Re: Developing Requirements for Mobile LiDAR Data (#1015)

Similar documents
Establishing Requirements, Extracting Metrics and Evaluating Quality of LiDAR Data

The process components and related data characteristics addressed in this document are:

Section G. POSITIONAL ACCURACY DEFINITIONS AND PROCEDURES Approved 3/12/02

A New Way to Control Mobile LiDAR Data

3D Data Acquisition in Tunnels Optimizing Track Time Using Terrestrial Mobile LiDAR. Scanning. Michael R. Frecks, PLS.

U.S. Geological Survey (USGS) - National Geospatial Program (NGP) and the American Society for Photogrammetry and Remote Sensing (ASPRS)

Aerial and Mobile LiDAR Data Fusion

Summary of Research and Development Efforts Necessary for Assuring Geometric Quality of Lidar Data

Quality Assurance and Quality Control Procedures for Survey-Grade Mobile Mapping Systems

Central Coast LIDAR Project, 2011 Delivery 1 QC Analysis LIDAR QC Report February 17 th, 2012

Federica Zampa Sineco SpA V. le Isonzo, 14/1, Milan, 20135, Italy

POINT CLOUD ANALYSIS FOR ROAD PAVEMENTS IN BAD CONDITIONS INTRODUCTION

PHOTOGRAMMETRIC SOLUTIONS OF NON-STANDARD PHOTOGRAMMETRIC BLOCKS INTRODUCTION

Performance Evaluation of Optech's ALTM 3100: Study on Geo-Referencing Accuracy

Mobile LiDAR for Ground Applications. Spar 2006, March Paul Mrstik, Terrapoint Canada Inc. Craig Glennie, Terrapoint USA LLC

Automating Data Accuracy from Multiple Collects

Figure 1: Mobile mapping project location in New York City.

IP-S2 HD. High Definition 3D Mobile Mapping System

Evaluating the Performance of a Vehicle Pose Measurement System

LIDAR MAPPING FACT SHEET

SpatialFuser. Offers support for GNSS and INS navigation systems. Supports multiple remote sensing equipment configurations.

Mobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP

APPLICATION AND ACCURACY EVALUATION OF LEICA ADS40 FOR LARGE SCALE MAPPING

QUESTIONS & ANSWERS FOR. ORTHOPHOTO & LiDAR AOT

PART A Three-Dimensional Measurement with iwitness

Hamilton County Enhances GIS Base Mapping with 1-foot Contours

TLS Parameters, Workflows and Field Methods

Jeffrey A. Schepers P.S. EIT Geospatial Services Holland Engineering Inc. 220 Hoover Blvd, Suite 2, Holland, MI Desk

TAKING FLIGHT JULY/AUGUST 2015 COMMERCIAL UAS ADVANCEMENT BALLOONS THE POOR MAN S UAV? SINGLE PHOTON SENSOR REVIEW VOLUME 5 ISSUE 5

SPAR, ELMF 2013, Amsterdam. Laser Scanning on the UK Highways Agency Network. Hamish Grierson Blom Uk

2. POINT CLOUD DATA PROCESSING

Advanced Highway Maintenance and Construction Technology Research Center

University of Technology Building & Construction Department / Remote Sensing & GIS lecture

ROAD SURFACE STRUCTURE MONITORING AND ANALYSIS USING HIGH PRECISION GPS MOBILE MEASUREMENT SYSTEMS (MMS)

Point Cloud Scoping and Acquisition. Best Practice Guidelines. v1.9

Rigorous Scan Data Adjustment for kinematic LIDAR systems

Terrestrial Laser Scanning: Applications in Civil Engineering Pauline Miller

Burns, OR LIDAR Project, 2011 Delivery QC Analysis LIDAR QC Report February 13th, 2012

Rogue River LIDAR Project, 2012 Delivery 1 QC Analysis LIDAR QC Report September 6 th, 2012

TLS Parameters, Workflows and Field Methods

Everything you did not want to know about least squares and positional tolerance! (in one hour or less) Raymond J. Hintz, PLS, PhD University of Maine

BEFORE YOU BUY: SEVEN CRITICAL QUESTIONS TO ASK ABOUT LASER SCANNERS. Robert Gardiner

Gregory Walsh, Ph.D. San Ramon, CA January 25, 2011

TERRESTRIAL LASER SCANNER DATA PROCESSING

Sandy River, OR Bathymetric Lidar Project, 2012 Delivery QC Analysis Lidar QC Report March 26 th, 2013

TLS Parameters, Workflows and Field Methods

Comparing Aerial Photogrammetry and 3D Laser Scanning Methods for Creating 3D Models of Complex Objects

A New Direction in GIS Data Collection or Why Are You Still in the Field?

