Statement of Work (SOW) IT activities associated with the Acne Sales Office Relocation Project

Similar documents
BME Smart-Colo. Smart-Colo is a solution optimized for the colocation of trading applications, built and managed by BME.

Wide Area Network (WAN)

Network Design Description & Guidelines. [Building Name] Revisions 10/20/97 11/19/97

CCNA 1 Chapter 1 v5.03 Exam Answers 2016

McGill University Firewall Sharing Services Service Description and Service Level Agreement. Prepared by Network and Communications Services

Overview of Data Furnisher Batch Processing

Westell VersaLink Gateway Troubleshooting

HP MPS Service. HP MPS Printer Identification Stickers

Request for Proposals (RFP) Bid Reference RFP 2016/DAF/ICT/001 UN CITY ICT BASIC SUPPORT AND OUTSOURCING SERVICES. Annex 1: Terms of Reference

Service Description: Advanced Services Fixed Price

Service Level Agreement

IT Essentials (ITE v6.0) Chapter 8 Exam Answers 100% 2016

Basic Technology Fee. Page 1

Service Level Agreement

HP Server Virtualization Solution Planning & Design

ERS IT Portfolio Report

Westinghouse Nuclear Automation. Ovation -based Rod Control Logic Cabinet

CCNA Voice ICOMM: (4 Day Course)

SafeDispatch SDR Gateway for MOTOROLA TETRA

FAMIS Services Policy for FAMIS Interfaces

Networks: Communicating and Sharing Resources. Chapter 7: Networks: Communicating and Sharing Resources

CaseWare Working Papers. Data Store user guide

Level 2 Cambridge Technical in IT

AVTRON MODEL K899 PERFORMANCE VIEW TM - ADDvantage Hardware Manual

NCTA-Certified Cloud Technologist (NCT) Exam NCT-110

Additional License Authorizations

Admin Report Kit for Exchange Server

CLIENT. Corporation. Hosting Services. August 24, Marc Gray Flywire Technology CLIENT. 104 West Candler St Winder, GA

WorldShip PRE-INSTALLATION INSTRUCTIONS: INSTALLATION INSTRUCTIONS: Window (if available) Install on a Single or Workgroup Workstation

System Requirements for SurveyTracker Plus 6.0

BlackBerry Server Installation and Upgrade Service

Getting started. Roles of the Wireless Palette and the Access Point Setup Utilities

Software Usage Policy Template

CCNA 1 Chapter v5.1 Answers 100%

Contact Center. Service Description for Release 2016 R4. April, 2017

Patch Management Policy

Update: Users are updated when their information changes (examples: Job Title or Department). o

Dear Milestone Customer,

Upgrade Guide. Medtech Evolution General Practice. Version 1.9 Build (March 2018)

ABELMed Platform Setup Conventions

CONTENTS. 1. Business information Introduction Business Strategy Our services...4

Managed Infrastructure SLA

Rapid Implementation Package

ABELDent Platform Setup Conventions

Dynamic Storage (ECS)

Mobile Testing. Rianna Neal KSU UXD Usability II

Honorable Mayor and Members of the City Council

Licensing the Core Client Access License (CAL) Suite and Enterprise CAL Suite

EDS-Site Entry User Manual

Level 2 Development Training

Quick Guide on implementing SQL Manage for SAP Business One

*LTE Speeds vary for reasons like location, distance from base stations, terrain, user numbers,

Courseware Setup. Hardware Requirements. Software Requirements. Prerequisite Skills

IT Essentials (ITE v6.0) Pretest Exam Answers 100% 2016

UPGRADING TO DISCOVERY 2005

Disaster Recovery. Practical Applications. Eric LaFollette. Director of Information Resources Lake County Clerk of Courts

IT Essentials (ITE v6.0) Chapter 7 Exam Answers 100% 2016

UNSW Technology Policy:

Integrating QuickBooks with TimePro

CAMPBELL COUNTY GILLETTE, WYOMING

Managed Infrastructure SLA

CSC IT practix Recommendations

PL-2302 Mac OS Driver MAC/PC and PC/MAC Communication Software

Clearfly SIP Trunks Configuration Guide PBX Platform: KX-TDE/NCP

Cntents 1 Intrductin Kit Cntents Requirements Installatin Gesture Sensr Kit Hardware and Jumper Settings De

