VDP extension to support NVO3 CSD. Qcn-csd-0715-v01 July2015

Similar documents
Crash course on Study Groups

IEEE Criteria for Standards Development (CSD)

IEEE Criteria for Standards Development (CSD)

IEEE Criteria for Standards Development (CSD)

IEEE Criteria for Standards Development (CSD)

CSD DRAFT for considerations 2.5G/5G Ethernet Backplane & Copper

IEEE Criteria for Standards Development (CSD)

25GSMF Study Group: Draft CSD Responses

IEEE Criteria for Standards Development (CSD)

50 GbE 40km Objective 5C Study Group Discussion

Summary of Proposed Responses to CSD

IEEE Criteria for Standards Development (CSD)

Proposed CSD Responses: Objectives Related to operation over DWDM System

25GSMF Study Group: Work Items and Goals for Jan Meeting

802.3bs PROJECT DOCUMENTATION CONSIDERATION. John D Ambrosia, Independent December 2, 2015

Credit based Flow Control PAR, 5 Criteria & Objectives

25 Gb/s Ethernet over a single lane for server interconnect Study Group: status and work

IEEE YANG Data Model(s) Study Group Closing Report

5 Criteria Responses

IEEE Gb/s per Lane Electrical Interfaces and Electrical PHYs (100GEL) Study Group Closing Report

IEEE Five Criteria

IEEE Beyond 10km Optical PHYs SG - Discussion of Objectives / CSD

Provider Bridging Remote Access PAR and 5c

Five Criteria Responses APPROVED WG (November 15, 2012) and 802 EC (November 16, 2012) Reduced Twisted Pair Gigabit Ethernet PHY Study Group

IEEE Five Criteria

Time Synchronization Study Group

Broad Market Potential

Five Criteria Responses

Draft 5 Criteria, v6 (Wordsmithed to align with Draft PAR, v7) September Interim, IEEE 802 September 06. AVB task group

IEEE DMLT Study Group Straw-man DRAFT PAR and 5C

Edge Virtual Bridging Draft PAR. PAR Request Date: 15 November PAR Approval Date: PAR Signature Page on File: No

IEEE Ethernet Working Group 19 July 2012 San Diego, CA

10Gb/s on FDDI-grade MMF Cable. 5 Criteria Discussion Slides. SG 10Gb/s on FDDI-grade MMF

John D Ambrosia Dell. IEEE Next Gen BASE-T SG 1

Forwarding and Queuing for Time-Sensitive Streams

40Gb/s Ethernet Single-mode Fibre PMD Study Group Proposed 5-Criteria Responses

Some Comments on PAR and 5C

P802.1CM Time- Sensitive Networking for Fronthaul

10Gb/s on FDDI-grade MMF Cable. 5 Criteria Motions. 13 January 2004

The 5-Criteria for EPoC

IEEE sub10-00/03r1. IEEE Broadband Wireless Access Working Group

IEEE GBASE-T T Study Group Agenda and General Information

IEEE GBASE-T T Study Group Agenda and General Information. Vancouver, BC January 9, 2003

The 5 Criteria for EPoC

IEEE 802 LAN/MAN STANDARDS COMMITTEE (LMSC) OPERATIONS MANUAL

Review of the 5 Criteria

10 Gb/s Ethernet on FDDI-grade MM Fiber

IEEE Congestion Management Study Group November Plenary Report. San Antonio, TX November, 2004

Introduction to Resilient Packet Rings. Raj Sharma Luminous Networks, Inc Working Group

1. An IEEE MAN shall be compatible with relevant and applicable IEEE 802 standards:

Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)

IEEE GBASE-T Study Group Closing Plenary Meeting Report

802.3at 5-Criteria and Objectives Housekeeping

Higher Speed Ethernet Update

IEEE Broadband Wireless Access Working Group <

Introduction to IEEE 802.1Qca Path Control and Reservation

IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002)

IEEE Backplane Ethernet Study Group Agenda and General Information. Vancouver, BC January 12, 2004

Proposed Copper EFM PHY

Yizhou Li Lucy Yong Lawrence Kreeger Thomas Narten David Black. Pat Thaler Joe Pelissier Eric Gray

Executive Summary...1 Chapter 1: Introduction...1

IEEE 802 Plenary Kauai Nov Criteria 10GBASE-CX4 10GBASE-CX4 1

1. Broad Market Potential o Broad set(s) of applications o Multiple vendors, multiple users o Balance cost, LAN vs. attached stations 802.

PAR DRAFT for considerations NGE BASE-T SG

Agenda and General Information

HUMBOLDT COUNTY Website Accessibility Policy

Securing Wireless LANs with Certificate Services

Agenda and General Information

Nokia Fax:

OPEN BASE STATION ARCHITECTURE INITIATIVE

IEEE 1722 Revision PAR Draft 0.4

IEEE P802.3ba 40 GbE and 100 GbE Standards Update

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

NERC CIP VERSION 6 BACKGROUND COMPLIANCE HIGHLIGHTS

IEEE 802 Network Enhancements for the Next Decade Industry Connections Activity


IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

IEEE 802 LAN/MAN STANDARDS COMMITTEE (LMSC) OPERATIONS MANUAL

INTERNATIONAL TELECOMMUNICATION UNION

Agenda and General Information

Technical Trust Policy

IEEE-SA Standards Board Project Authorization Request (PAR) Form (1999-Rev 1) 2. Assigned Project Number P1450.4

