CFI for CFI: 1x50Gb/s and 2x50Gb/s EPON

Similar documents
Super-PON Call For Interest Consensus Deck

IEEE Beyond 10km Optical PHYs SG - Discussion of Objectives / CSD

IEEE Ethernet Working Group 19 July 2012 San Diego, CA

IEEE Working Group July 2018 Plenary Week

Call For Interest Bidirectional 10Gb/s and 25Gb/s optical access PHYs. Mar 2018

Timeline Implications

Sensitivity definition and TDP in 802.3ca discussion

802.3bs PROJECT DOCUMENTATION CONSIDERATION. John D Ambrosia, Independent December 2, 2015

Guidelines for project

Introduction - Ethernet Bandwidth Assessment, Part II

IEEE NEA Agenda and General Information. John D Ambrosia, Futurewei, a subsidiary of Huawei IEEE Jan 2018 Interim Geneva, CH

IEEE Criteria for Standards Development (CSD)

Next-gen 400 and 200 Gb/s PHYs over Fewer MMF Pairs Call For Interest Consensus Presentation. IEEE Draft 0.3

IEEE Criteria for Standards Development (CSD)

IEEE Working Group March 2018 Plenary Week

Proposed CSD Responses: Objectives Related to operation over DWDM System

PON Technology Evolution Discussion

Timestamp Support for IEEE 802.1AS Time and Synchronization Call for Interest

Last modified: 28 April 2008

Extended reaches single Twisted Pair

Next Genera*on EPON Requirements and Architecture Considera*ons II

IEEE Working Group March 2014 Plenary Week. David Law Chair, IEEE Working Group Web site:

Next Generation PON: Lessons Learned from G-PON and GE-PON

Towards building a low cost 25G base PHY for 100G EPON

25G Ethernet CFI. Final Draft Brad Booth, Microsoft. Photo courtesy of Hugh Barrass

Agenda and General Information

10Gb/s on FDDI-grade MMF Cable. 5 Criteria Motions. 13 January 2004

Pay as You Grow or Mortgage Model? - The Needs for Standalone 25G EPON

Introduction of optical access showcase for G.epon/SIEPON ~ Activities for related standardization and interoperability test~

IEEE Working Group Closing Plenary 9 th November 2017

25GSMF Study Group: Draft CSD Responses

The Next Generation of FTTH

IEEE Gb/s per Lane Electrical Interfaces and Electrical PHYs (100GEL) Study Group Closing Report

Beyond 10km Optics Strawman (CFI) The Need. John D Ambrosia, Futurewei IEEE New Ethernet Applications Ad Hoc January 9, 2017

50 GbE 40km Objective 5C Study Group Discussion

25 Gb/s Ethernet over a single lane for server interconnect Study Group: status and work

ec ec IEEE motions Closing IEEE 802 EC Friday 10 th November 2017 IEEE Closing EC Items November 2017 Plenary Page 1

IEEE Working Group March 2019 Plenary Week

IEEE NGMMF Study Group: Inaugural Telecon

The Case for TDM Coexistence in O-Band

IEEE Working Group Interim meeting 25 th January 2018

IEEE Working Group November 2014 Plenary Week

IEEE Backplane Ethernet Study Group Agenda and General Information. Vancouver, BC January 12, 2004

IEEE 1G and 10G EPONs: Factors that Influenced the Architecture and Specification

IEEE GBASE-T T Study Group Agenda and General Information. Vancouver, BC January 9, 2003

IEEE YANG data model(s) Call For Interest Consensus Presentation

Higher Speed Ethernet Update

802.3bn Link Ad Hoc. Meeting Notes & Baseline

IEEE Higher Speed Study Group

Agenda and General Information

Current and Future Markets for PON, the Evolution to PON 3.0 Technology September 2017

IEEE Criteria for Standards Development (CSD)

Edwin Malle+e, Bright House Networks.

