October 13, From: Larry Snyder, Associate Director for Administrative Services. Subject: Solutions Center Facilities Emergency Response Plan

Similar documents
PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE. Purpose

UF CEMP Support Group Annex: Public Safety

St. Joseph s General Hospital LOCKDOWN EMERGENCY RESPONSE PLAN

Policies & Procedures Effective Date: January 24, Key Control

INFORMATION SECURITY- DISASTER RECOVERY

Data Center Access Policies and Procedures

Facility Security Policy

Keys To Disaster Preparedness

UH OFFICES OF FACILITIES, GROUNDS and CAMPUS OPERATIONS & MANAGEMENT in partnership with. OFFICE OF CAPITAL IMPROVEMENT University of Hawaii System

CCBC is equipped with 3 computer rooms, one at each main campus location:

UH OFFICES OF FACILITIES, GROUNDS and CAMPUS OPERATIONS & MANAGEMENT in partnership with. OFFICE OF CAPITAL IMPROVEMENT University of Hawaii System

Number: USF System Emergency Management Responsible Office: Administrative Services

Ulster University Policy Cover Sheet

Property Maintenance & Operations Manual Training

REGIONAL UTILITY COORDINATION PLAN. Portland, Oregon / Vancouver, Washington Metropolitan Area

Emergency Support Function (ESF) #14b: UTILITIES: Potable Water. ESF Activation Contact: Cornell Facilities Customer Service (607)

University Information Systems. Administrative Computing Services. Contingency Plan. Overview

XAVIER UNIVERSITY Building Access Control Policy

SAPP CENTER EMERGENCY ACTION PLAN

Select Agents and Toxins Security Plan Template

INFORMATION TECHNOLOGY SERVICES DISASTER RECOVERY PLAN

AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA. by Anna M. McRay

Data Centers and Mission Critical Facilities Access and Physical Security Procedures

JHH Online Outage System

Overview. Network Fault Restoration v

COMMUNICATIONS EMERGENCY SUPPORT FUNCTION (ESF #2) FORMERLLY COMMUNICATIONS AND WARNING

Emergency Notification System Guide

Hurricane Florence Response and Recovery. October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO

n+2 DATA CENTER CONTROL POLICY

Emergency Support Function (ESF) #17a: COMMUNICATIONS: PUBLIC. ESF Activation Contact: Cornell University Police (607)

UT Martin Environmental Health & Safety Safety Procedure

MADISON METROPOLITAN SCHOOL DISTRICT

University staff and student broadcast policy. Overview. Scope. Related Documents

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred.

FACTORYTALK PRODUCTIONCENTRE SUPPORT POLICY GUIDEBOOK. Copyright 2007 Rockwell Automation, Inc. All rights reserved.

THE SOUTHERN BAPTIST THEOLOGICAL SEMINARY PORTABLE ELECTRONIC DEVICE POLICY

Identity Theft Prevention Policy

DISASTER RESPONSE & RECOVERY PLANNING. Information Technology Services

Data and Voice Line Installation Procedure. Revision History

JT BUSINESS CONTINUITY VOICE RE-ROUTING

SERVICE LEVEL AGREEMENTS CALNET 3, Category 7 Network Based Managed Security

UF CEMP Support Group Annex: IT Group

IT CONTINUITY, BACKUP AND RECOVERY POLICY

Policy No: I-AS 002/2014. Ind-Aussie Solar (P) Ltd outlines protocols to be followed in using the mobile phones. Purpose:

Site Visitor Requirements Practice

Critical Facility Operations

MHCC Emergency Notification System (ENS) Protocols

Disaster Recovery Plan. Serving Community Care College Clary Sage College Oklahoma Technical College

On-Officer Body Camera Program

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT

Operating Policy and Procedure. DATE: January 11, 2018

OUTSOURCED FACILITIES MANAGEMENT SERVICES CAPE TOWN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY

JT DISASTER RECOVERY TELEPHONY DATA STORE and HOLD SERVICE

Definitions Importance of reporting hazards and incidents... 2

Keys and Electronic Access (KEAS) User Manual

Level 1 Interconnection Services at MIX Annex A Technical and Organizational Specifications