IEEE Working Group November 2014 Plenary Week

Internet Engineering Task Force (IETF) Updates: 5066 February 2014 Category: Standards Track ISSN:

COMMON CRITERIA CERTIFICATION REPORT

Cloud Computing Lectures. Cloud Security

Agenda and General Information

P802.1CM Time-Sensitive Networking for Fronthaul

Time-Sensitive Networking Profile for Automotive In-Vehicle Ethernet Communications

Standard CIP Cyber Security Systems Security Management

Functional Requirements 10/20/2003. IEEE Working Group on Mobile Broadband Wireless Access <

COMMON CRITERIA CERTIFICATION REPORT

Editors. Care & Feeding

ISO/IEC TR TECHNICAL REPORT

IEEE-SA Standards Board Project Authorization Request (PAR) Form (1999-Rev 1) 2. Assigned Project Number P1450.1

National Policy Governing the Use of High Assurance Internet Protocol Encryptor (HAIPE) Products

IEEE P802.3ba 40 GbE and 100 GbE Standards Update

Standard Development Timeline

IEEE-SA Conformity Assessment Program for IEEE 1588 in Mobile Networks AUTHORS:

Appendix 3-A: Planning Workshop Template

Transcription:

VDP extension to support NVO3 CSD Qcn-csd-0715-v01 July2015

Project process requirements Managed objects Describe the plan for developing a definition of managed objects. The plan shall specify one of the following: a) The definitions will be part of this project. b) The definitions will be part of a different project and provide the plan for that project or anticipated future project. c) The definitions will not be developed and explain why such definitions are not needed. a) Enhancement to managed objects for VDP will be included.

Project process requirements Coexistence A WG proposing a wireless project shall demonstrate coexistence through the preparation of a Coexistence Assurance (CA) document unless it is not applicable. a) Will the WG create a CA document as part of the WG balloting process as described in Clause 13? (yes/no) b) If not, explain why the CA document is not applicable. Not applicable this is not a wireless project.

5C requirements Broad market potential Each proposed IEEE 802 LMSC standard shall have broad market potential. At a minimum, address the following areas: a) Broad sets of applicability. b) Multiple vendors and numerous users. a) Network virtualization provides multi-tenancy support in a data-center network by isolating traffic and address space for tenants. Network virtualization is being widely deployed. NVO3 is being developed by the IETF to standardize network virtualization protocols. Use of an NVO3-based approach enables scalable deployment on large network infrastructures. RFC 7364 specifies the needs for a control plane protocol to populate an external Network Virtualization Edge (NVE) with the state needed to perform the Tenant System Interface (virtual station interface) to virtual network (VN) association functions. The proposed VDP extension was requested by the IETF NVO3 WG to fulfill this need. http://www.ieee802.org/1/files/public/docs2015/liaison-ietf-vdp- Requirement-for-NVo3-0515.pdf b) Multiple vendors and users have expressed their support for this extension to be used in IETF NVO3.

5C requirements Compatibility Each proposed IEEE 802 LMSC standard should be in conformance with IEEE Std 802, IEEE 802.1AC, and IEEE 802.1Q. If any variances in conformance emerge, they shall be thoroughly disclosed and reviewed with IEEE 802.1 WG prior to submitting a PAR to the Sponsor. a) Will the proposed standard comply with IEEE Std 802, IEEE Std 802.1AC and IEEE Std 802.1Q? b) If the answer to a) is no, supply the response from the IEEE 802.1 WG. The review and response is not required if the proposed standard is an amendment or revision to an existing standard for which it has been previously determined that compliance with the above IEEE 802 standards is not possible. In this case, the CSD statement shall state that this is the case. a) Yes.

Distinct Identity 5C requirements Each proposed IEEE 802 LMSC standard shall provide evidence of a distinct identity. Identify standards and standards projects with similar scopes and for each one describe why the proposed project is substantially different. There is no other 802 standard or approved project that provides the same functionality for end stations or bridges.

5C requirements Technical Feasibility Each proposed IEEE 802 LMSC standard shall provide evidence that the project is technically feasible within the time frame of the project. At a minimum, address the following items to demonstrate technical feasibility: a) Demonstrated system feasibility. b) Proven similar technology via testing, modeling, simulation, etc. a)there are existing implementations of VDP. VDP carries layer 2 context between an end station and a bridge. The technology used by the current VDP protocol will be reused by project to add layer 3 context to the information carried. There isn t a significant difference in the technical feasibility of carrying layer 2 context versus layer 3 context b)mechanisms similar to what is being proposed exist in VDP and have been shown to be reasonably testable.

5C requirements Economic Feasibility Each proposed IEEE 802 LMSC standard shall provide evidence of economic feasibility. Demonstrate, as far as can reasonably be estimated, the economic feasibility of the proposed project for its intended applications. Among the areas that may be addressed in the cost for performance analysis are the following: a) Balanced costs (infrastructure versus attached stations). b) Known cost factors. c) Consideration of installation costs. d) Consideration of operational costs (e.g., energy consumption). e) Other areas, as appropriate. a) The proposed amendment will have no significant impact on the cost of bridges or end stations. It would be software upgrade for either. b) The cost factors are well known from implementations of VDP. The proposed amendment is basically a software upgrade c) There are no incremental installation costs relative to the existing costs associated with VDP. d) There should be no significant impact on operation. By extending the association with IP addresses, it may reduce the operational cost for L3 traffic. e) No other areas have been identified.