Guide to IREE Certification

Similar documents
GUIDE TO CERTIFICATION

GUIDE TO TRUE ZERO WASTE CERTIFICATION

Green Star Volume Certification. Process Guide

CERTIFICATE SCHEME THE MATERIAL HEALTH CERTIFICATE PROGRAM. Version 1.1. April 2015

Air. CERTIFICATION PROCESS FOR CORE & SHELL v2.0. RESET Air PROCESS for Core & Shell v2.0. Copyright 2018 RESET

Personnel Certification Program

Hewlett Packard Enterprise Company Public Sector - Federal

Candidate Manual Certified Commissioning Firm (CCF) Program

Battery Program Management Document

CASA External Peer Review Program Guidelines. Table of Contents

The Open Group Professional Certification Program. Accreditation Requirements

Renewal Unit (RU) Provider Handbook and Application

Candidate Handbook Certified Commissioning Firm (CCF) Program

Eligibility & Certification Process ELIGIBILITY CONFIRMING ELIGIBILITY ELIGIBILITY CRITERION 1: BUILDING CHARACTERISTICS

Professional Evaluation and Certification Board Frequently Asked Questions

RECOGNITION POLICY (RPL)

Policy for Certification of Private Label Products Within the Cradle to Cradle Certified Certification Scheme. Version 1.0.

Certification Guidelines: Credential Standards and Requirements Table

IT Security Evaluation and Certification Scheme Document

Renewal Unit (RU) Provider Handbook and Application

Certified Assessor. Application for COBIT Certified Assessor

AACE Certification Background, Overview and Process Rocky Mountain Section September 22, Ken Cressman EVP PMP CCP Robert Van Gundy PMP PSP EVP

COMMERCIAL FURNACES CERTIFICATION PROGRAM

Green Squared Certification Manual

2018 CANADIAN ELECTRICAL CODE UPDATE TRAINING PROVIDER PROGRAM Guidelines

CMP GUIDE CREDENTIAL MAINTENANCE PROGRAM

CLTC RE-CERTIFICATION Candidate Information & Application

"Energy and Ecological Transition for the Climate" Label Control and Monitoring Plan Guidelines

Timber Products Inspection, Inc.

Trend Micro Professional Services Partner Program

Certification Guidelines: Credential Standards and Requirements Table

Code of Ethics Certification 2018 CHECKLIST

DEPARTMENT OF HEALTH and HUMAN SERVICES. HANDBOOK for

CMMI Institute Policy 0032 Publication Date 06 January 2016 CMMI V1.3 Renewal Process for the Certified CMMI

Certification program PCWU-3

TERMS OF ENGAGEMENT TO PROVIDE ACCESSIBILITY CONSULTING SERVICES BY A CERTIFIED ACCESS SPECIALIST (CASp)

USER GUIDE: NMLS Course Provider Application Process (Initial)

China Code of Ethics Certification 2018 CHECKLIST

IAB DIGITAL DATA SOLUTIONS CERTIFICATION. RECERTIFICATION HANDBOOK August 2016

Texas Commission on Fire Protection

Scheme Document. For more information or help with your application contact BRE Global on +44 (0) or

Authorized Training Provider Application Process

The Open Group Certification for People. Training Course Accreditation Policy

NRMCA Sustainable Concrete Plant Certification Policies and Procedures

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1

The Open Group Certification for People. Training Course Accreditation Requirements

ROJECT ANAGEMENT PROGRAM AND COURSE GUIDE

RFM Procedure 3: Certification Body Approval for Chain of Custody Standard. Alaska Responsible Fisheries Management (RFM) Certification Program 17065

GUIDE ON APPLICATION FOR ROUNDTABLE FOR SUSTAINABLE PALM OIL PRINCIPLES AND CRITERIA (RSPO P & C) INCLUDING GROUP CERTIFICATION

Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017

BIID CPD Providers Directory Handbook Version 2.8 (last updated 06/12/2016)

DATA PROTECTION POLICY THE HOLST GROUP

Certified CMMI Professional Renewal Policy & Required Activities

Telecommunications Equipment Certification Scheme FEBRUARY 2017

OIML-CS PD-05 Edition 2

Choosing the CGFM designation:

Certification Commission of NAMSS Policies and Procedures

1.0 TITLE: Auditing Procedure. 2.0 PURPOSE: To provide an outline and instructions on the GMCS auditing process of clients.

CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION

NEW USER GUIDE. 1 February 2019

SOIL ASSOCIATION CERTIFICATION. Small and Low Intensity Managed Forests (SLIMF) INTERNATIONAL CERTIFICATION PROCEDURES

Certified Commissioning Technician (CxT) Application

PROTERRA CERTIFICATION PROTOCOL V2.2

Alberta Reliability Standards Compliance Monitoring Program. Version 1.1

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP

Version No: 1.0 Approved by: Francine Seskin Approved on: 3/28/2018. CEA Exam with Live In-House Seminar Version

DOCUMENT UPLOADS. NOTE: If you already have a pending filing created, select the Edit with the pending filing. Figure 1: Create New Filing

The Open Group Certification for People. Certification Policy. for Examination-Based Programs

Evidence of Standards Compliance (ESC) Tool Navigation Instructions

AgileCxO Partner Program

New Distribution Capability (NDC)

FileMaker Business Alliance. Program Guide

Certified Recovery Peer Advocate Application

Handbook December 2018

Request for Proposal for Technical Consulting Services

Version No: 1.0 Approved by: Francine Seskin Approved on: 3/28/2018

ISO/IEC :2015 IMPACT ON THE CERTIFIED CLIENT

Administration of PEFC scheme

GUIDE TO ONLINE REGISTRATION

Appendix B: Certified Technology Specialist - Installation (CTS-I) Exam Application

REGISTERED TRAINING PROVIDER GUIDELINES AND APPLICATION 2018

Request for Comments (RFC) Process Guide

RSPO Certification Step by step

ASBO International. SFO Recertification Guide One-Step Process. Updated February 1, 2018 Tel: x

I-9 AND E-VERIFY VENDOR DUE DILIGENCE

Chain of Custody Policy. July, 2015

IOAS Operating Manual information and requirements specific to assessment against ISO/IEC 17065

SCS FSC Chain-of-Custody Guidance for Certification of Multiple Sites FSC-STD V2-1

UNOPS esourcing vendor guide. A guide for vendors to register on UNGM, and submit responses to UNOPS tenders in the UNOPS esourcing system

Welcome. to the. Contractor/Supplier. User Guide

ISO / IEC 27001:2005. A brief introduction. Dimitris Petropoulos Managing Director ENCODE Middle East September 2006

CaGBC Design and Construction Split Review Option

Certified Recovery Peer Advocate Application

ISO Certification For Laboratory Accreditation. Dr Amadou TALL Consultation

PORTAL TRANSITION GUIDE. 1 February 2019

Code of Practice for the TL 9000 Certification Process. Release 8.0

Basic & Pro Resellers

DEFINING FEATURES OF QUALITY CERTIFICATION AND ASSESSMENT-BASED CERTIFICATE PROGRAMS (Draft) Rev. 5.1 August 8, 2007

Audit Report. Chartered Management Institute (CMI)

Excel Professionally.IMPACT Urban Youth

Transcription:

Guide to IREE Certification Certification Congratulations on your decision to pursue Investor Ready Energy Efficiency (IREE) Certification for your project! As a building owner, by choosing to pursue IREE certification you are demonstrating that your project has followed the Investor Confidence Project (ICP) Protocols and that it is an energy efficiency project that is investment-ready. Investor Ready Energy Efficiency (IREE) certification is available from GBCI in all countries around the globe. This eight-step guide will lead you through the process; if you need assistance at any time, please don t hesitate to contact us: 1. TRAINING Take the Investor Ready Energy Efficiency Training. 2. REGISTER Register your project and submit payment. 3. SELECT ICP QUALITY ASSURANCE ASSESSOR Select and contract with an independent, approved Quality Assurance (QA) Assessor who will assess your project for compliance with ICP protocols for IREE Certification. 4. DEVELOP PROJECT Develop an energy efficiency project according to the requirements in the ICP Protocols. The development team must include a project engineer with a minimum of five years of relevant experience who is either: (1) a licensed Professional Engineer under a nationally recognized authority or (2) an Association of Energy Engineers (AEE) Certified Energy Manager (CEM), or (3) holds an equivalent license. Relevant experience includes for example, building energy auditing, commissioning, energy simulation, and measurement and verification. 5. APPLY Submit project documentation for review by the Quality Assurance Assessor. 6. REVIEW Quality Assurance Assessor reviews documentation for compliance with ICP Protocols and provides feedback to team. 7. GBCI QUALITY CONTROL and CERTIFICATION

