N ew in Version Milestones Professional 2017 New Features KIDASA Software, Inc. October shift their dates.

Similar documents
Transform your Microsoft Project schedules into presentation reports with Milestones Professional.

CIMA Asia. Interactive Timetable Live Online

CIMA Asia. Interactive Timetable Live Online

Kenora Public Library. Computer Training. Introduction to Excel

SME License Order Working Group Update - Webinar #3 Call in number:

Freedom of Information Act 2000 reference number RFI

Getting Started KIDASA So ware, Inc. All Rights Reserved

Designing Adhoc Reports

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

ICT PROFESSIONAL MICROSOFT OFFICE SCHEDULE MIDRAND

Stakeholder consultation process and online consultation platform

AIMMS Function Reference - Date Time Related Identifiers

Michigan Tech University Banner Finance Self-Service User Guide. Revised 1/11/17

Getting Started with Milestones Professional

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

NMOSE GPCD CALCULATOR

OPDEC Critical Path Tool Version 2011

Best Practices in CIS Implementation. TECO s CRB Implementation

Conditional Formatting

CS Programming I: Arrays

Measurement and Tracking Awareness June 2011

What future changes are planned to improve the performance and reliability of the Wairarapa Connection?

Decision Making Information from Your Mobile Device with Today's Rockwell Software

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019

CIMA Certificate BA Interactive Timetable

Seavus Project Viewer - Release 2016 (v12) Feature Status Release Date. Seavus Project Viewer - Release v11.1 Feature Status Release Date

2018 CALENDAR OF ACTIVITIES

You ve Got Mail! List Offer Creative. Timely insights & trends. Katie Parker Editorial Director. Zach Christensen Creative Director

DEPARTMENT OF THE ARMY *ER U.S. Army Corps of Engineers CECW-EC Washington, DC Administration PROJECT SCHEDULES

Service Excellence by Design. Tom Floodeen Vice President & General Manager Customer Support Division Mentor Graphics Corporation

For personal use only. Update Event & nearmap Solar

Since you can designate as many symbols as needed as baseline symbols it s possible to show multiple baselines with unique symbology.

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

DATE OF BIRTH SORTING (DBSORT)

Energy Engineering: Tools and Trends

Shift Left: Putting the Process Into Action

INFORMATION TECHNOLOGY SPREADSHEETS. Part 1

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

Grade 4 Mathematics Pacing Guide

C Structures, Unions, Bit Manipulations, and Enumerations

European Developments

Undergraduate Admission File

EVM & Project Controls Applied to Manufacturing

TOWN MANAGER S WEEKLY REPORT

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

Avira Test Results 2013

You can also access your time and expenses from anywhere with just a Web browser with a Cube Anywhere subscription, at

MISO PJM Joint and Common Market Cross Border Transmission Planning

Previous Intranet Initial intranet created in 2002 Created solely by Information Systems Very utilitarian i Created to permit people to access forms r

Contents:

Solutions to the Top 5 PM P

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

Designing Adhoc Reports

Information Technology Services. Informational Report for the Board of Trustees October 11, 2017 Prepared effective August 31, 2017

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

MHA LPI Date Correction Request Process

Digital Test. Coverage Index

Library. Summary Report

Interim Report Technical Support for Integrated Library Systems Comparison of Open Source and Proprietary Software

Intellicus Enterprise Reporting and BI Platform

COUNCIL MEETINGS July 2017 to June 2018

Reports Guide. Table of Contents. Welcome to EZLynx Reports... 5 REPORT BASICS... 5 Basic Functions... 5 Accessing Reports... 5 TYPES OF REPORTS...

NOT PROTECTIVELY MARKED. Public SPA Board Meeting Date 15 December 2016 Assembly Room, Tulliallan, Alloa

PrairieCat Governing Bodies, Committees and Meetings for FY2019

Characterization and Modeling of Deleted Questions on Stack Overflow

The following pages will detail these changes and allow you to get familiar with the new interface quickly.

