AlphaGateway SMG-01PE Quick Start Guide

Similar documents
AlphaGateway SMG-01PE Technical Manual Effective: January 2017

CableUPS Quick Start Guide

7" Touch Screen Display

1 Installing the VG4-A-ARMPLATE

Installing a Power over Ethernet injector

Installation Note. Agilent Technologies 85105A Option 50 Installation Instructions for RF Switch Replacement Kit

EVOLVE1-M MONITOR ARM

MBE Mounts and Adapters

AlphaGateway SMG-00LI-01 Technical Manual Effective: May 2018

AlphaNet IDH4 Series DOCSIS Status Monitor for XM2, XM2-HP, and XM2-300HP Series CableUPS. Installation and Quick Start Guide

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application

Mounting on the Ceiling Using Flush Mount (Face Down)

Quick Installation Guide

AW58100HTP-PAIR USER S MANUAL

R1 Extender. Quick Installation Guide

Installing the Camera

Arecont Vision HSG2 Installation Manual

LARGE S URGE-PROTECTOR S HELTER

DirectCommand Installation Case/Flexi-Coil/New Holland Air Cart Kit (Variable Rate Electro Hydraulic Systems) Ag Leader Technology

FLEXBOX. Installation Guide

Quick Installation Guide

COMPLETE S YSTEM SHELTER

R2 Extender. Quick Installation Guide

AutoScan to MultiScan Replacement Kit

Installing the Router

FLOE WIRELESS REMOTE ASSEMBLY INSTRUCTIONS KIT P/N

Installing the Interface Line Card in the Cisco cbr Chassis 6

Arecont Vision MegaView TM v1x Installation Manual

CONEC Industrial Ethernet Circular Sealed RJ45 Connector System consists of a RJ45 Plug Kit, a Receptacle Kit and a Protective Cover Assembly.

R2 BaseStation. Quick Installation Guide

Flat Surfaced Ceiling Mounted Exterior Dome (Face Down) IN-DO2MIRVSLL, IN-DO4MF, IN-DO4M36A, IN-DO1MIRF, IN-DO2MIRF,

Next Gen Sarix Enhanced IBE Series Bullet Cameras

PeopleNet Video Intelligence. Generation 1 & 2 Side Cameras. Installation Guide

Navigator II INstallatIoN MaNUal For static and PaN/tIlt configurations

2M IR Mini Dome Quick Installation Guide

MULTIBAND Dual Radio V4

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

INSTALL INSTRUCTIONS RSXMR-9886-P-48

IS-DM220/IR/HB IS-DM220

Ag Leader Technology. DirectCommand Installation Hardi 20-pin Interface Kit (Sprayer Chassis Mount)

GX Higher Power 40 W Dual-Band WCS/2.5 GHz TDD DAS Remote Quick Installation Sheet

AW58300HTA AW58300HTS USER S MANUAL

QUICK START GUIDE FOR THE TRANZEO WIRELESS TR-CPE90

Ruckus Wireless ZoneFlex 7762 Dual Band n Outdoor Access Point. Installation Guide

Arecont Vision MegaDome 2 Installation Manual (DN Models Only)

AirLink GX Series X-Card Installation Guide

ZC-OH5 TAMPER-RESISTANT INDOOR/OUTDOOR HOUSING INSTRUCTION MANUAL FOR USE WITH GANZ ZC-D5000 SERIES MINIDOME CAMERAS

Your Global Flow Control Partner. Series 50 Valve Status Monitor Operation and Maintenance Manual

TraceTek Leak Detection Master Module Installation Instructions TOOLS REQUIRED STORAGE

Back Mount SIP Access Control Intercom Installer s Guide

DC Outdoor Power Supply/Chargers

Installing the DX LCD Display

Arecont Vision MegaDome TM Installation Manual

Illustrated Parts List MODEL. Reproduction Not for. 8,000 Watt Generator Systems

Installation Note. Configurable Test Set Upgrade Kit. For PNA Series RF Network Analyzers (E8801A, E8802A, and E8803A) Network Analyzer Model Number

Quick Installation Guide

DynoWare EX+ Upgrade Installation Guide for Motorcycle Dynamometers.