Your Quality Assurance Assessor provides the certification recommendation to GBCI; remember IREE certification fees must be remitted to GBCI before the project is submitted to GBCI for final certification. Once the project passes final GBCI quality control, congratulations it is Investor Ready Energy Efficiency certified! Stakeholders can now make investment decisions with increased confidence based on your project earning IREE certification. 8. POST CERTIFICATION AND PERFORMANCE REPORTING After the project is certified and implemented, energy performance is measured and verified according to ICP protocols. 1. TRAINING The first step in certifying a project is to take the Investor Ready Energy Efficiency Training. The training will give you the information you need to develop an IREE project and determine if your project is ready for IREE certification. It is recommended that all team members involved in developing an IREE project complete the training but is not required the training be complete prior to registration. Sign up for training 2. REGISTER Registration is an important step in the process, and signifies your intent to pursue IREE certification. IREE Certification is available for future energy efficiency projects and recently installed energy efficiency projects. You ll register, submit payment and sign the certification services agreement (the project owner must do this last one) for your project. From here, you can assemble your project team and the documentation process begins! Register project here ROLES Here s a rundown of who s who: Owner: The person (or entity) who has the authority to hold and control the real and personal property associated with your project, and accepts (or authorizes the acceptance of) the certification agreement. While there may be multiple owners for a particular project (if so, please submit a Confirmation of Primary Owner s Authority Form), we ask that you identify a single individual to administer the certification process. Big takeaway: the owner has ultimate control over the IREE certification application, meaning that Green Business Certification Inc. (GBCI: the organization responsible for administering IREE certification) will respond to the

owner regarding the administration of the project over any other member of the project team. The owner accepts the certification results once the project has successfully completed all steps in the certification process. Agent: The person (or entity) who is granted actual authority by the owner to register the project and accept the certification agreement. In some instances, the Agent and the Project Developer may be the same. Project Developer/Development Team: This is the organization that employs the Project Qualifying Individual. Remember, the Project Developers must carry an appropriate minimum level of insurance per claim, for errors and omissions. Project Qualifying Individual: The Project Qualifying Individual is responsible for developing a project based on sound engineering principles and accepted industry best practices as specified by the ICP Protocols and Project Development Specification. It is recommended that this person take the IREE Training. The Project Qualifying Individual must have at least five years of relevant experience and be a licensed Professional Engineer under a nationally recognized authority or an AEE Certified Energy Manager (CEM), or hold an equivalent license (accepted on a case by case basis). Relevant experience includes building energy auditing, commissioning, energy simulation, and measurement and verification. 3. SELECT ICP QUALITY ASSURANCE ASSESSOR The next step is to select and contract with a GBCI approved Quality Assurance Assessor. The Quality Assurance Assessor will be your primary point of contact and will be completing an impartial, independent evaluation of your project to determine whether it meets the requirements of the ICP protocols. It is recommended that the Quality Assurance Assessor is involved early in the process during project development, so that issues can be identified and addressed as the project progresses, rather than at the end of the project development. Remember: your Quality Assurance Assessor should not be viewed as a consultant on your project, and is prohibited from providing design and/or consulting services for your project. List of GBCI Approved ICP Quality Assurance Assessors 4. DEVELOP PROJECT Your team will develop your energy efficiency project and prepare documentation demonstrating adherence to the ICP protocols. ICP specifications and templates are available to guide project development.

