APPROVED SUMMARY OF TSG-S MEETING for February 2006 in Jeju, Korea

Similar documents
APPROVED SUMMARY OF TSG-S MEETING for September 2006 in Xi an, China

Title: Source: Abstract: Recommendation: Notice: Page 1. APPROVED SUMMARY OF 3GPP2 TSG-C MEETINGS for 5 October 2004 Interim Plenary Conference Call

Abstract: This document is a summary of the 3GPP2 TSG-S meetings that were held during the period of 6-9 February 2012.

APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call

TSG-S Meeting Summary: July Seoul, Korea Page 1. APPROVED SUMMARY OF TSG-S MEETING for the period of July 2001 in Seoul, Korea.

APPROVED SUMMARY OF 3GPP2 TSG-C MEETING for 28 December 2001 conference call.

July 2004 TSG-X Meeting Summary

System Release Guide for the (R4) Release of the cdma2000 System Specifications

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Meeting Summary Orlando, FL USA

Guilin, China September 9, GPP2 TSG-SX. Meeting Summary #2 Miami, Florida

Miami, Florida June 3, GPP2 TSG-SX. Meeting Summary #1 Busan, Korea

TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA

3GPP2 Access Network Interfaces TSG (TSG-A) #69 Meeting Summary

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Meeting Summary Wailea, HI

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA

3GPP2 Access Network Interfaces TSG (TSG-A) #39 Draft Meeting minutes

3GPP2 From Geneva to San Francisco. Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee

3GPP2 Overview. Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom

System Release 4 Standardized Services and Features

3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington

3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI

3GPP2 Access Network Interfaces TSG (TSG-A) #24 Draft Meeting minutes

ESN Migration to MEID - Milestones & Timeline

3GPP2 Access Network Interfaces TSG (TSG-A) #25 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #30 Draft Meeting minutes

DRAFT SUMMARY OF 3GPP2 TSG-C MEETINGS for 8-12 July 2002 in San Diego, CA (USA)

IMT-2000 MC-CDMA System

cdma2000 Technology Initiative

Mar 3,2005 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE

Liaison Report to IFAST Meeting #22. Cellular. Networking. Perspectives

IMT-2000 MC-CDMA System

ARIB TR-T13-C.R v1.0. cdma2000 Multimedia Services Evaluation Methodology: Software Tools

Test Plan for CDMA Mobile Stations

Networking Perspectives

Partnership. Organizational Partners (SDOs) Market Representative Partners. Regional standards organizations:

Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC

3GPP2 Drafting Rules. SC.R1005-A Version 1.0 March GPP2

Test Plan for CDMA Mobile Stations

SIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA2000 1X AND HIGH RATE PACKET DATA SYSTEMS REVISION A

Editor: David Crowe Phone Vol. 10, No. 1 January, The Development of cdma2000 Standards

Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China

CDMA International Roaming

Liaison Report to IFAST Meeting #18

WLAN Coexistence Liaison Report

Interoperability & Global PoC Standards

From: Jean Johnson Sent: Wednesday, July 12, :06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

Agenda: 1) Determine what the appropriate format and content for the draft should be; and 2) Determine how the editorial team should move forward

ISO/IEC JTC 1 N

Draft Liaison Report to IFAST Meeting #16

IEEE Broadband Wireless Access Working Group < WirelessMAN coexistence function primitives consolidation

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

3GPP TS V6.4.0 ( )

All-IP System MMD Roaming Technical Report

IEEE P Wireless Personal Area Networks. TG9 KMP Minutes for November 2013 Plenary meeting, Dallas, TX USA

IEEE C /08

Approved by General Counsel. TR-41.3 Meeting Report Date(s): 11/20/ /20/2014 Location: Tuscon, AZ Approved: 12/05/2014

ARIB STD-T64-C.S v1.0. Mobile Equipment(ME) Conformance Testing with CSIM for cdma2000 Spread Spectrum Standards

Transcoder Free Operation

IEEE Broadband Wireless Access Working Group < Early transmission of higher layer packets in the idle mode

ETSI TS V (201

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) COMMENTS OF THE ALLIANCE FOR TELECOMMUNICATIONS INDUSTRY SOLUTIONS

Leading The Way With CDMA. Adam Gould CTO, CDMA VP Technology Management and Strategy Nokia Mobile Phones Business Group 27 May 2004 NOKIA

All-IP Core Network Multimedia Domain

TS-3GB-S.R0079-0v1.0 Support for End-to-End QoS Stage 1 Requirements

ETSI TS V ( )

ARIB STD-T64-C.R1001-E v1.0. Administration of Parameter Value Assignments for cdma2000 Spread Spectrum Standards, Release E

IEEE 802 EC ITU standing committee

Status of IMS-Based Next Generation Networks for Fixed Mobile Convergence

MEID FAQ. (FAQs also assist in the ESN and UIM_ID transition to MEID & EUIMID)

The 3GPP vision. Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group

3GPP Work Item Description. Title: Study on Licensed-Assisted Access using LTE

The Mobile Equipment Identifier (MEID)

IEEE Broadband Wireless Access Working Group < Proposal for MAC protocol modification for

1xEV-DO Inter-Operability Specification (IOS) for CDMA 2000 Access Network Interfaces

ISO/IEC JTC1/SC7 /N3945

Prepaid Packet Data Service in cdma2000 Wireless IP Network

Message definition to support MS network entry in centralized allocation model

Relay Support for Distributed Scheduling and its Bandwidth Request/Allocation Mechanism