Ruckus Wireless ZoneFlex g Outdoor Access Point. Getting Started Guide. Part Number (Revision B) Published October 2009

Adapter Kit for PanelView 1200/1200e Touch Screen Terminal Cutout

Arecont Vision MegaDome Installation Manual

Part Name/Description Part Number Quantity

Warning Before Installation. Package Contents EN - 1. Refer to your user s manual for the operating temperature.

Parts and Service Manual IMCO

SKYLEVEL INSTALLATION Manual

INSTALLATION PRACTICE Cabinets and Enclosures TripleStream Line Conditioner

Terragraph Installation Guide. March 8, 2017 Version 0.3

Part Name/Description Part Number Quantity

GCX Mounting Assembly Installation Guide. Pedestal Mount for Philips IntelliVue MP5/20/30/40/50/60/70, MX400/450/500/550/600/700/800

AlphaNet DM3.0 Series DOCSIS Status Monitor

Thanks for shopping with Improvements! Chalet Standard Mailbox Item # (With 1 Line Plaque) Item # (With 2 Line Plaque)

Instruction Manual. M Pump Motor Controller. For file reference, please record the following data:

C764i Integrated LCD Screen Option. Cardio Theater Integrated Bracket Assembly Instructions

KRONOS INSTALLATION INSTRUCTIONS

Illustrated Parts List MODEL. Reproduction Not for. 8,000 Watt Generator Systems

ReachFree ID Installation Instructions for Wash Select II. Unitec

INSTALLATION MANUAL. LO SIDE BOX ADD-ON KIT For driver or passenger side configurations TRUCK STORAGE SOLUTIONS FOR THE WAY YOU WORK

Installation Note. Removable Hard Disk Drive Upgrade Kit. For All PNA Series RF Network Analyzers. Network Analyzer Model Number

Remote RMM-1400 Intelligent Remote Site Management Device. Installation Guide

DOG ULTRA LOW LIGHT LONG RANGE FIXED CAMERA USER MANUAL

Cycles Integrated LCD Screen Option. Cardio Theater Integrated Bracket Assembly Instructions

A-dec 586 Ceiling Monitor Mount

LED Indicators on the Device. No LED State Description. No power to AP. Green On

Arecont Vision MegaView TM v1 Installation Manual

RELIABLE CONNECTIONS FOR A CONNECTED WORLD

Juniper Networks G10 CMTS

INSTRUCTION BULLETIN

Miller Nitro 4000 Series

Warning Before Installation. Package Contents EN-1

Smart Multivariable Transmitter (SMV 3000) Electronics Module Replacement Kit Instruction

Series 3700 Screw Terminal Assemblies Installation Instructions

DirectCommand Installation DirectCommand Complete Wiring Harness

The Telrad LTE CPE 7000 Outdoor Customer Premise Equipment Installation

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2

BreezeMAX Wi² and BreezeACCESS Wi² Quick Installation Guide

TRC-190 User s Manual

TABLE OF CONTENTS SECTION 1 TABLETOP CONFIGURATION SECTION 2 TABLETOP CONFIGURATION ACCESSORIES SECTION 3 SLIDE CONFIGURATION

FortiCam SD20 Mounting Guide

Tile Plow Installation O Connell

Replacing the Billboard Diagnostic Camera

Transcription:

