GB of cache memory per controller to DS4800 controllers with 8 GB of cache memory per controller.

Similar documents
System Storage DS3950 Quick Start Guide

IBM System Storage DS4700 Express Storage Subsystem Fibre Channel Cabling Guide

IBM TotalStorage DS4500 Fibre Channel Storage Subsystem Cabling Guide

IBM TotalStorage DS4000 Fibre Channel and Serial ATA Intermix Premium Feature. Installation Overview

Rack Installation Instructions

N3220 Installation and Setup Instructions

N3240 Installation and Setup Instructions

N3150 Installation and Setup Instructions

Power Systems and 5877 removal and replacement procedures

Hardware Replacement Guide Types 8099, 8116, 8155, 8156 Types 8157, 8158, 8159, 8160 Types 8215, 9210, 9211

Upgrading Memory in the 6580/6780 Controller CRU

Hardware Replacement Guide

Replacing Failed Memory in the 6580/6780 Controller Module

EXN4000 Storage Expansion Unit Installation and Setup Instructions

ThinkPad Dock, ThinkPad Dock II. User s Guide

Replacing a Controller Battery in the ST2500 M2 Array Module

ThinkCentre Hardware Installation and Replacement Guide. Machine Types 6062, 6065, 6071, 6076, 6089, 7103, 9011, 9014, 9071, 9089, 9162, 9182, 9303

Quick Installation Guide

System Storage EXP3000 Rack Installation Instructions

ThinkCentre Hardware Installation and Replacement Guide. Machine Types 6417, 6418, 6449, 6453

To connect the AC adapter:

E-Series Maintaining E2800 Hardware

IBM System Storage DCS3860 Quick Start Guide

ThinkCentre Hardware Installation and Replacement Guide

Power Systems. IBM Power 595 (9119-FHA) removal and replacement procedures

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

IBM TotalStorage DS300 and DS400 Quick Installation Guide

ThinkCentre. Hardware Removal and Replacement Guide Types 8143, 8144, 8146 Types 8422, 8423, 8427

Hardware Replacement Guide Lenovo 3000 J Series. Types 8453, 8454, 8455, 8458, 8459, 8460

SGI InfiniteStorage 120

Upgrading and Servicing Guide

Hard Drive and Storage Expansion Enclosure Installation and Migration Guide

IBM System Storage DCS3700 with Gen2 Controllers. Installation, User's, and Maintenance Guide IBM GA

Dell SC5020 and SC5020F Storage System Owner s Manual

Internal Cabling Guide for the HP Smart Array 6400 Series Controller on an HP Integrity Server rx7620

H4 Series Hardware Replacement Guide

Rack Installation Instructions

IBM. Rack Installation Instructions

SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.1

apple Service Source Xserve RAID 17 March Apple Computer, Inc. All rights reserved.

Lenovo 3000 Hardware Installation and Replacement Guide. Machine Types 7816, 7817, 7818, 7819, 9686, 9687, 9688, 9689, 9690, 9691

apple Service Source Xserve RAID Xserve RAID and Xserve RAID (SFP) Updated: 25 May Apple Computer, Inc. All rights reserved.

IBM System Storage DCS Series with Gen2 controllers. Hard Disk Drive and Storage Enclosure Installation and Migration Guide IBM GA

IBM System Storage DS3000 series Interoperability Matrix IBM System Storage DS3000 series Interoperability Matrix

Dell EMC PowerVault MD3460 Storage Arrays

Dell SC7020 Storage Controller Getting Started Guide

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

IBM System Storage DS3000 series Interoperability Matrix IBM System Storage DS3000 series Interoperability Matrix

Maintaining the Avaya S8800 Server for Avaya Aura SIP Enablement Services

Upgrading or Host Interface Card in the ST2500 M2 Array Module

Dell Storage Center. Getting Started Guide. SCv2000 and SCv2020 Storage System. Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001