IEEE 802 LMSC Guidelines Revision 1.6

IEEE C /26. IEEE Working Group on Mobile Broadband Wireless Access <

The 3GPP Standardization Process

IEEE Presentation Submission Template (Rev. 8.3)

ETSI TC INT IMS Network Testing Group. Giulio Maggiore TC INT Chair

IEEE P802.3cm 400G over MMF Task Force Agenda & General Information

PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE. Contents

ETSI TS V2.3.1 ( )

Agenda and General Information

Round Trip Delay Optimization

E2-E3: CONSUMER MOBILITY. CHAPTER-5 CDMA x OVERVIEW (Date of Creation: )

CDMA2000 Workshop. Paul Le Rossignol. Nortel Networks, OMA Board Director

IEEE 802 Network Enhancements for the Next Decade Industry Connections Activity

Agenda and General Information

8 May 2018 IEEE P IEEE P Smart Grid TAG

Marek Hajduczenia, ZTE Corp.

ETSI TS V9.0.0 ( ) Technical Specification

ETSI TS V ( ) Technical Specification

Transcription:

Page of Title: Source: Clifton J. Barber SECRETARY SUMMARY OF TSG-S MEETING for 0- February 00 in Jeju, Korea 0 0 0 Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0 (0) 0- (0) -0 fax cbarber@cjbarberconsulting.com Abstract: This document is a summary of the GPP TSG-S meetings that were held during the period of 0- February 00 in Jeju, Korea. Recommendations: For review and approval. Notice: 00 GPP KDDI grants a free, irrevocable license to GPP and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of GPP publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. KDDI is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner's standard which incorporates this contribution. This document has been prepared by KDDI to assist the development of specifications by GPP. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on KDDI. KDDI specifically reserves the right to amend or modify the material contained herein and to any intellectual property of KDDI other than provided in the copyright statement above.

Page of 0 0 0 During the period of 0- February 00, GPP TSG-S meetings were held at the Jeju Shilla Hotel in Jeju, Korea. This document is intended to summarize those proceedings. OPENING PLENARY. CALL TO ORDER AND OPENING REMARKS: The meeting was called to order on 0 February 00 at :0 PM local time by TSG-S Chair, Nick Yamasaki (KDDI). The Chair welcomed the participants to Jeju. The meeting participants each introduced themselves and were requested to sign-in electronically using the server sign-in facility.. ATTENDANCE REGISTRATION AND ROLL CALL: A roll call of TSG-S active companies indicated companies in attendance out of active companies (% participation). Thus, meeting quorum was achieved. The Secretary noted that no proxy statements had been received for this meeting. DISTRIBUTION AND NUMBERING OF CONTRIBUTIONS: Contributions were documented in S00-0000-000. All contributions were distributed in soft copy format and made available from the LAN based server.. ADOPTION OF AGENDA: The proposed agenda (S00-0000-00) was presented and reviewed. DECISION: The agenda was approved without objection as submitted (S00-0000-00).. REVIEW AND APPROVAL OF PREVIOUS MEETING SUMMARY: The summary of the January 00 TSG-S meeting in Vancouver, BC, Canada (S00-0000-00) was presented. DECISION: This summary was approved as modified by the discussion (S00-0000-00R). ACTION: The Secretary took an action to move all references to RESCINDED or WITHDRAWN from the Projects in Development list to the Published documents list in the meeting summary starting with this report.. REVIEW OF ACTION ITEMS FROM PREVIOUS MEETING: The following action items were left open from the January 00 meeting and require additional consideration: 00-0 Volunteers are being solicited for the position of Vice Chair. Interested parties should contact Chair, Alex Gogic (QUALCOMM). This action is still OPEN and the need for support in this area is urgent. 00-0 Nokia took an action to resolve the outstanding concerns detailed as Plenary action in the Report (S00-000-0). This action is still OPEN.. CORRESPONDENCE AND LIAISON REPORTS OP: No contributions.

Page of 0 0 0 SC: No contributions. GPP SECRETARIAT: The following correspondences were noted from the GPP Secretariat: E-mail correspondences regarding SC level review and approval of S.S00-xxx-C v.0 OAM&P (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to WG as FYI. E-mail correspondences regarding SC level review and approval of S.S00-0 v.0 cdma000 Network Performance Measurement Types (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to WG as FYI. E-mail correspondence dated 0 January 00 regarding V&V review of S.P00-A v.0. WLAN Interworking (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. E-mail correspondence dated 0 January 00 regarding V&V review of S.P00-0 v0. HRPD-cdma000 x Interoperability for Voice and Data System Requirements (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. E-mail correspondence dated 0 January 00 regarding V&V review of SC.P00-0 v.mobile Equipment Identifier (MEID) GHA (Global Hexadecimal Administrator) Assignment Guidelines and Procedures (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to the Numbering AdHoc as FYI. E-mail correspondence dated January 00 regarding SC level review of six () work item worksheets (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. E-mail correspondence dated February 00 regarding SC level approval of three () work item worksheets (S00-0000-00) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. Correspondence to all TSGs dated January 00 regarding Proposed Work Item Review over the signature of the TSG-S Chair (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by.

