Ascena Retail Group Maurices T1 Upgrade 2016 Visit 2

Similar documents
INSTALLATION INSTRUCTIONS Version 2.4

PracticeWire Installation Manual

Waiting Room Network Installation Manual

19CSP075 Broadband Network Upgrade. Appendix C Final Acceptance Checklist (Example) Site Name: Inspector Name: Inspection Date: Acceptance Signature:

PracticeWire. Field Support: Page 1

ALTAI C1N SUPER WIFI CPE INSTALLATION GUIDE. Version 1.0 Date: September, Altai Technologies Ltd. All rights reserved

2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks are trademarks of AT&T Intellectual Property.

ConnectedIO LTE Router Quick Installation Guide Connected IO All Rights Reserved Worldwide

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120

Contractor Work Packet

Installation Guide. Interactive Exam Room. Version 1.4

AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)

A+ Guide to Managing & Maintaining Your PC, 8th Edition. Chapter 16 Networking Types, Devices, and Cabling

Secured Series: Hub Plus Kit Single Door Controller Package Installation Manual

Installing the Cisco AS5400XM Universal Gateway

AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)

Installation Notes TII Model 341 Protector

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

HUAWEI FT2260 Home Phone Connect Quick Start

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

Wa r n i n g-wa r n i n g-wa r n i n g

NT1B-300 Rack Installation Instructions

SolarVu Installation Guide For CSI-KTL-GS Three Phase Inverters

Unified Office Gateway UMG Quick Installation Guide. Version: 1.0

COPPER-T EXTENDER TABLE OF CONTENTS SECTION 1 - DESCRIPTION SECTION 2 - SPECIFICATIONS... SECTION 3 - INSTALLATION

Wireless Area Controller (WAC50) i. Installation Instructions

Installation Guide. Exam Room Tablet. Version 1.0

CCNA Discovery 4.0 Designing and Supporting Computer Networks

3M Add-On Terminals 4220P (100, 200, 300 & 400 pairs)

PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS

NT1-220 Rack. Installation Instructions. Specifications. Contents of Shipping Box. Important Safety Instructions. NT1-220 Rack

UCIT LIVE HD 4 Camera DVR. Installation Manual. 10/17 Version 2.0

Target Interface / Construction Compliance Inspection Checklist

CONTENTS. Getting connected. Ethernet Setup. Connecting a Router. Logging on. Configuring DHCP in Windows. Configuring DHCP on a Mac.

ADTRAN Pro Services Description of Service Offering. ProStart On-Site Installation Services Wireless Local Area Networking

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

WRT4000 Series Cellular Wireless Routers

TravelNet Data/Voice Cellular Router Installation Guide ATTENTION INSTALLER

UCIT LIVE 4 Channel Installation Manual

Target Interface / Construction Compliance Inspection Checklist

Installation Guide. Exam Room Tablet. Version 2.0

InfraStruXure Central Standard/Enterprise Installation/Start-Up Service Procedure

Target Interface / Construction Compliance Inspection Checklist

CCBC is equipped with 3 computer rooms, one at each main campus location:

1. Carefully unpack the um260 s shipping carton and check the contents for damage.

ANSI/TIA/EIA-568-B Cabling Standard

ARC Series Router CBA850

SolarVu Installation Guide for Sungrow SG60KU-M Inverter

The SureID Registration Station. Installation Instructions

Wireless (Select Models Only) User Guide

AT&T Switched Ethernet Service SM

REQUEST FOR PROPOSAL (RFP)

PIX 520. PIX 520 Product Overview CHAPTER

Setup and Activation Guide for the TravelNet Data/Voice Terminal

Startup Guide. for Local Managers. Version 5.1 January

CAT5-1600A Extender. EXT-CAT5-1600A User Manual.

