Release Notes. Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series. Prerequisites. Preparing Your Location

Similar documents
Important Electrostatic Discharge and System Grounding Information for Cisco SCE 8000, Release 3.5.5

Replacing the Power Supply

Connecting Power and Ground

S4112-ON Series. Setup Guide

SECTION N -- ELECTROSTATIC DISCHARGE (ESD)

Chassis Overview. About the Cisco NCS 4016 Chassis. This chapter provides an overview of the Cisco NCS 4016 chassis and components.

Junos WebApp Secure 5.0 Hardware Guide

Intel Server Board S2600BP Intel Compute Module HNS2600BP Product Family

Installing the Cisco ME 2600X Shelf

Replacing the RAID Battery Backup Unit Assembly on Series 3 FireSIGHT 3500 Defense Centers, Version 5.x

Veritas Appliance Hardware Service Procedure

Quick Start Guide. C-100 Series Switches

Preparing to Install the Cisco AS5350XM Universal Gateway

Cisco ONS CL Shelf Assembly Hardware

P1 PowerStation Backlight Bulb

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Power Supply Installation

Veritas Appliance Hardware Service Procedure

Dell Networking S4810 Open Networking (ON) Getting Started Guide

Removing Components from the MX480 Chassis Before Installing It Without a Lift

Removing Components from the MX960 Chassis Before Installing It Without a Lift

Installing a New Solo 1150 Hard Drive

When Using An Anti-static Wrist Strap The Best Place To Attach The Grounding Clip Is

Installing the Cisco SFS 3504 Server Switch

Dual-Feed 80A Auto Low Voltage Disconnect Panel - 80LVD02

VEP4600. Setup Guide

Hardware Installation Guide for Cisco NCS 5500 Series Fixed-Port Routers

Intel NUC Kit NUC5i3MYHE & NUC5i5MYHE User Guide. Intel NUC Kit NUC5i3MYHE Intel NUC Kit NUC5i5MYHE User Guide

13 MMC for PC Option Modules

Install the Cisco ONS CL

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

RMB-3 Peripheral Unit. Installation Guide INSTALLATION GUIDE WESTELL.COM. Westell Technologies Part # Rev. A

Preparing to Install the VG248

9. NTP-C11 Remove and Replace an Ethernet Card, page 1-13 As needed, complete this procedure to remove and replace an ONS CL Ethernet card.

Power Supply and Fan Module Installation

AI130 AIswitch Series 130 Chassis Installation Guide

Installation Instructions

Intel NUC Kit D54250WYKH & D34010WYKH User Guide. Intel NUC Kit D54250WYKH Intel NUC Kit D34010WYKH User Guide

Replacing the Gateway 200ARC Keyboard

Connecting and Routing the Cables and Wires

Veritas Appliance Hardware Service Procedure

RMB Peripheral Units Installation Guide

Installing or Replacing Modules, Fan Trays, and Power Supplies

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

Intel NUC Kit DC53427HYE User Guide. Intel NUC Kit DC53427HYE

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

Remote RMM-1400 Intelligent Remote Site Management Device. Installation Guide

Intel NUC Kit DN2820FYKH User Guide. Intel NUC Kit DN2820FYKH User Guide

Installing the Cisco AS5400XM Universal Gateway

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

Dell Getting Started Guide for the S6100 ON System March 2016

Installing the Cisco 2524 and Cisco 2525 Routers

Installing the Cisco ASR 901 Mobile Wireless Router as a Satellite Shelf

Reference Manual EPM-PS1. PC/104-Plus Power Supply Module DOC. REV. 4/29/2009

Maintaining the Cisco Catalyst 5500 Multiswitch Router

Veritas Appliance Hardware Service Procedure

EOS-6000 Series Optical A/B Switch User Manual DC Version

Installation Instructions

1993 SPECIFICATIONS CSJ , ETC. & SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM

Installing and Removing SDRAM and DRAM

Intel NUC Kit NUC7i3BNHX1 with Intel Optane Memory. Intel NUC Kit NUC7i5BNHX1 with Intel Optane Memory

Replacing the Gateway M305 Optical Drive

Veritas Appliance Hardware Service Procedure

INSTALL INSTRUCTIONS RSXMR-9886-P-48

Installing a Network Module

Connect Router to the Network

EMC VNXe. Adding input/output modules to a disk processor enclosure REV 03. July, 2015

Wiring Best Practices

Replacing the Gateway M275 Keyboard

Customer Upgrade Procedure

Intel NUC7 Home, a Mini PC with Windows 10 NUC7i3BNHXF. Intel NUC7 Home, a Mini PC with Windows 10 NUC7i5BNHXF