Page of 0 0 0 V&V comments regarding S.P00 v0. GBA Framework (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. V&V comments regarding S.P0-0 v0. Security using GBA (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. V&V comments regarding S.P00-A v0. cdma000 WLAN Interworking (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. V&V comments regarding S.P00-0 v0. cdma000 x-hrpd Interoperability (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. V&V comments regarding SC.P00-0 v. GHA Guidelines (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to the Numbering AdHoc for review and action as appropriate. GPP Workplan files (S00-0000-0) was presented from the GPP Secretariat. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by. E-mail correspondence dated February 00 regarding GPP meeting planning (S00-0000-0) was presented from the GPP Secretariat as FYI for the TSG. ACTION: The Chair took an action to inform the SC that TSG-S participants have indicated a strong concern regarding the present meeting calendar and venue selection process in that the TSG participants should have the opportunity to review the potential meeting venues and provide meaningful feedback prior to commitment by contract. TSG-A: The following contributions were discussed: Correspondence dated 0 January 00 regarding TSG-A Work Item and Stage Review (S00-0000-00) was presented from TSG-A. ACTION: This contribution was remanded to and for review and action as appropriate.

Page of 0 0 0 Correspondence dated 0 January 00 regarding Release Release Critical Work Items Open Issues (S00-0000-00) was presented from TSG-A. ACTION: This contribution was remanded to for review and action as appropriate. TSG-C: The following contributions were discussed: The TSG-C Liaison Report for January 00 (S00-0000-00) was presented from the TSG-C Liaison as FYI for TSG-S. ACTION: All TSG-C WIs that were approved in January 00 (S00-0000-00A through S00-0000-00H) were remanded to for review and action as appropriate. Correspondence to TSG-A and TSG-X dated 0 January 00 regarding x to HRPD handoff (S00-0000-00) was presented from TSG-C. ACTION: This contribution was remanded to as FYI. Correspondence to TSG-A dated 0 January 00 regarding DoS DBM (DataOverSignaling using a Data Burst Message) (S00-0000-00) was presented from TSG-C. ACTION: This contribution was remanded to as FYI. Correspondence dated 0 January 00 regarding Proposed Work Item Review (S00-0000-00) was presented from TSG-C. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence dated 0 January 00 regarding GPP Workplan Question Updates (S00-0000-00) was presented from TSG-C. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence to TSG-X dated 0 February 00 regarding TSG-C Review of TSG-X EUIMID Proposal (S00-0000-0) was presented from TSG-C. ACTION: This contribution was remanded to and the Numbering AdHoc for review and action as appropriate. TSG-X: The following contributions were discussed from TSG-X: Correspondence dated 0 January 00 regarding Proposed New Work Item: HRPD-WLAN Simple IP Interoperability for Voice (S00-0000-00) was presented from TSG-X. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence dated 0 January 00 regarding Work Items GPP-00 and GPP-00 (S00-0000-0) was presented from TSG-X. ACTION: This contribution was remanded to for review and action as appropriate.

Page of 0 0 0 Correspondence to OMA MWG MMSG dated 0 January 00 regarding Recent Liaison Statements (S00-0000-0) was presented from TSG-X. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence to TSG-A dated 0 January 00 regarding Response for Correspondence on "Handoff With QoS Mode Changes" (S00-0000- 0) was presented from TSG-X. ACTION: This contribution was remanded to and as FYI. TR: The following contributions were discussed: Correspondence dated January 00 regarding Transposition of TSG-S Documents (S00-0000-0) was presented from TIA TR AHAG as FYI for TSG-S. Correspondence dated February 00 regarding S.P00 v0. IP based Location Security Framework (S00-0000-0) was presented from TIA TR. ACTION: This contribution was remanded to for review and action as appropriate. TIA Ballot Comments on S.P00 (TIA PN--0) GBA Framework (S00-0000-0) was presented from TIA TR AHAG. ACTION: This contribution was remanded to for review and action as appropriate. TIA Ballot Comments on S.P0 (TIA PN--0) GBA Security (S00-0000-0) was presented from TIA TR AHAG. ACTION: This contribution was remanded to for review and action as appropriate. ITU: No contributions. GPP: No contributions. GPP-SA and TM: No contributions. WiFi Alliance/IEEE 0: No contributions. OMA (Open Mobile Alliance): The following contribution was discussed: An LS dated 0 January 00 regarding request for support for OMA PoC v.0 Performance Enhancements (S00-0000-0) was presented from OMA REQ. ACTION: This contribution was remanded to for review and action as appropriate and as FYI. CDG: No contributions.

Page of 0 0 0 OTHER: No contributions.. NEW/OLD BUSINESS: The following contribution was discussed: A contribution related to http://www.gpp.org Specification/Report Cleanup (S00-0000-0) was presented from Samsung. ACTION: This contribution was remanded to all WGs for review and comment by the closing Plenary.. WG BUSINESS: ISSUES: The following contribution was discussed: DECISION: Proposed correspondence to OMA REQ regarding support for PoC Session Priority Access Levels (S00-0000-0R) was approved without objection for liaison with its attachment to TSG-C and TSG-X MMD for review and comment by our closing Plenary. WG ISSUES: No additional contributions or issues were noted. (PMT) ISSUES: No additional contributions or issues were noted. ISSUES: The following contributions were discussed: V&V comments on S.P00-0 v0. Generic Bootstrapping Architecture (GBA) Framework (S00-0000-0) was presented from Axalto. ACTION: This contribution was remanded to for review and action as appropriate. V&V comments on S.P00-0 v0. Generic Bootstrapping Architecture (GBA) Framework (S00-0000-00) was presented from Nokia. ACTION: This contribution was remanded to for review and action as appropriate. WG ISSUES: No additional contributions or issues were noted. EQUIPMENT NUMBERING ADHOC ISSUES: The following contribution was discussed: A contribution regarding Numbering Plans Related to Expanded R-UIM Identifier (S00-0000-0) was presented from KDDI. ACTION: This contribution was remanded to the Numbering AdHoc for review and action as appropriate. The Plenary was recessed on 0 February 00 at :00 PM local time.

