DIVISION 2600 MATERIALS CERTIFICATIONS

Similar documents
SDDOT CONSTRUCTION MANUAL PROJECT MANAGEMENT SECTION CHAPTER 3 MATERIALS TABLE OF CONTENTS

2.3. Quality Assurance: The activities that have to do with making sure that the quality of a product is what it should be.

Program Guidelines for Security Fenestration Rating and Certification Program Administered by Architectural Testing

Request for Quotations RFQ # Garage Door Panels for Building #2 Commercial Overhead Doors October 12, 2012

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

City of Topeka e-procurement Supplier User Guide

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289

Building Tune-Up Program Application

INVITATION FOR BIDS For a Nutanix Hyper-Converged Platform (CIP# AHW1801)

CERTIFICATION CONDITIONS

ACCREDITATION OF VR REPAIR ORGANIZATIONS

TxDOT Internal Audit Materials and Testing Audit Department-wide Report

Florida Product Approval FAQ s

GOVERNMENT OF THE RUSSIAN FEDERATION RESOLUTION. No. 128 dated 8 February, 2018 MOSCOW

Instructions for Contractors: Bid Pre-Qualification

SECTION.0900 LEAD-BASED PAINT HAZARD MANAGEMENT PROGRAM FOR RENOVATION, REPAIR AND PAINTING

Battery Program Management Document

Ch. 5 UPC SCANNING SYSTEMS CHAPTER 5. UPC SCANNING SYSTEMS AND PLU DEVICES GENERAL

SECTION ( ) LIGHTING CONTROL PANELBOARD

Sparta Systems TrackWise Digital Solution

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION {A, M, PP, S, E, H, HLW, U, UM, U2, U3, PRT and T}

SPECIAL SPECIFICATION 1303 Lifelink

AMENDMENT NO.: 3 INVITATION FOR BID. IFB FQ16005 requesting bids for the above referenced project is hereby changed in part as listed below:

City Hall,18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 NOTICE OF INTENDED PROCUREMENT

Case Study: idworx!... electronic WAWF and UID submittals reduces time and errors.

CSA STANDARDS W47.1, W47.2 & W186 CERTIFICATION GUIDE FOR APPLICANT COMPANIES TO. Congratulations and Welcome to the Certification Application Process

TO THE FLORIDA BUILDING COMMISSION

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel

Exhibit A CTA NETWORK A & CTA NETWORK B Market Data Internal and External Redistribution

Request for Proposal # For. Services

Timber Products Inspection, Inc.

REQUEST FOR QUOTES PRINTING AND MAIL SERVICES CITY OF CREVE COEUR NEWSLETTER BUNDLE

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

Checklist for Submission to Utility

Operation of Photovoltaic Equipment Certification Program

Final Estimates Level 2

DATE: Feb TO: Harris/RF Communications Suppliers. FROM: Harris/RF Configuration Management. SUBJECT: Supplier Support Request Procedure

SPECIAL PROVISION Instructions to Bidders

Visual EstiTrack - Chapter 9 9 QUALITY CHAPTER

Use of Controlled Substances in Research

PAN INDIA INFRAPROJECTS PRIVATE LIMITED VENDOR REGISTRATION FORM. Enlistment of contractor for Electrical / Civil / Miscellaneous works

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

Enterprise Income Verification (EIV) System User Access Authorization Form

Exhibit A Questionnaire

eprocurement Visual Guide Purchase Order List

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

Controlled Substance Training Manual

CLi Overview. CLi Program Highlights

PARAGRAPH INDEX QUALITY ASSURANCE INSTRUCTIONS TO SUPPLIERS NON DESTRUCTIVE TESTING

Data Subject Access Request Procedure. Page 1 KubeNet Data Subject Access Request Procedure KN-SOP

Kansas Department of Transportation

Request for Proposal. Monroe County Schools Copier Consortium Copier Bid

CNAS-RC01. Rules for Accreditation of Certification Bodies

Sparta Systems TrackWise Solution

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)

General Requirements and Information for Construction Inspection Agreements Revised 01/03/2008

ATTACHMENT H COST/PRICE PROPOSAL RESPONSE FORM

Just-Property Ltd GDPR Client Data Register

Subcontractor Approval Form

AsureQuality Limited. CodeMark Programme. Certificate Holder Responsibilities and Requirements

CENTRAL CALIFORNIA EMERGENCY MEDICAL SERVICES

1510 MOTOR CONTROLLERS

DEQ Guidance on Recordkeeping and Reporting

BHG Operational Awareness Program May 8, 1998 Surveillance Guide NSS-18.1 Revision 0 Criticality Safety Page 1 of 8 CRITICALITY SAFETY

The Need for Regulations For Private Labs Certification. Waleed Khaled Eid, PhD Consultant, Sematco Soil and Engineering Material Testing Co. W.L.L.

SECTION ELECTRIC METERING

R Delegation of Powers and Duties to the Executive Secretary. R Application for Certification.

Review and Answer Defective Material Notice (DMN)

Exhibit A Questionnaire

Indefinite Delivery, Indefinite Quantity (IDIQ)

SAI GLOBAL PRODUCT SERVICES

MECHANICAL CONTRACTORS ASSOCIATION OF AMERICA, INC. CLEANROOM PIPING AND PROCEDURES BASIC CONSIDERATIONS

Request for Proposals 2015 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS

Request for Quotation RFQ SUBJECT: PRINT: TRANSCRIPT PAPER AND ENVELOPES

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

TITLE 595. DEPARTMENT OF PUBLIC SAFETY CHAPTER 10. CLASS D DRIVER LICENSES AND IDENTIFICATION CARDS AND MOTOR LICENSE AGENT PROCEDURES

Department of Natural Resources. VENDOR: Name: Address: Phone #: Address: Contact Name: Contact Vendor #:

WIRELESS DEVICES: ACCEPTABLE USE AND GUIDELINES

Requirements for the Certification of a Welding Quality Control Co-ordinator

TARIFF DISTRIBUTION. DATE: January 20, 2012

Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION

NEWTON COUNTY OPEN RECORDS ACT POLICY

Chapter 10: Regulatory Documentation

Unofficial English translation offered by EuropElectro, for reference only

DOCUMENT NO. CSWIP-PED Requirements for the approval of NDT Personnel CERTIFICATION SCHEME FOR PERSONNEL. 2 nd Edition January 2011

School District City of Hamtramck Request for Proposal Copiers

CONTRACTOR EVALUATION FOR SERVICE CONTRACTS. Name & Title of Dept. Evaluator: Evaluator s Signature: Name & Title of Supervisor Approving Evaluation:

Green Star Volume Certification. Process Guide

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)

International Competitive Services Product and Price Changes. SUMMARY: The Postal Service is revising Mailing Standards of the United

Process for the Evaluation and Acceptance of Building Products in the USA

Cyber Security Requirements for Electronic Safety and Security

Certified Trainer Program Guide

Training Requirements. Quality Control Personnel Training

declaration that the same application has not been submitted to any other registered body;

NFRC Errata and Addendum Log

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DEPARTMENT OF PROCUREMENT

Accreditation Criteria For Conformity Assessment Bodies

Transcription:

TABLE OF CONTENTS DIVISION 2600 MATERIALS CERTIFICATIONS SECTION 2601 - MATERIALS CERTIFICATIONS... 2600-1 PAGE i

SECTION 2601 MATERIALS CERTIFICATIONS 2601.1 DESCRIPTION This specification governs the requirements for the content and distribution of certifications when dictated, in part or in whole, as the basis of acceptance for a material. 2601.2 REQUIREMENTS a. General (1) The contractor is responsible for obtaining all certifications and arranging for their delivery to the proper destinations prior to use of the material and allowing sufficient time for review as stated herein. (2) Provide the following information on all certifications regardless of type. (a) Identification of the organization submitting the certification. (b) KDOT project number and KDOT contract number. (c) Name of contractor. (d) Identification markings on the shipment. As a minimum, this must include the name of the manufacturer. Also include the lot or heat number referenced in the certification, the serial number if applicable, and the date of manufacture if available. (e) Quantity of material represented by the certification. If multiple lot/heat numbers are submitted, the quantity should be listed per lot/heat number. (f) KDOT Contract line number (bid item) and item code number of the material represented by the certification. (g) Statement that all material complies with the applicable specifications. List the specifications by responsible organization, number, section reference or other appropriate identification. (h) Additional information as required in the specification for the material, or as added requirements for the various types of certifications in subsection 2601.2b below. (3) The general information outlined above may be provided by the supplier on a cover sheet to the manufacturer s certification(s). An example of a cover sheet is included at the end of this specification. Verify that the cover sheet and certification(s) are so well cross referenced and identified as a unit that they can be reunited if accidently separated. (4) When lot or heat numbers are required in a certification, the manufacturer is required to provide information with regard to the typical quantity of material and production time intervals represented by these numbers. Also include the dates of manufacture for the lots or heats involved. This information will be evaluated by the KDOT and may constitute a basis for rejection if the quantities or time intervals are considered excessive. (5) A signature is not required on laboratory reports or manufacturer s certifications unless specifically required by other applicable specifications. However, the document must clearly identify the organization submitting the report or certification. The organization submitting certifications, reports, and related written statements is responsible for the contents of these documents whether they are signed or not. b. Types of Certifications. (1) Type A certification. This certification is to include a copy of the results of tests conducted by the manufacturer s or other qualified laboratory on samples obtained from the lot or lots of material in the shipment. When a mill test report is submitted as the laboratory report, the quantity in the shipment does not need to be included on the report, provided that the identifying heat or lot numbers involved are roll stamped, embossed, or durably affixed to each item of material in the shipment represented by the report. In this case, provide the necessary quantity information on a cover sheet, clearly identifying the quantity of each heat or lot in the shipment. (2) Type B certifications. This certification is to include a current summary of the maximum to minimum range of the manufacturer s quality control test results as determined by the manufacturer s or other qualified laboratory. These summaries must provide data on all major specification requirements. Also include the range of lots and manufacture dates represented by the data. When combining multiple components into a single item, submit a detailed parts summary indicating the lot/heat number, part description and quantity for each part. Summary reports dated more than six months prior to the date of manufacture or shipment of the product will not be 2600-1

accepted. The Engineer of Tests may also request copies of detailed test reports for material produced during a specified time interval for verification of the certification. (3) Type C certifications. This certification is to include a statement certifying that the material in the shipment is essentially the same as material that is prequalified. (4) Type D certifications. This certification is to comply with subsection 2601.2a. (5) Type E certifications. This certification applies to assemblies or structures that are composed of two or more components or materials. These components or materials have been approved previously on an individual basis for KDOT projects, but lose their identity when they are incorporated into an assembly or structure. This certification would apply to signs, overhead sign and lighting structures, etc. The certification is to state that all the components or materials used in the fabrication of the represented assembly or structure were previously approved for KDOT use. c. Responsibility for Preparation. The manufacturer of the individual item is responsible for preparing certifications of Type A, Type B, Type C, and Type D certifications. The fabricator or assembler of individual items is responsible for preparing a Type E certification. d. The Engineer reserves the right to sample and test any material or product that is governed by a certification. If deviations from the applicable specifications are found, the results will be reviewed by the Engineer to determine the final disposition of the material or product. Serious deviations may be cause for removal from prequalified status. e. Distribution of Certifications. (1) Types A and B certifications. (a) Submit one copy of the certification via hard copy or e-mail to: Materials and Research Center Attn: Materials Certification Technician 2300 Van Buren Topeka, KS 66611 E-mail address: typeabcerts@ksdot.org These certifications will be evaluated for compliance with the applicable specifications as well as this section. The appropriate personnel will be notified of a certification s disposition status through the issue of a hardcopy or electronic report, whichever is most expedient. (b) Submit one copy to the Field Engineer responsible for the project construction. (2) Types C, D and E certifications. (a) Issue one copy to the Field Engineer responsible for the project construction. (b) Do not issue these certifications to the Bureau of Construction and Materials, the Materials Certification Technician, or the Engineer of Tests unless they are specifically requested. f. Certification of Aggregates. Provide the Engineer a certification for each classification of aggregate utilized in a project. (1) Aggregates Delivered to the Site: Certify each classification of aggregate delivered to a project or product preparation site. Prepare these certifications under the signature of the aggregate producer or their designated representative. (a) Certify aggregates that are tested at their destination to determine final disposition as to the locations of the deposits from which they were produced. (b) Certify aggregates that are tested at their production site to determine final disposition. These certifications state that the aggregates were removed from a KDOT tested and approved stockpile at the production site, or that they were removed from a plant while it was producing aggregate that was in compliance with the applicable specifications. (2) Aggregates Incorporated into the Project: At locations where aggregates and products that incorporate aggregates are produced for KDOT and non-kdot use, provide certifications stating that only KDOT tested and approved aggregate was provided for the KDOT projects. (3) Frequency of Certification: (a) Prior to the initial delivery of aggregates to a project or product preparation site, provide the Engineer a certification. This certification is to be under the signature of the aggregate producer or 2600-2

their designated representative and state that all aggregates to be provided for the project are in compliance with all the applicable KDOT specifications. (b) Upon completion of the project, provide certifications as specified in subsection 2601.2f.(1) and (2) of this specification to the Engineer. These certifications apply to all aggregates that were delivered to the project or product preparation site and ultimately used in the project. These certifications are to indicate the approximate quantities in tons or cubic yards of each aggregate delivered to the project and the approximate quantities in tons or cubic yards of each aggregate delivered to the product preparation site and incorporated into a product that was utilized in the project. 2601.3 TEST METHODS Not applicable. 2601.4 PREQUALIFICATION Not applicable. 2601.5 BASIS OF ACCEPTANCE When certifications are incorporated into a material or product specification, acceptance will be based on the following: a. All applicable requirements are complied with. This includes the requirements of this section as well as the requirements of specifications unique to the product or material. b. The final disposition of any product or material will be completed at the final destination as the result of inspection for the quality of workmanship and the delivery condition. 2600-3

Date: Submitted by: (include name, address, phone number, email address) (Note, as per the specification, although the Contractor is responsible to submit certifications, the party submitting them is responsible for the contents of this certification packet.) Kansas Department of Transportation Materials Certifications 2300 Van Buren Topeka, Kansas Project Number: Contract Number: Line Number: Item Code: Contractor Name: ID Markings on Shipment: Additional Information: This is to certify that the following items furnished by our firm for use on the reference project meet or exceed the requirements of section of the edition of the Kansas Department of Transportation Standard Specification. or This is to certify that the following items furnished by our firm for use on the reference project meet or exceed the requirements of special provision of the edition of the Kansas Department of Transportation Standard Specification. Quantity Description Heat/Lot Manufacturer Total quantity if applicable 2600-4