AT&T Virtual Private Network Service (VPN) and AT&T VPN Express

Similar documents
AT&T Virtual Private Network Service (VPN) and AT&T VPN Express

AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)

AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)

AT&T Switched Ethernet Service SM

SECTION 5 -- EQUIPMENT LAYOUT & EQUIPMENT ENVIRONMENTS

Add an AT&T Switched Ethernet Service port to your site

Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120

Site Preparation CHAPTER

Construction Guidelines. for Providing Communications Services

ANSI/TIA/EIA-568-B Cabling Standard NOTE

Tarleton State University. Specifications

PIX 520. PIX 520 Product Overview CHAPTER

Installing the Cisco MDS 9020 Fabric Switch

E-Series Site Preparation Guide

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

Business Customer Demarcation Information

SECTION N -- ELECTROSTATIC DISCHARGE (ESD)

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

PIX 535. PIX 535 Product Overview CHAPTER

Installation of the POTS splitter card requires the following steps: Determining the cables you need. Installing the POTS splitter chassis

NZQA unit standard version 2 Page 1 of 5

MODEL 9266 LITTLE LEAGUE BASEBALL SCOREBOARD. Instruction Manual

Electrical Demand Specification (Reference SOP: )

Installation Job Aid for VSP 4450GTX-HT- PWR+

PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS

17. Microwave Collocation 17.1 General

Installing the Cisco AS5400XM Universal Gateway

Junos WebApp Secure 5.0 Hardware Guide

Quick Start Installation Guide

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

Basketball Shot Clock Set LX2180 Manual

A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).

Intelligent Channel Bank Shelf

Liebert XDA Air Flow Enhancer. User Manual

User s Manual. ACS550-PD Stock 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

Managed WAN SLA. Contents

MODEL 9360-SO SOCCER SCOREBOARD

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

Model 7416LED

Technical Planning for Moving Into a Colocation Data Center

ICS Entrance Management Sign Installation Guide. Version 1.0

PRELIMINARY. CR Series. Ceiling Rack Systems with AmbiTILT Equipment Loading

TIA/EIA 568A Sub-system HORIZONTAL CABLING

Installation Job Aid for VSP 4850GTS

Target Interface / Construction Compliance Inspection Checklist

Newark, Delaware Architectural Engineering Senior Thesis Portfolio

Installing the IPS 4345 and IPS 4360

INSTALLATION INSTRUCTIONS FOR

EVERSAN. Instruction Manual MODEL 9007/9008 TENNIS SCOREBOARD. Address: 34 Main Street, Whitesboro, NY 13492

Total Reach ISDN/DDS Isolation Card P P30059 Isolation Card

SuperBus 2000 Phone Interface/Voice Module Installation Instructions

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

Managed WAN SLA. Contents

550VA Audio/Video Backup Power Block - Exclusive UPS Protection for Structured Wiring Enclosure

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS

FIBER OPTIC HARDWARE STEVE PAULOV

Installation Notes TII Model 341 Protector

Installation Job Aid for Ethernet Routing Switch 3600 Series

HCS Newsletter No. 43, Dated Thursday, 04 December, 2003 HCS DataLine Cabinets and Enclosures

CSM200 Expansion Tray

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

6. Secured Collocation Open Physical Environment (SCOPE) 6.1 Description

MODEL 3312 LED

Technical Planning for Moving Into a Colocation Data Center

Configuration for AT&T VPN Gateways 6300-CX

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

Table of Contents. 1 Introduction. 2 Facility and Space Planning Requirements

Spring Test 9 due 05/11/2013

SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS

INSTALLATION INSTRUCTIONS FOR THE MINI-KEY SYSTEM. Doc Rev B

Meter Enclosure and Equipment Standards

Dell MD1280 Storage Enclosure Getting Started Guide

Power Supply (48Vdc, 2.5A)

User s Manual. ACS550-PD 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

ANT CNTR DC ALRM LNB RX DC ALRM +18V OFF

USER GUIDE. AXIS T8120 Midspan 15 W 1-port ENGLISH

1. Carefully unpack the um260 s shipping carton and check the contents for damage.

1 Getting Started Installing & Configuring

This simple chassis houses one media-converter module and features an external AC power supply and also a terminal block for DC power input.

Nevco Message Center Installation Manual Retain this manual in your permanent file. 08/27/ Rev. C

EMC Symmetrix VMAX Cloud Edition

Prisma II Platform. Optoelectronics

What s in the Box. Table of Contents

AI130 AIswitch Series 130 Chassis Installation Guide

Site Preparation for ClearCube Installation. Rev. F

DIVISION 27 COMMUNICATIONS

DC POWER OVERVIEW BROCHURE Powerful Solutions for Critical Data and Telecom Applications

Specifications for Modular Sound Shadow Sound Masking Sound Management Group, LLC.