Page of 0 0 0 CLOSING PLENARY The Plenary was reconvened on February 00 at :0 PM local time by TSG-S Chair, Nick Yamasaki (KDDI). Quorum had been established at the opening Plenary and was not challenged at this session. One () additional GPP individual member company was noted in attendance. 0. WORKING GROUP REPORTS: Report (S00-0000-0) was presented by the Chair, Alex Gogic (QUALCOMM), as FYI. Vice Chair position is still OPEN and volunteers are needed. Progressed the development of the following documents: S.P00-A End-to-end Quality of Service Stage Revision A S.P00-A WLAN Interworking Stage Revision A S.P00-0 HRPD - cdma000 Interworking SRD S.P0-0 Expanded R-UIM ID Stage S.P0-0 Enhanced cdma000 SRD S.P0-0 Emergency Call Support on HRPD Flexible A Interface (New Business) has scheduled a joint teleconference on OMA PoC v.0 Requirements related to PoC performance targets: March00, - PM Central Time (North America); March AM in Asia. Discussed issues related to clean-up of the specification page on the GPP website. Reviewed GPP workplan and documented all comments in S00-0000-0C. ACTION: comments on the GPP Workplan (S00-0000-0C) were remanded to for review and action as appropriate. DECISION: Proposed correspondence to OMA REQ regarding support for PoC Session Priority Access Levels (S00-0000-) was approved without objection for transmission with the TSG review version of S.P0-0 attached. DECISION: Proposed correspondence to TSG-X regarding S.R000 and TIA- (S00-0000-) was approved without objection for transmission. DECISION: S.P00-A v0. Support for End-to-End QoS Stage Requirements (S00-0000-0) was approved without objection as TSG review text.

Page of 0 0 0 DECISION: Proposed correspondence to all TSGs regarding TSG review of S.P00-A v0. Support for End-to-End QoS Stage Requirements (S00-0000-) was approved without objection for transmission with S00-0000-0 as an attachment. DECISION: S.P00-A cdma000 WLAN Interworking Stage Requirements (S00-0000-0) was approved without objection for publication as S.R00-A v.0. DECISION: S.P00-0 HRPD-cdma000 x Interoperability for Voice and Data System Requirements (S00-0000-0) was approved without objection for publication as S.R00-0 v.0. DECISION: Proposed correspondence to all TSGs regarding a joint teleconference to address OMA PoC v.0 Performance Targets (S00-0000-) was approved without objection for transmission. DECISION: Proposed correspondence to TSG-X regarding Expanded UIMID Format Position (S00-0000-R) was approved without objection for transmission. WG Report (S00-0000-0) was presented by WG Chair, John Kay (Motorola), as FYI. The publication of S.P00-0 v..0 is still on hold until referenced documents are published. Reviewed issues related to clean-up of the specification page on the GPP website but additional discussion is needed to finalize a WG position. WG comments on the GPP workplan is noted in S00-0000-0A WG comments on WI-000 Packet Data Network Access Evolution is noted in S00-0000-0B ACTION: WG comments on the GPP Workplan and WI-00 were remanded to for review and action as appropriate. DECISION: Proposed correspondence to all TSGs regarding TSG review of S.P00-A v0. IP Network Architecture Model for cdma000 Spread Spectrum Systems (S00-0000-) was approved without objection for transmission with its attachment. PMT Report (S00-0000-0) was noted by PMT Chair, Eileen Hadwen (NEC), as FYI. This report was not reviewed in detail. DECISION: The following WIs were approved without objection for TSG review as distributed by the PMT Manager: GPP-00: Signaling Conformance Spec for Multi-Flow Packet Applications (S00-0000-0C)

Page 0 of 0 0 0 GPP-00: Simulation Methodology for Multimedia Services (RTPSIM-0) (S00-0000-0D) GPP-00: Markov Service Option (MSO) point release (S00-0000-0E) GPP-00: A new revision to the AN Minimum Performance Standard to support HRPD Rev. B and BCMCS Rev. A access network (S00-0000-0F) GPP-000: A new revision to the AT Minimum Performance Standard to support HRPD Rev. B and BCMCS Rev. A access terminals (S00-0000-0G) GPP-00: Revision B of Test Application Specification to Support HRPD Rev B and BCMCS Rev A (S00-0000-0H) GPP-00: Revision B of Signaling Conformance Specification to Support HRPD Rev B and BCMCS Rev A (S00-0000-0I) GPP-00: Point Release of Over-the-Air Service Provisioning Specification (S00-0000-0J) GPP-00: HRPD-WLAN Simple IP Interoperability for Voice (S00-0000-0K) GPP-00: A-Interface Flexibility (A-Flex) (S00-0000-0L) DECISION: The following WIs were approved without objection for SC level review as distributed by the PMT Manager as available from the GPP website unless indicated as a contribution number below: GPP-00: HRPD Supplemental Services Update GPP-00: Update to Data Service Options for Spread Spectrum Systems: Service Options and DECISION: Proposed correspondence to all TSGs regarding Invitation to a Joint Session on April 00 during the : - :00 PM timeframe to review the proposed work item GPP-00: A-interface flexibility support (A-Flex) (S00-0000-0) was approved without objection for transmission with its attachments. ACTION: Larry Young (Sprint/Nextel) took an action to secure responses to questions from the sponsors of GPP-000: Location Services (Sprint/Nextel, LGE, Verizon, QUALCOMM) as indicated in the Report (S00-0000-0R). DECISION: Proposed correspondence to all TSGs and MRPs regarding Reminder for Joint Session to Review SC.R00-00-0 v0., "System Release Guide for the (R) Release of the cdma000 System Specifications" (S00-0000-) was approved without objection for transmission with its attachment.