Regroup Quick Start User Guide

Service Level Agreement

Deploying a distributed application with OpenStack

Service Level Agreement

FollowMe. FollowMe. Q-Server Quick Integration Guide. Revision: 5.4 Date: 11 th June Page 1 of 26

TPP: Date: October, 2012 Product: ShoreTel PathSolutions System version: ShoreTel 13.x

Utilities Global Business* Service Descriptions and Metrics

DELL PowerVault MD3200/MD3220 Series of Storage Arrays. A Dell Transition Guide Version 1.0

Moving GIS to the Cloud: What it Involves & Lessons Learned from a Municipal Electric Utility

1. Which organization certifies vendors for adherence to the standards to improve interoperability of products?

Quick Start Guide. Basic Concepts. DemoPad Designer - Quick Start Guide

Launching Xacta 360 Marketplace AMI Guide June 2017

BT111 Development Kit

Red Cactus Internet Business Standard Service Level Agreement. Copyright 2016 Red Cactus Software

AvePoint Pipeline Pro 2.0 for Microsoft Dynamics CRM

Info Tech Update Contract Management Conference March 29, 2017

Modern Home Cabling Guidelines for Internet, Cable TV, Security Systems and Phone

Community Living Staff Computer Reference/Troubleshooting Guide. January P a g e

NiceLabel LMS. Installation Guide for Single Server Deployment. Rev-1702 NiceLabel

These tasks can now be performed by a special program called FTP clients.

Technology on Campus. What Tech Can I Bring to Park Central?

USER GUIDE. Thanks for purchasing the igate! You ll need to follow these five Configuration Steps to get your igate up and running:

Aastra 6757i User Guide

Application Notes for Stratus ftserver 6310 with VMWare and Avaya Aura Contact Center Release 6.2 Issue 1.0

Milestone XProtect. NVR Installer s Guide

Milestone Solution Partner IT Infrastructure Components Certification Summary

multiport Floppy Drive User s Manual

Upgrade Guide. Medtech Evolution Specialist. Version 1.11 Build (October 2018)

USO RESTRITO. SNMP Agent. Functional Description and Specifications Version: 1.1 March 20, 2015

Description of the international LOFAR station datatransport system

Secure Mobile Access to the Local ICS Network. Jan Vossaert Veilige industriële netwerken 29/09/2016

OpenScape Business V2

Medtech Evolution. Installation Guide

Service Description: Cisco Preemptive Service

WebEx Web Conferencing Quick Start Guide

Transcription:

SOW fr New Data Center Prject Statement f Wrk (SOW) IT activities assciated with the Acne Sales Office Relcatin Prject Draft as f February 15 th, 2012 Descriptin: Relcate the Acne Sales Office peratin frm their current lcatin at 330 West 34 th Street, New Yrk, NY t a lcatin n the 9 th flr f the 240 West 35 th, Street, New Yrk, NY lcatin. Scpe: The details belw represent the varius effrts assciated with relcating all Acne Sales Office persnnel and all related IT related equipment t the new lcatin: 1. Data Cnnectivity: Build ut at 240 West 35th street: Assumes Landlrd s General Cntractr t hire Structured Wiring Vendr. Statin wiring will be standard Cat 5e, dual data prts per statin and certified by the General Cntractr s Electrical Cntractr. Data Circuits t rdered and installed. Bth nn-recurring and recurring csts are t be defined in the cst estimate. New VIP Slutin specific hardware (Switches and Ruters t be spec d, prcured, staged, installed at West 35 th street, and tested. 2 new racks t be prcured. 2 new Wireless Access pints t be rdered, cnfigured and installed. Prcure, cnfigure and install tw 48 prt switches. Patch equipment t supprt 81 immediate active prts, as fllws: a) 67 Desktps - the distributin between Windws PC s and MAC s t fllw. b) 6 LAN printers c) 4 Netwrked cpy machines d) 2 fr Wireless access pints e) 2 fr Crprate Security s use f) Balance fr near-term grwth Include a Cable Mdem redundant netwrk back-up. Develp specificatins assciated with the new Cmm Rm are required, flr plan, physical layut, electrical pwer, etc. Prvide n-site pst mve supprt n the first business day at new the lcatin Reclamatin at West 34th street: Issue Data Circuits discnnect rders. File name / revisin Page 1 f 5