ASCO 920 Remote Control (RC) Switches

Cabling a Data Center to TIA-942 Standard

FCC Regulatory Information

sonnen Installation Practical

TABLET DOCK USER S GUIDE

2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks are trademarks of AT&T Intellectual Property.

Los Angeles Community College District Design Standards

LifeSize ClearSea Installation Guide August 2012

Fujitsu Stylistic ST4000 Series TABLET DOCK USER S GUIDE

Preparing to Install the VG248

Transcription:

AT&T Virtual Private Network Service (VPN) and AT&T VPN Express Site preparation guide This guide is designed to assist local on-site contacts to understand what you will need to accomplish in preparation for activating your VPN. For issue resolution during the provisioning process, please contact your assigned AT&T contact.

Local site contact Responsibilities Responsibilities Local on-site contact must be knowledgeable and on-site to meet with the AT&T or other access provider engineering rep (access engineer) to complete required site surveys. Keep notes from your site survey! For managed options, complete the site survey form for your CPE prior to your access on-site survey, if and as required. For more details: see slide 9 Make sure that you obtain important contact information for everyone for future reference Keep both your access engineer and order specialist informed on the progress of your site readiness and completion Close coordination and effective communication is critical to ensure your service will be available when you need it Working with AT&T or any other vendors to schedule building access and resolve any issues, as needed Obtaining building access and being familiar with the telecom rooms Showing AT&T where the circuit demarcation (demarc) is located. The demarc is the location inside the building where AT&T s service terminates from the street Guiding AT&T during the Ethernet site survey visit, noting further action needed to complete the site requirements (take notes) Overseeing the site build out and confirming the completion dates to AT&T. You should be fully empowered to make decisions Disclosing any noise or time restrictions; building access parking, loading zones, elevators concerns; work area concerns such as asbestos, hazardous materials, etc. Providing adequate safe working space, a clear path and easy access to the backboard, jack, land line, power outlets and the equipment For multi-tenant buildings, working with the property manager or building owner to determine the location of your company s demarc, which may or may not be collocated with existing copper facilities Acting as a liaison and advocate when working with the building owner or manager Confirming the demarc is in the same room as the router Providing inside wiring if the building s demarc is not in your office location or on a different floor than the equipment For managed options, ensuring that the required POTs line to the AT&T-provided modem is installed For wireless backup with managed options, ensure that adequate wireless signal strength exists at your location. Additionally, supply us with private IP addresses to be used for your wireless interface on each router. These addresses are assigned dynamically to each wireless device. For more details: see slide 9 2

Site survey visit Site preparation Site delayed or not ready & Guides Local on-site contact meets with the access provider engineer to walk through what he or she will need to complete before we can install the service It s a good idea to take notes and keep the name and contact information of the access provider engineer in case you have questions later We will keep the local on-site contact notified if there are any delays on our end, such as special construction, or facility delays In certain instances, special construction may be required due to lack of facilities. In these cases, your AT&T rep will contact you with additional information and instructions AT&T negotiates a project schedule with all parties to enable service completion as close to your desired date as possible Please try to address and complete the site preparation as soon as possible from the time you place your order and complete the site survey(s). This includes any electrical requirements, the backboard for the network equipment and any applicable extended inside wire. This will help avoid any installation delays Please provide your AT&T order manager and access provider engineer with a site completion date, which must be minimally 15-days prior to your service scheduled due date, keeping them informed of your progress and notifying them upon completion of work There are typically 5 basic areas that are your responsibility to facilitate equipment installation and delivery of service path; space; environmental; power; and ground, which are outlined within this guide Access provider engineer may elect to revisit your site to verify the work has been completed or if it has been determined that additional may be required Any changes to plans or any delays associated with site preparation can have a corresponding impact to the service delivery date Please contact your AT&T ordering team and your account team representative if delays are anticipated so work forces can be rescheduled There may be billing implications if the site is not ready in time AT&T VPN implementation guide available on AT&T BusinessDirect (Provide your user name and password) For a quick tutorial on preparing your site for installation, see the AT&T How to Video Series: Site Readiness for Fiber Technology Installation: Click here 3

