela Raigarh 400kV D/c at Jharsuguda Pooling station LILO of Meramundali Jeypore 400kV S/c line at Angul pooling station (vi) LILO of one ckt of Talcher - Meramundali 400kV D/c line at Angul pooling station * As the pooling stations/ transmission system identified for evacuation of power would not be available for some of the generation projects which are likely to come prior to available of evacuation system, interim arrangement for connectivity at the cost of project developers for the following generation projects has been planned as under: Sterlite Ind Bharat GMR Jindal LILO of one ckt of Rourkela-Raigarh 400kV D/c line LILO of other ckt of Rourkela-Raigarh 400kV D/c line LILO of one ckt of Talcher-Meramundali 400kV D/c line LILO of Meramundali-Jeypore 400kV S/c line Part-B System Strengthening Common for WR and NR associated with Orissa IPPs Establishment of 765kV substation at Dharamjaygarh Establishment of 2x1500 MVA, 765/400kV Jabalpur Pooling Station Jharsuguda Pooling Station Dharamjaygarh (WR) 765kV D/c LILO of Ranchi WR Pooling near Sipat 765kV S/c line at Dharamjaygarh Dharamjaygarh Jabalpur Pool 765kV D/c line (vi) Jabalpur Pool Jabalpur 400 kv D/c (high capacity) Part-C System Strengthening Common for WR and NR associated with Orissa IPPs Jabalpur Pool Bina 765kV D/c line Bina Gwalior 765kV S/c (3 rd circuit) - Page 2 -

System Strengthening in NR associated with Orissa IPPs Gwalior - Jaipur 765kV S/c line Jaipur - Bhiwani 765kV S/c line This is for the information of the members. 2.0 Agenda proposed by GETCO : Utilization of GETCO network Zerda (Kansari) Kankroli Inter-Regional link between WR and NR. 2.1 GUVNL has intimated that since commissioning of Zerda (Kansari) kankroli link GETCO network is being utilized for inter-regional transfer of power to NR as Zerda substation is not connected to the CTU network. It has requested for applicability of GETCO transmission charges and losses for utilization of GETCO network for any transfer of power to NR on Zerda-Kankroli inter-regional link. 2.2 With regard to the above it may be noted that Ranchodpura-Zerda 400 kv D/C line planned as a part of WRSS-II is under implementation through RPTL and once this line is commissioned Zerda would get connected to the CTU network. 2.3 In our view issue raised by GETCO are commercial in nature and Standing Committee on Power System planning may not be the appropriate forum for discussing such issues. We would suggest that GUVNL may take up the issue in appropriate forum for readdresal. Members may deliberate 3.0 Agenda proposed by CSPTCL for alternative supply to Jagdalpur (South Chattisgarh) area. 3.1 CSPTCLvide their letter dated 8 th June 2010 has informed that at present the whole of South Chattishgarh comprising of Jagdalpur, Kanker, Dantewada, Bijapur & Narayanpur Districts is getting supply through a 220 kv double circuit line, which a radial line emanating from Bhilai 220 kv substation to Barasur (Bodghat). The break down of the double circuit line results in failure of power to all the districts. CSTPCL has further stated that there are dense forest with lot of naxal activities and there is no alternative supply even for feeding essential loads like waterworks, hospitals etc. They have proposed a 220 kv line from Jeypore (Orrissa) in Eastern Region to Jagdalpur as an alternative dependable supply to South Chhattisgarh. 3.2 The proposal of CSPTCL involves supply to South Chattishgarh from Eastern Region grid. Therefore the proposal needs to be primarily discussed in the Standing Committee of Eastern Region. Also CSTPL would need to indicate the injection point in Eastern Region and the source from which they intent to draw power from Eastern Region. WR constituents may consider the CSPTCL proposal. 4.0 Open Access Applications pertaining to New Generation Projects in Southern Region with target beneficiaries in Western/Northern/Southern Region 4.1 The following transmission system for system strengthening within WR/NR and between WR and NR for transfer of power from the New Generation Projects in Southern Region to their target beneficiaries in WR and NR was informed in the 29 th Standing Committee of WR: - Page 3 -