Preparing to Install the Cisco AS5350XM Universal Gateway

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

USER MANUAL. MODEL 1225 ParaLink TM Parallel Short Range Modem. SALES OFFICE (301) TECHNICAL SUPPORT (301)

SERVICE MANUAL MODEL WPP-331-D WEATHERPROOF TELEPHONE MODEL HOB-331-D WEATHER RESISTANT TELEPHONE. and MODEL SSP-311-D STAINLESS STEEL PANEL TELEPHONE

Networking the printer

Pre-Deployment Information

Users Manual for the MXD Personal Emergency Response System

TL-PA4010 AV600 Powerline Adapter

Upgrade Kit for the 4300 Remote BAC About This Document Using This Document Note Caution Inspecting Shipment

USER MANUAL. MODEL 1018 High Speed Short Range Modem w/ Extra Controls SALES OFFICE (301) TECHNICAL SUPPORT (301)

Cradlepoint AER1600/AER1650

PARTNER Contact Closure Adjunct

Next Generation Firewall

BLU- CIF Interface Board

Version Release Date Description V First release. Change History V1.0.0 i

TOTALPASS SMALL BUSINESS PREMIUM BIOMETRIC QUICK START GUIDE PLEASE READ THIS FIRST. Version:

Protect It! 7-Outlet Surge Protector, 6-ft. Cord, 1080 Joules, Fax/Modem Protection, RJ11

ANSI/TIA-568-C Cat 6A Field Test Specifications

Model 7416LED

Version 13. Cisco to Meraki Firewall Upgrade Graphical Instructions

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2

REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/ #:

1993 SPECIFICATIONS CSJ , ETC. & SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM

SERVICE MANUAL MODEL SSW-520-F

USER MANUAL MODEL 2017P MODEL 2017P60. RS-232 to 20mA and. RS-232 to 60mA Current Loop Converters

SERVICE MANUAL MODEL SSC-301-F (FORMERLY 301-FS) MODEL BLC-301-F (FORMERLY 301-F)

*000IPODIG* ipod Installation Guide. Tools Needed: (depending upon vehicle) 000IPODIG IMPORTANT

T-Monitor E-Monitor TABLE OF CONTENTS SECTION 1 - DESCRIPTION...2 SECTION 2 - SPECIFICATIONS...3 SECTION 3 - INSTALLATION...5

GlobeSurfer III. Quick Start Guide

V910 Kit. Hardware Installation Guide. P/N Revision: A

UCIT LIVE HD 4 Camera DVR. Installation Manual. 1/18 Version 1.0

SolarVu Installation Guide For Fronius SYMO Inverters

Basketball Shot Clock Set LX2180 Manual

INDOOR 25 LINE NETWORK INTERFACE DEVICE DESCRIPTION AND INSTALLATION

NTS-protect. Description of GPS antenna and NTS time server connection via system lightning protector system /NTS-3000, NTS-4000, NTS-5000/

Delivered the Way Yo u Want

Special Provision No. 683S27 June 2017

SERVICE MANUAL MODEL SSW-321-F MODEL BLW-321-F

MEDICAL ALERT SETUP GUIDE

Document revision: A

SERVICE MANUAL FOR MODEL SSC-500-F (FORMERLY 501-FSZ) STAINLESS STEEL HANDS FREE CHARGE-A-CALL TELEPHONE EQUIPPED WITH LOW-POWER SPEAKER BOARD

Quick Start Guide. Console Servers

Self-Install Aruba Wireless Access Point Ver. 17

Quick Start Guide. Cisco 220 Series Smart Plus Switches

Transcription:

Ascena Retail Group Maurices T1 Upgrade 2016 Visit 2 Router Upgrade, Cradlepoint Installation & T1 Connection Visit 2 of Revised 2 Trip Project Schedule Implemented 08/26/2016 Version 3.0 08/26/2016 Page 1