Maintenance Coordinator SQL SERVERS EXPRESS REVISIONS 8x

DoD Environmental Security Technology Certification Program (ESTCP) Tim Tetreault DoD August 15, 2017

New Concept for Article 36 Networking and Management of the List

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015

Coaching emerit Certified Event Find out what level you are ready for and what you need to JHB

e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013

Scheduling. Scheduling Tasks At Creation Time CHAPTER

Effective Online Marketing 101.4: Fundamentals for effective online fundraising

Tutorials. Lesson 9 - Make a Schedule from a Spreadsheet. In this lesson you will learn how to: Import from the clipboard using Smart Import.

Section 1.2: What is a Function? y = 4x

TABLE OF CONTENTS DOCUMENT HISTORY

MONITORING REPORT ON THE WEBSITE OF THE STATISTICAL SERVICE OF CYPRUS DECEMBER The report is issued by the.

Martin Purvis CEO. Presentation following the AGM. 26 April 2012

Bill Boroski LQCD-ext II Contractor Project Manager

Microsoft Excel 2007

Project Management for Organizing OSS Essential Training

Transition Implementation Status Reporting. 31 March 2016

ACTIVE MICROSOFT CERTIFICATIONS:

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud

Monthly Statistical Digest

SAS Scalable Performance Data Server 4.3

IAB Internet Advertising Revenue Report

OPDEC Critical Path Tool Version 2016

Excel Functions & Tables

Polycom Advantage Service Endpoint Utilization Report

2018 IT Academy Program. December 2017

Polycom Advantage Service Endpoint Utilization Report

Tutorials. Lesson 11 - Introduction to ValueSets and DataGraphs

Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0028 Safety System Logic & Control (SSLC) Class 1 HMI

Oracle HCM Cloud Common Release 12. What s New

Price Change Proposed. October 2018

Pennington County Government Justice Center. Schematic Design - October 27, 2015

PROFESSIONAL CERTIFICATES AND SHORT COURSES: MICROSOFT OFFICE. PCS.uah.edu/PDSolutions

WorkflowMax & Xero Month-end Process

Transcription:

N ew in Version 2017 Full undo feature, with the ability to undo up to 100 actions. An undo counter on the status bar indicates how many actions can be undone. Intuitive CTRL-A to select either all symbols or all tasks. Independent date headings can be attached to task rows. View the selected symbol in the status bar. Add a web or file link to any freeform text block. Choose border line pattern and colors for free-form text blocks. Also, change the colors of individual lines of text. Support for hi-res monitors. It s now possible to select a group of symbols and shift their dates. Show the after status (incomplete) version of a bar in the legend. Design your own import symbology for Microsoft Project. When linking to Microsoft Project, select a group of tasks to import. Create a variety of schedules from Microsoft Outlook calendar or tasks using a simple wizard. Also, export a Milestones Professional schedule to Outlook as a task list. Create a schedule from Excel and keep it up to date with a refresh. Much more! Undo up to 100 a c tions! /2 /2 7/2 Hi- res m o nitor im pr ov ements Design y our own Pr o jec t I mpor t s ym b ol og y Level 1 In Progress Level 1 S h ow af ter status in le gend Show val ue on p oint or bar Freeform te x t m ore c ustomizati o n T as k da te headings more f lexible Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Improved Undo I m p r o v e d U n d o A new Multiple Undo feature has been added to Milestones. Now all actions can be undone. You can set the number of actions that can be undone from 1 to 100 (the default is 20). This is done using the Tools Program Options Edit screen: Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Schedule presentation enhancements Line by Line Color for Freeform Text Now, individual lines of free-form text can be colored. Border choices for Freeform text Change the color and the line pattern for individual blocks of text.. Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Schedule presentation enhancements Date headings attached to rows can be different than main headings It is now possible to attach any single type of date heading to a row. Now, when you right-click on the menu to attach a date heading to a row, a dialog appears that lets you remove the heading, attach a copy of the schedule headings, or a single independent heading of any type: Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Schedule presentation enhancements Legend can now automatically show after status (incomplete) version of symbols/bar If you check the Show After Status Settings in the Legend Entry Edit screen, the legend will show the after status (incomplete) version of the symbols/ bar. This makes it easier for people who wish to show legend entries for both complete and incomplete tasks. They no longer need to manually create an incomplete version of their symbols/bar: Level 1 In Progress Level 2 In Progress Level In Progress Level 4 In Progress Level 1 Level 2 Level Level 4 Selectively suppress interior column dividers It s now possible to suppress the interior column dividers on just one side of the schedule: Automatic Page Breaks You can now insert Page Breaks automatically based upon outline level or number of rows: Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

