Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL

Similar documents
STRUCTURAL STABILITY ASSESSMENT REPORT

February 11, Mr. Michael Cox Arkansas Egg, LLC Mill Road Summers, AR Compliance Inspection AFIN: , Permit No.

Appendix C.6. Best Management Practices for Construction Activities

ARLINGTON COUNTY, VIRGINIA

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Knight Piésold. Knight Piésold

March 4, Billy and Amber Lyons Lyons Car Wash 8601 J.B. Baxley Rd. #40 Benton, AR RE: AFIN: Permit No.

December 27, Mr. Paul Tabor Mr. Clean Car Wash #3 Ball Park Lane Center Ridge, AR RE: AFIN: ; Permit No.

DEQ Guidance on Recordkeeping and Reporting

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

Environmental Vision was retained to review and evaluate a set of computer-generated renderings

Environmental Management Procedure (EMP)

Inspector for Stormwater Management. Department of Environmental Quality Office of Training Services

MANITOBA LANDFILL OPERATOR CERTIFICATION PROGRAM SUSTAINABLE DEVELOPMENT

NON STRUCTURAL STORMWATER STRATEGIES (NJAC 7:8-5.3) - ATTACHMENT G

STATE OF NORTH CAROLINA

Environmental Impact Questionnaire

Lesson 7: Gathering Stand-Level Information

ewell User Guide Created by: Applications Support Help Desk Version: 1.1 Date: 03 October 2016

A Montana Solution SB 409. Montana Mining Association Presentation for Pacific NorthWest Economic Region, 25 th Annual Summit, July 14, 2015

F O R S A L E 2 Acre Outparcel Four Lane Exposure Gateway Corridor to Downtown 0 Kathleen Road, Lakeland, Florida 33801

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

MEMORANDUM. Corona Subdivision XP Storm Evaluation. Date: March 5, Curt Bates, City of Petaluma. David S. Smith, P.E., WEST Consultants, Inc.

Redevelopment Agency of Midvale City

Appendix E-1. Hydrology Analysis

PUBLIC WORKS ORGANIZATIONAL CHART

RI AND RF CRITERIA AND FORMATS

Mount Pleasant Waterworks. Cross-Connection Control Program Guidelines October 2010

NSF 61 CERTIFICATION OF CONCRETE

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan

HCFCD Review Process

Security and Disaster Preparedness: New York s Experience. Presented by: New York Department of Public Service. December 7, James T.

Office of Inspector General Office of Professional Practice Services

EXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS

Downtown Boise Multimodal Center

SUBCHAPTER 08F - CERTIFICATION OF OPERATORS OF ANIMAL WASTEMANAGEMENT SYSTEMS SECTION GENERAL PURPOSE/DEFINITIONS

2016 North Dakota Living MEDIA KIT

The City of St. Petersburg (City) initiated

Report. Diemer Plant Improvements Program Audit Report. Internal Audit Report for January 2011

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

i. Prepare an SPCC plan in accordance with good engineering practices. (40 C.F.R )

Helios 3D TM Product Sheet

e-manifest ASTSWMO August, 2017 Joint Solid and Hazardous Waste Conference U.S. Environmental Protection Agency

INTRODUCTION and REGULATORY REQUIREMENTS MODULE ONE

Chapter 16. Table of Contents

2003 Bachelors of Science in Electrical Engineering University of Puerto Rico at Mayagüez

SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox

ONLINE REGISTRATION AVAILABLE

ENMAX Power Corporation

MID-SOUTH RECLAMATION INDUSTRIES

PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year

SECTION 106 ACTIVITIES ANNUAL REPORT

Instructions for Applying for Consultants Competitive Negotiation Act (CCNA) Certification with Palm Beach County (PBC)

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

MEMORANDUM. DATE: July 1, Whom It May Concern. FROM: C. Patrick Walker, P.E. Technical Services Manager Manufactured Building Division

Along the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow.