Summary of Proposed Responses to CSD

IEEE Criteria for Standards Development (CSD)

Ethernet The Next Generation

E3-E4 (CFA) EPON & GPON. For BSNL internal circulation only

Path forward for 100G SMF objectives in 802.3cd

The 5-Criteria for EPoC

10 Gb/s Ethernet on FDDI-grade MM Fiber

100 GBE - WHAT'S NEW AND WHAT'S NEXT

IEEE P802.3cm 400G over MMF Task Force Agenda & General Information

Major PAR form questions

G.epon and Current Status of Related Standardization

Unified Evolution-Ready 25/50/100 Gbps-EPON Architecture Proposal

IEEE GBASE-T T Study Group Agenda and General Information

Interoperability Test Guideline. For Optical Access Network Devices

Joint ITU-T/IEEE Workshop on Next Generation Optical Access Systems. Standards Overview of ITU-T SG15/Q2

10G-EPON Standardization and Its Development Status

CSD DRAFT for considerations 2.5G/5G Ethernet Backplane & Copper

Consensus building discussion on next-generation MMF PMDs. Presented by Robert Lingle, Jr. IEEE Interim Huntington Beach, CA January 9 th, 2017

IEEE Liaison report (Oct ) T v000 Tom Palkert, Macom

10Gb/s on FDDI-grade MMF Cable. 5 Criteria Discussion Slides. SG 10Gb/s on FDDI-grade MMF

DOCSIS Provisioning of EPON (DPoE ) Architecture, Specifications, Qualification Curtis Knittle IEEE/ITU Joint Workshop, Geneva September 22, 2012

Interoperability Test Guideline. For Optical Access Network Devices

Selection of 100G-EPON Wavelength Plan

Knowledge Development. NEA: Multi Gig optical of Automotive CFI consensus building. November 2018

NG- PON2 & XGS- PON: Lowering the Cost of Consolida<ng Residen<al and Business Services

IEEE Criteria for Standards Development (CSD)

Joint ITU-T/IEEE Workshop on Next Generation Optical Access Systems. Requirements for Next Generation PON

Agenda and General Information

Ethernet PON (EPON) and the PAR + 5 Criteria

Edwin Mallette, Bright House Networks.

Next Generation Access Architecture (NGA 2 ) -Evolution and Convergence. June 3-4, 2009 NGN Forum, Taipei

NG-PON2 Next Generation PON. Single Technology Plataform for all Services

MCPC IN EPOC. Ryan Hirth, Glen Kramer

More on Super-PON. Scale Fully Passive Optical Access Networks to Longer Reaches and to a Significantly Higher Number of Subscribers

IEEE P802.3ba 40 GbE and 100 GbE Standards Update

25GSMF Study Group: Work Items and Goals for Jan Meeting

FTTX NETWORKS. Application Notes. Author John Peter & Timo Perttunen. Issued June 2014

A Flexible Architecture for EPON

IEEE Working Group Opening Plenary 9 th July 2018

IEEE Criteria for Standards Development (CSD)

Error characteristic and test in XGPON system (Ber=1e-2)

IEEE P802.3ba 40 GbE and 100 GbE Standards Update

IEEE 802 EC 5G / IMT-2020 standing committee

IEEE Working Group Interim meeting 17 th September 2015

100 Gigabit Ethernet. An Industry Update. John D Ambrosia Chair, IEEE P802.3ba Task Force Senior Scientist, Force10 Networks October 8, 2009

Multiaccess in Ethernet Passive Optical Networks (EPON)

Agenda and General Information

Transcription:

CFI for CFI: 1x50Gb/s and 2x50Gb/s EPON Mark Laubach, Broadcom Curtis Knittle, CableLabs CFI for CFI presentation IEEE 802.3 January 2018 Interim / NEA 1

Objective For This Meeting To measure the interest in when to start a CFI to address: EPON 50G serial rate for 50Gb/s (1x50G) and 100Gb/s (2x50G) full duplex, symmetric, service rates. In this room, we do not need to: Fully explore the problem Debate strengths and weaknesses of solutions Choose any one solution Create a CFI consensus presentation, PAR, or CSD Create a standard or specification Anyone in the room may speak and participate in straw polls RESPECT give it, get it 2