November 20, Dear Ms. Crabb:

Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam. ESF Activation Contact: Cornell IPP Customer Service (607)

Title: Construction Hazard Analysis and Job Safety Analysis

Cell and PDAs Policy

Marshall University Information Technology Council. Procedure ITP-16 IT INFRASTRUCTURE AUTHORIZATION PROCEDURE

Physical and Environmental Security Standards

GARDEN CITY POLICE DEPARTMENT REGULATION MANUAL

UniWide Wireless Service

Managed Security Services - Endpoint Managed Security on Cloud

EMERGENCY MANAGEMENT

University Facilities Management (UFM) Access Control Procedure (non-residence areas)

DISASTER PREPAREDNESS IN THE COUNTY: IMPROVEMENTS NEEDED

Corporate Security & Emergency Management Summary of Submitted 2015 Budget From Rates

THE SOUTHERN BAPTIST THEOLOGICAL SEMINARY PORTABLE ELECTRONIC DEVICE POLICY

Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations

Texas A&M University Controlled Substances Guidelines Training Module. September 2017

Banff Mineral Springs Hospital LOSS OF TELEPHONE EMERGENCY RESPONSE PLAN

A CHECKLIST FOR SUBMITTING YOUR RISK MANAGEMENT PLAN (RMP) FOR CHEMICAL ACCIDENT PREVENTION

Wireless Communication Device Use Policy

Service Level Agreements Category 7 Network Based Managed Security

TeamDynamix Project Manager User Guide. November TeamDynamix Project Manager User Guide rev. 11/2015 Page 1

Wireless Services Allowance Procedure

STANDARD (PAY AS YOU GO) PRE-PAID SUPPORT PACKAGE SERVICE LEVEL AGREEMENT

Urgent Medical Device Correction LIFEPAK 1000 Defibrillator

Privacy Act; System of Records; Amendment of the EPA Personnel Emergency

Hurricane and Storm Commercial Damage Assessment

Communications Room Policy

Data Storage, Recovery and Backup Checklists for Public Health Laboratories

SAS SOLUTIONS ONDEMAND

TELECOMMUNICATIONS ACCESS POLICY 2011

STANDARD OPERATING PROCEDURE Critical Infrastructure Credentialing/Access Program Hurricane Season

URI Online Time Cards

Audio, Video or Photographic Recording Devices 5. DEFINITIONS 6 CANCELLATIONS 7. REFERENCES

SOP Unplanned Outages/Major Incidents

Frequently Asked Questions

Information Security Incident Response Plan

Business Continuity Plan Executive Overview

Local Government Disaster Planning and what can be learned from it.

PROCEDURE COMPREHENSIVE HEALTH SERVICES, INC

2010 HURRICANE SEASON PREPARATION BRIEFING

Centeris Data Centers - Security Procedure. Revision Date: 2/28/2018 Effective Date: 2/28/2018. Site Information

MOTT COMMUNITY COLLEGE. Procedure for Cellular Telephones

EMERGENCY SUPPORT FUNCTION (ESF) 13 PUBLIC SAFETY AND SECURITY

Transcription:

October 13, 2015 From: Larry Snyder, Associate Director for Administrative Services Subject: Solutions Center Facilities Emergency Response Plan Purpose: To document the procedure for responding and communicating actions taken regarding Facilities Emergency Calls. The procedure has slight variations according to the time of day the trouble call is received. Physical Plant/Facilities & Campus Services (FCS) is fully staffed from 7:00 am to 3:00 pm Monday- Friday (except holidays). These shifts are known as normal working hours. Off shift is to be considered from 3:00 pm to 7:00 am Monday Friday, all day on weekends, and holidays. The second shift (3:00 pm to 11:00 pm) and the third shift (11:00 pm to 7:00 am) have limited Physical Plant staffing. The FCS Solutions Center is staffed 24/7 and is the primary contact for trouble calls. The Solutions Center will initiate any and all communications to the Customer and FCS staff regarding the emergency. Discussion: This procedure applies to all non-residential facilities-, grounds- and utilities-related emergencies; it also applies to residential facilities-related emergencies affecting building-wide or campus systems. This procedure does not apply to residential facilities maintenance, routine or urgent, that is localized in nature and/or does not affect building-wide or campus systems. Definitions: Non-residential facilities, grounds and utilities and residential facilities affecting building-wide or campus systems refer to any area of campus of or pertaining to the following: Partitions, doors, walls, ceilings, floors, shelves, windows, cabinets, air conditioning units, and any other equipment attached to non-residential campus buildings; All non-residential custodial services, refuse collection and disposal, and recycling; Utility (including electrical, gas, water, sewer, steam and air lines, and controls), structural, mechanical and fire protection systems outside and within both non-residential and, where building-wide or campus systems are involved, residential campus buildings; Trees, shrubs, flowers, lawn areas, and all campus landscape elements and features, including those outside both non-residential and residential campus buildings, except those used for instruction or research purposes;

All ice and snow removal; And any work site involving the repair, maintenance, renovation, remodeling, alteration, or construction of a campus facility coordinated through either the Physical Plant or Design & Construction Management Divisions. For the purposes of this protocol, Emergency refers to a facilities-related (as defined above) problem or incident that creates an immediate hazard to safety, property, or loss of essential services such as electrical distribution, potable water, sewage, steam distribution, or hydrant and building standpipes. This procedure is intended for use by Facilities & Campus Services personnel in conjunction with the Facilities-related Emergency Contact Protocol dated September 9, 2014. Action: In the event of a facilities emergency, the FCS Solutions Center will record pertinent information on the Repair Tag notepad (during normal working hours) or the Trouble Call Log (during off-shift hours). The Solutions Center shall access the appropriate section (Electrical, Water, Steam, Flood, Snow) of the Emergency Response Gamebook to determine Campus and FCS personnel requiring notification. During normal working hours, the Solutions Center shall immediately contact appropriate technicians to address the emergency. It should be noted that Environmental Health & Safety (EHS) should be contacted first if the emergency involves the presence of any sort of environmental issue including chemical, gas, or noxious odors. Until they clear the site, they become the Lead Person The Gamebook includes a checklist (Enclosure #1) to be utilized in determining who to call at what point in time. The Gamebook lists who to call for the initial report of the emergency and, in some cases, the minimum staffing levels for various situations. When the Lead Person is determined, that person will instruct the Solutions Center what other trades are necessary to call in. The Solutions Center shall record who answers the call and who doesn t, as well as any refusals to respond. Once appropriate staffing is acquired, the Solutions Center shall report responses to the Lead Person. Once the emergency response is being addressed, the Lead Person/On-site Supervisor shall report the situation status back to the Solutions Center. The Solutions Center shall send notifications to affected campus customers and FCS personnel via the campus notification system RAVE. Notifications shall include pertinent information such as feeder, manhole, system(s) affected, Buildings/Areas affected, and actions underway. Physical Plant staff shall take the lead to provide the Solutions Center with appropriate information to be included in the notifications. As the RAVE system has a limited SMS Text field (160 characters), standard procedure is to provide a brief message of the facilities issue in the SMS Text field refers to the Voice/Email text that includes a more detailed and comprehensive information about the issue and impacts. Once the emergency situation is resolved, the Lead person shall inform the Solutions Center of actions taken and any resolution. The Solutions Center staff shall record a brief description of these actions on the Repair Tag if emergency occurs during normal working hours or on the Trouble Call Log if the emergency occurs outside of normal working hours. The Solutions Center shall make every attempt to contact the original caller and all campus and FCS personnel originally notified and inform them of any resolution or actions taken. If there is no resolution during the current shift, an entry on the off-shift Trouble Call Log shall be made and communicated to the staff on the following shift. It is the Lead Person s responsibility to escalate any incident by contacting the Solutions Center