2017 DataGraph Project Funding Dashboard a n d V a l u e Se t E n h a nc e me n t s 12/10/2018 Assign default values to toolbox symbols It s now possible to add default ValueSet values to a toolbox symbol. Each 2018 Earned symbol can include a default for any or all of the 9 available ValueSets. This Value makes it easy to build DataGraphs which rely on constant values. Jul nts $,922 WORK P DESCRIP Page 1 of 1 201 January February 4,444 pages 10,000 A 7,777 pages,000 B 24,444 pages 10,000 C ngs 12,42 pages,444 D 4,4 pages 1,111 E F $ 4,444 pages 10,000 22, pages $800 Billed 70,000 Pages,000 400,000 00,000,000 100,000 0 12,000 pages 4,42 pages,000 22, pages 22, pages 22, pages 12,000 pages 22, pages 120,008 pages 22, pages 12,000 pages 12,000 pages,000 22, pages 12,11 pages 1,000 pages,000 22, pages 22, pages 22, pages 22, pages Billed Cost/ Page Total Cost 14,0 0 Costs $1,22.00.12 $10,97.1 218,70 2020 Q1 Sep $4,28.84 74,77 $,.00.0 $4,48. $2,01.44 Oct Q2 Nov $,80Feb Dec $,000 Mar Jan 197,118 $21,00.00.08 $1,79.44 $,2. 71,07 $12,077.00.08 $,8.08 $,90.92 17,84 $,11.00.09 $1,1. ($10,020.) 12,42 $1,.00.12 $1,04.24 $1,44.7 91,110 $1,000.00.1 $11,844.0 $4,1.70 $1,00 TEST MOTOR DESIGN AND SUPPORT APTVP ANALYSI S PLAN 11, DP SDA $ $0 $800 $800 $1,0 $1,27 $1,400 $1,07 TVP 19,97 DP SYSTEM DESIGN ANALYSI S Show the value next to the point or bar Project Status $1,400 SYSTEM A new ValueSet property makes it possible to display values near the point (point and line graphs) or near the bar for a bar graph..0 $1,01.0 2/1/18 ngs Project 1 2/1/18 Finish 8/2/18 2/1/18 S ENGINEE RING Feb'18 Budget Mar'18 $8,000 Actual 8/2/18 /22/18 Apr'18 May'18 Jun'18 4/19/18 2/1/18 $2,000 4/18/18 $1,4 $849 4/18/18 /22/18 $870 $2 ($2,000) 4/18/18 /10/18 4/19/18 $4,800 /21/18 4/19/18 $,00 Project /21/18 $2,400 /28/18 Project /21/18 7/11/18 Project 7 7/12/18 $1, e Baseline Costs e Current Costs 8/2/18 /10/18 $4,800 /12/18 $2,780 /1/18 $2,1 /20/18 $82 /21/18 7/12/18 $1,871 $1, $1,87 $1,14 $,721 $2,7 $,4 Current Costs $1,01,0 $887,2 $42,080 $4,000 $4,4 $2,1 $1,400 $2,199 $1,07 $1, $1,00 $48,77 $1,000 $1,000 $17,22 $10,70 $108,000 Funds Remaining $90,000 $ $187,000 $ $1,84,0 $1,00,000 $1,01,0 $1,07,972 $1,029,77 $770,0 $7,129 $9,018 $280,111 $20,48 $94,41 $288,141 $29,117 $272,79 $278,29 $27, $17,000 $400,000 $,000 Milestones Professional 2017 New Features Baseline Track Revised Track KIDASA Software, Inc. October 201 Current Status $ $2,000,000 $9,018 $9,222 $ Over Funding Limit $20,000 8/2/18 $400,000 $ $2,908 Funds Exhausted $,1 $800,000 C Var $,80 7/11/18 Baseline Costs Current Costs Cost DS $189,000 $,29 $1,,000 osts sts Aug'18 /11/18 $,000 Project 4 $2,900 $,840 $129 Project Jul'18 $4,000 4/18/18 $ Baseline SEI $,000 $888 Project 2 $20 2018 DS DRAFT SDA Baseline vs. Current Costs and Finish Dates Baseline Baseline Start End May SEI REDLINE DESIGN PLAN $20Revised Q Apr $1,0 AP TEST & VERIFICA TION PLAN Start Date Remaining PROJECT MILESTONES 91,44 410,014 $1,0 Q4 Net 7,0,000 ngs 22, pages 120,008 pages,00 12,000 pages,000 4,444 pages 10,000 G 12, pages 4,22 8,000 pages,000 Total # Pages March 22, pages $1,00 Baseline Government Plan Cost Contract to Date Task Cost Aug Sep Oct Nov Dec Jan 2019 Feb Mar Press Productivity - Profit Analysis Press 2019 www.kidasa.com

