Legal Name of the Customer (or, if an individual, individual's name):

Similar documents
For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)

Midwest Energy, Inc. Distributed Generation Interconnection Expedited & Standard Process Application

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

Instructions. Interconnection Customer declares its intention to interconnect with the AEP Distribution System.

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Interconnection Application

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011

CenterPoint Energy P O Box 1700 Houston, TX

Checklist for Submission to Utility

Oncor Application for Interconnection of Distributed Generation

Updated: 02/15/18. Step by Step Guide to Level 1 Interconnection Applications in PowerClerk

DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

Power System Network Simulator (PSNsim)

Generation Interconnection Impact Study Report. For. Interconnection Customer Q0022

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS

Document C0. Use for:

Minnesota DER Interconnection Process Kristi Robinson, P.E.

Green Power Connection Net Energy Metering Online Application Training

Small Hydro Regulatory and Permitting Requirements California

LONG ISLAND POWER AUTHORITY INTERCONNECTION REQUIREMENTS FOR NEW DISTRIBUTED GENERATION GREATER THAN 300 KVA OPERATING IN PARALLEL WITH LIPA S RADIAL

Superseding REVISED SHEET NO. 34D-8 REVISED SHEET NO. 34D-8 Effective May 27, 2010 Effective December 3, 2011

WN U-60 Original Sheet No. 152

Appendix 1 Interconnection Request INTERCONNECTION REQUEST

U.S. Virgin Islands Water and Power Authority

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM

1. Coordination of series-rated devices is permitted where indicated on Drawings.

Features. Application range. Si-TEC Xtend Recip interface. Accumulated data recording of engine running hours, kwatt hours, kvar hours, etc.

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

Project Center User Guide

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

NEW ERA METER. Installation & Operation Guide NE METER

Medium Voltage Metal-Enclosed Thyristor-Switched Harmonic Filter Banks

The City of Winnipeg Dry Type Transformers up to 600 V Primary Section Bid Opportunity No Page 1 of 2

ENERGY SERVICES. Project Center User Guide. This guide is intended to help customers / contractors operate the

State of Minnesota Interconnection Process for Distributed Generation Systems

State of Minnesota Interconnection Process for Distributed Generation Systems

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

Elmhurst Mutual Power & Light nd Street South Tacoma, WA

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

PUBLICLY AVAILABLE SPECIFICATION

DISTRIBUTED ENERGY RESOURCES NEM PLUS APPLICATION MANUAL

Technical Guideline For Interconnection Of Generators To The Distribution System

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Substation Automation Products. Generator protection REG670/650 Relion 670 and 650 series

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

Collector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co.

Medium Voltage Metal-Enclosed Power Capacitor Banks

THE INTERCONNECTION HANDBOOK

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

JUNXY Series DC Load Banks

PG&E Transmission Interconnection Handbook

Large Embedded Generators Register of Completed Projects

Rocky Mountain Power Docket No Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

PGC 4000v2 POWER GENERATION CONTROLLER

Summary. Registration RULE 21 ONLINE PORTAL PILOT PG&E CONTACT DETAILS

Free Standing Emergency Department DGL Project No SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL

AcquiSuite Ally 48 Advanced Branch Circuit Monitor

REQUIREMENTS FOR CONNECTION OF EMBEDDED GENERATORS UP TO 5MW TO THE EVOENERGY NETWORK VERSION SM3201

The Co-operatives Act, 1996 Continuance (Jurisdictional)

Interconnection Standards for Delmarva Power & Light Company s Delaware Operating Territory

C E R T I F I C A T E O F C O M P L I A N C E

reliable company...caterpillar

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

1-Line Load Calculation Software. User s Manual APPROVED. Copyright 2013 Durand & Associates. Page 1

Modular Smart Grid Power Systems Simulators (Utilities)

APPLICATION FOR CONNECTION OF SMALL AND MICRO GENERATION CONNECTED TO AN ESKOM LV NETWORK

Energy Storage Systems Utilizing the SunDial Plus 30PV+S Inverter

CERTIFICATE OF COMPLIANCE

Si-TEC Xtend CGC DATA SHEET. Digital control range for steam turbine generators. Key features. Models. Description

PUBLIC SERVICE OF NEW HAMPSHIRE. Technical Requirements for Non Utility Generation Interconnecting to the PSNH Distribution System

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards

ISGS. Intelligent SwitchGear System The Flexible Solution

JK Series POWER DISTRIBUTION. Solid State Starters Medium Voltage A

Inverter grounding and overvoltages. Michael Ropp, Ph.D., P.E. Northern Plains Power Technologies

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

Series 2400 Paralleling Switchgear

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

UL 508 A standard-compliant design of industrial control panel

TriStar MPPT (150V and 600V) Wind Charging Control Info

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

Si-TEC Xtend CGC ET DATA SHEET. Digital control range for extraction steam turbines. Key features. Models. Description

INSTALLATION AND COMMISSIONING CHECKLIST

FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE

5.1. Motor Protection and Monitoring. Contents. Product Overview. Monitoring Relays. D64R Series Digital Ground Fault Relays...

Medium Voltage Metal-Enclosed Harmonic Filter Systems

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SYSTEM DESIGN SECTION

The Business Names Registration Act Registration of a Saskatchewan Business Name

Submission Cover Page

Replacement of GCP-10 Series with easygen-1500 Application Note

POWER SYSTEMS STUDY: SIGNIFICANT (OR TOTAL) DELETION OF EXISTING TEXT

Installation Manual. APEX Series. Silicon and MOV Panel Protection. APEX Series

1 of 5. APPLICATION CHECKLIST - IMPORTANT - Submit all items on the checklist below with your application to ensure faster processing.

C E R T I F I C A T E O F C O M P L I A N C E

ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER

ETAP PowerStation 4.0

Electronic gen set controllers and auxiliairy devices for Generator Sets SICES SRL

Transcription:

Instructions An Interconnection Customer who requests a Utah Public Service Commission jurisdictional interconnection must submit this Interconnection Request by hand delivery, mail, or delivery service to the public utility, PacifiCorp, d/b/a Rocky Mountain Power. This application is available only for inverter-based Generating Facilities no larger than 25 kw that meet the codes, standards, and certification requirements of Utah Administrative Code Rule R746-312-5. The Interconnection Customer is to complete all fields of this application form to the extent that such requested information is applicable to the proposed Generating Facility. If questions exist about the applicability of the requested information or assistance is needed, please contact the designated contact person identified below: Designated Contact Person: Graham Retzlaff Address: 825 NE Multnomah, Suite 1600, Portland, OR 97232 Telephone Number: 503-813-6126 Facsimile Number: 503-813-6893 E-Mail Address: graham.retzlaff@pacificorp.com Processing Fee There is no processing fee required with this application. Legal Name of the Customer (or, if an individual, individual's name): Contact Person: Mailing Address: Physical Address: Telephone (Daytime): Facsimile Number: E-Mail Address: (Evening): Address of Customer Facility Where Proposed Generating Facility will be Interconnected: Street Address: 1

System Installer/Consulting Engineer: Contact Person: Mailing Address: Physical Address: Telephone (Daytime): Facsimile Number: E-Mail Address: (Evening): Electric Service Information for Applicant s Facility where Generator Will be Interconnected: Will the Generating Facility be used for any of the following? To Supply Power to the Interconnection Customer? Yes No To Supply Power to Others? Yes No For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: (Local Electric Service Provider) (Existing Account Number) Existing Type of Service: Single Phase Three Phase Requested Point of Interconnection: Interconnection Customer s Requested Installation Date: Interconnection Customer's Requested In-Service Date: Is Facility going to be a Qualified Facility ( QF )? Yes No If yes, has Applicant completed FERC Notice of Self Certification? Yes No 2

Generating Facility Information: Energy Source: Solar Wind Hydro Diesel Natural Gas Fuel Oil Biomass Other Prime Mover: Fuel Cell Reciprocating Engine Gas Turbine Steam Turbine Microturbine PV Other Type of Generator: Synchronous Induction Inverter Generator Nameplate Rating: kw (Typical) Generator Nameplate kvar: Interconnection Customer or Customer-Site Load: kw (if none, so state) Typical Reactive Load (if known): Maximum Physical Export Capability Requested: kw Proposed Generating Facility Characteristic Data (for inverter-based machines): Manufacturer: Model: Type: Forced Commutated Line Commutated Electric Nameplate Capacity Rated Output: Amps Volts kw Efficiency: % Power Factor: % Max design fault contribution current: Instantaneous RMS Harmonics characteristics: Start-up requirements: Is the equipment UL1741 Listed? Yes No If Yes, attach manufacturer s cut-sheet showing UL1741 listing List components of the Small Generating Facility equipment package that are currently certified: 1. Equipment Type Certifying Entity 3

2. 3. 4. 5. Application for Electrical Interconnection Interconnection Customer Transformer Data (please provide information for all transformers, attach separate sheet if necessary): Will a transformer be used between the generator and the point of common coupling? Yes No Is the transformer: single phase three phase Size: kva Transformer Impedance: % on kva Base Transformer Primary: Volts Delta Wye Wye Grounded Transformer Secondary: Volts Delta Wye Wye Grounded Transformer Tertiary: Volts Delta Wye Wye Grounded Transformer Fuse Data (if applicable, for Interconnection Customer-Owned Fuse): (Attach copy of fuse manufacturer's Minimum Melt and Total Clearing Time-Current Curves) Manufacturer: Type: Size: Speed: Interconnecting Circuit Breaker (if applicable): Manufacturer: Type: Load Rating (Amps): Interrupting Rating (Amps): Trip Speed (Cycles): Other Facility Information: Enclose copy of site electrical one-line diagram showing the configuration of total proposed Generating Facility equipment, current and potential circuits, and protection and control schemes. Please include system impedance and distance for all segments of the generating facility. 4

One Line Diagram attached: Yes No Enclose copy of any site documentation that indicates the precise physical location of the proposed Generating Facility (e.g., USGS topographic map, distance from public utility facility number, other diagram or documentation). Plot Plan attached: Yes No Enclose copy of any documents that provide proof of site control. Site Control attached: Yes No Applicant Signature: I hereby certify that all of the information provided in this application request form is correct. Applicant Signature: Title: Date: 5