Dallas Municipal Archives Archives Collections Finding Guides and Inventories

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Lysimeters

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017

Learn how to link a hydrologic model to the SWMM storm drain model

WMS 10.0 Tutorial Storm Drain Modeling SWMM Modeling Learn how to link a hydrologic model to the SWMM storm drain model

APPLICATION FOR AIR EMISSION TESTING BODY (AETB) ACCREDITATION

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments

Safe and Reliable Service at Just and Reasonable Rates: The Economics of Storm Hardening

WMS 9.1 Tutorial Storm Drain Modeling SWMM Modeling Learn how to link a hydrologic model to the SWMM storm drain model

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

NOT PROTECTIVELY MARKED SUPPLIER REGISTRATION FORM

RPR CRITERIA AND FORMATS

Using SUE to reduce Delays and Disruptions on City of Toronto s Yonge Street Project

The Agricultural Environmental Site Assessment (AgESA)

FAQ Guide. edmr. Electronic Discharge Monitoring Reports

Breaking New Ground Georgia s Education and Training Certification Requirements for Persons Involved with Land Disturbing Activity

17. Microwave Collocation 17.1 General

Atlantic Coast Service Center

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application

4215 Exchange Ave, Vernon

ELGA 2018 Application Questions

Got It Covered. Developing a Standard of Cover. Modeling Standard of Cover with ArcGIS Network Analyst 9.2. By Mike Price, Entrada/San Juan, Inc.

SECTION 106 ACTIVITIES ANNUAL REPORT

TANK TRUCK CLEANING FACILITY AUDIT FORM

FY 12/13 Recommended Public Works Budget $4,472,871

NDTMA 2015 Annual Conference

Code Version *Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary.

Re: April 24 to July 7, 2017 Dust Monitoring and Site Work Observations, Lots 12 and 13, Beverly Hills, California

SQF Program. March 28, 2018

Singleton Swash Profile Analysis

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

Modeling Storm Sewer Networks in the City of Newport News, Virginia Using Two Different Software Solutions

1. Significant Changes

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT. Online Permit Information Center External User s Guide

Organic Certification Procedures and Costs 1

EACH MONTH CUTTING EDGE PEER REVIEW RESEARCH ARTICLES ARE PUBLISHED

DATE: April 8, 2013 REPORT NO. CD TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS

Levee Vulnerabilities Web-Application on FERIX September 09, 2016

NORTHPINE COMMUNITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN 01 st July th June 2022

A Step Ahead and a Vision to be Greater. EnviroFocus Technologies (EFT) Tampa,FL

Transcription:

5012 W. Lemon Street Tampa, Florida 33609 Ph 813.944.3464 Fax 813.944.4959 December 31, 2015 (via email) Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL 33602 kozwolak@tecoenergy.com Subject: First Annual (2015) CCR Impoundment Inspection Report Economizer Ash Pond System FDEP#20 Tampa Electric Company Big Bend Power Station Apollo Beach, FL As authorized by Tampa Electric Company (TECO) Work Order Number 50204 dated November 19, 2015, AREHNA Engineering, Inc. (AREHNA) is presenting this first Annual CCR Impoundment Inspection Report for the Economizer Ash Pond System at TECO s Big Bend Plant. This report summarizes the findings of the inspections performed by a qualified Professional Engineer at the referenced site in December, 2015. Project Scope On April 17, 2015 the Environmental Protection Agency (EPA) published a final rule to regulate the disposal of coal combustion residuals (CCR) as solid waste under Subtitle D of the Resource Conservation and Recovery Act (RCRA). The rule includes requirements for annual inspections (starting within 9 months of rule publication): conducted and certified by a qualified professional engineer, focused primarily on the structural stability of the CCR surface impoundment to ensure that the operation and maintenance of the CCR surface impoundment is in accordance with recognized and generally accepted good engineering standards. This report documents the inspections of the earthen berms surrounding the three ponds related to the economizer ash system, located at Tampa Electric s Big Bend Power Station. These ponds are filled with water and CCR (economizer ash and pyrites). This inspection was performed by a Professional Engineer in December 2015. Attached to this Annual Inspection Report is an aerial photo outlining the ponds and perimeter earthen berms related to the economizer ash pond system. The perimeter berms were observed, either while on foot or operating a slow moving motorized vehicle to identify indications of distress, unusual or adverse behavior, or malfunction of each CCR unit. The Professional Engineer used a checklist for the following conditions: www.arehna.com