Project Overview Mapping Technology Assessment for Connected Vehicle Highway Network Applications

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments

Leica High-Definition Surveying Systems. Leica HDS3000. The Industry Standard for High-Definition Surveying

The Leica HDS Family. The Right Tool for the Job HDS3000 HDS2500 HDS4500. Cyclone & CloudWorx. Press the QuickScan button to define the field-of-view.

Orthophotography and LiDAR Terrain Data Collection Rogue River, Oregon Final Report

2/19/2018. Who are we? Who am I? What is Scanning? How does scanning work? How does scanning work? Scanning for Today s Surveyors

Control System International a.s., Papírenská 114/5, Praha 6, Czech Republic Web site: www. controlsystem.cz,

THE RANGER-UAV FEATURES

2-4 April 2019 Taets Art and Event Park, Amsterdam CLICK TO KNOW MORE

Merging LiDAR Data with Softcopy Photogrammetry Data

Critical Aspects when using Total Stations and Laser Scanners for Geotechnical Monitoring

Virtually Real: Terrestrial Laser Scanning

Critical Assessment of Automatic Traffic Sign Detection Using 3D LiDAR Point Cloud Data

LiDAR & Orthophoto Data Report

An Overview of Applanix.

TerraMatch. Introduction

Iwane Mobile Mapping System

The YellowScan Surveyor: 5cm Accuracy Demonstrated

Automated Road Segment Creation Process

Photogrammetry: A Modern Tool for Crash Scene Mapping

REPRESENTATION REQUIREMENTS OF AS-IS BUILDING INFORMATION MODELS GENERATED FROM LASER SCANNED POINT CLOUD DATA

ADS40 Calibration & Verification Process. Udo Tempelmann*, Ludger Hinsken**, Utz Recke*

NATIONWIDE POINT CLOUDS AND 3D GEO- INFORMATION: CREATION AND MAINTENANCE GEORGE VOSSELMAN

AUTOMATIC DRAWING FOR TRAFFIC MARKING WITH MMS LIDAR INTENSITY

A METHOD TO PREDICT ACCURACY OF LEAST SQUARES SURFACE MATCHING FOR AIRBORNE LASER SCANNING DATA SETS

Technology for Cadastral Applications. John R. Hacker, Jr. Marketing Manager Geospatial Applications

Understanding Geospatial Data Models

Integrated Multi-Source LiDAR and Imagery

Using Mobile LiDAR To Efficiently Collect Roadway Asset and Condition Data. Pierre-Paul Grondin, B.Sc. Surveying

#65 MONITORING AND PREDICTING PEDESTRIAN BEHAVIOR AT TRAFFIC INTERSECTIONS

COMBINED BUNDLE BLOCK ADJUSTMENT VERSUS DIRECT SENSOR ORIENTATION ABSTRACT

Geometric Accuracy Evaluation, DEM Generation and Validation for SPOT-5 Level 1B Stereo Scene

LaserFleX New Generation of High Performance Infrastructure Measurement System

Comparing Aerial Photogrammetry and 3D Laser Scanning Methods for Creating 3D Models of Complex Objects

Microwave. Infrared. Preprogrammed Chip

Mobile mapping system and computing methods for modelling of road environment

Smoothness of Pavement in Weighin-Motion

POINT CLOUDS AND DERIVATIVES FOR NATIONWIDE GEOSPATIAL INFORMATION GEORGE VOSSELMAN

Development of Unmanned Aircraft System (UAS) for Agricultural Applications. Quarterly Progress Report

Overview September 7, 2017

IP-S2 HD HD IP-S2. 3D Mobile Mapping System. 3D Mobile Mapping System

A Method to Create a Single Photon LiDAR based Hydro-flattened DEM

UAS Campus Survey Project

Trimble Realworks Software

BLM Fire Project, 2013 QC Analysis Lidar and Orthophoto QC Report November 25th, 2013