AlphaGateway SMG-01PE Quick Start Guide 9 Power-Passing Tap 2 AlphaGateway SMG 5 1 8 6 3 4 7 PoE Devices Security Camera Wi-Fi Radio 1. 1 RF Connector Test Port A -20dB test port allowing measurement of the downstream signal levels in the device. 2. 2 F Connector Powers the device via the F connection from a power-passing tap or directional coupler. 3. 3 Attenuation Port (2) A connection point for JXP-style attenuation pads to adjust the upstream and downstream RF levels. 4. 4 Grommet (2) A weather-tight grommet designed for a CAT5e (or better) Ethernet connection to the PoE port. 5. 5 Power-over-Ethernet (PoE) Port (2) Provides power to connected devices via a minimum 26 AWG CAT5e (or better) Ethernet cable (IEEE802.3at PoE+). 6. 6 Local Management Port Provides local Web page access to a personal computer via Ethernet cable. 7. 7 Enclosure Bolts (4) Hardware securing the top and bottom lid of the SMG. 8. 8 Ground Lug Mount Provides grounding through #6 AWG wire connection to a driven ground rod or the strand ground on the pole to which the unit is mounted. 9. 9 Security Location for optional Alpha security screw (Alpha p/n 647-189-13). 1

Pre-Installation Provision the SMG s DOCSIS Modem and RF MAC Address (including, but not limited to): Assign a cable modem configuration file with the EMS as a trap destination, CPE enabled, and the bandwidth set properly. Set up a billing account (if applicable). Provision each connected device (e.g. camera, Wi-Fi radio) using the device s MAC address. Install a Power Passing Tap on the hard coax. The SMG can also be connected to the hard coax through a directional coupler. Each device will register as a distinct CPE device; these may need fixed IP addresses depending upon the model. Ensure that unused ports are covered with plugs. Remove only the plugs necessary for installation. For other mounting options, refer to the SMG Technical Manual (Alpha p/n 018-344-B0-001). Tools Required (User-Supplied): Torque Wrench 7/16 (11mm) Socket 1/2 (13mm) Socket Drill (Wall Mount Installation) Signal Level Meter Strand Mount Installation 1. Take the two strand mount brackets from the strand bracket installation kit (Alpha p/n 746-627-20-001) and remove the two plugs from the top of the enclosure, securing the mounting brackets to the SMG in their place. Position the strand mounting brackets around the strand and verify the proper orientation as shown. Use the hex head bolts, lock washers, and flat washers from the strand bracket installation kit to secure the strand brackets to the SMG, torquing to 44.3 53.1 in-lbs (5 6 N-m). Bracket Hex head bolt Flat washer Lock washer SMG 2

The SMG must hang from the strand with the hinges facing down. 2. Hang both brackets on the strand through the clamps on the bracket as shown. For thicker 3/8 strands, reverse the orientation of the clamp so that the larger concave side faces the strand. Insert the carriage bolt through the back of the bracket and tighten the hex head nut, lock washer, and flat washer against the clamp on the front of the bracket, torquing to 79.7 88.5 in-lbs (9 10 N-m). Repeat for the second bracket. Hex head nut Lock washer Flat washer Carriage bolt Clamp Strand Bracket Ground lug mount 3. Properly ground the SMG by connecting a #6 AWG wire from the ground lug mount on the outside of the enclosure to either a driven ground rod or the strand ground on the pole to which the unit is mounted. Apply antioxidant compound (e.g. Noalox or equivalent) to the ground connection. 4. Proceed to the Start-Up and Verification section. 3

Wall Mount Installation 9.69 (246.2mm) 1/4-20x1/2 Bolt 1/4-20x1/2 Bolt Drill Here 10.64 (270.2mm) Drill Here 1/4-20x1/2 Bolt 1/4-20x1/2 Bolt 1. Align the bracket (Alpha p/n 746-645-20-001) into the desired installation position on the wall. Mark the four holes where the 5/16 (M8) hex head screws will be drilled into the wall. 2. Drill four pilot holes into the wall using the wall mount bracket as a template. If mounting to drywall, a stud should be located and used to secure any two of the hex head screws. 3. Using the four 1/4-20x1/2 bolts and flat washers, mount the SMG to the wall mount bracket with the 7/16 (11mm) socket, torquing to 44.3 53.1 in-lbs (5 6 N-m). The F connector must be facing down with the hinges on the enclosure facing left. 4. Mount the SMG and wall mount bracket on the wall by partially screwing in the top two 5/16 lag bolts without washers and hang the unit by the bracket with the key-holes. Install the other two lag bolts with washers and tighten all four. 5. Properly ground the SMG by connecting a #6 AWG wire from the ground lug mount on the outside of the enclosure to either a driven ground rod or the strand ground on the pole to which the unit is mounted. Apply antioxidant compound (e.g. Noalox or equivalent) to the ground connection. 6. Proceed to the Start-Up and Verification section. 4