Document Change Log: Date Version Applied Changes to SOW Author 07/26/16 1.0 1 st Draft N.T. 08/01/16 1.1 Re-order task list. No UPS in Maurices, change to power strip N.T. 08/09/16 1.2 Change Cradlepoint Connection to LAN1 + Move DSL Router Removal Step N.T. 08/17/16 1.3 Added 100 Extension Cord to Technician Required Tooling N.T. 08/20/16 2.0 CHANGE TO ALL REPORTING/CALL/BRIDGE PROCESSES N.T. 09/19/16 3.0 PROJECT CHANGED TO 2 TRIPS THIS VERSION FOLLOWS VISIT 1.5 T1 EXT. N.T. Technician Required Tooling 6, 8, 12 Foot Step Ladders TECHNICIANS MAY NOT USE STORE LADDERS AT ANY TIME 200 Steel Fish Tape Tone Wand + Generator 110/66 Type Punch Tool RJ45 Modular Crimp Tool with 45 Male Plugs (Create Loopback Plug) Butt Set with Banjo CAT5E Cable Tester/Certifier Mechanical Label Printer, i.e. Brady, Brother P-Touch, Etc. w. 3/8 Black on White Tape Cordless Drill w/hole Saw Kit, o Masonry Bits 1/4-1 x 6, o Masonry Bit 1 x 18, o Wood/Metal Bit Index 1/16 3/4 Fiberglass Fish Rods, set length >20 or Gopher Pole Laptop with Putty or other terminal emulator. Cellular Modem/Aircard strongly recommended. Torpedo Level Printed SOW Document in COLOR Cell Phone w/ Camera CrossCom Technician Badge 100 Extension Cord Router Testing at the Smart Jack Technician Supplied Materials/Hardware Manufacturer Part # Description U of M Quantity Any Any CAT5E CMR, Solid Bare Copper, White Foot 1000* Any Any CAT5E CMP, Solid Bare Copper White Foot 1000* Any Any Pull String/Jet Line Foot 1500* Any Any Cable Lube, Clear Quart 1 Any Any CAT5E Keystone Jack, White Each 4 Any Any 1 Port Keystone Surface Mount Box Each 4 Any Any CAT5E Patch Cord, 5', Blue Each 4 *Usage will vary by store cabling needs. Tech must be prepared to extend T1 service, and/or install AP or Cradlepoint cables if required. Page 2

Customer Supplied Equipment Shipping to site by CrossCom/Ascena prior to dispatch Manufacturer Model Description U of M Quantity Cisco 1921 K9 1900 Series Router Each 1* Cisco T1 WIC Card T1 Card for Cisco 1900 Series Router Each 1* Cradlepoint CBA850LPE-VZ Cellular Modem Each 1 Cisco 6' Console Rollover Cable Each 1 CCN Misc Velcro Tie Wraps Pack 10 1 *Most locations have an existing 1921 router. If so, only a T1 WIC Card will be shipped. Project Overview Partnering with IBM, CrossCom will assist the Ascena Retail Group with network equipment upgrades for its Maurices brand stores. Work will include the upgrade of an existing Cisco 1921 router and installation of a 3/4G cellular back up device. Work may also include the installation of a CAT5E cables for an optional T1 service extension. Work will begin prior to store opening, but will continue through the opening of the business day. Technicians are expected to be aware of customer and associate needs at all times. All sales floor related tasks should be completed prior to the opening hour. Once open for business, no ladders, materials or cabling may be left on the sales floor. NEW AS OF 08/19/16 - Each work order will have a posted call Bridge Number. Tech will use this bridge number after the initial check in with CrossCom for all updates. CrossCom will no longer transfer each call during the installation process. It is critical that all calls into this Bridge number be logged by the tech. Call in time, hold time, Ascena representative, call end time, and resolution. Technicians will be required to contact CrossCom: On Arrival Log In. Prior to Departure Log Out. OOS Requests. Any out of scope not listed below as optional labor must be pre approved by CrossCom. This includes BRIDGE HOLD TIMES of greater than 5 minutes. If reporting this hold time, tech must call from a separate line to avoid loss of place on the Ascena Bridge. OPTIONAL LABOR No optional labor lines will be required as of 09/19/16. T1 extensions are completed on Visit 1.5, prior to arrival on this work order. Any changes to contracted labor must be approved by CrossCom prior to work being started. Prior To Arrival Tech shall print and read this document. Any questions should be addressed with the CrossCom PM/PC assigned the work order prior to the trip date. The final page is an inventory form that must be filled out and submitted as a deliverable. Page 3

