HAA Tools Roadmap. October 26, 2016 PHAAUG Face to Face Meeting. April Freeman Reliability Services Engineer

Similar documents
TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers

Peak V&R R-T Voltage Security Assessment (VSA) Tool Validation 9/9/2014, JSIS. Hongming Zhang EMS Applications Manager, PEAK RC

Peak Reliability Coordination Services in the West March 30, 2018

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Project Consideration of Commission Directives in Order No. 693

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor

System Operations Division. PR-OC-229 Update Registers, Notifications, CANs, Update Transpower Website

Real-time Power System Operation. Energy Management Systems. Introduction

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision

Specifics of Implementation

FNM Expansion Training Webinar

2016 Fall ITO Stakeholder Meeting. Topics in Operations

System Operations Division. PR-OC-213_Conduct Peer Review of a Manual Security Constraint

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS.

Solutions for transmission network management

DRAFT Risks and Mitigations for Losing EMS Functions

Reliability Coordinator Procedure

EMS-LECTURE 2: WORKING OF EMS

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO

Midwest ISO. Module B- Network Integration Transmission Service Overview. Vikram Godbole Lead, Transmission Service Planning October 20, 2010

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence.

Standards Authorization Request Justification

Enhanced Curtailment Calculator Update

Dispatcher Training Simulator (DTS) JOB AIDE

Model Parts and Assembly. Jay Britton Britton Consulting LLC

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Residual Auction Revenue Rights

Residual Auction Revenue Rights

Real Time Monitoring of

Minnesota Hosting Capacity Analysis

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

The Future of Real-Time Energy Management Systems For Transmission System Operations

Achieving Smarter Grid Operation With On-Line DSA Technology

Installation Guide and Users Manual

Standard CIP Cyber Security Critical Cyber As s et Identification

Member Impacting Project Overview Data Push

On-line Estimation of Power System Security Limits

Year Assessment Preliminary Needs

Residual Auction Revenue Rights Enhancement

Transient Stability Analysis with PowerWorld Simulator

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia

PowerWorld Simulator 17 What s New in Simulator. Mark Laufenberg

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

SIGUARD System for Phasor Data Processing

Optimal Power System Management with SIGUARD

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

savvi Digital I/O Tool User Guide savvi 5.3 & 5.4

MOD Transmission Reliability Margin Implementation Document

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP

PAP13 - Harmonization of IEEE C with IEC and Precision Time Synchronization

2017 RTEP Assumptions for Western Sub-Region

primary Control Center, for the exchange of Real-time data with its Balancing

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

Model Parts and Assembly. Jay Britton Britton Consulting LLC

Power System Controls

Steve Ashbaker Director Operations. NASPI Workgroup Meeting February 21, 2013 Atlanta, GA

How to blend backup and high availability

ERO Enterprise IT Projects Update

Data Quality and Integrity Investigation in Laboratories (Analytical)

Geomagnetic Disturbances

Unofficial Comment Form Project Real-time Monitoring and Analysis Capabilities IRO and TOP-010-1

WAProtector Power System Wide Area Monitoring Protection and Control

Forced and Planned Outage Substitution, RAAIM Pre-Calc

EIM Entity Readiness Criteria May 6, 2015

USE CASE 14 CONTROLLED ISLANDING

TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements. FRCC Spring RE Workshop April 17-18, 2018

Synchrophasors and Next Generation Energy Management Systems (EMS)

Chapter 2 State Estimation and Visualization

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

RC Coordination Efforts

PJM Emergency Procedures

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Southwest Power Pool Portal Market Participant General User s Guide

Connection of Distributed Generation to Enel's Network in the Transition Period from Passive Networks to Smartgrids.

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

Resource Adequacy Pre-Market Simulation Training Workshop

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Standards Authorization Request Form

OVERVIEW: KEY APPLICATIONS

USE CASE 13 ADAPTIVE TRANSMISSION LINE PROTECTION

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra

Duplicate Detection addon for Dynamics CRM by Cowia

Multi User Operations Training Simulator. Trainers Workshop Reception

Always an eye to security

User Guide. Document Version: 1.0. Solution Version:

TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER

Perry. Lakeshore. Avon. Eastlake

UCT Application Development Lifecycle. UCT Business Applications

RELIABILITY OF THE BULK POWER SYSTEM

Data Miner 2 Release Notes Release 18.09

Transcription:

HAA Tools Roadmap October 26, 2016 PHAAUG Face to Face Meeting April Freeman Reliability Services Engineer

Situational Awareness View 2 The proposal for Situational Awareness View is for filtering and grouping contingencies o No notes or attachments are supported igrid displays have an underlying XML file that feeds the display o Exploring the option of updating the XML file based on the subscriptions that you maintain as part of RTCA Alarming o Your subscriptions would feed your own custom RTCA igrid display

Automating Studies Peak is planning to work with one of our customers to test the ability for you to automate topology changes due to outages in STNET studies Peak will provide you with the file format required to input data, you will be responsible for creating outage files in correct format. 3

Automation Considerations Updates to the file management tool Peak needs to figure out: o Shared Folder o Load data may need to include data for all entities so may not be available for automatic input in first trial 4

What else should we focus on? Voltage Stability Analysis SMTNET Dynamic Limit Assessments 5

Voltage Stability Analysis 6 Voltage Stability Analysis in STNET allows the user o To stress any case to see where the limit of the system is by applying a custom scenario to predefined interfaces Network copy of current case Study case with contingencies applied Planning case o Get a precise idea of how much load can be added to the system before there is an invalid solution

VSA Custom Scenarios 7 Define Source Area(s) o Define specific units to include/exclude Define Sink Area (s) o Define specific loads to include/exclude Define an Interface o Define all lines that you want to monitor between source/sink Define maximum increase & iteration step size (MW) for stressing system

VSA Considerations Peak to define custom scenarios for you Need to figure out o If interfaces can be created for HAA only There is the ability to create interfaces via the UI, but it will probably get deleted after each new case is loaded into a clone o If custom display(s) needs to be created Can HAA users see others scenarios 8

SMTNET Multiple Timepoint Network Study Performs look ahead study for each timepoint For each timepoint, it reads scheduled outages, generation profile, load forecast, and interchange schedule data. Max No. of timepoints: 12 (configurable) 9

Overview 1. Create multiple timepoints Analyst Trigger Study Summary 6. Store violation For every timepoint 2. Read databases smtnet netmom ctgs rasmom 5. Run Contingency Analysis STCA 3. Update schedules and flat file data 4. Run Power Flow NPF netmom ctgs rasmom 10

User Interface 11

Performing Multi Timepoint Study Start Task Retrieve latest NETMOM, CTGS, RASMOM databases Create Time Points 12

Performing Multi Timepoint Study Initialize Timepoints Read input data In-Service, Out of Service equipment data Area load forecast data Area net Interchange Schedules Generation profile 13

Performing Multi Timepoint Study Review Input Data igrid display Run Solution Sequence with just PWRFLOW 14

Performing Multi Timepoint Study 15

Performing Multi Timepoint Study Review basecase violations 16

Performing Multi Timepoint Study Run Solution Sequence with Contingency Analysis 17

Results Run Solution Sequence with Contingency Analysis 18

Results 19

Additional features Enable/Disable contingency groups Enable/Disable certain RAS schemes Each timepoint can be linked to a different savecase Various savecase creation options 20

SMTNET Considerations Peak is not currently performing multi timepoint studies o Process driven, not application driven Licensing with GE 21

Dynamic Limit Assessment IROLs/SOLs Total Transfer Capability 22

Thank you April Freeman afreeman@peakrc.com (360)213-2675