Round Pole Mount Installation 1. Align the I-bracket (Alpha p/n 607-210-B1-001) on the back of the SMG as shown above, with the F connector on the SMG facing down. 2. Using the four 1/4-20 bolts, lock washers, and flat washers, mount the I-bracket to the SMG with the 7/16 (11mm) socket, torquing to 44.3 53.1 in-lbs (5 6 N-m). 3. Secure the round pole mount bracket (Alpha p/n 607-212-N2-001) to the pole using the metal straps. 4. Using the two 1/4-20 bolts, lock washers, and flat washers, fasten the SMG and I-bracket to the pole mount bracket with the 7/16 (11mm) socket, torquing to 44.3 53.1 in-lbs (5 6 N-m). The F connector must be facing down with the hinges on the enclosure facing left. 5. Properly ground the SMG by connecting a #6 AWG wire from the ground lug mount on the outside of the enclosure to either a driven ground rod or the strand ground on the pole to which the unit is mounted. Apply antioxidant compound (e.g. Noalox or equivalent) to the ground connection. 6. Proceed to the Start-Up and Verification section. 5

Square Pole Mount Installation 1. Align the I-bracket on the back of the SMG as shown above, with the F connector on the SMG facing down. 2. Using the four 1/4-20 bolts, lock washers, and flat washers, mount the I-bracket to the SMG with the 7/16 (11mm) socket, torquing to 44.3 53.1 in-lbs (5 6 N-m). 3. Secure the square pole mount bracket (Alpha p/n 607-211-N2-001) to the pole using the metal straps. 4. Using the two 1/4-20 bolts, lock washers, and flat washers, mount the SMG and I-bracket to the square pole mount bracket with the 7/16 (11mm) socket, torquing to 44.3 53.1 in-lbs (5 6 N-m). The F connector must be facing down with the hinges on the enclosure facing left. 5. Properly ground the SMG by connecting a #6 AWG wire from the ground lug mount on the outside of the enclosure to either a driven ground rod or the strand ground on the pole to which the unit is mounted. Apply antioxidant compound (e.g. Noalox or equivalent) to the ground connection. 6. Proceed to the Start-Up and Verification section. 6

Start-Up and Verification WARNING! ELECTRICAL HAZARD Low impedance grounding is mandatory for personnel safety and critical for the proper operation of the cable system. 1. Connect the powered-coax from the coaxial F connector port to the power-passing tap or directional coupler. When installing the coax to the F Connector, torque to 35 in-lbs (4.0 N-m). 2. Using the 1/2 (13mm) socket, loosen the four M8 enclosure bolts and open the SMG. If replacing the Pin to F Connector, first remove the coax from the F Connector, then loosen the Pin Seizure screw and remove the connector. Apply silicone-based o-ring grease (Dow Corning 55 O-Ring, or equivalent) to the 5/8-24 threads of the new connector. Install the new connector by hand (to avoid cross-threading) and tighten it to the enclosure with a torque of 44 in-lbs (5.0 N-m). Torque the Pin Seizure screw to 12 in-lbs (1.3 N-m). 3. Verify that the unit powers up by looking at the DOCSIS Modem POWER LED. 4. Measure the downstream power level of the RF connector Test Port with the signal level meter. The RF connector Test Port is located above the upstream and downstream attenuators. The reading obtained from the RF connector Test Port will be 20dB less than the actual power level of the cable plant. 5. Ensure that the downstream recieve signal level does not exceed +15dBmV. Attenuation can be adjusted through the replaceable JXP-style attenuators. DOCSIS Specifications limit downstream power levels to be within +15dBmV to -15dBmV. DOCSIS Modem LEDs RF Connector Test Port Pin Seizure Screw ETH ONLINE US DS POWER Downstream Attenuator POE OUTPUT 1 POE OUTPUT 2 LOCAL MGMT Upstream Attenuator 7