(vi) (vii) Sholapur Pune 765 kv 2 nd S/c. Jabalpur Pooling station Orai 765 kv S/c line. Orai Bulandshahar 765 kv S/c line. Bulandshahar Sonipat 765 kv S/c line Establishment of 765/400 kv 2X1000 MVA substation at Orai by LILO of one circuit of Satna Gwalior 765 kv line Establishment of 765/400 kv 2X1500 MVA substation at Bulandshahar by LILO of Agra Meerut 765 kv line. Establishment of 765/400 kv 2X1500 MVA substation station at Sonepat by LILO of Bhiwani Meerut 765 kv line. 4.2 The above transmission system has been discussed and agreed by the NR constituents in their 28 th Standing Committee meeting of NR held on 23.02.2010. The transmission system agreed is as given below: (vi) (vii) (viii) (ix) (x) (xi) Sholapur Pune 765 kv 2 nd S/c. Jabalpur Pooling station Orai 765 kv S/c line. Orai Bulandshahar 765 kv S/c line. Bulandshahar Sonipat 765 kv S/c line Establishment of 765/400 kv 2X1000 MVA substation at Orai by LILO of one circuit of Satna Gwalior 765 kv line Establishment of 765/400 kv 2X1500 MVA substation at Bulandshahar by LILO of Agra Meerut 765 kv line. Establishment of 765/400 kv 2X1500 MVA substation station at Sonepat by LILO of Bhiwani Meerut 765 kv line. Orai-Orai (UPPCL) 400kV D/c (Quad) Sonipat-Kurushetra 400 kv D/c (Quad) Sonipat (new) Sonipat (Under Construction) 400 kv D/c (Quad) Bulandshahr Hapur ( UPPCL) 400kV D/c (Quad) Transmission charges of item would be shared by IPPs in SR in Tuticorin, Krishnapatnam & Srikakulam area for exporting to WR & NR and remaining items shall be shared by IPPs exporting to NR. Charges would be transferred to beneficiaries as and when confirmed This is for the information of the members. 5.0 Transmission system of Vindhyachal-IV & Rihand-III gen. projects 5.1 The transmission system associated with Vindhyachal IV (1000 MW) and Rihand III (1000 MW) generation projects of NTPC was deliberated in the 28 th and 29 th meeting of Standing committee on power system planning in WR. The final agreed system comprised of Generation specific transmission system, Common system for WR and NR and System Strengthening in NR. With the commissioning of 1 st unit of Vindhaychal-IV (2x500MW) and Rihand-III(2x500 MW) generation, Vindhyachal Pooling Station-Satna 765kV link was to be charged at 400kV level and with the commissioning of 2 nd unit of Vindhyachal-IV & Rihand- III, Vindhyachal Pooling Station-Satna was to be charged at 765kV along with suitable reactive compensation. - Page 4 -

5.2 Subsequently, POWERGRID had informed that charging of above line initially at 400kV level would involve about 7(Seven) nos. line crossings at Satna. Further, there would be acute ROW problem due to inhabitation around Satna S/s. Keeping this in view, POWERGRID proposed that above 765kV Vindhyachal Pooling Station- Satna 2xS/c line may be charged at 765kV from the beginning itself. 5.3 In view of the above, it is proposed that 765kV Vindhyachal Pooling Station - Satna 2xS/c line may be operated at 765kV level from the beginning itself. Members may deliberate and may kindly note. 6.0 Evacuation arrangement for M/s Ideal Energy (2x135 MW+2x660 MW), M/s Power Maharashtra Ltd (3x660 MW + 2x660 MW) 6.1 MSETCL vide their letter no. MSETCL/CO/STU/Trans Plan/6561 dated 05.05.2010 have proposed interconnection of M/s Ideal Energy (2x135 MW+2x660 MW) and M/s Power Maharashtra Ltd (3x660 MW + 2x660 MW) with Wardha(PG) and Aurangabad(PG) substation respectively. The evacuation arrangement proposed by MSETCL in their letter is as given under: A. Evacuation Arrangement for M/s Ideal Energy Project Ltd. (2x135 MW+2x660 MW) LILO on one ckt. of 400 kv Koradi II Wardha (PG) at M/s Ideal Energy B. Evacuation Arrangement for M/s Power Maharastra Ltd. ((3X660 