Spatial Density Distribution

Sensor Fusion: Potential, Challenges and Applications. Presented by KVH Industries and Geodetics, Inc. December 2016

Alaska Department of Transportation Roads to Resources Project LiDAR & Imagery Quality Assurance Report Juneau Access South Corridor

LiDAR Drone. Land Profile to Your Desktop. Processing. for LiDAR data processing, point cloud vectorization, classification and more

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

Absolute Horizontal Accuracies of Pictometry s Individual Orthogonal Frame Imagery

A Comparison of Laser Scanners for Mobile Mapping Applications

Transcription:

TM Tech Notes Certainty 3D April 10, 2012 To: General Release From: Ted Knaak Certainty 3D, Inc. Re: Developing Requirements for Mobile LiDAR Data (#1015) Introduction Recent discussions within the industry have revolved around requirements for the acquisition of mobile LiDAR system data. While no formal best practices have been published, there exists sufficient experience and expertise within the industry to provide some guidelines. This document summarizes information necessary to make informed decisions as to the development of project requirements. It should be noted that this document does not intend nor does it claim to be a formal standard or guideline for establishing such requirements. Rather it is simply meant to share the experience and expertise of Certainty 3D and our colleagues with the industry. We welcome comments and critiques. Topics covered are: Project stage Suggested best practice guidelines Project Stage One might begin by defining Mobile LiDAR Project (MLP) requirements within the context of the overall project stage for which the data is to be applied. The following is thus a brief discussion of project Phases and how each phase may impact a MLP. Phase I Long Range Planning MLP data used for long range planning typically would be characterized by much longer corridors. This data would be applied in support of environmental impact studies, new intersection development, road widening, etc.. The data would be geospatially 7035 Grand National Drive, Suite 100, Orlando, FL 32819 Phone: 407-248-9927 Fax: 407-248-2636 www.facebook.com/certainty3d www.certainty3d.com

referenced to the level of the IMU trajectory accuracy, which could deviate 30cm or more from survey level coordinates. Note however that point cloud and image data relative to the trajectory are much more accurate thereby providing a rich 3D description of the corridor for GIS purposes. It typically would not make much sense to achieve greater absolute accuracies for long range planning given the added time and expense of establishing ground control and further data post processing. Furthermore the environment along any corridor changes so much that MLP data can often lose sufficient integrity in as little as six to 12 months after it was acquired. Phase II Design & Construction Planning Design and construction planning require the establishment of the survey coordinate system. The signed and sealed set of engineering drawings is the product of Phase II. Currently MLPs are not typically applied at during Phase II however there are potential applications. Phase II operations would typically impose a higher level of accuracy on the MLP data. In this case it becomes necessary to bring in traditional survey control along the corridor to be used as a reference for MLP data adjustment as well as establishing lineage to a sealed survey control. In order to achieve survey quality consistent with Design and Construction requirements, a higher level of system calibration and data processing performance will be necessary for the MLP. This level of quality will typically call for mutually agreed upon QA/QC processes between data provider and customer. Phase III Field Engineering and Construction These operations require the highest level of precision and accuracy. Such projects necessitate the establishment of a clear lineage from the MLP data back to the sealed survey control reference network. This lineage should be defined is such a way that there is a common analysis process agreeable to both the MLP data supplier and customer. Both Phase II and III accuracy requirements will necessitate the most stringent requirements in the overall processing of the MLP data. Note that this processing does not include feature and 3D model extraction. Rather this stage of processing will include: System Calibration Acquisition Adjustment Geometric Correction Map projections Organization Post-Acquisition QA/QC Page 2 of 9