SOW fr New Data Center Prject Shutdwn, remve and package and ship all existing equipment back t Acne s primary Data Center Lcatin fr dispsitin f reuse / reclamatin. 2. Vice Cmmunicatins Build ut at 240 West 35th street: This slutin will be the Acne standard Cisc VIP system where the PC s are behind the telephne. Prcure, stage, install and test a new VIP system t supprt 70 endpints. Detailed distributin belw: Prcure, cnfigure, install and prgram 67 telephne handsets: This includes ne Receptin area phne with 4 number sidecar as fllws: 3 General phnes and ne Publisher phne 3 cnference rm plycms Nte that the 4 fax machines n-site are included as a part f the netwrk printer cunt abve. Include sftware, vice-mail and 911 license fees in the cst estimate accrdingly. Telephnes will require call waiting, caller id and transfer capabilities. Order, crdinate the installatin and turn-up f, and cut ver new circuit/phne numbers (if necessary) t supprt the phne system. Order and install POTS lines fr system backup, netwrk remte access and alarm/fire mnitring as necessary. Prvide n-site pst mve supprt n the first business day at new the lcatin. Reclamatin at West 34th street: All telephne handsets Cancellatin f all existing Verizn Centrex lines since existing telephne numbers can t be prted t new carrier platfrm. 3. Server Equipment Build ut at 240 West 35th street: N activity required. All existing equipment will be sent t Acne s primary Data Center facility. Build ut at Acne s primary Data Center: A physical flr lcatin Acne s primary Data Center needs t be identified and built ut. Meaning, electrical pwer, fiber cnnected, netwrk cnnected, etc. Include any recurring fees t the cst estimate. Windws server team t cnduct relcatin / recnfiguratin Includes standard back-up sftware installatin. Includes any new license fees as applicable. Prvide n-site pst mve supprt n the first business day at new the lcatin. File name / revisin Page 2 f 5

SOW fr New Data Center Prject Reclamatin at West 34th street: Decmmissin and remve 1 IBM e-server and return t Acne s primary Data Center fr dispsitin f reuse / reclamatin. 4. Strage Team Include csts t prvide nightly system back-up in Acne s primary Data Center lcatin. 5. Desktp Cmputing Services Shutdwn, discnnect and recnnect the fllwing: 67 Desktps - the distributin between Windws PC s and MAC s t fllw. 6 LAN printers 4 Netwrked cpy machines Prvide n-site pst mve supprt n the first business day at new the lcatin. Crdinate the dispsitin f several PC s and Mnitrs currently nt in use and being stred in the Cmm Rm at West 34th street. Target Dates: Start: March 1st, 2012 End: August 27 th, 2012 Exclusins: Excluded frm this effrt are: 1. Cst assciated with Cable Televisin service installatin. 2. Csts assciated with any electrical pwer installatin at 35 th street are nt included in this cst estimate. 3. Csts and prcurement f ffice, cmputer r persnal hand-held equipment (i.e.: Furniture, Blackberry / Mbile Phnes, I-Pad s, PCs, printers, fax machine, headsets, etc.) nt included. 4. Cst fr the physical relcatin f all equipment (Servers, PCs, faxes, printers, cpiers, etc.) is nt part f this estimate. 5. Cst assciated with Security cabling / equipment. 6. Lw Vltage Cabling cst (General Cntractr effrt). 7. Cst fr Wiring Cnsultant. 8. Custmer des nt require Vide cnferencing. 9. There is n Music On-Hld Requirement. 10. Dr buzzer in receptin area t be installed by Security vendr. File name / revisin Page 3 f 5