2017 W o r k i n g w i t h Mi c r o so f t P r o j e c t 2017 New Project Interface Features Design your own custom symbology Custom symbology is available in places. As an option for ad-hoc import of tasks, via Link to active Project Task Page 1 of 1 1 Custom Page 1 of Let the Wizard Guide You Import 201 Tasktasks option. In the refresh dialog, used fortask the Append Jan Feb Mar Apr May 201 Start End May Apr Feb JanMar AprDec Jul May AugJun Sep JulOct Aug Sep Feb Oct Mar Nov Jun Jan Jul Jun 201 Whether refreshing, importing, or adding tasks to an existing presentation schedule, it s possible to design your own symbology set. Some examples of symbology which can be customized: No Aug Baseline Finish Baseline Start Baseline Finish Start Finish 201 201 Key1 Start 2017 2018 12 2019 2020 2021 7 2022 Key 4 Key 2024 Key4 8 202 202 Key 2027 2 Key7 Key Keyb 2028 2029 1 9 Keya 1 Date8 Date Date7 202 4 /7/201 Finish Date Date Date4 Date2 Key2 Key Project Milestones and Events /9/201 Start Start Finish Baseline Date1 2014 Baseline Finish Baseline Start Key9 Keyd Keyc Key Deliverables 11 Testing 12 7 7 2 TSST Plan 7 7 TSST RPT 4 2 1 DT-B Integration 12 12 DT-B4 1 8 9 OT-B 8 Summary 9 Eventa Event + month # Eventb Eventd Event1 Event12 10 Planned Evente Eventa Planned Eventf DT#1 1 2 8 Event1 Eventc Milestones Professional 2017 New Features 8 9 Event type 2 + month # Summary 2 Event8 4 Event Baseline Event1d Summary 7 10 Event4 10 Event KIDASA Software, Inc. October 201 Summary Event2 8 Event1dd EMALS 9 9 Base Sum Event7 Event www.kidasa.com Planned Event1b 7 Baseli