Storage/Archive The MLP data customer should have mutually acceptable processes in place to QA/QC the incoming data to assure it meets specification. Note that such QA/QC procedures need not rectify any error. Rather they need only identify if an error exists such that the data can be returned to the provider for further processing and associated documentation. The geodetic quality transition from Phase I through Phase II can thus be thought of as a progression from GIS to high accuracy land survey. Progression through these requirements is accompanied by significant increases in cost. Therefore it is useful to well define the intended application of the MLP data in order to optimize its cost/benefit. Suggested Best Practice Guidelines The following are some common sense guidelines for defining MLP requirements developed through the experience of Certainty 3D and some of our colleagues in the industry. One will note that our recommendations are principled in nature and do not lean toward specific equipment and/or workflows. Rather we attempt to lay out the concepts as we understand them so as to encourage an informed dialogue between suppliers and purchasers of MLP data. It will be incumbent upon these parties to define specific processes which fulfill the principles contained herein. Mobile LiDAR Deliverable Data Components Typically the most prominent data component of a MLP is the resultant point cloud. It is also become increasingly common for high resolution color images to be included as well. From these two data components are extracted the features and 3D models typically desired from the MLP data. It should be pointed out however, that there are other readily available data components inherently tied to the structure and integrity of the point cloud and image data. Vehicle Trajectory and RMSE Trajectory Requirements Of particular importance are the trajectory and the root mean squared error (RMSE) trajectory. The trajectory describes the path of the vehicle within the project space. Without going into detail far beyond the scope of this paper, we can describe how the trajectory is developed as follows. The GPS, measuring position geodetic position/heading, and the inertial measurement unit (IMU), measuring roll/pitch/heading orientation, are acquired and input into a computer model or estimator. The estimator models the system and predicts where it believes it should be based on past sensor measurements. The estimator then corrects its model based on the error between its prediction and the sensor readings. This error is actually the source of the RMSE trajectory. Page 3 of 9

The significance of the RMSE trajectory is that it is a measure of the convergence of the estimator model and the sensor readings. A small convergence indicates the acquired sensor readings were consistent with where the estimator predicated it should be. The RMSE trajectory can be correlated with the spatial trajectory and serve as a strong indicator as to the quality of the trajectory and resultant data integrity. A typical high quality RMSE trajectory might be on the order of 2 cm (1 sigma) with occasional spikes at bridges and areas of GPS loss. (Note: this does not mean the data is all within 2 cm accuracy only that the model has rather strongly converged.) The following description is intended to provide a more intuitive understanding. Begin by thinking of the trajectory as a tube and not a thin line. A thin tube of say 2 cm radius indicates that the estimator and sensors reached an agreement along the trajectory as to where the vehicle was. The probability is high that this trajectory and point cloud/image data can be adjusted such that it fits to reference survey coordinates relatively well. Now consider a much larger RSME trajectory implying a much thicker tube. This means that the sensors and the estimator never agreed too much on where they thought the vehicle was. Perhaps the GPS configuration was poor or there was a misalignment between the IMU and/or GPS to the vehicles reference frame. Such a situation would cause the sensor inputs and estimator to consistently disagree more and the tube gets thicker. As the radius of the tube increases, it becomes more difficult to fit the trajectory and point cloud/image data tightly to the survey reference coordinates there s just too much uncertainty as to the relative position of the vehicle within the tube. Note that a complete delivery of RSME trajectory information would be relatively complex, require special software for complete analysis and typically exceed the data customer s ability for direct analysis. However a fully processed and spatially correlated RSME trajectory plot or similar format would be relatively easy to interpret. One can then identify varying quality along a trajectory and accept/reject accordingly. Note this also allows the customer to accept/rejects portions of the project instead of applying one standard to the entire data set. Point Cloud Requirements Laser scanners mounted to the mobile system platform generate the point cloud. In effect one can think of each point s measured coordinates as the result of a vector with the origin tied to vehicle trajectory pointing to a point on an object s surface. For current mobile system technology, these vectors do not contribute to trajectory position they kind of hang on to the trajectory. One can divide up the scanner errors into two categories: 1) systematic and 2) random. Page 4 of 9