Annual (2015) Earthen Berm Inspection TECO Big Bend, FL December 31, 2015 Embankment / Liner Penetrations Seepage Soil Deltas Settlement / Subsidence Scarps Animal Burrows Vegetation Overgrowth Cracks Surface Erosion Liner Deficiencies Bulges Vandalism The visual inspection and evaluation outlined in this inspection report were performed in accordance with generally accepted engineering practice ordinarily used by geotechnical engineers practicing in this area at the time the inspections were made. No other warranty, expressed or implied, is made. These ponds are also being inspected weekly by TECO personnel. We were provided the opportunity to review weekly inspection reports for the period October 20, 2015 through November 24, 2015. Monthly instrumentation inspections are also being performed by TECO personnel. We reviewed the monthly inspection report dated November 6, 2015; the December monthly instrumentation report had not been submitted for review at the time of our inspection. Economizer Ash Pond System As indicated on the attached aerial photo, the economizer ash pond system is located south of Big Bend Road. The economizer ash pond system includes three ponds / storage areas: North Economizer Ash Pond This is an active CCR storage area approximately 330 x 710 feet in plan. Approximately the eastern half of the pond currently has exposed CCR materials / vegetation that extend above the water level in the pond. Economizer Ash Suction Pond This pond is located west of the north economizer ash pond and is approximately 230 x 340 feet in plan. The plant instrumentation for the water level in the economizer ash pond system is located in this pond. Since the weekly inspections required by the new rule began, the water surface elevation ranged from +26.51 to +27.59 feet (plant datum). We understand this corresponds to +24.51 to +25.59 NAVD88 datum. South Economizer Ash Pond This CCR facility no longer actively receives CCR materials; it is approximately 330 x 960 feet in plan. The 2012 survey shows the top of the impounded materials range from elevation +35 feet NAVD88 (west side) to +45 feet (east side) NAVD88. This pond has a perimeter ditch that conveys stormwater runoff to the Long Term Fly Ash pond, by routing along the north, west, and south sides of the impoundment to three drain pipes. The above information is based on the documents provided to us, including: Bid Specification for Earthwork in Byproducts Storage / Disposal Area, prepared by Stone and Webster Engineering Corporation, dated 1982. This specification also indicates at least 95 percent of ASTM D-1557 compaction was specified for the structural fill used to construct the berms. A 2010 plan for the South Economizer Pond prepared by George F. Young, Inc. showing: 2 P age

Annual (2015) Earthen Berm Inspection TECO Big Bend, FL December 31, 2015 o o o o Inside slopes of 2.6:1 (H:V) Bottom liner at elevation +5 feet (plant datum, + 3 feet NAVD88) Average top of berm top elevation +31.4 feet (plant datum, +29.4 feet NAVD88) Design impounded fill height of +51 feet (plant datum, +49 feet NAVD88) A 2012 survey of the area, performed by George F. Young, Inc. The survey shows the top of the economizer ash berms to be slightly above elevation +29 feet NAVD88, which corresponds to slightly above elevation +31 feet in the plant datum system. Based on the materials provided and discussions with TECO personnel, no hydraulic structures are known to underlay the base of these CCR units, passing through the berms. As indicated above, visible portions of the influent and effluent penetrations were observed / inspected by our engineer. Findings and Recommendations This is the first inspection performed under the EPA s CCR rules published April 17, 2015. The slopes of the perimeter berms were generally well maintained with the vegetative overgrowth adequately mowed to permit observation of the slopes and for detection of structural and other concerns, as outlined previously. Representative photos of our operations are attached. No exterior seepage or other critical conditions that would require an immediate response were noted. In summary, based on the information provided to us and our observations, we certify: 1. A review of aerial photographs dated January 17, 2014 and February 19, 2015, revealed no changes in the geometry of the impounding structures. 2. The plant instrumentation for this system of ponds is located in the economizer ash suction pond. This instrumentation records the water level relative to the plant datum elevation system. 3. The data provided shows that during the period October 20, 2015 through November 24, 2015: a. minimum water elevation: +26.51 feet (plant datum), i.e. +24.51 NAVD88 datum b. maximum water elevation: +27.59 feet (plant datum), i.e. +25.59 NAVD88 datum c. latest water elevation (11/24/15): +27.13 feet (plant datum), i.e. +25.13 NAVD88 datum 4. As indicated in the attached calculations, the calculated storage capacity of the north economizer ash pond is based on: a. a bottom liner elevation of +5 feet (plant datum) b. a water / CCR elevation of +27.5 feet (plant datum) The resulting storage capacity of the north economizer ash pond is approximately 83 acre feet, and the storage capacity of the economizer ash suction pond is approximately 21 acre feet. 5. The volume of the impounded water and CCR at the time of inspection was calculated as outlined above, resulting in approximately 83 and 21 acre feet in the north economizer ash pond and the 3 P age

Annual (2015) Earthen Berm Inspection TECO Big Bend, FL December 31, 2015 economizer ash suction pond, respectively. Based on the 2012 survey information provided, the south economizer pond has been filled to within 4 to 14 feet of the design top elevation. 6. In our inspection we did not observe any appearances of an actual or potential structural weakness of the economizer ash pond system, or any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the economizer ash pond system and appurtenant structures. 7. This is the first inspection under the referenced rules. As indicated previously, our review of aerial photographs, as well as our site observations, did not reveal recent changes to the economizer ash pond system that may have affected the stability or operation of the impounding structures. Two areas were noted in the TECO weekly inspections, as well as this inspection, that should be further investigated: There is a small bulge in the liner beneath the central pipe that drains stormwater from the previously capped and inactive South Economizer Ash Pond to the Long Term Fly Ash Pond. The reason for the bulge is not readily apparent. Since the bulge is directly below a drainage pipe, we recommend that this area be further inspected. The lined inside north-slope of the economizer ash suction pond has an inconsistent slope surface that also resembles a bulge. The water level in the suction pond should be lowered and this area further inspected. We appreciate the opportunity to support you on this project. If you have any questions with regard to this report, please do not hesitate to contact us at 813.944.3464. Sincerely, AREHNA Engineering, Inc. FLORIDA BOARD OF PROFESSIONAL ENGINEERS CERTIFICATE OF AUTHORIZATION NO. 28410 Curtis J. Roos, P.E. Jessica A. McRory, P.E. Senior Geotechnical Engineer Geotechnical Engineer Florida Registration 27570 Florida Registration 68440 Copy to: Zel Jones: ZDJones@tecoenergy.com Randy Melton: RMelton@tecoenergy.com Attachments: Earthen Berm Inspection Plan Storage Volume Calculations 4 P age

ATTACHMENTS Earthen Berm Inspection Plan Storage Volume Calculations

5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Earthen Berms Inspected Economizer System Earthen Berm Inspection TECO Big Bend, FL

North Economizer Ash Pond (north side, looking west) North Economizer Ash Pond (east side, looking south) 5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Economizer System Earthen Berm Inspection TECO Big Bend, FL

North Economizer Ash Pond (south side, looking east) Economizer Ash Suction Pond (east side, looking northeast) 5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Economizer System Earthen Berm Inspection TECO Big Bend, FL

Economizer Ash Suction Pond (south side, looking east) Economizer Ash Suction Pond (north side, looking west at irregular liner surface) 5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Economizer System Earthen Berm Inspection TECO Big Bend, FL

Economizer Ash Suction Pond (west side, looking east at embankment penetrations) Economizer Ash Suction Pond (west side, looking south at instrumentation platform ) 5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Economizer System Earthen Berm Inspection TECO Big Bend, FL

South Economizer Ash Pond (east side, looking north) South Economizer Ash Pond (south side, looking west) 5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Economizer System Earthen Berm Inspection TECO Big Bend, FL

South Economizer Ash Pond (south side, looking southwest at bulge below central pipe discharging into the Long Term Fly Ash Pond) South Economizer Ash Pond (south side, looking southeast at bulge below central pipe discharging into the Long Term Fly Ash Pond) 5012 W. Lemon Street, Tampa, FL 33609 Phone 813.944.3464 Fax 813.944.4959 Economizer System Earthen Berm Inspection TECO Big Bend, FL