Tech shall carry to site all tooling, ladders, cabling equipment, and hardware listed above. Failure to comply may result in an incomplete project. All work shall be completed in 1 day. Installation Tasks Tech must follow the task order to avoid network outages. 1. Arrive promptly at the time posted on the work order. Carry all tools and 1 ladder to the door tech may not have repeated access to mall entrances, or be required to walk 10-15 minutes to the parking lot. Technicians are expected to be waiting at the store for the opening manager with tools in hand. a. Log in with the CrossCom IVR (800) 820-9229. i. CrossCom will transfer you to the Ascena Help Desk and CrossCom will drop off the call. b. Introduce yourself to the Manager On Duty. c. Produce work order documents and CrossCom Badge. d. Locate the materials shipped to site. The box will ship with a large pink label reading HOLD FOR T1 TECHNICIAN DO NOT OPEN. Inventory against the list on Page 3 and report any damaged or missing items to Ascena immediately. NOTE: Do not remove power down, or disconnect any network equipment in Step 2 until the store has opened registers for the day. Network equipment will be changed out only after the store has opened all registers for business. Ask the MOD to open all registers for the business day before proceeding. 2. Upgrade the Existing Cisco 1921 Router. Follow instructions below for installing a new T1 WIC Card in the existing 1921 router. NOTE: Do Not Unplug the power while moving/installing WIC Slot Cards to keep the chassis grounded. Follow the 5 steps below to update the hardware on the 1921 router. NOTE: During this migration, do NOT power down or remove the connections on the DSL/Broadband modem. This connection needs to remain active for remote access until a new connection has been established. Page 4

Step 1 Power Down the 1921 Router Step 2 Remove the existing card from Slot WIC0 Step 3 Insert existing card into Slot WIC1 Step 4 Insert the New T1 WIC Card into Slot WIC0 Step 5 *If Required, move the power cord to the Rack Mount PDU or Surge Protector if present. Power the 1921 Router back on. 3. Verify Router to Switch Connection. a. Locate the patch cord in port G1 on the Cisco 2960 switch. Verify this patch cord is connected to 1921 Port GE 0/1. Page 5

b. Verify that the existing 2960 switch is plugged into an existing power strip or surge protector if possible. If not, the power cable must be moved ONLY after the registers are open by the MOD. 4. T1 Circuit Verify, Patch & (Optional) Extend Circuit. a. Locate the T1 extension or smart jack. Extensions were completed on Visit 1.5 @ 1 week prior to installation. b. Patch the 7 blue patch cord into the new Router s T1 WIC Card. Before proceeding to STEP 4c, Call CrossCom for a transfer to Ascena - Milestone Report for T1 to Router Status. c. WITH PERMISSION FROM ASCENA - De-install the old DSL/Broadband Modem. Record the serial number on the D&A form & Ascena Inventory Form. Modem shall be packed and left with the store manager for return to the DSL/Broadband Provider. 5. Install the Cradlepoint Wireless Backup device. a. Unpack the Cradlepoint device. Attach the (2) high gain bunny ear antennas on the AUX and MAIN SMA connection ports (no connection to GPS). b. Connect PORT LAN1 on the Cradlepoint device to the 1921 Router port GE 0/0 using the supplied BLACK CAT5e patch cord. c. Locate the console cable supplied with the Cradlepoint device. Connect the CONSOLE port on the device to the CONSOLE port on the 1921 router. d. Plug the supplied power adapter into the Eaton 350 UPS Back Up. e. Install the device as shown below, listed in order of preference. Note that the device distance to the switch/router cannot exceed the length of supplied patch and console cables. i. 1 st Preference - Mount to the wall/backboard above the network equipment. ii. 2 nd Preference - Place on top of the router/switch. iii. 3 rd Preference - Place on a flat surface near the router/switch. The Cradlepoint device will take @ 5 minutes to boot back up. The signal strength should still be 4G (blue status light) with 2 of 4 bars or better. If the unit is EITHER in 3G (green status light) or has only 1 bar of signal, move to the 2 nd or 3 rd option above. Once the Cradlepoint is mounted in a location passing testing requirements, move to STEP 6. 6. Dress Cabling. Use supplied Velcro tie wraps to secure cable slack, and ensure neat patch cord dressing. Clean up all packaging surplus, cabling materials and technician tools/ladders. Page 6