Exam Questions 9L0-314

Intel NUC Kit NUC6CAYS User Guide

Dell OptiPlex 7460 All-in-One. Intel Optane card installation guide

TRC-190 User s Manual

256 Kbytes (1771-DRS) 1 Mbyte (1771-DRS1) 4 Mbytes (1771-DRS4) Installation Data

User Guide for NUC8i5BEK, NUC8i3BEK. Intel NUC Kit NUC8i5BEK Intel NUC Kit NUC8i3BEK. User Guide

Dell Precision Hard Drive Assembly Installation Guide

Site Preparation CHAPTER

TippingPoint Zero Power High Availability Installation Guide

Metro-Optical Transport Access Nodes

INSTALLATION GUIDE. Remote RMM-700 Intelligent Site Management Device. Installation Guide WESTELL.COM

PIX 535. PIX 535 Product Overview CHAPTER

Intel NUC Kit NUC7i7BNH Intel NUC Kit NUC7i5BNH Intel NUC Kit NUC7i3BNH

Dell Latitude Solid State Drive Installation Guide

Dell SCv300 and SCv320 Expansion Enclosure Owner's Manual

Dell Networking S4100-ON Series. Set-Up Guide

Open Processor with Square D Driver

Intel NUC Kit NUC8i7HNK & NUC8i7HVK User Guide. Intel NUC Kit NUC8i7HNK Intel NUC Kit NUC8i7HVK User Guide

TRC-190 User s Manual

AC300/AC400 SERIES DYNAMIC BRAKING and ADDITIONAL FORM C RELAY. INSTALLATION INSTRUCTIONS Document Number:

User Guide for NUC7i3DNHNC. Intel NUC7 Business, a Mini PC with Windows 10 NUC7i3DNHNC. User Guide

apple Service Source Xserve RAID 17 March Apple Computer, Inc. All rights reserved.

OptiPlex XE3 Tower. Remote Power Switch Installation Guide. Regulatory Model: D18M Regulatory Type: D18M005

4 Channel 4~20mA/0~10VDC Analog Data Fiber Link System

M40e and M160 CIP Installation Instructions

Intel NUC Kit NUC8i7HNK & NUC8i7HVK User Guide. Intel NUC Kit NUC8i7HNK Intel NUC Kit NUC8i7HVK. User Guide

NI PXI-1042 POWER SUPPLY SHUTTLE USER GUIDE

EMC VNXe. Replacing a link control card in a 12-slot disk-array enclosure REV 02. July, 2015

Transcription:

First Published: 2017-01-31 Text Part Number: Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Prerequisites This document uses illustrations to explain the workflow that we recommend for grounding the Cisco NCS 2000 Series chassis. It also explains best practices to be followed to prevent electrostatic discharge (ESD) damage, which can occur when the equipment is improperly handled. The following sections are included in this document: Before locating and grounding any chassis, you must complete the following prerequisites: Preparing Your Location, on page 1 Preparing the Rack Room, on page 3 Preparing Yourself, on page 4 Preparing Your Location This section illustrates how the building that houses the chassis must be properly grounded to the earth ground. (See the figure below.) Warning This product requires short-circuit (overcurrent) protection to be provided as part of the building installation. Install only in accordance with national and local wiring regulations. Statement 1045. 1

Preparing Your Location Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Warning A readily accessible two-poled disconnect device must be incorporated in the fixed wiring. Statement 1022. Figure 1: Building with Rack Room Connected to Earth Ground 2

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Preparing the Rack Room Preparing the Rack Room This section explains how the rack enclosures must be properly connected to the building earth ground. It also illustrates how to keep the chassis in a sealed anti-static bag until you are ready to install it. (See the figure below.) Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003. Figure 2: Rack Room Connected to Earth Ground 3

Preparing Yourself Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Preparing Yourself This section illustrates how to prepare yourself before removing the chassis from the sealed anti-static bag. The figure below illustrates how to cuff the ESD strap around the wrist and the ground cord that connects the cuff to the ground. ESD wrist straps are the primary means of controlling static charge on personnel. Figure 3: Wearing the ESD Strap 4

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Locating and Grounding the Chassis The figure below illustrates how you must be properly grounded before handling the chassis. Figure 4: Handling the Chassis Locating and Grounding the Chassis This section explains how to locate and ground the following Cisco NCS chassis: Locating and Grounding the Cisco NCS 2002 Chassis, on page 6 Locating and Grounding the Cisco NCS 2006 Chassis, on page 8 Locating and Grounding the Cisco NCS 2015 Chassis, on page 11 5