Engineering Consultation Path and Power Path and Power 4 You are responsible for completing the site preparation work or hiring someone to complete the work on your behalf For Ethernet Access for US sites: Your Ethernet access provider engineer, whether from AT&T or another vendor, will conduct a site survey with the assistance of your local on-site contact. For more details: See slide 3 Items on this page are a list of general requirements associated with installation of fiber optic-based service. Your access provider engineer will identify actual requirements for your specific installation during the site visit If you are eligible for the entrance facility offer*, we will complete the pull box, wall mounted backboard / relay rack and power / electrical specifications on your behalf, after you sign a systems permissions form For non-ethernet Access: for US sites: For non-ethernet orders, your technician will inform your local on-site contact with the site specific work they need to complete on this page Outside conduit specifications (Property line to your building) Minimum 2 /.05m, recommended 4 /.10m conduit with pull rope to point-of-entrance Minimum 3 /.9m sweeping radius Pull box required when: Less than 3 /.9m sweeping radius, no right angles, no more than 3 90 o turns Path is longer than 300 /91 meters Dimensions for pull box 12 x 12 x 18 /.3x.3x.46m Wall mounted backboard / relay rack 4 x4 x 3/4 /1.2x1.2x.02m Fire retardant plywood mounted to studs with screws 40-85 F/5 o 30 o C at 0% - 85% humidity for Ethernet 40 o 100 o F/5 o 37 o C at 20% - 50% humidity for DS3 Relay racks / cabinets must be grounded (very important!): See slide 8 Power / Electrical specifications AC power outlet on a dedicated fused breaker rated min. 15 amps OR Nominal voltage, 48VDC, +24/-24 VDC, 110V, 125V, 220v or 240v Must be located within 6 /1.8m of the equipment *The entrance facility offer is only valid on for Ethernet sites in the United States, and only within AT&T s 21 state footprint Power / Electrical specifications AC power outlet on a dedicated fused breaker rated min. 15 amps OR Nominal voltage, 48VDC, +24/-24 VDC, 110V, 125V, 220v or 240v Must be located within 6 /1.8m of the CPE Inside Conduit Specifications (Demarc to router) Clear path with conduit or cable tray from building entrance to demarc point Minimum 2 /.05m EMT type conduit with hard plastic corrugated inner duct with pull rope Additional inside wiring Inside wiring, unless otherwise noted for managed options, is your responsibility You can do it yourself, hire AT&T (in some US states) or a vendor Telephone land line (not mobile) Managed options require a land line for network management purposes. If you do not have a land line, talk to your sales person about ordering one

Floor space and environmental requirements Example Cabinet Equipment Footprint Requirements 5 Must meet regional specifications dictated by local regulatory agencies, as well as be clean, environmentally conditioned and have proper lighting. If AT&T equipment is provided, space must be secure, including locks on doors Equipment placement should be decided prior to order placement and subject to confirmation during site visit by access provider engineer Space must include 3 /.9m clearance around equipment and floor must withstand between 750lbs / 340 kilos (without batteries) to 1,100lbs / 499 kilos (with batteries) Standard installation, fiber transport equipment is placed in common area with access to entire building. Local on-site contact must obtain necessary permissions Wall mounted installation is recommended based on small size of most network terminating equipment, though you may opt for floor rack mount if preferred. For example of wall mount diagrams: See slide 7 Cabinet installations require that if the floor is raised, that there be no obstructions below the floor tiles and a small section of tile must be cut to allow for cable entry. See example cabinet equipment footprint requirements Rack must be suitable strength and quality for site s earthquake risk factor and be able to support the intended equipment weight and must meet minimum standards for secure operation If equipment is placed in center of terminal room, an overhead ladder racking or under floor cable tray from the wall to fiber equipment is required EXAMPLE CABINET FOOTPRINT Requires approximately: 1 /.3m clearance on top for fan exhaust 3 /.9m clearance from power EXAMPLE 7 FT. RELAYRACK FOOTPRINT Requires approximately: 3 /.9m for front to rear access 1 /.3m clearance on top for fan exhaust 3 /.9m clearance from power

Rack quality / installation for multiple AT&T services AT&T supports your need to maximize your floor / rack space. For requests to deploy equipment for multiple AT&T services within same rack, the following applies: Minimum of 36 /.9m space in front and rear of rack, per building code requirements Aluminum racks require stiffening plates made up of a 12 /.3m minimum tall blank plate secured to the frame to strengthen it, with the stiffening plate located mid-height Minimum opening for 19 /.5m rack is 17.80 /.45m to allow for 19 /.5m EIA width for equipment to be mounted in rack Rack must be securely mounted and braced by bolts to building floor (raised access floor panel is not building floor). Rack is secured to adjacent frame in lineup to prevent impact between frames Minimum standards for quality are sufficient to bear expected weight of equipment, including bracing shelves Equipment should be placed in the lower half of frame with heaviest being the lowest Rack quality / installation for multiple AT&T services Cable supporting structure must meet the US National Electric Code Standards and/or your local regulatory and may be either a cable rack or metallic EMT conduit. For door installations, this may include, but not limited to, a cable rack, backboard and any required conduit. For outdoor installations, installation could include, but not limited to, a H-frame, pole, wall space and any required conduit For fiber facilities, the equipment comes with connectors that handle rigid conduit between ¾ to 1 ¼ /.20 to.03m in diameter, but 1 ¼ /.03m flexible non-metallic conduit may also be used For copper facilities, equipment comes with connections that handle rigid conduit between ¾ or 1 /.03m, but 1 /.03m liquidtight flexible non-metallic conduit may also be used For conduit that does not meet identified specifications, you must provide all required connectors Transport equipment varies by vendor, but the footprint and floor space requirements are approximately the same. Higher speed equipment may require more than one bay or cabinet and have different power requirements All mounting hardware is to be provided by customer 6

Example: Wall Mount Diagram - Fiber Example: Wall Mount Diagram - Copper (If Required) (If Required) 7

Grounding your CPE Centralized Bulk Power Plant Embedded / Integrated Power Grounding the customer premises equipment (CPE) is your responsibility, we encourage you to consult with your electrical contactor All equipment, including the router, whether you provide the CPE or it is AT&Tprovided, relay racks and cabinets must be grounded by placing an exposed #6 or larger grounding wire to the building s ground source The ground wire needs to be attached to the closest ground rod (earth ground) or building bus bar available and run to your network terminating equipment location All equipment requires a properly grounded 110v, 220v or 240v (dependent upon in-country standards), 15 amp, 3- prong AC outlet Not properly grounding your equipment will result in potential service degradation in quality and maintenance issues If you are utilizing a stand-alone, centralized bulk power plant, required grounding: A #2 stranded ground is required from your earth electrode system to the equipment room. It should be connected to a grounding bus bar or otherwise directly connected to different components A #6 stranded ground is required from the grounding bus bar to the network terminating equipment If you are using an embedded or integrated power configuration where the power plant is located within the same rack or cabinet as the equipment it powers, requiring grounding: A #6 stranded ground is required from your earth electrode system to the equipment room. This would be connected to a grounding bus bar or otherwise directly connected to different components A #6 stranded ground is required from the grounding bus bar to the network terminating equipment Specific requirements may also be discussed with the AT&T access engineer or AT&T field technician at the time of the site survey visit 8

Router Installation and Configuration Managed site requirements Wireless quality / installation 9 Managing your own CPE You are responsible for installing and configuring your CPE, including connecting the router to the demarcation point of the telco circuit. We will provide you a configuration guide to assist you AT&T VPN managed option We configure, ship and install your CPE and test the connectivity from the router through to your Telco local access circuit AT&T VPN managed option customer self installation (US only) We configure and ship your CPE to you and provide you with an implementation planner with installation instructions for your use Note: If you ordered IP Flexible Reach, your router configuration must include a static route to enable VQM (Voice Quality Manager) support. Directions are in the Voice over IP Customer Configuration Guide Guides AT&T VPN managed router customer selfinstallation implementation planner Site survey form For managed options, you will be sent a site survey form to fill out and return, prior to an on-site survey being completed, if applicable The site survey form outlines space and power requirements and what inside wiring AT&T performs on your behalf. Instructions are provided on any additional site preparation you are expected to perform and updates required prior to test and turn up of service For 4G/LTE wireless backup/failover option or the wireless primary access, adequate wireless signal strength is required where managed router is located. Adequate signal strength must be confirmed on the site survey form Out-of-band requirements An important requirement outlined in the site survey is the provisioning of a POTS line (Plain Old Telephone Service line). The POTs line is required by us to provide outof-band management of the CPE for remote diagnostic capability during lifecycle and change management Wireless site requirements (US only) Adequate wireless signal strength must be confirmed and is defined as less than -90dB RSSI (received signal strength indicator) when measured with LTE capable device connected to the AT&T network Two 10 coaxial cables with antenna extensions are supplied and installed by AT&T with each wireless router to provide flexibility in antenna positioning and to improve signal strength You can test signal strength by converting your mobile device in order to read RSSI. To convert bubbles/bars on your iphone to RSSI reading dial *3001#12345#* and press call. All other models, RSSI conversion instructions are available from your manufacturer or via an internet search Note: for optimal LTE signal receptions, the two LTE antenna should be positioned 17 inches apart. Therefore, you should always use the cables provided to position the antenna 17 inches apart, as opposed to attaching the antenna directly to the antenna connections on the router itself