Agenda Overview History of 25Gb/s serial for EPON Motivation for 50Gb/s serial for EPON Impact on P802.3ca work What is different? When to target a CFI presentation? Discussion Straw poll 3

History of 25Gb/s Serial for EPON In July 2015 the CFI for Next Generation EPON was presented and accepted by the 802.3 WG. This led to the creation of project P802.3ca (NGEPON) with its first meeting in January 2016. To create a standard for Physical Layer Specifications and Management Parameters for 25 Gb/s, 50 Gb/s, and 100 Gb/s Passive Optical Networks. Technical and economic feasibility was established in the CSD for 25 Gb/s channels. P802.3ca Task Force adopted a 1x25Gb/s, 2x25Gb/s, and 4x25Gb/s architecture for 10km and 20km networks, as well as MPRS, PCS, and PMA, etc. Much diligence has been brought before the Task Force. Draft 1.0 is targeted for May 2018. 4

Motivation for 50Gb/s serial for EPON In July 2017, the Task Force received a joint contribution from multiple individuals wangbo_3ca_2_0717.pdf (page 3) stating a new desire for the Chinese market to evolve from 10G platform directly to 50G/100G with enhanced line rate such as 50Gb/s to satisfy service requirements around 2025. Individuals affiliated with North American operators continue to express desire for the P802.3ca 1x25Gb/s and 2x25Gb/s standard to be completed as soon as possible for initial testing and deployment in 2019/2020. 5

Impact on P802.3ca work 50Gb/s serial study was initiated in P802.3ca. Technical and economic feasibility has yet to be established for 50Gb/s serial for EPON. In November 2017, P802.3ca adopted a motion to remove 100 Gb/s in downstream and less than or equal to 100 Gb/s in upstream from its Objectives: P802.3ca Closing Report. This effectively removed the 100G EPON 4x25Gb/s serial configuration. Moving 100Gb/s to a new project has NO impact on P802.3ca. A new project would address development of 1x50Gb/s and 2x50Gb/s. Work continues for 1x25Gb/s and 2x25Gb/s. 6

What is different? 50Gb/s serial technology is distinct from 25Gb/s serial: Higher density modulation and/or serial speed. More challenging power budget for both 10km and 20km ODN. May require more gain from FEC, different line code, etc. 50Gb/s upstream burst CDR/SERDES should be a follow-on to 25Gb/s. Note: 25Gb/s upstream burst receiver products do not exist at this time. 50Gb/s serial economic feasibility is different than for 25Gb/s and has not been sufficiently studied. Different desired market availability: 25Gb/s serial for 25G/50G EPON -> ~2020 50Gb/s serial for 50G/100G EPON -> ~2025 ~5 year difference. Note: a PAR has an initial 4 year lifetime. IEEE 802.3 addresses new technical and economic feasibility, market availability, and distinct identity for Ethernet by starting a CFI. 7

When is the right time to start a CFI for 50Gb/s serial for 1x50Gb/s (50G) and 2x50Gb/s (100G) for EPON? What are the advantages of starting now? Responsive to the July 2017 contribution. Provides maximum time to solve difficult problems in time for the desired market availability. What are the advantages of waiting? EPON always uses hand me down technology from serial point-to-point. As we wait longer, technologies will become more mature and technical breakthroughs improve technical and economic feasibility. Better alignment with 50Gbps serial TDM PON project that is now being discussed in ITU SG15/Q2. Design and implementation feedback on 25Gb/s from vendors will be available. This decision should be discussed by all interested parties. IIEEE 802.3 January 2018 Interim / NEA 8

DISCUSSION CFI for CFI presentation EEE 802.3 January 2018 Interim / NEA 9

Straw Poll 1: When should we target a Call For Interest presentation for 50Gb/s serial for 1x50Gb/s (50G) and 2x50Gb/s (100G) EPON? Vote for one choice: 1) As soon as possible: 2) As late as possible, but meeting 2025 availability target: 3) Somewhere in between: 4) No opinion: Room Count: 10

THANK YOU! CFI for CFI presentation EEE 802.3 January 2018 Interim / NEA 11