6. Once the first four LEDs on the DOCSIS modem are solid green (POWER, DS, US, and ONLINE) remove one (or both) of the grommet plugs below the F connector port to access the PoE ports from outside the enclosure. The fifth LED (ETH) will continually flash green as an indication that the SMG ports have established communications link necessary for PoE port MAC and IP connected device data reporting. The local port will be ready for connectivity approximately twenty seconds after this LED begins to continually flash. CAUTION! Failure to properly install the sealing insert and nut could result in water intrusion into the enclosure. 7. Feed the minimum 26 AWG Ethernet cable (4 6.6mm diameter) through the grommet hole. Plug the cable into the PoE port and torque the sealing nut to 12 in-lbs (1.5 N-m, hand tight), then connect the Ethernet cable to the desired device. Each PoE port has two LEDs to indicate PoE and communication status. Normally, the Body of the grommet connected to the enclosure stays installed. However, if it gets removed, apply silicone-based o-ring grease (Dow Corning 55 O-Ring, or equivalent) to the gasket surface that faces the enclosure, and reinstall, torquing to 30 in-lbs (3.5 N-m). 8. Proceed to the Web Page Access for Diagnostics section before returning to complete steps 9 and 10. 9. Close the lid on the AlphaGateway SMG and hand tighten the four M8 enclosure bolts. With the bolts firmly in place, use the 1/2 (13mm) socket to torque each to 44.3 48.7 in-lbs (5 5.5 N-m) following the order of the numbers on the enclosure. 10. Verify that the grommet for any unused PoE port remains plugged to ensure a weathertight enlcosure. A fifth bolt is available as an optional Alpha security screw (Alpha p/n 647-189-13). Torque to 26.6 in-lbs (3 N-m). Pin Seizure Screw Pin to F Connector Grommet Sealing Insert Clamping Claw Sealing Nut Body 8

ETH ONLINE US DS POWER POE OUTPUT 1 POE OUTPUT 2 LOCAL MGMT Web Page Access for Diagnostics 1. Connect an Ethernet cable (CAT5 or better) from the Local Management port to a laptop or similar device. 2. Open a Web browser. 3. Enter the default IP address (192.168.100.1) of the SMG into the Web browser s address field.the SMG s Web interface will load. 4. Navigate the site to record diagnostic information and verify operational status of the SMG. Refer to the DOCSIS page located under the System menu selection for signal level specifications. Install the appropriate amount of attenuation using the JXP-style attenuators to adjust the upstream and downstream signals to the desired level. If the SMG Home Page is not displayed after entering the default IP address, the computer may need a static IP address assigned to its network configuration settings. See the SMG technical manual (Alpha p/n 018-344-B0-001) located at www.alpha.com. 9

Worldwide Corporate Offices North America Tel: +1 360 647 2360 Fax: +1 360 671 4936 Europe Tel: +49 9122 79889 0 Fax: +49 9122 79889 21 Latin America Tel: +561 792.9651 Fax: +561 792.7157 Asia Pacific Tel: +852 2736.8663 Fax: +852 2199.7988 Alpha Technologies Alpha reserves the right to change specifications without notice. Alpha is a registered trademark of Alpha Technologies. For more information visit www.alpha.com 2017 Alpha Technologies Inc. All Rights Reserved.