Page of 0 0 0 Report (S00-0000-0) was presented by Chair, Adrian Escott (QUALCOMM), as FYI. Progressed the development of the following documents: S.P00 GBA Framework S.P0 Security Mechanisms using GBA S.P00-0 Location Security Framework Discussed issues related to clean-up of the specification page on the GPP website. DECISION: Proposed correspondence to TIA regarding TIA Ballot Comments on S.P00-0 v0. (TIA PN--0) (S00-0000-R) was approved without objection for transmission with its attachments. DECISION: Proposed correspondence to TIA regarding TIA Ballot Comments on S.P0-0 v0. (TIA PN--0) (S00-0000-) was approved without objection for transmission with its attachments. DECISION: S.P00-0 IP-Based Location Services Security Framework (S00-0000-) was approved without objection for publication as S.S00-0 v.0. WG Report (S00-0000-0) was presented by John Kay (Motorola), as FYI. Progressed the development of the following documents: S.P00-xxx-C "OAM&P for cdma000 (GPP R Delta Specification)" Definition of Performance Measurement Types WG comments on the TSG-S discussion of clean-up of the specification pages on the GPP website was noted as S00-0000-0A. DECISION: Proposed correspondence to GPP SA regarding GPP SA and GPP TSG-S WG IMS Harmonization (S00-0000-) was approved without objection for transmission. ACTION: The WG Report (S00-0000-0) was remanded to for review and action as appropriate with respect to the WG review of WIs as detailed in section of that report. The Equipment Numbering AdHoc Report (S00-0000-0R) was presented by AdHoc Chair, Alex Gogic (QUALCOMM), as FYI. Progressed the development of the following projects: SC.R00 MEID GHA Assignment Guidelines and Procedures Expanded UIM Identifier

Page of 0 0 0 DECISION: SC.P00-0 GHA MEID Assignment Guidelines and Procedures (S00-0000-0) was approved without objection for publication as SC.R00-0 v.0 and liaised to TIA TR EUMAG. The Numbering AdHoc request for the Chair to petition the SC for the allocation of an SC.R document (SC.R00-0 is proposed) with the tentative title "Guidelines and Procedures for Allocation and Administration of Numbering Space for Expanded R-UIM Identifiers" was withdrawn pending further consideration in the AdHoc.. ADDITIONAL CORRESPONDENCES AND LIAISON REPORTS: OP: The following contribution was discussed: A contribution regarding GPP Drafting Rules Topics (S00-0000- ) was presented from the WPD AdHoc as FYI for TSG-S. SC: No contributions. GPP SECRETARIAT: No contributions. TSG-A: No contributions. TSG-C: No contributions. TSG-X: The following contribution was discussed: Correspondence to TSG-C dated 0 February 00 regarding Advanced copy of LS from ITU-R WP F (S00-0000-) was presented from TSG-X as FYI for TSG-S. TR: No contributions. TR AHAG: No contributions. ITU: No contributions. GPP: No contributions. GPP-SA and TM: No contributions. WiFi Alliance/IEEE 0: No contributions. OMA (Open Mobile Alliance): No contributions. CDG: No contributions. OTHER: No contributions.. NEW BUSINESS (continued): No contributions.

Page of 0 0 0. OLD BUSINESS (continued): An update of the contribution related to http://www.gpp.org Specification/Report Cleanup (S00-0000-0R) was presented from Samsung. ACTION: The Chair took an action to make a recommendation to the SC that the GPP website make all specification and report revisions for all TSGs on the GPP publications page but to clearly identify those that have been superseded. The TSG-S Document Status Table (S00-0000-00) was presented and reviewed. DECISION: This contribution was approved (S00-0000- 00R) pending final review by WG Chairs and document Editors by COB next Tuesday.. ADMINISTRATION AND OTHER BUSINESS: The future meeting schedule for TSG-S is noted as follows: -0 March 00 - April 00 - May 00 Dallas Addison Marriott Quorum in Dallas, TX, USA Fairmont Kansas City in Kansas City, MO Grand Hyatt Regency Denver Hotel in Denver, CO, USA Although not explicitly reviewed during the meeting, the assignments, other than document remands, that were not completed at this meeting are summarized as follows: 00-0 Volunteers are being solicited for the position of Vice Chair. Interested parties should contact Chair, Alex Gogic (QUALCOMM). 00-0 Nokia took an action to resolve the outstanding concerns detailed as Plenary action in the Report (S00-000-0). 0000-0 The Secretary took an action to move all references to RESCINDED or WITHDRAWN from the Projects in Development list to the Published documents list in the meeting summary starting with this report. 0000-0 The Chair took an action to inform the SC that TSG-S participants have indicated a strong concern regarding the present meeting calendar and venue selection process in that the TSG participants should have the opportunity to review the potential meeting venues and provide meaningful feedback prior to commitment by contract. 0000-0 Larry Young (Sprint/Nextel) took an action to secure responses to questions from the sponsors of GPP-000: Location Services (Sprint/Nextel, LGE, Verizon, QUALCOMM) as indicated in the Report (S00-0000-0R). 0000-0 The Chair took an action to make a recommendation to the SC that the GPP website make all specification and report revisions for all TSGs on the GPP publications page but to clearly identify those that have been superseded. This meeting was adjourned on February 00 at approximately : PM local time.