for action. In turn, if the Solutions Center staff deems it necessary to call-in addition Solutions Center support, they shall contact the Maintenance & Operations Work Management Manager for approval and instruction. If the situation requires escalation to a catastrophic emergency, it is the responsibility of the appropriate Assistant/Associate Director to declare the escalation per Emergency Response Plan, policy # PP.11.A.001.B. Should the emergency continue for a duration that requires providing lodging for the work force, staffing requirements shall be communicated to the EOC Incident Commander, who shall make arrangements with the Campus Center Hotel (or Environmental Health & Safety if no rooms are available). All responses and action taken shall be noted on the Solutions Center Repair Tags or Trouble Call log. Prior to the end of the shift on which the incident occurred, the Solutions Center staff member shall review all Repair Tags and/or Trouble Calls during their shift and make sure each incident is updated to the most current status. Unresolved incidents need to be referred to the next shift personnel. All incidents should be documented through to resolution/completion. At the start of the normal working hours shift (M-F 7:00-3:00), the Solutions Center shall email all Physical Plant Supervisors, Managers, Assistant/Associate Directors, and the Director and Associate Vice Chancellor the previous night s Trouble Call Log. If any trouble calls remain unresolved, the Solutions Center staff shall state in the Subject Line of that email notification Unresolved Calls need to be addressed. It is the responsibility of those supervisors/mangers to ensure that the issue is addressed in a timely manner. It is the responsibility of the Assistant/Associate Directors of the various units of Physical Plant to maintain up-to-date Emergency Callback and minimum staffing requirement lists at the Solutions Center. It is recommended these lists be reviewed on a monthly basis at a minimum. Enclosures: (1) Emergency Plan Checklist (2) Facilities-related Emergency Contact Protocol

Enclosure #1 - Emergency Plan Checklist Emergency Call to Solutions Center Access appropriate section of Gamebook Electrical, Water, and/or Steam for notification lists Determine who to call to report emergency o Notify EHS if it is environmental in nature including any chemical, gas, or noxious odor Call Lead Person from list. The Lead Person will determine who else to call in Call technicians as directed by Lead Person o Record who answers and who doesn t o Record refusals Report back to Lead Person RE responses Emergency Response is being addressed Lead Person/On-site Supervisor reports situation status back to Solution Center. The Solution Center shall send notifications to affected campus customers and FCS personnel. Include pertinent information such as: o Feeder, Manhole, System(s) Effected o Buildings/Areas Effected o Actions underway Notify affected people/buildings via RAVE If emergency continues for an extended period of time and it is deemed appropriate to house employees on site, Lead Person/On-site Supervisor/EOC Incident Commander coordinates with Campus Center Hotel for rooms or EH&S for additional cots if no rooms available. Lead Person informs Solutions Center that problem is resolved, emergency over. Notify those effected and FCS personnel. Included in this notification are Physical Plant Maintenance Area Supervisors, who are responsible for resetting system(s) if necessary. Maintenance Area Supervisors are also responsible for addressing any ancillary work Submit checklist(s) with Trouble Call log at end of shift