SOW fr New Data Center Prject Assumptins: The fllwing assumptins have been made related t this initiative: 1. Assumes Landlrd s General Cntractr t hire Structured Wiring Vendr. 2. Assumes Lw Vltage statin wiring will be tw data prt jacks per statin. 3. Assumes a near-term 9% expansin f users. 4. An 8-10 week lead-time frm the time f prject authrizatin is received t prcure, stage, install and test all circuits and netwrk and vice systems equipment. 5. This relcatin will be planned t ccur ver a weekend, including after hurs effrts. Assume a Friday 5pm start, with a systems up and ready fr Business User use n later than 10am n Sunday. Please price yur resurces accrdingly. 6. Remve the current 20kva UPS system frm 330 West 34th street and send it t Acne s primary Data Center lcatin fr installatin there. Acne will prvide an apprpriately sized UPS unit fr installatin and use at 35 th street. 7. Existing telephne numbers will nt be transferred t the new lcatin. 8. An assumptin f 80% entry-level, 20% executive-level phne set type and 1 expansin mdule requirements will be made fr budgetary purpses. 9. Arrangements will be made t have all ld telephne handsets reclaimed and dispsed f as apprpriate. 10. Vice Services will prvide phne lines t be used fr fire and burglar mnitring, but extensin and terminatin f thse lines will be crdinated by the tenant. 11. The data circuit size will supprt the ability t relcate all applicatin / database transactins t be mved frm West 34 th street t Acne s primary Data Center facility. 12. All data center envirnments (fiber, WAN, pwer, etc.) required in Acne s primary Data Center t receive the 34 th street server equipment are already in-place. 13. A new V-LAN space will be created fr the new lcatin. 14. All equipment currently stred in the Cmm rm at 34 th street, meaning several PC and Mnitrs will nt be shipped t the 35 th street address fr strage in the new Cmm rm. This equipment will be left behind and becme the Landlrd s respnsibility. 15. All required cabling fr Security will be accmplished by Security vendr. 16. Physical relcatin f all equipment (PCs, faxes, printers, cpiers, etc.) t be crdinated by the Facilities department. 17. The Landlrd s cnstructin vendr will engage wiring cnsultant. 18. Being that this lcatin is a unin shp; the Cable TV vendr wuld nt be able t pull the cax necessary t install the cable mdem. They require the electrician t pull the cable frm TWC riser which is lcated in cmmunicatin clset r stairwell n ur flr directly t yur ffice. 19. MTR will be centrally lcated, eliminating the need fr an IDF. 20. Custmer stated there is n requirement fr Vide Cnferencing. 21. All switch prts will be patched by the IT Data Cnnectivity grup and the General Cntractr s wiring vendr t include patch crd in their pricing / deliverable. File name / revisin Page 4 f 5

SOW fr New Data Center Prject Cnstraints: The fllwing cnstraints exist related t this prject: 1. Signing f the lease agreement. 2. Adequate lead-time t permit Cnstructin and IT services t supprt a mve in date. 3. IT emplyee availability fr supprt ver a weekend effrt. Acceptance Criteria: The fllwing represent the final prject acceptance criteria: 1. The Acne Sales Office team can cnnect t the internet and Acne s internal netwrk 2. The Acne Sales Office team can cnnect t all required Business Applicatins / Websites 3. The Acne Sales Office team can initiate and receive telephne call / faxes Prject Cst The budgeted cst f this effrt is $163,060.00. Refer t estimate: # 12345 Fr thse prjects withut frmal estimates, break dwn csts as fllws: Descriptin Capital Operating Hardware $68,000.00 Maintenance $13,000.00 Sftware $37,000.00 Telecmm $9,850.00 Prfessinal Services: - Hurly $12,675.00 Prfessinal Services T&E $750.00 Prfessinal Services Fixed Price Direct Emplyee Labr $9,785.00 Internal T&E Training Other Expense (License fees) $12,000.00 Ttal Prject Cst $138,060.00 $25,000.00 SOW Apprval The fllwing signatures indicate apprval f this Statement f Wrk (SOW): Rle Name Date Signature Spnsr Add name Add date Prject Manager Add name Add date Functinal Manager Add name Add date Technlgy Lead Add name Add date File name / revisin Page 5 f 5