Working with Microsoft Project Link to Active MS Project Task add several tasks at once In past versions, one Microsoft Project task could be linked via the Link to Active MS Project task feature. Now, groups of tasks can be selected in Microsoft Project. Then, the link feature makes it possible to link all selected tasks at once. One option is add all dates from selected tasks to a single row on the Milestones chart. The other option is to have Milestones add new rows for each Project task. Add new Project tasks to Milestones more easily When using the refresh feature, an option to append new tasks is available. Now, it s possible to use a Project Flag field to indicate the tasks to be added. Additionally, it s possible to use a Microsoft Project Number field to specify the Milestones row for the new task(s). Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Working with Microsoft Excel Excel: Smart Import and Custom Import enhanced Importing from Microsoft Excel (or any table) is now easier than ever. Two methods for importing have been enhanced. Smart Import, which maps the Microsoft Excel (or table) column headings to fields in Milestones automatically has been enhanced to: Allow the use of a UniqueID field to tag task rows and symbols in Milestones for future update when the table changes. Offer a set up screen which can be used to add more flexibility to the column naming. For example, if the spreadsheet column heading for the start date is My Start Date, the setup screen can be used to map that to the task start date. Custom Import, which offers field mapping using a simple two column mechanism, has also been enhanced to allow the use of a UniqueID field. Excel: Refresh from a Spreadsheet it is possible to add a tag to items imported from Excel. It s also possible to refresh a schedule using an Excel table when the dates in the Excel table have changed. Page 1 of 1 10/2/201 % TaskName 201 July August September October November December Project 1 Research Design Procurement Production Testing Review Delivery Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Working with Microsoft Outlook Outlook Import/Export A new Outlook to Milestones wizard makes it easy to import from Microsoft Outlook. Bring calendar or task items in and produce several presentation Milestone charts using a simple step-by-step wizard. Presentation Timeline '18 '19 Category Q2 Q Q4 Q1 Q2 Q SV Start Demo Const Finish Category 1 Stoplight Report % '1 '14 '1 '1 '17 Comp. Tasks Status Priority IV I II III IV I II III IV I II III IV I II III taskfolder1 Project ABC Task Low Project ABC Task 4 Const SV Start Demo DV Project ABC Task 1 Project ABC Task 2 High Category 2 taskfolder1subfolder1 EV FV PS Task 1- Add order 1 Category SV DV Const Start Demo Task 1-1 Add order 2 Task 1-9 Add order PS SV Const FV DV EV Start Demo Task 1-4 Add order 4 Task 1-1 Addorder taskfolder1subfolder1 Category 4 Task 1- Add order 1 PS FV EV Task 1-1 Add order 2 Category DV SV Const PS FV EV DV SV Const Start Demo Start Demo Task 1-9 Add order Task 1-4 Add order 4 Task 1-1 Addorder Task 1-1 Addorder Category PS FV EV Planned Not Started Waiting on someone else Deferred In Progress Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

Improved Usability Pick your own toolbox background color Change the color for the selected item s background. Pick a color that makes it easier for you to be able to see which items are currently selected.project task) Show Symbol Type in Status Bar when Symbol is Selected Now when a symbol is selected, then actual symbol will be shown in the Status Bar: Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

More! Select all symbols or all tasks In previous versions, it was necessary to hold down the Shift key to select multiple symbols. Now, once a symbol is selected there are options on the right-click menu to select all symbols of the same type or all symbols on the schedule. Select all symbols of the same toolbox type: Select all symbols: Shift just selected symbols In addition to shift all dates and shift selected tasks, it s now possible to shift selected symbols. Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