Random error is basically a measure of the uncertainty in each individual range measurement. The result of this error is noise or fuzziness of the point cloud. This is relatively easy to measure. Examine data in an area covering a flat surface (flat for transportation corridors can be a sign, sidewalk section, etc.) Fit a plane and measure the deviation of the points about that surface. This will be the random noise or fuzziness. Select a deviation number that assures one can identify features to be extracted from the data. For example, one could extract just about anything along a roadway if the deviation was say +/-3mm. However it would be difficult to extract curb lines, edge of pavement, etc. if the deviation was say +/-6cm or more. Look at sample data, consider was must be extracted and agree on a number that works. Systematic error is basically fixed error(s) in the system. Such errors typically produce offsets in the data and typically must be corrected at the system level.. These errors could be caused by scanner misalignment, scanner rangefinder performance, or some combination of both. The easiest way to identify such error is to exploit the static scene by requiring at least two passes from different lanes and/or direction over the same area. As systematic errors typically manifest themselves as shifts and/or rotations of the data, multiple passes to common objects will result in residual point cloud misalignments that cannot be removed through translations adjusting individual point clouds to match one another. Theoretically there will always be some error. But selecting a maximum allowable deviation of say X cm in elevation over the road surface between multiple passes, maximum allowable horizontal deviations between point clouds covering common vertical objects of say Y cm would inherently establish a systematic error requirement. Density is primarily the spacing between point cloud shots on the surface of interest. As a matter of practicality, little focus is necessary along the density of each scan line. Modern scanners take measurements so quickly that the spacing between successive points along a scan line is relative dense. An agreement on say point density along each scan line across a road could be easily reached as say less than a few cm. The density issue arises along the direction of vehicle travel. The spacing between the successive lines is a function of the scanner mirror angular velocity, or lines per second, and the vehicle speed. An agreement between data producer and purchaser should be reached that will meet downstream extraction requirements while achieving reasonable levels of productivity via vehicle speed. As a reference, one might expect 20 cm line spacing at highway speeds (60mph) for the latest technology scanners. Relative Precision refers to the fidelity of the point cloud structure referenced to the trajectory. More simply spoken, the trajectory might be off by 30cm or more. However the accuracy between points measured within the point cloud is of much higher precision. Therefore this accuracy requirement would relate to relative distances within the point cloud, say for example bridge clearance measurement. Page 5 of 9

Absolute Accuracy would refer to the accuracy of the point cloud data within the project coordinate frame. The typical way to assess this accuracy is to compare the point cloud against individual surveyed points measured from the Primary Survey network within the point cloud. Such points are commonly referred to as the survey control and are often validated and sealed by a professional land surveyor (PLS). Note that such points need to be an order of magnitude higher precision than the mobile mapper. Thus typically these points are established with traditional total station/level survey technology. As elevation error is typically the prime concern in MLP data, assessment of point cloud data is relatively straightforward. Typically the control points in the network are placed on hard surfaces such as roadway, sidewalk, etc. Software applications will typically average the elevation of point cloud elements within a radius of the NE location of the control point and compare elevations. The entire control network compared to the point cloud elevations at those NE locations can then be collected and analyzed statistically. Referring back to the systematic error analysis, horizontal NE errors are inherently identified by examining how vertical features common to multiple scans line up. Multiple scans lining up over common arbitrary stable features serve as a good indicator of horizontal accuracy. One should note that strong RSME trajectory typically results in acceptable NE errors. Thus a typical requirement for NE accuracy might be written such as... X number of random checks between vertical elements contained in multiple scans shall not reveal misalignments greater than Y. File Management Requirements Typically mobile LiDAR systems will feature automated cutoff of files sizes based on distance travelled. File sizes should be limited to a distance of reasonable lengths so they are easier to transfer and manage. This is by no means the only requirement for file management. However this can be accomplished by an open discussion between data provider and consumer as to the best strategy for managing the data. So it will not be discussed here. Survey Control Any land survey data acquired to support the alignment and/or QA/QC of MLP data should be included as a deliverable. Images Calibrated images have become an increasingly important component of the MLP data set. Images increase information content and decrease the time requirement to identify and extract features, 3D models, etc. from the data. Calibrated images typically contain metadata on the camera model, image location and orientation within the project coordinate frame same frame as the delivered point cloud. These images can be mapped very accurate to the point cloud data. Page 6 of 9

Image metadata requirements can be summarized as Camera calibration model (for each camera) Image out file format (example- jpeg) Image location in project coordinates (same as final point cloud) Image orientation in project coordinates Performance requirements can simply be given as images shall be aligned with point cloud to within X pixels. This is easily checked by using the point cloud to extract CAD elements of vertical and horizontal objects, ie corner of building, paint line edge in road, etc. Then the image is mapped to the point cloud and the misalignment in pixels can be counted between the element and the image. Requirements Summary The following summarizes this discussion of suggested technical guidelines for procurement MLP data. Phase I Type MLP Mobile LiDAR Deliverable Data Components Point Cloud Images (optional) - Camera model - Position of each image (final project coordinate system) - Orientation of each image (final project coordinate system) Trajectory RMSE Trajectory Survey control (if used) Vehicle Trajectory and RMSE Trajectory Requirements Trajectory No Test RMSE trajectory (spatially correlated) Test: Assure within specified tolerance with some spiking expected. Point Cloud Requirements Random Error Test: standard deviation along flat plane to desired level Systematic Error Test: Multiple pass alignment checks within some tolerance Density Test: Measure samples of data density along and across direction of travel Accuracy Relative Test: Measure & verify sample distances within point cloud Absolute Test: not applicable if no ground control network used. Image Requirements Image Alignment Test: Extract lines in point cloud and compare to corresponding image. Count pixel misalignment. Page 7 of 9

Phase II & III Type MLP Mobile LiDAR Deliverable Data Components Point Cloud Images (optional) - Camera model - Position of each image (final project coordinate system) - Orientation of each image (final project coordinate system) Trajectory RMSE Trajectory Survey control Vehicle Trajectory and RMSE Trajectory Requirements Trajectory No Test RMSE trajectory (spatially correlated) Test: Assure within specified tolerance with some spiking expected. Point Cloud Requirements Random Error Test: point cloud standard deviation along flat plane(s) to desired level Systematic Error Test: Multiple pass alignment checks within some tolerance Density Test: Measure samples of data density along and across direction of travel Accuracy o Relative Test: Measure & verify sample distances within point cloud o Absolute Test: Measure elevation difference between survey control coordinates and point cloud at corresponding NE (horizontal) location. Major horizontal shifts will typically be obvious. Systematic Error test results above will typically assure absolute accuracy also. Image Requirements Image Alignment Test: Extract lines in point cloud and compare to corresponding image. Count pixel misalignment. Mixed-Use Phase I, II & III MLP Several proposed MLPs have intended to acquire very long corridors quickly as a database and use this data for Phase I, II or III projects as needed. For the higher accuracy required by Phase II & III projects the approach is to select the data along the corridor section of interest when needed, acquire traditional survey control along that section and adjust the data accordingly. Page 8 of 9

We should note here that the contributors to this paper remain skeptical of this approach due to decreasing integrity with time, errors in the original data collect that might not have been identified, etc. However we offer the following recommendations to maximize the probability of success for such an approach. To increase the probability of success, one must assure that the data procured is of such quality that it could be adjusted to control and yield results sufficiently accurate for Phase II & III type projects. Our opinion is that this would call for a mixed approach to defining the MLP requirements and quality assurance tests. Specifically one might consider the following: Divide very large projects into sections. Define sections such that the Mobile LiDAR system configuration will stay stable during the acquisition (no mount, dismount, no need for recalibration, etc.) Apply the more stringent Phase II & III MLP requirements along short corridor intervals approximately at the beginning, midpoint and end of each project section. Adjust the blind intervals down to the control survey points applying tests accordingly. We expect this approach will increase the probability that the remaining data outside the smaller test intervals for each section can be adjusted down to project control at some later date. Conclusion This document should be considered a white paper reflecting Certainty 3D s understanding of the Mobile LiDAR system technology and processing methods at this time. The information is only intended to communicate our understanding to customers and industry colleagues. We strongly urge use of this information as a basis for a constructive dialogue between data producers and consumers. In the end, it will be up to these parties to agree on, document and execute the deliverable requirements, testing and evaluation methods appropriate to their project. We would like to conclude with a special thanks to Mr. Chris Siebern, Director of the HNTB LiDAR Lab at Purdue Research Park and Mr. Josh France, Applications Systems Engineer Riegl USA, for their comments and recommendations. Questions and/or Comments Please contact: Author: Ted Knaak, President Certainty 3D, LLC 7039 Grand National Drive, Suite 100 Orlando, FL 32819 Tel: 407 248 0160 Email: ted.knaak@certainty3d.com www.certainty3d.com Page 9 of 9