Dell SCv3000 and SCv3020 Storage System Getting Started Guide

SCv3000 and SCv3020 Storage System. Owner s Manual

Upgrading and Servicing Guide

IBM Flex System EN Gb Scalable Switch. User s Guide

IBM Shared Disk Clustering. Hardware Reference

Power Systems. System processor assembly

Upgrading and Servicing Guide

SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.1

CRESCENDO /7200 G3. Quick Start Guide for Crescendo /7200. Processor Upgrade Card for Power Macintosh 7200/8200 Computers

Installing and Removing SDRAM and DRAM

IBM TotalStorage FAStT900 Storage Server New Offering Expands IBM SAN Storage Solutions

N6000 Series Filer Installation and Setup Instructions

Upgrading and Servicing Guide

efolder Replibit Pro Appliance Maintenance Manual (Pro 3000, 6000, 9000, and models) Replibit Pro Appliance Maintenance Manual

JanusRAID SA-6692J Hardware User Manual

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

System i and System p. Service provider information Reference information

LSI CTS2600 Controller-Drive Tray

IBM. Setup Instructions. IBM RS/ Model 260 SA

Part Number: 92P1476. h Battery pack. h Computer

IBM ThinkPad 380XD/385XD Setup Guide

Rack Installation Instructions

Rack Installation Instructions

Dell PowerEdge FD332. Owner's Manual. Regulatory Model: E02B Regulatory Type: E02B003

ThinkCentre User Guide. Machine Types: 3026, 3039, 3137, 3149, 3245, 3269, 3319, 3394, 3491, 3627, 5391, 5472, 5485, 5536, 5548, 5567, 5864, and 6213

Installing the NVR Connectivity and 2nd CPU Kits 1

Oracle <Insert Picture Here>

Nvidia Quadro FX 5600 graphics card and auxiliary power adapter cable installation

IBM. Service Guide and User's Guide. Supplement to the RS/ P Series SN

Quantum DXi4700 Capacity Upgrade Guide

SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.2

Removing and Replacing Chassis Components

TDM To MiniMech conversion ProceDure

Replacing an ESM/IOM CRU in the CSM200 Drive Module

ThinkCentre User Guide. Machine Types: 7258, 7260, 7268, 7270, 7280, 7296, 7298, 7304, 7307, 7413, 7491, and 7508.

IBM System Storage DS3000 Interoperability Matrix IBM System Storage DS3000 series Interoperability Matrix

Service Manual - Memory Upgrade

Replacing an Advanced Power and Cooling (APC) Unit

Dell Storage MD1400 Enclosures Hardware Owner's Manual

ENCORE /ST G4. Processor Upgrade Card for Power Mac G4 AGP Graphics. Quick Start Guide for Encore/ST G4

Installing a Network Module

easyraid Q24P2-U4R4 Hardware Manual

Installing the A4504A PMC Bridge Adapter and A4509A Expansion Adapter. HP Part No. A Edition E1197 Printed in U.S.A.

Replacing the SATA PCI Controller Card

FUSION RX1600RAID. Rackmount 16-Drive SATA Storage System with Internal SAS Expanders. Drive Enclosure User s Guide

E-Series Hardware Cabling Guide

Dell PowerVault MD3060e Storage Enclosure Owner's Manual

Customer Replacement Procedure

Perle Gigabit Media Converter Module. Installation Guide P/N

Transcription:

IBM System Storage DS4800 Controller Cache Upgrade Kit Instructions Attention: IBM has renamed some FAStT family products. FAStT EXP100 has been renamed DS4000 EXP100, FAStT EXP700 has been renamed DS4000 EXP700, and FAStT EXP710 has been renamed DS4000 EXP710. Note that this change of product name only indicates no change in functionality or warranty. All products with new names are functionally-equivalent and fully-interoperable. Each DS4000 product retains full IBM service as outlined in service contracts issued for analogous FAStT products. Getting started The IBM System Storage DS4800 Controller Cache Upgrade Kit enables you to upgrade the DS4800 controller memory cache either in the DS4800 storage subsystem models 82A/H to 4 GB of memory cache per controller or in the DS4800 storage subsystem models 82A/H and 84A/H to 8 GB of cache memory per controller. There are three DS4800 controller cache upgrade options that are available from IBM: v DS4800 Model 82A/H Cache upgrade to 8 GB. This option upgrades the DS4800 controllers with 2 GB of cache memory per controller to DS4800 controllers with 4 GB of cache memory per controller. v DS4800 Model 82A/H Cache upgrade to 16 GB. This option upgrades the DS4800 controllers with 2 GB of cache memory per controller to DS4800 controllers with 8 GB of cache memory per controller. v DS4800 Model 84A/H Cache upgrade to 16 GB. This option upgrades the DS4800 controllers with 4 GB of cache memory per controller to DS4800 controllers with 8 GB of cache memory per controller. Important: v The machine type and model for the DS4800 are printed on the product label affixed to the DS4800 storage subsystem chassis. As a result, the label that identifies this information does not change when you perform a DS4800 controller upgrade. However, after you upgrade the controller cache, the DS4800 storage subsystem functions as and is treated as the DS4800 model with the cache memory to which you have upgraded. If you perform a future controller replacement, ensure that you identify the correct controller part number for your DS4800 and mention that you have previously upgraded the DS4800 storage subsystem controllers. v Whenever you add options to your DS4800 storage subsystem, be sure to update the MAC information in Appendix A of the DS4800 Installation, User s, and Maintenance Guide. Attention: Do not dispose of the DS4800 controller CRUs that you replace with the controller CRUs in this upgrade kit. If separate return processing instructions for the DS4800 controller CRUs you replace are included with this upgrade kit, follow the instructions to return the replaced controllers. The DS4800 Model 82A/H Cache upgrade to 8 GB Upgrade Kit contains the following: v Two controllers with 4 GB of cache per controller (Part Number: 22R4269) v DS4800 Controller Cache Upgrade Kit Instructions v DS4800 Controller Label Kit and Installation Instructions The DS4800 Model 82A/H Cache upgrade to 16 GB and the DS4800 Model 84A/H Cache upgrade to 16 GB Upgrade Kit contain the following: v Two controllers with 8 GB of cache per controller (Part Number: 39M5873) v DS4800 Controller Cache Upgrade Kit Instructions v DS4800 Controller Label Kit and Installation Instructions

Upgrade preparations requirements Before you upgrade the controller cache in your existing DS4800 storage subsystems, perform the following steps: 1. Save the DS4800 storage subsystem profile. Store the profile in a different location than the disks that are attached to the DS4800 storage subsystem to be upgraded. Also, save the configuration of the setup, including the topology and logical drives to logical unit number (LUN) mapping. Refer to the online help in the Subsystem Management window for instructions on how to save the subsystem profile and configuration information. 2. Perform a full system backup. 3. Upgrade the DS4000 drive expansion enclosure ESM firmware version of the existing DS4000 drive expansion enclosures to the latest levels that are posted on the DS4000 System Storage Disk Support Web site: www.ibm.com/servers/storage/support/disk/ You must perform the drive expansion enclosure ESM firmware version upgrade before you upgrade the controller firmware in the following step. 4. Upgrade the DS4000 Storage Manager client host software to DS4000 Storage Manager version 9.15 or later and the DS4800 storage subsystem controller firmware to version 06.15.xx.xx or higher. 5. Verify that both of the DS4800 storage subsystem power supply fan units are plugged in, powered on, and in optimal state. Use the DS4000 Storage Manager client host software to verify that the DS4800 storage subsystem is in optimal state. (This step is not required for cold upgrades.) 6. If the DS4800 host ports are connected to a FC switch, use the switch monitor tool to make sure that the DS4800 host ports and the server FC host bus adapter (HBA) ports are operating optimally. No unexpected port log-out and log-in events should be reported. If there are any, make sure that the cause or causes of these events are corrected before starting the DS4800 controller cache upgrade. (This step is not required for cold upgrades.) 7. Verify that the premium feature keys are available. Also, locate all premium feature and entitlement proofs of purchase and ensure that they can be accessed when needed. 8. Have the DS4800 Installation, User s, and Maintenance Guide available for reference. This upgrade procedure may refer to specific sections in the DS4800 Installation, User s, and Maintenance Guide. A hard copy of this guide was included in the original DS4800 shipment. The guide is also available in PDF format on the DS4000 System Storage Disk Support Web site: www.ibm.com/servers/storage/support/disk/ 9. If you use out-of-band (direct) management and assign IP addresses to the DS4800 controllers using Dynamic Host Configuration Protocol (DHCP) based on the DS4800 controller MAC addresses, you must upgrade your DHCP server with the new MAC addresses for the replacement DS4800 controllers in the upgrade kit. Two upgrade methods are possible when you perform the DS4800 controller cache upgrade: v Hot-case upgrade procedure on page 3 The DS4800 storage subsystem remains powered on and receives I/Os during the controller cache upgrade. Because the DS4800 storage server controllers will be swapped during the upgrade, you should schedule the upgrade during a non-peak I/O (low-usage) period. Use the DS4800 Storage Manager performance monitor function to determine the non-peak I/O load time if required. v Cold-case upgrade procedure on page 7 The DS4800 storage subsystem is powered down when controllers are upgraded. 2 Note: The cold-case controller upgrade procedure is recommended if your production environment allows the scheduling of downtime for maintenance purposes.

ds48015 Hot-case upgrade procedure To perform a hot-case upgrade, do the following steps. 1. Perform all of the prerequisite tasks. See Upgrade preparations requirements on page 2. 2. Make sure that both power supply-fan CRUs are plugged-in, powered on, and optimal. Verify the status of the power supply-fan CRUs status using the LEDs on the CRUs and the DS4800 Subsystem Management window in the DS4000 Storage Manager client program. Make sure that there are not any Needs Attention LEDs lit and the status of the DS4800 storage subsystem is displayed as Optimal in the DS4800 Subsystem Management window. Important Do not proceed with the upgrade procedure if both power supply-fan CRUs are not optimal. Consider using the cold-case upgrade procedure if this is the case. 3. Upgrade the DS4800 storage subsystem controller firmware and NVSRAM with the latest version from the DS4000 System Storage Support Web site: www.ibm.com/servers/storage/support/disk/ Check the readme file for any prerequisites that need to be performed such as whether a certain version of ESM firmware or hard drive firmware is required before applying the firmware and NVSRAM upgrade. 4. In the DS4800 Subsystem Management window, place controller B to Offline state. Wait a few minutes and verify the Needs Attention and the Service Action Allowed LEDs on the controller B CRU are lit. If the Service Action Allowed LED is not lit, it means that there is another component failure in the DS4800 storage subsystem and removing the controller B CRU from the DS4800 chassis might cause the DS4800 to be powered down. Use the Recovery Guru menu icon in the DS4800 Subsystem Management window to correct any errors or faults before proceeding to the next step. Call IBM Support if needed. 5. Put on antistatic protection. 6. Disconnect all attached interface cables from controller B (bottom controller), including the SFP modules. Ensure that you label all cables so that you can reconnect them correctly to the new controller. Figure 1 shows the location of the connectors on the back of a controller. DC power AC power Strain-relief clamp Dual-ported drive channels Controller A Ethernet ports RS-232 serial port Host channels Controller B Host channels RS-232 serial port Ethernet ports Dual-ported drive channels AC power DC power Strain-relief clamp Figure 1. Controller connections 7. Use the following procedure to remove the SFPs: 3

Statement 3: CAUTION: When laser products (such as CD-ROMs, DVD drives, fiber optic devices, or transmitters) are installed, note the following: v Do not remove the covers. Removing the covers of the laser product could result in exposure to hazardous laser radiation. There are no serviceable parts inside the device. v Use of controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure. DANGER Some laser products contain an embedded Class 3A or Class 3B laser diode. Note the following. Laser radiation when open. Do not stare into the beam, do not view directly with optical instruments, and avoid direct exposure to the beam. a. Remove the LC-LC fibre channel cable from the SFP module. b. Unlock the SFP module latch: v For SFP modules that contain plastic tabs, unlock the SFP module latch by pulling the plastic tab outward 10, as shown in Figure 2. Protective cap 10 o Plastic tab SFP module F10ug009 Figure 2. Unlocking the SFP module latch - plastic variety v For SFP modules that contain wire tabs, unlock the SFP module latch by pulling the wire latch outward 90, as shown in Figure 3 on page 5. 4

ds48045 Wire tab Protective cap 90 o SFP module F10ug010 Figure 3. Unlocking the SFP module latch - wire variety c. With the SFP latch in the unlocked position, extract the SFP module. v For SFP modules that contain plastic tabs, slide the SFP module out of the port. v For SFP modules that contain wire tabs, grasp the wire latch and pull the SFP module out of the port. d. Replace the protective cap on the SFP module. e. Place the SFP module into a static-protective package. f. Replace the protective cap on the port. 8. Remove the strain-relief nut and cable strain-relief clamp from the RAID controller. 9. Unplug the power cord from the electrical outlet and then disconnect the power cord from the AC power connector on controller B (bottom controller). 10. Release the controller levers and remove controller B (bottom controller) from the DS4800 chassis. Figure 4 shows the controller sliding from the storage subsystem chassis. Refer to Releasing a component lever in the DS4800 Installation, User s, and Maintenance Guide for more information on unlatching and removing the controller from the DS4800 chassis. Levers in released position Latches RAID controllers Figure 4. Removing a controller from the DS4800 11. Unpack the new controller. Save all packing materials in the event you need to return the replaced controller. 12. Using the provided label placement instructions and the controller label kit, apply the controller labels for host channels, drive channels, power inputs, and numeric display to the replacement 5

controller. Make sure that you use the correct labels for the controller that you replaced. (Note that controller A is the top controller, controller B is the bottom controller). Ensure the labels are aligned properly and do not cover any ports or LEDs. 13. Install the new DS4800 controller in the storage subsystem. a. Carefully position the controller at the back of the storage subsystem chassis. Ensure that the controller can slide into the storage subsystem chassis without obstruction. b. With the left and right levers rotated out perpendicular to the face of the controller, slide the back of the controller into the appropriate slot. c. Push on both sides of the controller so that it slides into the slot evenly. Stop inserting the controller when it is about 1 inch from being fully inserted into the slot. With the controller not fully inserted in the slot, attach all the SFPs and cables that you disconnected from the controller in step 6 on page 3. 1) Replace the SFPs into the appropriate ports. See Installing SFP modules in the DS4800 Installation, User s, and Maintenance Guide. 2) Reconnect all cables, including all host and drive channel cables and secondary cables (such as Ethernet connections). d. Holding both levers, slowly push the controller until the notches in both the left and right levers are aligned with the pins on the DS4800 enclosure so that the controller is pulled evenly into the DS4800 storage subsystem chassis, ensuring full electrical connection contact on all interface pins. Attention: Verify that the controller does not snag any other DS4800 cables when you slide it into the controller bay. e. Press the controller fully into the slot, engaging the pins on the enclosure. f. Hold open both latches and push both left and right levers simultaneously to the closed position. Release the latches. When you release the latches, you should hear both latches snap over the levers, indicating that the component is locked in place. 14. Wrap the strain-relief clamp around the power cord approximately 20 cm (8 in.) from the controller connection end. Leave some slack between the clamp and the controller end of the power cord. Replace the strain-relief nut and tighten it securely to secure the clamp to the controller. 15. If you use out-of-band (direct) management and assign IP addresses to the DS4800 controllers using Dynamic Host Configuration Protocol (DHCP) based on the DS4800 controller MAC addresses, you must upgrade your DHCP server with the new MAC addresses for the replacement DS4800 controllers in the upgrade kit. You can find the MAC addresses on the controller near the Ethernet ports. Figure 5 shows the location of the MAC address labels. MAC address label (Controller A) ds48059 MAC address label (Controller B) Figure 5. MAC address labels on DS4800 RAID controllers Make sure that the DHCP record changes are in effect. 16. Connect the power cord to the bottom controller AC power connector. Plug the power cord into a properly grounded electrical outlet. Flip the power switch to the on position if required. 6

17. The newly inserted controller will be in offline state with the controller Needs Attention and Service Action Allowed LEDs lit. Refer to the DS4000 Storage Manager client program online help for instructions on bringing the controller online. For example, in the DS4000 Storage Manager client Subsystem Management Window, select the offline controller and click Advanced > Recovery > Place controller online. 18. Wait up to 10 minutes for the DS4800 controller to be online and the DS4000 Storage Manager client software to recognize the new controller. (The amount of time it takes depends on the number of drives in the configuration, the I/O loads to the DS4800 subsystem, and whether the new controller s firmware and NVSRAM are automatically synchronized with old controller s firmware and NVSRAM.) 19. Verify the state of the LEDs on the newly inserted controller. See RAID controller LEDs in the DS4800 Installation, User s, and Maintenance Guide. Also verify the LEDs status of the power supply-fans CRUs. There should be no Needs Attention LEDs lit. The Batteries Charging LEDs will be flashing. Make sure that the Needs Attention and Service Action Allowed LEDs on the controller are not lit, and the new controller numeric display LEDs display the same numeric value (DS4800 enclosure ID) as the existing (old) controller numeric display LEDs. This value is normally set to 85 unless it has been changed. 20. Use the DS4000 Storage Manager client Subsystem Management Window to check the status of all components in the storage subsystem. v If the new controller is online and the DS4000 Storage Manager client Subsystem Management Window indicates normal operation, go to step 23. Important: Do not go to step 23 if the new controller is not online. v If the new controllers are online and the DS4000 Storage Manager client Subsystem Management Window indicates a problem status, go to Troubleshooting the storage subsystem in the DS4800 Installation, User s, and Maintenance Guide. v If the new controller is offline, go to step 17. If the problem persists, call IBM Support for assistance. 21. If the fibre channel (FC) switch zoning is configured with the DS4800 controller WWNN, make modifications to FC switch zone tables to reflect the WWNN of the new controller before they can be seen by the fibre channel host bus adapters (HBAs) in the host servers. Ensure that the new FC switch zone tables are activated before proceeding to step 22. 22. Use the DS4000 Storage Manager client Subsystem Management Window to perform Logical Drives Redistributing. If the logical drives do not redistribute between the controllers, do not proceed with controller A replacement. Determine why the logical drives did not redistribute. For example, this might include verifying that controller B is online and optimal, verifying fibre channel cabling between the host servers and controller B are connected, and verifying fibre channel switch zoning is updated. Contact IBM Support if necessary. 23. Wait approximately 5 minutes after the successful completion of the logical drives redistributing and repeat steps 4 on page 3 through 22 to upgrade controller A (top controller). Important: Do not perform this step if controller B is not in optimal state and step 22 was not completed successfully. Otherwise, loss of data access might occur. 24. Remove the antistatic protection. 25. Use the DS4000 Storage Manager client software to print a new storage subsystem profile. Cold-case upgrade procedure To perform a cold-case upgrade, do the following steps. 1. Perform all of the prerequisite tasks. See Upgrade preparations requirements on page 2. 2. Schedule downtime for the upgrade. 3. Power down the DS4800 configurations using the instructions in the Turning off the storage subsystem section in the DS4800 Installation, User s, and Maintenance Guide. 4. Put on antistatic protection. 7

ds48015 5. Disconnect all attached interface cables from controller A (top controller), including the SFP modules. Ensure that you label all cables so that you can reconnect them correctly to the new controller. Figure 6 shows the location of the connectors on the back of a controller. DC power AC power Strain-relief clamp Dual-ported drive channels Controller A Ethernet ports RS-232 serial port Host channels Controller B Host channels RS-232 serial port Ethernet ports Dual-ported drive channels AC power DC power Strain-relief clamp Figure 6. Controller connections 6. Use the following procedure to remove the SFPs: Statement 3: CAUTION: When laser products (such as CD-ROMs, DVD drives, fiber optic devices, or transmitters) are installed, note the following: v Do not remove the covers. Removing the covers of the laser product could result in exposure to hazardous laser radiation. There are no serviceable parts inside the device. v Use of controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure. 8 DANGER Some laser products contain an embedded Class 3A or Class 3B laser diode. Note the following. Laser radiation when open. Do not stare into the beam, do not view directly with optical instruments, and avoid direct exposure to the beam. a. Remove the LC-LC fibre channel cable from the SFP module.

b. Unlock the SFP module latch: v For SFP modules that contain plastic tabs, unlock the SFP module latch by pulling the plastic tab outward 10, as shown in Figure 7. Protective cap 10 o Plastic tab SFP module F10ug009 Figure 7. Unlocking the SFP module latch - plastic variety v For SFP modules that contain wire tabs, unlock the SFP module latch by pulling the wire latch outward 90, as shown in Figure 8. Protective cap Wire tab 90 o SFP module F10ug010 Figure 8. Unlocking the SFP module latch - wire variety c. With the SFP latch in the unlocked position, extract the SFP module. v For SFP modules that contain plastic tabs, slide the SFP module out of the port. v For SFP modules that contain wire tabs, grasp the wire latch and pull the SFP module out of the port. d. Replace the protective cap on the SFP module. e. Place the SFP module into a static-protective package. f. Replace the protective cap on the port. 7. Remove the strain-relief nut and cable strain-relief clamp from the RAID controller. 8. Unplug the power cord from the electrical outlet and then disconnect the power cord from the AC power connector on the top controller. 9. Release the controller levers and remove the top controller (controller A) from the DS4800 chassis. Figure 9 on page 10 shows the controller sliding from the storage subsystem chassis. Refer to Releasing a component lever section in the DS4800 Installation, User s, and Maintenance Guide for more information on unlatching and removing the controller from the DS4800 chassis. 9

ds48045 Levers in released position Latches RAID controllers Figure 9. Removing a controller from the DS4800 10. Unpack the new controller. Save all packing materials in the event you need to return the replaced controller. 11. Using the provided label placement instructions and the controller label kit, apply the controller labels for host channels, drive channels, power inputs, and numeric display to the replacement controller. Make sure that you use the correct labels for the controller that you replaced. (Note that controller A is the top controller and controller B is the bottom controller). Ensure the labels are aligned properly and do not cover any ports or LEDs. 12. Install the new DS4800 controller in the chassis. a. Carefully position the controller at the back of the storage subsystem chassis. Ensure that the controller can slide into the storage subsystem chassis without obstruction. b. With the left and right levers rotated out perpendicular to the face of the controller, slide the back of the controller into the appropriate slot. c. Push on both sides of the controller so that it slides into the slot evenly. Stop inserting the controller when it is about 1 inch from being fully inserted into the slot. With the controller not fully inserted in the slot, attach all the SFPs and cables that you disconnected from the failed controller in step 5 on page 8. 1) Replace the SFPs into the appropriate ports. See Installing SFP modules in the DS4800 Installation, User s, and Maintenance Guide. 2) Reconnect all cables, including all host and drive channel cables and secondary cables (such as Ethernet connections). d. Holding both levers, slowly push the controller until the notches in both the left and right levers are aligned with the pins on the DS4800 enclosure so that the controller is pulled evenly into the DS4800 storage subsystem chassis, ensuring full electrical connection contact on all interface pins. Attention: Verify that the controller does not snag any other DS4800 cables when you slide it into the controller bay. e. Press the controller fully into the slot, engaging the pins on the enclosure. f. Hold open both latches and push both left and right levers simultaneously to the closed position. Release the latches. When you release the latches, you should hear both latches snap over the levers, indicating that the component is locked in place. 10

13. Wrap the strain-relief clamp around the power cord approximately 20 cm (8 in.) from the controller connection end. Leave some slack between the clamp and the controller end of the power cord. Replace the strain-relief nut and tighten it securely to secure the clamp to the controller. 14. Connect the power cord to controller A (top controller) AC power connector. Plug the power cord into a properly grounded electrical outlet. Do not turn the power switch to the on position yet. 15. Repeat steps 4 on page 7 through 14 for the upgrading the bottom controller (controller B). 16. If you use out-of-band (direct) management and assign IP addresses to the DS4800 controllers using Dynamic Host Configuration Protocol (DHCP) based on the DS4800 controller MAC addresses, you must upgrade your DHCP server with the new MAC addresses for the replacement DS4800 controllers in the upgrade kit. You can find the MAC addresses on the controller near the Ethernet ports. Figure 10 shows the location of the MAC address labels. MAC address label (Controller A) ds48059 MAC address label (Controller B) Figure 10. MAC address labels on DS4800 RAID controllers Make sure that the DHCP record changes are in effect. 17. Follow the instructions in Turning on the storage subsystem in the DS4800 Installation, User s, and Maintenance Guide to apply power to the DS4800 storage subsystem configuration. Important: Do not power on the DS4800 storage subsystem until all of the drive expansion enclosures are properly reconnected to the DS4800 controller drive ports, powered on, and do not have any controller Needs Attention LEDs lit or the port bypass LEDs of the controller ports that are part of the drive expansion enclosures connections are not lit. 18. Remove the antistatic protection. 19. Wait up to 10 minutes for the DS4000 Storage Manager client software to recognize the new controller, depending on the number of drives and enclosures in the configuration and the work load in the management network. Complete any remaining Recovery Guru procedures for controller replacement, if needed. 20. Check the LEDs on the new controllers to verify that the controllers are fully operational. See RAID controller LEDs in the DS4800 Installation, User s, and Maintenance Guide. 21. Use the DS4000 Storage Manager client Subsystem Management Window to check the status of all components in the storage subsystem. v If the new controller is online and the DS4000 Storage Manager client Subsystem Management Window indicates normal operation, use the DS4000 Storage Manager client software to print a new storage subsystem profile. Go to step 23 on page 12. v If the new controllers are online and the DS4000 Storage Manager client Subsystem Management Window indicates a problem status, go to Troubleshooting the storage subsystem in the DS4800 Installation, User s, and Maintenance Guide. After resolved, go to step 23 on page 12. v If the new controller is offline, go to step 22. 22. If any of the newly inserted controllers is in an offline state, see the DS4000 Storage Manager client program online help for instructions on bringing the controller online. If necessary, open the DS4000 Storage Manager Subsystem Management window and place the controller online; select the offline 11

controller and click Advanced > Recovery > Place controller online. Perform steps 18 on page 11 and 19 on page 11 to verify the status of the replaced controller. If the controller can not be placed Online, call IBM Support for assistance. 23. If necessary, use the saved premium feature keys to reactivate all of your premium features. The status of the premium features might be shown as Out-of-Compliance until they are reactivated. 24. Upgrade the DS4800 storage subsystem controller firmware and NVSRAM with the latest version from the DS4000 System Storage Support Web site: www.ibm.com/servers/storage/support/disk/ Check the readme file for any prerequisites that need to be performed such as whether a certain version of ESM firmware or hard drive firmware is required before applying the firmware and NVSRAM upgrade. 25. Use the DS4000 Storage Manager client software to print a new storage subsystem profile. 26. If the fibre channel switch zoning is configured with the DS4800 controller WWNNs, make modifications to switch zoning tables to reflect the WWNNs of the new controllers before they can be seen by the fibre channel host bus adapters (HBAs) in the host servers. 12

Trademarks IBM, the IBM logo, and System Storage are trademarks of International Business Machines Corporation in the United States, other countries, or both. Other company, product, or service names may be trademarks or service marks of others. Second edition (November 2006) Copyright International Business Machines Corporation 2005, 2006. All rights reserved. US Government Users Restricted Rights Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. GC26-7774-01 (1P) P/N: 22R6615