More! Autosave Improvements When a Milestones session exits it now only clear autosaves done by its own Process ID (PID), not any others whether they are running or not. This should prevent an autosave entry from disappearing without the user being able to restore it. This fixes the problem of multiple Milestones sessions running and deleting autosaved files from a crashed session before the user gets a chance at a restore. The autosave Restore dialog now prompts the user to select an entry before OK is accepted. Before, if the user forgot to select an entry the autosave files were deleted. Also added, was a new button in the Tools Program Options Files and Automation screen which lets you display the current list of Autosaved files. New Symbol Date Format The Time of a symbol may now be appended to the displayed symbol date. Before, it was not possible to display both date and time in the symbol date display area. Show time using 12 hour or 24 hour formats. Optionally, choose to append AM and PM. E n h a n c e d s u p p o r t f o r h i g h r e s o l u t i o n m o n i t o r s Milestones now automatically adjusts to operating on a high resolution monitor, sometimes referred to as a 4K monitor. In the Apple world, these are referred to as Retina displays. These high resolution monitors come in such resolutions as x100, 840x210 etc. Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com

2017 Samples Integration Master Phasing Schedule Monthly Review 201 M J J A 2017 S O N D J F M CDR HW Request Major Milestones A M J Jul Aug Oct ReAsm 1 Asm 22 PDR Nov Dec J F M ReAsm 28 19 TI TI TI 8 20 2 DemoDemo 11 2 27 2018 Sep Watch OK 10 Demo 21 Ahead CDR SW R TR Prelim Design Design Design Integration Prove In Prep 1 R TR Prelim Design Design Integration Prove In Prep 1 R TR Prelim Design Design Integration Prove In Prep 1 24 1 Testing 22 14 1 LEGEND CDRHW- Critical Design Review Hardware CDRSW-Critical Design Review Software PDR-Preliminary Design Review TRR-Test Readiness Review TI-Test Integration Asm-Assemble ReAsm-Reassemble 19 2 10 1 29 4 27 Actual Hours 7 10 14 27 27 14 2 Jul 7 20 17 17 17 100 17 12 00 0 400 400 19 21 0 17 9 1 12 24 4 M J J A S O N D J F M A M J Actual Hours 10 0 21 1 1 17 17 0 Aug 17 Sep 1 Oct 00 Nov Dec J F M 10 400 0 Maximum Hours 0 00 Minimum Hours 00 IIQ Customer Lifecycle - Strategic Account - Year 1 20 20 10 100 0 IIQ sold Deploy 10 Lifecycle milestones 100 00 Executive touchpoint (strategic accounts) CSM engages Customer Go Live survey Expand Executive touchpoint (strategic accounts) Renew Executive touchpoint (strategic accounts) survey Executive touchpoint (strategic accounts) renewal status calls monthly newsletter Director level Checkpoint (key accounts) Director level Checkpoint (key accounts) Director level Checkpoint (key accounts) Sales debriefs CSM CSM updates SalesForce Process breakdown account background business drivers key contacts license info partner info IMPROVEMENTS Touchpoints Executive and Director level *For Strategic Key accounts only Assigned SailPoint executive contacts client executive to: celebrate key wins build relationship understand concerns Topics covered: open cases current/future objectives and status key SailPoint news Project Roadmap 2018 2019 J A S O N D J F M A M J J A S O N D 10/2 PROPOSAL 10/8 Jan Feb Mar Apr May Jun 2020 Jul Aug 9/7 L/L AMO Nov Dec Task -1 4/17 /27 /22 8/24 10/19 12/21 TIM #2 TIM # TIM #4 TIM # 1/1 CRB PHASE III /12 H/W FCA/PCA SYST. S/W FCA/ 2/ 8/1 /18 LONG LEAD AUTH. PCA H/W CRB A/C FCA/PCA LRIP KIT 1 MAINT. VAN TOOLING 2/22 4/2 /20 11/2 1/8 FSD TKI FSD 90% AMO 9/ /24 /12 4/2 4/1 8/1 DEFINE & TRADES /2 11/22 1/21 RA 8/1 DD /2 PD 11/9 1/8 12/14 S/W DEV 9/7 4/11 GOVN PROCURE/DEVEL - FAB - INTEG - TEST H/W S/W MERGE 4/12 INT 7/1 8/21 10/11 12/1 DD PD FCA/PCA 4/12 1/2 11/10 RA F/F NEGOTI. 2/22 S/W DEV INT A/C GROUND TEST 8/11 DD PREPARE RETRO. GO-AHEAD PREP. GO-AHEAD IMPACT ASSESSMENT RETRO START 8/7 1/7 /7 10/20 PD Renew 11/7 TKI 90% /4 RA Key SalesForce datapoints captured earlier in the lifecycle TIM # TIM #7TIM #8 TIM #9TIM #10 /11 8/11 11/22 1/21 Handoff/debrief step from Sales to CSM added 11/9 INCORP. CHGS. 2/ Expand 7/18 Task 2-1 CSM engaged earlier in the lifecycle to lessen customer confusion & provide additional project oversight 2021 J F M A M J J A S O N D J F M A M J 2/7 TIM #1 /1 Oct Deploy 1st FLIGHT PROG AUTH GOVERNMENT HMU 1/ AVAIL /4 DELTA PDR NEGOTIATION 1/21 8/11 11/1012/2 RR / SSR PDR CDR /2 DELTA RR/SSR 1/22 DELTA CDR 9/ Sep 9/7 11/9 Task 1-1 /2 CSM ensures proper customer contact receives renewal quote well in advance of software renewal expiration date b) Post Go live, CSM captures key data points & updates SalesForce CSM customer intro meeting Topics covered: license overview support best practices services overview reference program customer success plan CSM status calls begin 2017 Renewal a) CSM updates SalesForce to ensure support is aware of critical Go Live period DEV INT S/W DEV DD /14 INT S/W DEV INT /11 9/7 11/10 2/9 /11 7/1 8/19 10/11 11/22 2/21 12/1 RA PD DD DEV INT 4/24 8/14 /14 / DEV INT DEV INT 8/14 7/1 10/11 Milestones Professional 2017 New Features 11/22 2/21 /24 8/14 12/8 KIDASA Software, Inc. October 201 www.kidasa.com

Samples Project / Task % Comp. Earned Value Report with Budget and Actual Costs 201 July August September FACWP (Actual Cost) EV (Earned Value) BAC (Budget) $8,000 Project ABC 0% $,8 $,72 $7,100 Task 1 71% $7,100 $ $21 0 Task 2 2% $0 $208 $400 $,777 Task % $17 $14 $20 Task 4 7% $710 $94 $1,00 $,42 Task 2% $ $41 $72 $4,17 Task 81% $100 $181 $22 $,7 $,90 Task 7 % $ $18 $0 $2,88 Task 8 % $1, $1,14 $1,77 $2,1 $1,78 Task 9 48% $10 $24 $0 $1,1 $1,7 Task 10 0% $800 $17 $88 Task 11 0% $207 $42 $88 $4 $141 Earned Value $2 Budget Status Marker Summary Task Duration Phase 1 Detailed Schedule with "Logarithmic" date headings Phase 1 Milestones Q'19 4Q'19 1Q'20 2Q'20 Q'20 4Q'20 July August September October November December Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 7/2 Funding 9/1 Supplemental Funding 9/1 SOW for Phase 1 Task 1. 7/18 7/18 1/10 7/4 12/7 Task 2. Task 2-1 Task 2-1-1 Task 2-1-2 Task 2-2 Task 2- Task. Task 4. Task. Final Report Task. Working Group Meetings 7/18 7/18 7/18 7/18 8/20 8/1 8/20 8/1 8/1 /2 8/1 /2 8/1 8/11 8/1 /1 1 2 4 1 2 4 7/18 1 2 4 11/18 No. 1 7/2 9/18 1 2 4 Q'19 4Q'19 1Q'20 2Q'20 Q'20 4Q'20 No. 2 8/0 No. 10/8 No. 4 11/2 1/21 No. /1 /4 /24 /10 7/1 Milestones Professional 2017 New Features KIDASA Software, Inc. October 201 www.kidasa.com