Locating and Grounding the Chassis Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Warning This equipment is intended to be grounded. Ensure that the host is connected to earth ground during normal use. Statement 39. Warning Use copper conductors only. Statement 1025. Warning When installing or replacing the unit, the ground connection must always be made first and disconnected last. Statement 1046. Note A #6 AWG cable or a 1 inch wide flat copper braid (with minimum total strands count of 1050 x 36 AWG or 260 x 36 AWG) is mandatory to install the Cisco NCS 2000 Series chassis. Locating and Grounding the Cisco NCS 2002 Chassis SUMMARY STEPS Before locating and grounding the Cisco NCS 2002 chassis, you must complete the prerequisites mentioned in Prerequisites, on page 1. To locate the ground point and attach a ground cable to the Cisco NCS 2002 chassis: 1. Verify that the office ground cable is connected to the top of the bay and the office ground, according to local site practice. 2. Remove any paint and other non-conductive coatings from the surfaces between the chassis ground and bay frame ground point. Clean the mating surfaces and apply appropriate antioxidant compound to the bare conductors. 3. Attach one end of the shelf ground cable (#6 AWG cable or 1 inch copper braid) to the ground point on the chassis using the specified dual-hole lug connector. (See diagrams 1 and 2 in the figure below.) 4. Attach the other end of the shelf ground cable to the bay frame using a dual-hole lug connector according to the equipment bay frame specifications. (See diagram 3 in the figure below.) DETAILED STEPS Step 1 Verify that the office ground cable is connected to the top of the bay and the office ground, according to local site practice. Note Additional ground cables may be added depending on local site practice. The Cisco NCS 2002 chassis is designated only for a Common Bonding Network (CBN), according to the GR-1089-CORE Issue 4 (sec 9.3) definitions. Note The DC power battery return (BR) terminal or positive terminal must be grounded at the source end (power feed or DC mains power end). The DC power BR input terminal is not connected to the equipment frame (chassis), so it is configured as DC-I according to the GR-1089-CORE, Issue 4 (sec 9.8.3) definitions. 6

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Locating and Grounding the Chassis Step 2 Step 3 Step 4 Remove any paint and other non-conductive coatings from the surfaces between the chassis ground and bay frame ground point. Clean the mating surfaces and apply appropriate antioxidant compound to the bare conductors. Attach one end of the shelf ground cable (#6 AWG cable or 1 inch copper braid) to the ground point on the chassis using the specified dual-hole lug connector. (See diagrams 1 and 2 in the figure below.) Attach the other end of the shelf ground cable to the bay frame using a dual-hole lug connector according to the equipment bay frame specifications. (See diagram 3 in the figure below.) Figure 5: Grounding NCS 2002 Chassis 7

Locating and Grounding the Chassis Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Stop. You have completed this procedure. Locating and Grounding the Cisco NCS 2006 Chassis SUMMARY STEPS Before locating and grounding the Cisco NCS 2006 chassis, you must complete the prerequisites mentioned in Prerequisites, on page 1. To locate the ground point and attach a ground cable to the Cisco NCS 2006 chassis: 1. Verify that the office ground cable is connected to the top of the bay and the office ground, according to local site practice. 2. Remove any paint and other non-conductive coatings from the surfaces between the chassis ground and bay frame ground point. Clean the mating surfaces and apply appropriate antioxidant compound to the bare conductors. 3. Attach one end of the shelf ground cable to the ground point on the chassis using the specified dual-hole lug connector. (See diagrams 1 and 2 in the figure below.) 4. Attach the other end of the shelf ground cable to the bay frame using a dual-hole lug connector according to equipment bay frame specifications. (See diagram 3 in the figure below.) DETAILED STEPS Step 1 Verify that the office ground cable is connected to the top of the bay and the office ground, according to local site practice. Note Additional ground cables may be added depending on local site practice. The Cisco NCS 2006 chassis is designated only for a Common Bonding Network (CBN), according to the GR-1089-CORE Issue 4 (sec 9.3) definitions. Note The DC power battery return (BR) terminal or positive terminal must be grounded at the source end (power feed or DC mains power end). The DC power BR input terminal is not connected to the equipment frame (chassis), so it is configured as DC-I according to the GR-1089-CORE, Issue 4 (sec 9.8.3) definitions. 8