Page of

Page of A listing of the contributions for this meeting is itemized below: NUMBER SUBJECT OPENING PLENARY - GPP-S00-0000- 000 CONTRIBUTION REGISTER 00 AGENDA 00 Meeting Summary - January 00 - Vancouver, BC, Canada 00 00 00 00 00 00 00 00 0 0 0 0 0 0 0 TSG-C Liaison Report - January 00 Correspondence to TSG-A and TSG-X dated 0 January 00 regarding x to HRPD handoff Correspondence to TSG-A dated 0 January 00 regarding DoS DBM (DataOverSignaling using a Data Burst Message) Correspondence dated 0 January 00 regarding Proposed Work Item Review Correspondence dated 0 January 00 regarding GPP Workplan Question Updates Correspondence dated 0 January 00 regarding TSG-A Work Item Review Correspondence dated 0 January 00 regarding Release Release Critical Work Items Open Issues Correspondence dated 0 January 00 regarding Proposed New Work Item: HRPD-WLAN Simple IP Interoperability for Voice Correspondence dated 0 January 00 regarding Work Items GPP-00 and GPP-00 Correspondence to OMA MWG MMSG dated 0 January 00 regarding Recent Liaison Statements Correspondence to TSG-A dated 0 January 00 regarding Response for Correspondence on Handoff With QoS Mode Changes E-mail correspondences regarding SC level review and approval of S.S00-xxx-C v.0 OAM&P E-mail correspondences regarding SC level review and approval of S.S00-0 v.0 cdma000 Network Performance Measurement Types E-mail correspondence dated 0 January 00 regarding V&V review of S.P00-A v.0. WLAN Interworking E-mail correspondence dated 0 January 00 regarding V&V review of S.P00-0 v0. HRPD-cdma000 x Interoperability for Voice and Data System Requirements SOURCE SECRETARY CHAIR SECRETARY TSG-C LIAISON TSG-C TSG-C TSG-C TSG-C TSG-A TSG-A TSG-X TSG-X TSG-X TSG-X GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT ACTION FYI APPROVAL APPROVAL FYI, A-G for APPROVAL,, WG WG

Page of NUMBER 0 0 00 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 SUBJECT E-mail correspondence dated 0 January 00 regarding V&V review of SC.P00-0 v.mobile Equipment Identifier (MEID) GHA (Global Hexadecimal Administrator) Assignment Guidelines and Procedures E-mail correspondence dated January 00 regarding SC level review of six () work item worksheets E-mail correspondence dated February 00 regarding SC level approval of three () work item worksheets Correspondence to all TSGs dated January 00 regarding Proposed Work Item Review over the signature of the TSG-S Chair V&V comments regarding S.P00 v0. GBA Framework V&V comments regarding S.P0-0 v0. Security using GBA Correspondence dated January 00 regarding Transposition of TSG-S Documents Correspondence dated February 00 regarding S.P00 v0. IP based Location Security Framework TIA Ballot Comments on S.P00 (TIA PN--0) GBA Framework TIA Ballot Comments on S.P0 (TIA PN--0) GBA Security LS dated 0 January 00 regarding request for support for OMA PoC v.0 Performance Enhancements V&V comments on S.P00-0 v0. Generic Bootstrapping Architecture (GBA) Framework V&V comments on S.P00-0 v0. Generic Bootstrapping Architecture (GBA) Framework V&V comments regarding S.P00-A v0. cdma000 WLAN Interworking V&V comments regarding S.P00-0 v0. cdma000 x-hrpd Interoperability V&V comments regarding SC.P00-0 v. GHA Guidelines Numbering Plans Related to Expanded R-UIM Identifier GPP Workplan files E-mail correspondence dated February 00 regarding GPP meeting planning http://www.gpp.org Specification/Report Cleanup Correspondence to TSG-X dated 0 February 00 regarding TSG-C Review of TSG-X EUIMID Proposal Proposed correspondence to OMA REQ regarding support for PoC Session Priority Access Levels SOURCE GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT TIA TR AHAG TIA TR TIA TR AHAG TIA TR AHAG OMA REQ AXALTO NOKIA GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT KDDI GPP SECRETARIAT GPP SECRETARIAT SAMSUNG TSG-C ACTION NUMBERING ADHOC ALL WGs FYI, NUMBERING ADHOC NUMBERING ADHOC ALL WGs FYI ALL WGs, NUMBERING ADHOC APPROVAL

Page of NUMBER CLOSING PLENARY - GPP-S00-0000- 00 Document Status Table 0 Report 0 WG Report 0 0 0 0 0 0 0 0 0 PMT Report SUBJECT Report WG Report Numbering AdHoc Report SC.R00-0 v.0 GHA MEID Assignment Guidelines and Procedures proposed publication text S.P00-A cdma000 WLAN Interworking Stage Requirements proposed publication text S.P00-0 HRPD-cdma000 x Interoperability for Voice and Data System Requirements proposed publication text S.P00-A v0. Support for End-to-End QoS Stage Requirements TSG review text Proposed correspondence to all TSGs regarding TSG review of S.P00-A v0. Support for End-to-End QoS Stage Requirements Proposed correspondence to all TSGs regarding TSG review of S.P00-A v0. IP Network Architecture Model for cdma000 Spread Spectrum Systems Proposed correspondence to TSG-X regarding S.R000 and TIA- Proposed correspondence to TSG-X regarding Expanded UIMID Format Position Proposed correspondence to all TSGs regarding a joint teleconference to address OMA PoC v.0 Performance Targets Proposed correspondence to GPP SA regarding GPP SA and GPP TSG-S WG IMS Harmonization GPP Drafting Rules Topics Proposed correspondence to OMA REQ regarding support for PoC Session Priority Access Levels Proposed correspondence to all TSGs and MRPs regarding Reminder for Joint Session to Review SC.R00-00-0 v0., "System Release Guide for the (R) Release of the cdma000 System Specifications" Proposed correspondence to all TSGs regarding Invitation to a Joint Session on April, : - :00PM to review the proposed work item GPP-00: A-interface flexibility support (A-Flex) SOURCE WG WG NUMBERING ADHOC NUMBERING ADHOC WG WG WPD ADHOC ACTION APPROVAL FYI FYI FYI WIs FYI FYI FYI FYI

Page of NUMBER SUBJECT Proposed correspondence to TIA regarding TIA Ballot Comments on S.P00-0 v0. (TIA PN--0) Proposed correspondence to TIA regarding TIA Ballot Comments on S.P0-0 v0. (TIA PN--0) S.P00-0 IP-Based Location Services Security Framework proposed publication text Correspondence to TSG-C dated 0 February 00 regarding Advanced copy of LS from ITU-R WP F SOURCE TSG-X ACTION FYI

Page of NUMBER S.R000-0 S.R000-A S.R000-0 S.R000-A S.R000-B S.R000-0 S.R000-0 S.R000-0 S.R000-0 S.R000-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.S00-0 S.S00-0 S.S00-0 S.S00-A S.S00-xxx-B S.S00-xxx-C S.R00-0 S.R000-0 PUBLISHED TSG-S SPECIFICATIONS AND REPORTS TITLE GPP System Capability Guide v.0 GPP System Capability Guide v.0 GPP Service Implementation Guide v.0 GPP Network Reference Model (Rev. A) v.0 GPP Network Reference Model (Rev. B) v.0 Cellular Features Description (TIA/EIA--A Rev A) v.0 User Selective Call Forwarding (Stage ) v. Answer Hold (Stage ) v.0 User Identity Module (Stage ) (PN-) v.0 Preferred Language Enhancement (Stage ) (PN-) v.0 Advice of Charge (Stage ) (PN-) v.0 Rejection of Undesired Annoying Calls (Stage ) (PN-) v.0 Global Emergency Call Origination (Stage ) v.0 Tandem Free Operation (Stage ) v.0 ISDN Interworking (Stage ) v.0 Automatic Code Gapping (Stage ) v.0 G Wireless Network Management System High Level Requirements (Stage ) v.0 Prepaid Services (Stage ) (PN-) v.0 Location Based System Services (LBSS) Stage v.0 Multimedia Streaming Stage v.0 Video Conferencing Stage v.0 High Speed Data Enhancements for cdma000 x Stage - Data Only v.0 WLL Stage v.0 WPP Stage v.0 High Speed Data Enhancements for cdma000 x Stage - Integrated Data and Voice (xev-dv) v.0 Personal Mobility Stage v.0 OAM&P Specification v.0 OAM&P Specification v.0 OAM&P Specification v.0 OAM&P Specification v.0 OAM&P Specification v.0 - parts 000 through 000 OAM&P Specification v.0 - parts 000 through 000 Access control based on call type Stage v.0 Broadcast Multicast Services Stage v.0 RESP WG WG UIM ID ADHOC WG S.R000-A Broadcast Multicast Services Stage v.0 WG WG WG WG WG WG

Page 0 of NUMBER S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-A S.R000-0 S.R00-0 S.R00-0 S.S00-0 S.S00-0 S.S00-0 S.S00-A S.R00-0 S.R00-0 S.R00-0 S.R000-0 S.R00-0 S.R00-0 S.R00-0 S.P00-0 S.R00-A S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R000-0 S.R000-A S.R00-0 S.R00-0 PUBLISHED TSG-S SPECIFICATIONS AND REPORTS TITLE ESA and ESP Stage v.0 Realm Configured Packet Data Session Dormancy Timer Stage v.0 UIM ID Assignment Guidelines v.0 RESCINDED: Superseded by S.R00-0 GPP NAM v.0 GPP Evolution Document v.0 RESCINDED July 00 RESCINDED July 00 RESCINDED July 00 MEID Stage v.0 MEID Stage v.0 RESCINDED July 00 EMS Stage v.0 GPP System Release Guide v.0 Common Cryptographic Algorithms v.0 Interface Specification for Common Cryptographic Algorithms v.0 Enhanced Cryptographic Algorithms v.0 Enhanced Cryptographic Algorithms v.0 IP Based Service Architecture System Requirements v.0 IP Multimedia Domain System Requirements v.0 Legacy MS Domain Step- v.0 Removable User Identity Module (R-UIM) Mobile Equipment (ME) Interface Testing v.0 Immediate Messaging v.0 Presence Service v.0 Multimedia Messaging Stage v.0 RESCINDED Multimedia Messaging Stage v.0 Fast Call Setup Stage v.0 IP Based Location Services Stage v.0 Enhanced Call Recovery Stage v.0 LLA_ROHC Stage v.0 Header Stripping and Generation Stage v.0 GPP Process Guidelines v.0 PUBLISHED AS SC.R00-0 Legacy System Packet Data Surveillance Requirements v.0 IP System Packet Data Surveillance Requirements v.0 RESP UIM WG WG NUM ADHOC NUM ADHOC UIM ID ADHOC S.R00-0 Internet Over-the-Air Handset Configuration Management v.0