Enclosure #2 - Facilities-related Emergency Contact Protocol September 9, 2014 Scope This protocol applies to all non-residential facilities-, grounds- and utilities-related emergencies; it also applies to residential facilities-related emergencies affecting building-wide or campus systems. This protocol does not apply to residential facilities maintenance, routine or urgent, that is localized in nature and/or does not affect building-wide or campus systems. Definitions Non-residential facilities, grounds and utilities and residential facilities affecting building-wide or campus systems refer to any area of campus of, or pertaining to, the following: Partitions, doors, walls, ceilings, floors, shelves, windows, cabinets, air conditioning units, and any other equipment attached to non-residential campus buildings; All non-residential custodial services, refuse collection and disposal, and recycling; Utility (including electrical, gas, water, sewer, steam and air lines, and controls), structural, mechanical and fire protection systems outside and within both non-residential and, where building-wide or campus systems are involved, residential campus buildings; Trees, shrubs, flowers, lawn areas, and all campus landscape elements and features, including those outside both non-residential and residential campus buildings, except those used for instruction or research purposes; All ice and snow removal; And any work site involving the repair, maintenance, renovation, remodeling, alteration, or construction of a campus facility coordinated through either the Physical Plant or Design & Construction Management Divisions. For the purposes of this protocol, Emergency refers to a facilities-related (as defined above) problem or incident that creates an immediate hazard to safety, property, or loss of essential services such as electrical distribution, potable water, sewage, steam distribution, or hydrant and building standpipes. Personnel This protocol is intended for use by all University personnel, contract workers, and the campus community in general. Scenarios/Actions If the facilities-related emergency involves fire, fire potential, loss of life, bodily injury, lifethreatening or criminal activity, chemicals or other environmental hazards Call 911 if using a campus phone. The preferred method for reaching the UMass Police using a cell or off-campus phone is to direct dial 413-545-2121. Once the area and the public are reasonably secure, the controlling UMass authority on the scene (UMass Police, Environmental Health & Safety, or other) should notify the Facilities Solutions Center ASAP by calling 413-545-6401.

All other emergencies involving non-residential facilities, grounds or utilities, or residential facilities affecting building-wide or campus systems, should be reported immediately and directly to the Facilities Solutions Center by calling 413-545-6401. Facilities Solutions Center 24/7/365 Coverage The Facilities Solutions Center is staffed 24 hours a day, 7 days a week, 365 days a year. Regardless of when the emergency occurs, or is discovered, the witness/first responder should report the incident as soon as possible to the Facilities Solutions Center by calling 413-545-6401. Further Notifications It is the responsibility of the Facilities Solutions Center, upon assessment of the situation, to notify and mobilize any repair or service personnel, and to determine if any other parties require immediate notification, including UMass project managers, construction site contractors, building occupants, administrative staff, research personnel, department heads, Departmental Building Coordinators, or F&CS Customer Service Representatives. Facilities Solutions Center personnel, or their direct assigns, will coordinate and carry out this notification process. Documentation and Resolution The Facilities Solutions Center will monitor and document all facilities-related incidents. All repair or service personnel should update the Facilities Solutions Center as to their progress in a timely manner. The Facilities Solutions Center will update all relevant parties as necessary and upon resolution of the incident. Approved by: Date: Procedural Addendum Data and Information Management All Facilities Solutions Center personnel will have access to, and be trained in using, the RAVE emergency notification system in order to notify building occupants when necessary and appropriate. The RAVE system, or its successor(s), will be maintained by the department of Environmental Health & Safety, Emergency Preparedness and Planning Manager. All Facilities Solutions Center personnel will be trained in generating and using a weekly updated Emergency Contact List for Active Campus Construction Projects. The Facilities Solutions Center will generate this list on a weekly basis from information contained in the project information management program (PIMS or e-builder) currently in use by Design & Construction Management (D&CM); D&CM project managers will be required to keep emergency contact information current and accurate for all active construction projects. This information will be further posted and distributed as necessary by the F&CS Communications Manager, or assign(s).

All Facilities Solutions Center personnel will be provided, and trained in using, updated contact lists for Departmental Building Coordinators and Customer Service Representatives. These lists will be updated, maintained and provided to the Facilities Solutions Center by F&CS Work Management. All Facilities Solutions Center personnel will occasionally be provided, and trained in using, specialized building- or departmental-specific contact lists. It is the responsibility of the individual department and/or Departmental Building Coordinator to provide such lists to the Facilities Solutions Center in a readable and accessible fashion, and to make certain the lists are kept current and accurate. The Physical Plant Assistant Manager for Building Maintenance, or assigns, may make special arrangements to include various parties in an automated notification processes attached to building system monitors/alarms. It is the responsibility of the Physical Plant Assistant Manager for Building Maintenance, or assigns, to provide the Facilities Solutions Center with an accurate, updated list of these automated notification arrangements.