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Locating and Grounding the Chassis Step 2 Step 3 Step 4 Remove any paint and other non-conductive coatings from the surfaces between the chassis ground and bay frame ground point. Clean the mating surfaces and apply appropriate antioxidant compound to the bare conductors. Attach one end of the shelf ground cable to the ground point on the chassis using the specified dual-hole lug connector. (See diagrams 1 and 2 in the figure below.) Attach the other end of the shelf ground cable to the bay frame using a dual-hole lug connector according to equipment bay frame specifications. (See diagram 3 in the figure below.) Figure 6: Grounding NCS 2006 Chassis 9

Locating and Grounding the Chassis Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series 10

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Locating and Grounding the Chassis Stop. You have completed this procedure. Locating and Grounding the Cisco NCS 2015 Chassis SUMMARY STEPS Before locating and grounding the Cisco NCS 2015 chassis, you must complete the prerequisites mentioned in Prerequisites, on page 1. To locate the ground point and attach a ground cable to the Cisco NCS 2015 chassis: 1. Verify that the office ground cable is connected to the top of the bay and the office ground, according to local site practice. 2. Remove any paint and other non-conductive coatings from the surfaces between the chassis ground and bay frame ground point. Clean the mating surfaces and apply appropriate antioxidant compound to the bare conductors. 3. Attach one end of the shelf ground cable to the ground point on the chassis using the specified dual-hole lug connector. (See diagrams 1 and 2 in the figure below.) 4. Attach the other end of the shelf ground cable to the bay frame using a dual-hole lug connector according to equipment bay frame specifications. (See diagram 3 in the figure below.) DETAILED STEPS Step 1 Verify that the office ground cable is connected to the top of the bay and the office ground, according to local site practice. Note Additional ground cables may be added depending on local site practice. The Cisco NCS 2015 chassis is designated only for a Common Bonding Network (CBN), according to the GR-1089-CORE Issue 4 (sec 9.3) definitions. Note The DC power battery return (BR) terminal or positive terminal must be grounded at the source end (power feed or DC mains power end). The DC power BR input terminal is not connected to the equipment frame (chassis), so it is configured as DC-I according to the GR-1089-CORE, Issue 4 (sec 9.8.3) definitions. 11

Locating and Grounding the Chassis Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Step 2 Step 3 Step 4 Remove any paint and other non-conductive coatings from the surfaces between the chassis ground and bay frame ground point. Clean the mating surfaces and apply appropriate antioxidant compound to the bare conductors. Attach one end of the shelf ground cable to the ground point on the chassis using the specified dual-hole lug connector. (See diagrams 1 and 2 in the figure below.) Attach the other end of the shelf ground cable to the bay frame using a dual-hole lug connector according to equipment bay frame specifications. (See diagram 3 in the figure below.) Figure 7: Grounding NCS 2015 Chassis 12

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Locating and Grounding the Chassis 13

Installing the Line Cards Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Stop. You have completed this procedure. Installing the Line Cards This section describes how to properly install the line cards. The following topics are included in this section: Preparing the Work Surface for Installing Line Cards, on page 14 Transporting Line Cards, on page 16 Handling Line Cards, on page 17 Removing and Installing Line Cards, on page 18 Preparing the Work Surface for Installing Line Cards This section illustrates how you and the work surface that you are placing the line card on must be properly grounded. As shown in the figure below, ensure that you follow these steps: Ground yourself by wearing an ESD wrist band that is connected to the earth ground. Ground the table to the earth ground. Ground the chassis to the earth ground. 14

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Installing the Line Cards Ground the rack to the earth ground. Figure 8: Work Surface for Installing the Line Cards 15

Installing the Line Cards Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Transporting Line Cards This section illustrates how the line card must be kept in a sealed antistatic bag while being transported. (see the figure below) Figure 9: Transporting Line Cards 16

Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Installing the Line Cards Handling Line Cards This section illustrates how you must be properly grounded before removing the line card from the antistatic bag. It also illustrates how you must handle the line card by the front panel and the metal carrier only. (see the figure below) Figure 10: Handling Line Cards 17

Installing the Line Cards Electrostatic Discharge and Grounding Guide for Cisco NCS 2000 Series Removing and Installing Line Cards This section illustrates the precautions to be taken while removing and installing the line cards. (see the figure below) Figure 11: Removing and Installing Line Cards Any Internet Protocol (IP) addresses used in this document are not intended to be actual addresses. Any examples, command display output, and figures included in the document are shown for illustrative purposes only. Any use of actual IP addresses in illustrative content is unintentional and coincidental. 2017 Cisco Systems, Inc. All rights reserved. 18

2017 Cisco Systems, Inc. All rights reserved.