The Project Development Specification describes accepted approaches, recommended best practices, and resources that project development teams should utilize in order to adhere to these industry standards and protocols and achieve IREE Certification. Other Project Development Resources, Templates and Tools. [Hyperlink to resources] Technical questions? The Quality Assurance Assessor is your primary point of contact for all technical questions throughout the certification process. The Quality Assurance Assessor can help answer your questions about IREE certification and clarify requirements in instances where you are unable to find an answer in published guidance, and/or your project has a unique or complex scenario for which you and your consultant require additional support. Please note that your Quality Assurance Assessor should not be viewed as a consultant on your project, and is prohibited from providing design and/or consulting services for your project. Project Interpretation Ruling: Having difficulty fulfilling a protocol requirement? Have you thought of an alternative way to interpret a requirement? We ve established an inquiry process so that you can gain clarification before you register your project or as you re working through your application. A Project Interpretation ruling allows you to obtain technical guidance related to a particular facet of the protocol. GBCI will let you know if your interpretation of a particular requirement is consistent with published protocol requirements. For all inquiries and ruling request, please use our Contact Us page. 5. APPLY Now comes the fun part: you re ready to collect and submit the required documentation via the online platform so that your Quality Assurance Assessor may review your project. Upload your completed materials and make sure to perform a rigorous quality check (as outlined in the Project Development Specification) of your entire application before submitting for review. Documentation should be clearly identified and organized to facilitate the review process. File attachments are clearly and intuitively labeled. Only required documentation is submitted. Concise narratives are used to describe project-specific circumstances. All finished? Ready, set, submit your project to your Quality Assurance Assessor! Don t forget you must have selected your Quality Assurance Assessor and paid your registration fees prior to submitting your project. Important Considerations Deadline for submitting for review All projects must submit for certification within six months of construction completion. If you have difficulty meeting this deadline, please reach out to GBCI we will work with you on a solution for your project.

6. REVIEW Your Quality Assurance Assessor will conduct a thorough technical review of the documentation submitted as part of your application. They will check your application for completeness and compliance with ICP protocols. The Quality Assurance Assessor will indicate which documentation is complete and approved and which elements are pending further information or not approved. Your team will provide additional information as requested by the Quality Assurance Assessor for the final phase of the review. They will review the additional information and if satisfied that the project meets the ICP protocol requirements, they will make a recommendation to GBCI for certification. The primary responsibilities of the Quality Assurance Assessor include: Ensuring that the project was developed in accordance with the most appropriate ICP Protocol as specified by the Project Development Specification. Validating that all necessary documentation is provided and complete. Checking that methodologies, assumptions, and results follow best practices and are reasonable based on the Quality Assurance Assessor s professional experience, available guidelines, or data-driven thresholds. Completing the QA Checklist which lists all of the required elements for ICP compliance. A signature provided by a GBCI Approved Quality Assurance Assessor verifies that the project is ICP compliant and satisfies the requirements of an ICP Investor Ready Energy Efficiency project. Quality Assurance Assessor Timeline The Quality Assurance Assessor is expected to provide an anticipated timeline to the project development team on the activities they will complete for the project. Reviews will only begin after the project team has provided all the required documentation to the Quality Assurance Assessor. Timelines will vary from project to project depending on Quality Assurance Assessor schedule, and the responsiveness of the project team to requests for information/documentation from their Quality Assurance Assessor. GBCI has provided the following timelines as general guidance on what to expect from your Quality Assurance Assessor. Activity Party Recommended Timeline Initial Review Quality Assurance Assessor 10 business days Provide supplemental information (if needed) Project Team 20-25 business days Final Review Quality Assurance Assessor 10 business days Final Quality Control and Certification GBCI 5-10 business days

Fees So, how much will it cost to certify your project? IREE Certification provides an exceptional value for your money. Project Registration Certification Total Project Size IREE Targeted Certification $100 $225 $325 IREE Standard Certification $250 $500 $750 $75k-$500k w/o model IREE Large/Standard Certification $500 $1,250 $1,750 <$1M w/ model IREE Large Certification $750 $1,750 $2,500 >$1M w/ model Registration fee: There is a flat registration fee calculated on a per-project basis that you ll pay up front at the time of registration. Rates are based on the fee schedule published at the time of registration. Registration fees must be paid within 30 calendar days, otherwise the registration may be cancelled. Certification fee: The certification fee is charged on a per-project basis and based on the project scope. Certification fees are due within 30 calendar days from when you submit your application for review. After all that work you did to submit your documentation, don t forget to send your payment! Also, please note that certification fees are based on the fees published at the time the project is submitted for review and cover preliminary and final reviews. Payment terms: Invoices must be paid within 30 calendar days. A one-time extension of an additional 30 calendar days is available please contact GBCI. If invoices are not paid within the required timeframe, they will be cancelled, and in subsequent requests for services, the invoice amount will reflect the prevailing fee schedule at the time the new invoice is generated. Fees are non-transferrable. 7. CERTIFY If you ve achieved certification: congratulations from all of us at GBCI! You ve made it to the finish line. Certification is achieved after the Quality Assurance Assessor certification recommendation passes quality control checks and is accepted by GBCI. Once you ve earned certification, it s likely that you ll want to tell the world. You should! IREE Certification benefits your business bottom line and underscores your sustainability efforts. It s