NOTE: CrossCom tech will not remove any equipment for return to CCN on this project. 7. Collect Deliverables. Failure to supply clear deliverables that follow the detailed criteria will result in a warranty return trip to collect. It is the sole responsibility of the installation technician to ensure workmanship and quality deliverables. If more than 1 photo is required to properly display the needed information, upload multiple photos. 8. Log Out with CrossCom (800) 820-9229. Be prepared to report all bridge times, Ascena representative names and issue resolutions. As of 08/19/16 CrossCom will no longer join Bridge calls. All recorded OOS by technicians will be reviewed with Ascena prior to approval. NOTE: All photos must have the store identifier sheet included clearly in the photo. Fold the attached form in half, and fill in the 4 digit store number for the appropriate brand. This sheet must appear in each photo or they will be rejected by CrossCom and Ascena. See sample below. Work Order deliverables list shows a #### prefix for internal purposes. a. D&A Form Complete with equipment serial numbers, return tracking number, time in/time out, and manager s signature b. T1 Demarcation-Side Photo photo showing the tagged (and extended) delivery point of the T1 circuit and the identifying labeling. Photo should be close enough to see the label id of the circuit in the future, but far enough for a frame of reference at the point of demarcation. c. T1 MDF Side-Photo photo showing the extension of the T1 to the suite backboard and punch down with proper circuit labeling on the cable and surface mount box. Photo should be close enough to see the label id the circuit in the future, but far enough for a frame of reference at the backboard for later identification. d. T1 Router Photo photo needs to show the router with T1 card in WIC0, analog card in WIC1, and connected to WIC0 with a blue patch cord. e. T1 Connection Photo photo showing the wiring from the surface mount box to the router to insure it is neat, unobtrusive, and secured. f. Cradlepoint Photo Cradlepoint location and bars that are active. g. Ascena Inventory Document - Photo of the completed inventory of decommissioned hardware and cables. Page 7

ADDITIONAL INSTALLATION SUPPORT Switch Ports T1 Loopback Plug Pin-Out Diagram 1 2 3 4 5 6 7 8 T O P Page 8

Cable Patch and Port Assignments Project Specific Device Device Port Patch Port Switch or Device Port Cradlepoint LAN1 GE 0/0 1921 Router T1 Circuit See Work Order For Circuit ID SMB Below Network Rack 1921 EHWIC 0 Cisco 1921 Router GE 0/1 Cisco 2960 Switch G1 Logical Line Diagram = CAT5e White Cable Run For T1 Extension Completed On Previous 1.5 Visit. = Technician Supplied BLUE CAT5E Patch Cord. = CrossCom Supplied Console Cable. If Cradlepoint Is Mounted On Sales Floor, Do Not Install Leave At Rack. = Black CAT5e Patch Cord For Cradlepoint, Supplied by Cradlepiont. T1 HCGS 077416 Maurices 1234 T1 HCGS 077416 Maurices 1234 T O L *Rack Mount PDU may not be present. Alternates Include a Surge Protector or Wall Outlet(s). * Page 9

Ascena Retial Group - Old Equipment Inventory Form Maurices V1.0 072516 Store Number City, State Technican's Name: Date of Decomission Store Assocaite Name Assocate Signature 1 Existing Cellular Back UP Manfacturer Serial Number IMEI Number Model SIM 2 DSL/Broad Band Modem - Leave On Site for Provider Manfacturer Model Serial Number SIM IMEI Number 3 List the circuit ID, associated POTS line, etc for the existing internet curcuit connected to the old router: