SED2 Variable Frequency Drives

Similar documents
SED2 VFD NEMA Type 3R and 3R Harsh Environment (3RHE) Bypass Operating Instructions

Installation, Operation and Maintenance Manual

SED2 VFD NEMA Type 3R Bypass/Air Conditioner

PowerFlex 400 AC Drive Guide Specification

INSTRUCTION MANUAL IM253 R0. AquaStart COMBINATION SOFT STARTERS START-UP MANUAL

SED2 Variable Frequency Drives with Electronic (E) Bypass Options

Baltimore Aircoil Company

VLT 2800 DRIVE SPECIFICATIONS

Firmware Manual - EC Series Drives

EQ5 SERIES Quick Start Guide for Constant Torque Applications

SED2 Variable Frequency Drives Conventional Bypass (C-Bypass) Options

Table of Contents. Safety. Attention. Warnings

Table of Contents 1. Overview Installation...6

VLT 6000 Start-Up. Oct 2003

S Reclosers Form 4C Microprocessor-Based Recloser Control KME (120V) and KME (240V) Analog Current Metering Accessory Design II

BuildingName The Description of the Project P DOCUMENTS

PART 1: GENERAL PART 2: PRODUCT. Effective: 12/29/10 Page 1 of 6 FECA-TE-104D

Zenith DS9000 Dispensing System

FLÄKTGROUP OFFERS A WIDE RANGE OF PER- MANENT MAGNET MOTORS (PM) AND FREQUENCY CONVERTERS FOR PLUG FANS. POWER RANGE IS FROM 0,8 KW TO 15 KW.

H Manual Stretch Wrap Machine uline.com FILM ROLL CAPACITY TECHNICAL DATA ELECTRICAL SPECIFICATIONS TURNTABLE SPECIFICATIONS

Drive Technology \ Drive Automation \ System Integration \ Services. Manual. Control Cabinet Inverter MOVITRAC B Functional Safety

SED2 Variable Frequency Drives Startup, Operation, and Maintenance Manual

HVAC Products. Introducing the SED2 Variable Frequency Drives

SED2 Variable Frequency Drives

BT300 HVAC Drives Electronic Bypass (E-Bypass) Options

ZC Series Zone Monitoring Controllers

SECTION VARIABLE FREQUENCY DRIVES

SSW06. Soft Starters.

GV3000/SE 230 VAC 1-20 HP General Purpose (Volts/Hertz) and Vector Duty Drive Software Start-Up and Reference Manual Version 6.04

SED2 Variable Frequency Drives

1 Extended and Advanced Cascade Controller Option 3

Pump Data Sheet - Patterson HVAC Pumps Company: Intermountain Hydron Name: Cache County Mountain Crest Date: 09/24/2018

Unidrive M200, M201 (Frame 1 to 4) Quick Start Guide

SMVector Additional I/O Module Installation and Operation Manual

Siemens Industrial s

ATV212HD18N4 variable speed drive ATV kW - 25hp - 480V - 3ph - EMC - IP21

ATV212HD11N4 variable speed drive ATV212-11kW - 15hp - 480V - 3ph - EMC - IP21

lnvertek Drives.com ct,ve ELECTRICAL SUPPLIERS LTD

IPS INTELLIGENT PUMP STARTER

ATV12P075M3 variable speed drive ATV kW - 1hp V - 3ph - on base plate

SMARTSTART MOTOR STARTERS

Q9 ASD LOW VOLTAGE DRIVE

ATV12H018M2 variable speed drive ATV kW hp V - 1ph

Power Connections: Basic Wiring:

SECTION SOLID-STATE REDUCED VOLTAGE STARTERS

Unidrive M400 (Frame 1 to 4) Quick Start Guide

18805 Adams Ct., #110 ~ Morgan Hill, CA 95037, USA ~ ~ ~

BT300 HVAC Drives. Designed for HVAC. Description. Technical Specification Sheet Document No March 4, 2013

ABB Industrial Systems Inc. Standard Drives. ACH500-06E Effective 6/1/95

Warning. Important. Always follow all local building electrical codes. PECCSUN3672DB46M PECCSUN3672EN46M

ATV12P037F1 variable speed drive ATV kW hp V - 1ph - on base plate

PowerMust Office Uninterruptible Power System

UPS READY POWER DISTRIBUTION ASSEMBLY

A drive dedicated to variable speed control for HVAC applications

Smartstart Control Module

SSW06. Soft Starters. Applications. Standard Features. Pumps Fans Blowers Compressors Crushers Saws Grinders Mixers.

ATV12H075M3 variable speed drive ATV kW - 1hp V - 3ph - with heat sink

ATV12HU22M3 variable speed drive ATV12-2.2kW - 3hp V - 3ph - with heat sink

Quick Start Guide TS A

QUICK REFERENCE GUIDE

ATV212HD15N4 variable speed drive ATV212-15kW - 20hp - 480V - 3ph - EMC - IP21

SMVector Additional I/O Module Installation and Operation Manual

APPLICATION CONTROL GUIDELINES. IntelliROL Power Supply PN Revision Date: March 15, 2017

ATV1200A kv kva

ATV1200A kv kva

ATV1200A kv kva. Phase-shifting transformer Medium voltage arrestors Cooling fans Human machine interface Plinth (2) Power cells (9)

MOTOR STARTERS & VARIABLE SPEED DRIVES Variable speed drives

TR200 DRIVE STANDARD FEATURES

LiquiFlo AC General Purpose (Volts/Hertz) and Vector Duty Drive Software Start-Up and Reference Manual Version 6.4

ATV212HU55N4 variable speed drive ATV kW - 7.5hp - 480V - 3ph - EMC - IP21

ATV212HU55N4 variable speed drive ATV kW - 7.5hp - 480V - 3ph - EMC - IP21

Installation Instructions

ADJUSTABLE SPEED DRIVES. Q9 Series

ATV310HU30N4E variable speed drive ATV310-3 kw - 4 hp V - 3 phase

Line Interactive 1000VA/1400VA/2000VA Uninterruptible Power System

ACOPOSinverter P74. User's Manual. Version: 2.20 (August 2016) Model no.: Original instruction

ATV212WU55N4 variable speed drive ATV kW - 7.5hp - 480V - 3ph - EMC class C2 - IP55

E1 Plus Electronic Overload Relay

PART 1: GENERAL PART 2: PRODUCT. Phone: Fax: Web: -

Safety Instructions 1-1 Avoid unintended Start General Description 2-2

ATV212HD15N4 variable speed drive ATV212-15kW - 20hp - 480V - 3ph - EMC - IP21

MC Series Drives. Flexible, simple, rugged, robust!

EM-F-7G Safety Extension Module

PowerFlex 40 Sample Specification

ATV310H075N4E variable speed drive ATV kw - 1 hp V - 3 phase

Powermite 599 MT Series SAS Electronic Valve Actuator 24 Vac or 24 Vdc, Proportional Control

GV3000/SE General Purpose (Volts/Hertz) and Vector Duty AC Drive, HP, 230V AC

ATV32HD11N4 variable speed drive ATV32-11 kw V - 3 phase - with heat sink

ATV212WU40N4 variable speed drive ATV212-4kW - 5hp - 480V - 3ph - EMC class C2 - IP55

SQM5 Reversing Actuator with Analog Input Signal

PIEZO FEEDER CONTROLLER

Standard Options. Model 4100 Position Indicating Meter. Three Phase Motor Control. Positran Transmitter

ATV32HU75N4 variable speed drive ATV kw V - 3 phase - with heat sink

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

ACH550 Product Overview

Powered to Perform. Everyday Reliability. Exceptional Value. Expertise and Support

SmartOnline 40kVA Modular 3-Phase UPS System, On-line Double-Conversion UPS for North America

ENERGY MANAGEMENT SOFT-STARTER THE MOST INTELLIGENT SOFT-STARTER YET

Vacon HVAC100 Commissioning Guide

ATV212HD75N4. Main. Range of product Altivar 212. Device short name. Motor power hp 160 A 460 V khz with derating factor

Transcription:

SED2 Variable Frequency Drives Startup Procedure and Checklist Document No. 155-718 Table of Contents Prerequisites...1 Preparing for SED2 VFD Startup...1 HVAC Startup Procedure for SED2 with Bypass Option...4 Quick Commissioning Procedure...6 HVAC Startup Procedure for SED2 without Bypass Option...7 Appendix: User-Defined Parameter Settings...8 Prerequisites Before proceeding, familiarize yourself with SED2 Variable Frequency Drive (VFD or drive ) documentation: SED2 VFD Installation & Startup Guide, Document Number 125-3201: Connection diagrams Terminal function Quick commissioning Parameter reference list SED2 VFD Operation & Maintenance (O&M) Manual, Document Number 125-3202: Preparing for SED2 VFD Startup Commissioning features Programmable features Troubleshooting examples In order to provide you with the most reliable drive available, and to avoid any extra costs related to loss or reduction of warranty coverage, a factory certified specialist should complete this startup procedure. Please complete the following checklist and maintain it in a secure location as technical service personnel may request information from this checklist. Inability to provide this information may result in delays and extra costs to the end user.

Startup Procedure and Checklist SED2 Variable Frequency Drives Date: Startup Person: Customer (Company): Serial Number of Drive: Startup Company: Phone Number: Location: Serial Number of Bypass: Startup person (print): Signature: Application (circle one): Fan Pump VFD Start via: VFD Speed Reference via: Owner s Representative: Printed Name: Company: Phone Number: Signature: Environmental Conditions: NOTE: Conditions of area. Environmental Conditions During Startup: Dust: ( ) Light ( ) Moderate ( ) High Contaminants: ( ) None ( ) Metal ( ) Corrosive Moisture ( ) Low Humidity ( ) High Humidity ( ) Dripping Water ( ) Standing Water ( ) Equipment Flooded Temperature ( ) 60 to 70 F (15 to 21 C) ( ) 95-105 F (35 to 40 C) ( ) 70-95 F 21 to 35 C) ( ) Above 105 F or Below 60 F (Above 40 C or Below 15 C) Environmental Conditions that may occur after Startup: Page 2

SED2 Variable Frequency Drives Startup Procedure and Checklist Check Step ( ) 1. The SED2 is thoroughly tested at the factory. Verify that the drive is free of shipping and installation damage. Shipping damage is not covered by the Siemens warranty; claims must be filed directly with the shipping company as soon as possible. ( ) 2. Review the Installation & Startup Guide (Document No. 125-3201) and the O&M Manual (Document No. 125-3202). Review option instructions and schematics shipped with the drive. ( ) 3. Verify that the model numbers and the voltage ratings are as specified in the purchase order by matching the nameplate data for each unit to the purchase order. ( ) 4. Verify that the drive has been installed in accordance with the mechanical and electrical installation sections in the O&M Manual. CAUTION: Failure to comply with mechanical and electrical installation requirements may void the product warranty. ( ) 5. Verify that the 50/60 Hz DIP switch has been set to the appropriate setting, as instructed in the Installation & Startup Guide. ( ) 6. Inspect the security of the supply line power, ground connections, and all control circuit connections as identified in the SED2 documents. IMPORTANT: Confirm that the incoming line power supply connects to the drive input terminals (L1(r), L2(s), L3(t)) and NOT to the output motor terminals (T1(u), T2(v), T3(w)). IMPORTANT: Double check all power wires (L1(r), L2(s), L3(t)) and motor wires (T1(u), T2(v), T3(w)) to make sure that they are securely tightened down to their respective lugs. Loose wire connections may cause problems at any time, and are not covered under warranty. ( ) 7. Review the installer s as wired schematic. Determine where the motor safety circuit is connected. Verify that the customer s emergency contacts are properly terminated in the drive s safety shutdown circuit or bypass panel. Verify that all other field-installed wires are correctly terminated (including the shields). ( ) 8. Record the motor(s) nameplate information: Voltage: Service Factor: Full Load Amps (FLA): RPM: ( ) 9. Verify that the input voltage matches the drive s rating. ( ) 10. Verify that the motor is wired for the application voltage. ( ) 11. IMPORTANT: Verify that the motor rated full load amps (FLA) does NOT exceed the rated output current of the drive controlling it. When multiple motors are simultaneously operated by the drive, the sum of all motor rated FLA values must be less than or equal to that of the drive controlling them. ( ) 12. Record any other connections to the drive by terminal number to determine if special programming is required. Note any changes in the Appendix: Parameter Settings. ( ) 13. If applicable, verify that the building automation system logic is ready to perform adequately for start, stop, and speed command functions. This concludes the preparation process for SED2 VFD startup. Keep your Installation & Startup Guide, O&M Manual, option schematics, and any other instructions sent with the drive easily accessible to assist you through the remainder of this startup process. Page 3

Startup Procedure and Checklist SED2 Variable Frequency Drives HVAC Startup Procedure for SED2 with Bypass Option Review the Preparing for SED2 VFD Startup section in this document. Use the following HVAC startup procedure for SED2 VFDs with the Bypass Option. For startup of SED2 VFDs without the Bypass Option, see the HVAC Startup Procedure for SED2 without Bypass Option section in this document. Check Step ( ) 1. Verify that the electrical supply power lines connect to the input device and that the motor leads connect to the output terminals of the overload relay. Ensure that all connections are tight; factory connections may come loose during shipment. Set the thermal mechanical overload for the bypass panel to the motor s FLA. ( ) 2. Record all other connections to the bypass cabinet or the VFD and confirm (if applicable) that the building management system logic is ready to perform adequately for start, stop, and speed command functions. ( ) 3. Before applying power, make sure that the following conditions are met: The DRIVE/OFF/BYPASS switch is OFF. For units with three contactors, the Drive Test ON/OFF switch is OFF. ( ) 4. Apply power to the drive and bypass package. Make sure that all three phases are present and that the input voltage is correct for the system being set up. Then move the DRIVE/OFF/BYPASS switch to the DRIVE position. At this time, if the display indicates a fault, press to reset it. ( ) 5. Verify that the drive display is on. ( ) 6. Press to access Parameter r0000 and to enter the SED2 programming mode. From here, you can access and change Level 1 parameters using or. Repeatedly press to advance to Parameter P0010. Press to access the parameter values level. Press to advance to 1. Press to confirm and save the P0010=1 setting. The Quick Commissioning procedure starts. See the Quick Commissioning Procedure section in this document for details. On completion of the Quick Commissioning procedure, continue with Step 7. ( ) 7. Press and then to return to the drive operating mode. ( ) 8. To start the Drive, press and then (green start key). The drive will ramp up to 10 HZ. Verify that the direction of motor rotation is correct. NOTE: If the direction of motor rotation is wrong, turn the DRIVE/OFF/BYPASS switch to OFF; and turn Power Off! Wait for 5 minutes. Swap wires on the motor terminals (T1(u), T2(v)) or on the output terminals of the motor overload relay. Tighten the terminal lugs, reapply power, turn DRIVE/OFF/BYPASS switch to DRIVE; and recheck the direction of motor rotation. Page 4

SED2 Variable Frequency Drives Startup Procedure and Checklist ( ) 9. With correct motor rotation, manually run the drive throughout its entire operating range while observing operation. If the drive trips on over-current during acceleration adjust the acceleration time rate via Parameter P1120. If the drive trips on over-voltage during deceleration, adjust the deceleration time rate via Parameter P1121. If excessive vibration of the driven load is noted at specific input frequencies, use Skip Frequency Parameters P1091 through P1094 to eliminate this vibration. ( ) 10. Determine whether the remote speed reference is a 0 to 10 Vdc or a 4 to 20 ma signal. Connect signal wires and place analog input DIP Switch in the appropriate position. ( ) 11. Check the signal for proper polarity. Observe if the remote speed command can achieve the minimum and maximum speeds desired. If not, scale as required. ( ) 12. Set the DRIVE/OFF/BYPASS switch to OFF. When the drive is in the run mode, it will coast to a stop. For units with three contactors, set the Drive Test ON/OFF switch to ON. Verify that the drive input contactor energizes. ( ) 13. Make additional drive application parameter settings as required, and record them in Appendix: Parameter Settings. ( ) 14. BYPASS TEST Be prepared to monitor rotation of the motor in bypass operation. Bump the DRIVE/OFF/BYPASS switch to BYPASS and then quickly back to OFF. Check the motor rotation. CAUTION: Do NOT allow the motor to operate in bypass mode unless the motor rotation is correct. ( ) 15. If motor rotation in bypass mode is correct, skip to the next step. If motor rotation in bypass mode is NOT correct, check the following and perform as described: Turn OFF the incoming power feed to the drive. Since the correct rotation in drive mode was previously established, do not change any output wires at motor. Instead, verify that power to the input device is OFF. Swap L1 & L2 on the input side of the circuit breaker/disconnect switch. This will affect rotation in the bypass operation only. Once connections are complete and tight, reapply incoming power and repeat Step 14 to recheck the rotation direction. ( ) 16. Verify that running at full speed will NOT damage the system. Run the motor in bypass by turning the DRIVE/OFF/BYPASS switch to BYPASS. Record all the phase voltages and currents at this time. AC input voltage: Phase A Phase B Phase C AC output voltage: Phase A Phase B Phase C Output Current: Phase A Phase B Phase C Display Current: Software Version: ( ) 17. Turn the DRIVE/OFF/BYPASS switch to DRIVE and set panel to auto start/stop. Check speed references from application specific devices for appropriate operation. This completes the startup procedure for the SED2 VFD with Bypass Option. Page 5

Startup Procedure and Checklist Quick Commissioning Procedure SED2 Variable Frequency Drives P0010 Start Quick Commissioning 0 = Ready to Run 1 = Quick Commissioning 30 = Factory Setting NOTE: P0010 must always be set back to 0 before operating the motor. However, if P3900 = 1 is set after commissioning, this is done automatically. ** P1000 Selection of Frequency Setpoint (on/off/reverse) 0 = No Frequency Setpoint 1 = MOP Frequency Control 2 = Analog Setpoint 6 = P1/N2 Communications P0100 Operation for Europe/ N. America 0 = Power in kw; f default 50 Hz 1 = Power in hp; f default 60 Hz 2 = Power in kw; f default 60 Hz NOTE: Use DIP switches to permanently change settings 0 and 1. P1080 Minimum Motor Frequency Minimum motor frequency (0-650 Hz) at which the motor will run irrespective of the frequency setpoint. This value is valid for both clockwise and counterclockwise rotation. (20-30% Max) * P0304 Rated Motor Voltage 10-2000V Nominal motor voltage (V) from rating plate. * P0305 Rated Motor Current 0.01-10000A Nominal motor current (A) from rating plate. * P0307 Rated Motor Power 0.01-2000 kw or hp Nominal motor power (kw or hp) from rating plate. If P0100 = 1, values will be in hp. * P0310 Rated Motor Frequency 12-650 Hz Nominal motor frequency (Hz) from rating plate. P1082 Maximum Motor Frequency Maximum motor frequency (0-650 Hz) at which the motor will run irrespective of the frequency setpoint. This value is valid for both clockwise and counterclockwise rotation. P1120 Ramp-up Time 0-650s Time taken for the motor to accelerate from standstill up to the maximum motor frequency. P1121 Ramp-down Time 0-650s Time taken for the motor to decelerate from the maximum motor frequency down to standstill. Recommended: (Fan: 60-120s, Pump: 10-20s) Recommended: (Fan: 60-120s, Pump: 10-20s) * P0311 Rated Motor Speed 0-40000 1/min Nominal motor speed (rpm) from rating plate. ** P0700 Selection of Command Source (on/off/reverse) 0 = Factory Setting 1 = Basic Operator Panel 2 = Terminal/Digital Inputs 6 = P1/N2 Communications P3900 End Quick Commissioning 0 = End commissioning without motor calculation or factory reset. 1 = End commissioning with motor calculation and factory reset (recommended without bypass). 2 = End commissioning with motor calculation and with I/O reset. 3 = End commissioning with motor calculation but without I/O reset (recommended with bypass option). * ** Motor related parameters. Parameters that have more possible settings for use in specific applications. Page 6

SED2 Variable Frequency Drives Startup Procedure and Checklist HVAC Startup Procedure for SED2 without Bypass Option Review the Preparing for SED2 VFD Startup section in this document. Use the following HVAC startup procedure for SED2 VFDs without the Bypass Option. For startup of SED2 VFDs with the Bypass Option, see the HVAC Startup Procedure for SED2 with Bypass Option section in this document. Check Step ( ) 1. Record all other connections to the drive. If applicable, verify that the building automation system logic is ready to perform adequately for start, stop, and speed command functions. ( ) 2. Apply power to the drive. Make sure that all three phases are present and that the input voltage is correct for the system being set up. Verify that the drive display is on. At this time, if the display indicates a fault, press to reset it. ( ) 3. Press to access Parameter r0000 and to enter the SED2 programming mode. From here, you can access and change Level 1 parameters using or. Press to advance to Parameter P0010. Press to access the parameter values level. ( ) 4. ( ) 5. Press to advance to 1. Press to confirm and save the P0010=1 setting. The Quick Commissioning procedure starts. See the Quick Commissioning Procedure section in this document for details. On completion of the Quick Commissioning procedure, continue with Step 4. Press and to return to the drive operating mode. Press to place drive in hand mode. To start the Drive, press (green start key). The drive will ramp up to 10 HZ. Verify that the direction of motor rotation is correct. NOTE: If the direction of motor rotation is wrong, turn Power Off! Wait for 5 minutes. Swap wires on the motor terminals (T1(u), T2(v)) or on the output terminals of the motor overload relay. Tighten the terminal lugs, reapply power, and recheck the direction of motor rotation. ( ) 6. With correct motor rotation, manually run the drive throughout its entire operating range while observing operation. If the drive trips on over-current during acceleration adjust the acceleration time rate via Parameter P1120. If the drive trips on over-voltage during deceleration, adjust the deceleration time rate via Parameter P1121. If excessive vibration of the driven load is noted at specific input frequencies, use Skip Frequency Parameters P1091 through P1094 to eliminate this vibration. ( ) 7. Determine whether the remote speed reference is a 0 to 10 Vdc or a 4 to 20 ma signal. Connect signal wires and place analog input DIP Switch in the appropriate position. ( ) 8. Check the signal for proper polarity. Observe if the remote speed command can achieve the minimum and maximum speeds desired. If not, scale as required. ( ) 9. To turn on drive, press and, and then enable by automation setup. This completes the startup procedure for the SED2 VFD without Bypass Option. Page 7

Startup Procedure and Checklist Appendix: User-Defined Parameter Settings SED2 Variable Frequency Drives DATE: Parameter Number Description Set Value and Index Code Additional Comments Additional Comments/Remarks: Signature: Date: Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and models as design improvements are introduced. Other product or company names mentioned herein may be the trademarks of their respective owners. 2002 U.S.A. Your feedback is important to us. If you have comments about this document, please send them to technical.editor@peconet.com Document No. 155-718 Printed in the U.S.A. Page 8

Represented By: POWER EQUIPMENT COMPANY 2011 Williamsburg Road Richmond, VA 23231 Ph. 804-236-3800 Fx. 804-236-3882 www.peconet.com