a cause for celebration. The IREE Certification logo may be used to represent the associated project's achievement. These logos may be included in collateral and other marketing materials, and on physical installations such as plaques, decals and banners. You ll also receive a formal certificate of recognition, and may promote your certification in a number of ways that will be detailed in our public relations guidelines. Our press team is here to support you in your marketing efforts. Contact our press team for assistance. You ll also have the option to order formal certificates of recognition. How GBCI Utilizes your Project Data We use your project data for the greater good: to educate and provide resources for project teams and others around the world, showcase your strategies, and share the size and power of IREE. Registered and certified IREE projects are considered public projects by default and are included in the public project directory. A listing in this directory allows the general public and members of the media to look up your project listing and its related details. Here's a full list of the data and project elements that may be listed in the public project directory: Project name Project ID Physical address Date of registration Date of certification Projected energy savings Description of energy conservation measures Owner name Project type All public projects also benefit from publicity opportunities: we may utilize your project data to create case studies highlighting your project's features, reference your project on our website or to the media, or create other derivative works. Information that may be used for articles, project profiles, other features: Service providers Project team members Promotional or other project photographs Project strategies for certification Quotations from team members You may opt-out of the project directory and publicity opportunities as a private project at the time of registration: specific instructions on how to do so are available in the online platform. All private projects that earn certification will be prompted once more to transition to public status (we can t help ourselves, we love sharing good news!). You will need to re-confirm your private status at that time, if you wish to retain it.

Please carefully review of the GBCI Trademark Policy and Branding Guidelines for more information. Important Considerations Deadline for achieving certification All projects must certify within five years of the registration date. If you have difficulty meeting this deadline, please reach out to GBCI we will work with you on a solution for your project. Review Challenge We ve created the Review Challenge Policy to protect the integrity and fairness of the IREE certification process. We anticipate that resolution of technical issues or disputes related to the requirements of IREE can be accomplished though our traditional customer service channels. If, however, resolution of a technical issue is not satisfactorily achieved via GBCI s customer support channels, you may initiate a Review Challenge. GBCI Review Challenge Policy: http://www.gbci.org/gbci-review-challenge-policy Revocation of IREE Certification In rare situations, IREE certification may be revoked. We ve created the Certification Challenge Policy to ensure that all IREE project submittals and subsequent reviews by Quality Assurance Assessors are done so with integrity, accuracy and truthfulness. A certification challenge may be initiated by GBCI or any third party within 18 months of a project s certification. We recommend you retain all project documentation related to your certification for two years in case of a challenge. GBCI Certification Challenge Policy: https://www.usgbc.org/resources/gbci-certificationchallenge-policy 8. POST CERTIFICATION AND PERFORMANCE REPORTING While the project may be certified at this stage in the project s life cycle, there are important tasks that still need to be accomplished as required by the ICP Protocols both during and after construction. These tasks vary by protocol, but include: Implementation of the Operational Performance Verification (OPV) plan, and development of an OPV report or statement Training of the facility personnel Updates to the Systems Manual and Operator s Manual (or creation of these manuals if they do not exist) Implementation of the ongoing management regime (periodic inspection, Building Automation System (BAS) review, periodic recommissioning, fault detection and diagnostics, etc.)

Measurement and verification efforts It is recommended that the QA process apply to all of these construction and post-construction elements as well. The Quality Assurance Assessor may be retained and included in all of these activities, providing the same level of compliance and technical review as is involved with the development of the Investment Package. The Quality Assurance Assessor will subsequently help ensure that these items are paid the proper attention by the development team.