MW (Phase -I) + 2X660 MW (Phase II)) Tiroda (Gondia) Warora 400 kv D/c line (quad), 195 km. Tiroda (Gondia) Koradi III 765 kv 2X S/C line, 120 km 2X1000 MVA, 765/400 kv ICT at Tiroda (Gondia) Koradi III Akola-II 765 kv 2X S/C line, 282 km Akola-II Aurangabad (PG) 765 kv 2X S/C line, 210 km 6.2 At present, the transmission corridor from Wardha towards Aurangabad(PG) and beyond viz. Wardha-Aurangabad 765 kv 2XD/c transmission line, Aurangabad- Phadge/ Dhule 765 kv line is planned as a part of the transmission scheme for IPP generation projects coming up in Chhattisgarh who have signed BPTA/ furnished BG and transmission margins would not be available for evacuating power from M/s Ideal Energy Project Ltd. and M/s Power Maharastra Ltd beyond Wardha / Aurangabad. 6.3 For absorption of power in Maharashtra from the above generation projects MSETCL (STU) should plan and develop the requisite intra-state network. In case the power from above generating stations is proposed to be sold outside Maharashtra the generators should approach CTU for open access in inter-state transmission system based on which inter-state network could be planned. Members may discuss. 7.0 Transmission system of IPP generation projects coming up in Chhattisgarh- KSK Mahanadi Power Co. Ltd and Jindal Power Ltd.- regarding 7.1 In the 29 th meeting of Standing committee on power system planning in WR, transmission system for IPP generation projects coming up in Raigarh/Champa generation complex in Chhattisgarh was agreed. For KSK Mahanadi (erstwhile Wardha Power) generation project (6x600 MW) in Champa complex and Jindal Power generation project (4x600 MW) in Raigarh(Tamnar) complex, it was decided that keeping in view large plant capacity and - Page 5 -

contribution of high short circuit current in case of interconnection at 400kV level, both the generation projects are to be interconnected at the respective pooling station at 765kV level. M/s KSK and M/s Jindal Power informed that their generating units have been proposed to be stepped-up at 400kV level. For this, it was decided that KSK Mahanadi and Jindal Power Ltd generating units shall be connected at separate 400kV bus at Champa and Raigarh(Tamnar) pooling station respectively and further to be stepped-up at 765kV level through 400/765kV transformers as a part of their dedicated transmission system. Accordingly following dedicated transmission system was agreed for M/s KSK and M/s JPL: Dedicated tr. system for KSK Mahanadi Power Co. Ltd. (3600MW) a) 400KV Wardha Power- Champa Pooling Station 2x D/c (Quad) b) 765/400kV 3x1500 MVA transformer at Champa Pooling station Dedicated tr. system for Jindal Power Ltd. (2400+400 MW) a) 400kV JPL Pooling station (Near Tamnar) 2x D/c (Quad) b) 765/400kV 3x1500 MVA transformer at Raigarh Pooling station (Near Tamnar) 7.2 PGCIL has stated that at 765/400kV Champa Pooling station, other generation projects of relatively smaller installed capacity (upto 1320MW) other than KSK project are being pooled at 400kV level which is to be further interconnected at 765kV level through 400/765kV transformer as a part of common transmission system of IPP generation projects coming up in Champa complex. Similarly, at 765/400kV Raigarh(Tamnar) pooling station, other future smaller capacity IPPs are envisaged to be interconnected at 400kV level with step-up at 765kV level through common 765/400kV transformers. 7.3 PGCIL has further stated that considering the fact that 765/400kV Pooling stations at Champa and Raigarh(Tamnar) along with 765/400kV transformers at Champa Pooling station (for other IPPs) is being implemented by POWERGRID as part of common transmission system of IPP projects in Chhattisgarh, PGCIL has proposed that dedicated 765/400kV 3x1500MVA transformers each at Champa & Raigarh(Tamnar) Pooling Station may be implemented by POWERGRID as a part of transmission system of IPP projects in Chhattisgarh. Members may deliberate. - Page 6 -