Page of NUMBER S.R00-0 S.R00-0 S.R00-0 S.S00-0 S.S00-A S.R00-0 S.R000-0 S.R00-0 S.R00-0 S.S00-0 S.R00-0 S.P00-0 S.S00-0 S.S00-A S.S00-B S.R00-0 S.R00-A S.R00-0 S.R00-0 S.R000-0 S.P00-0 S.R00-0 S.S00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.P00-0 S.R00-0 S.R000-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.P00-0 PUBLISHED TSG-S SPECIFICATIONS AND REPORTS TITLE Multimedia File Format Stage v.0 Accounting and Auditing Stage v.0 GPP Vision Document - PUBLISHED AS SC.R00-0 Common Security Algorithms v.0 Common Security Algorithms v.0 End-to-End QoS Stage v.0 Wide Band Speech Codec for CDMA 000 Systems Stage v.0 Enhanced Packet Data Air Interface Security Stage v.0 Broadcast-Multicast Service Security Framework v.0 Broadcast-Multicast Service Security Framework v.0 Packet PrePaid Services Stage v.0 GPP Equipment Numbering JEM Report and Conclusions - WITHDRAWN TO BE INCLUDED AS AN ANNEX IN S.R00 MEID STAGE GPP IMS Security Framework v.0 GPP IMS Security Framework v.0 GPP IMS Security Framework v.0 WLAN - cdma000 Interworking v.0 WLAN - cdma000 Interworking v.0 PUBLISHED AS SC.R00-0 PUBLISHED AS SC.R00-0 Network Initiated Data Sessions (NIDS) v.0 WITHDRAWN LMSD Step Stage v.0 cdma000 Network Performance Measurement Types v.0 Rm Interface Enhancements v.0 Support for ISIM on UICC v.0 TrFO v.0 PUBLISHED AS SC.R00-0 RESCINDED - //0 - Functionality included in X.P00 PUBLISHED AS SC.R00-0 System Requirements for PoC v.0 IOTA DM Stage v.0 PUBLISHED AS SC.P00-0 Network Firewall Configuration and Control Stage v.0 HAT Authentication System Requirements v.0 Hotlining System Requirements v.0 Packet Switched Video Telephony (PSVT) Stage v.0 RESCINDED - /0/0 - Unsponsored WI RESP VISION ADHOC NUM ADHOC NUM ADHOC S.R00-0 HRPD-cdma000 x Interworking System Requirements v.0 WG

Page of PUBLISHED TSG-S SPECIFICATIONS AND REPORTS NUMBER TITLE RESP S.S00-0 Location Services Security Framework Report v.0 S.R0-0 Expanded R-UIM Identifier Stage v.0 S.R0-0 General Bootstrapping Architecture (GBA) Stage Requirements v.0

Page of NUMBER S.P000-0 S.P00-0 S.P00-0 S.P00-0 S.P00-0 S.P00-0 S.P00-0 S.P00-0 S.P0-0 S.P0-0 S.P0-0 S.P0-0 S.P0-0 S.P0-0 TSG-S PROJECTS IN DEVELOPMENT TITLE Location Information Restriction (LIR) Stage All IP System Capability Guide GPP NAM v.0 UIM Support in All IP Networks Rescue Channel Stage Protocol Alignment Reference Wireless Applications Management General Bootstrapping Architecture (GBA) Stage / specification Enhanced cdma000 SRD Security Mechanisms Using GBA Emergency Call Support on HRPD Stage PPP-Free Operation Stage Multimedia Priority Services Stage Telephone Number Mapping (ENUM) Stage RESP WG UIM ID ADHOC

Page of GPP QUORUM ROLL CALL TSG-S (Systems and Services Aspects) Jeju, Korea -Feb-0 INDIVIDUAL MEMBER COMPANY Attendance Attendance Consecutive Voting Quorum Status /0/00 //00 Mtgs Missed Status at Mtg Start AIRVANA 0 0 ALLTEL 0 AXALTO BELL CANADA 0 0 CHINA UNICOM 0 0 COMVERSE 0 0 DOCOMO US LABORATORIES 0 0 ERICSSON FUJITSU 0 GEMPLUS 0 0 HUAWEI 0 0 HEWLETT PACKARD 0 HITACHI 0 0 KDDI 0 KYOCERA 0 LG ELECTRONICS 0 LG TELECOM 0 LUCENT 0 MOTOROLA 0 NEC 0 NOKIA 0 NORTEL NETWORKS 0 QUALCOMM 0 RESEARCH IN MOTION 0 0 SAMSUNG 0 SPRINT/NEXTEL 0 TELCORDIA 0 VERIZON WIRELESS 0 0 TOTALS QUORUM CALCULATION % % ADDITIONS OBSERVERS AND GUESTS CDG ARIB 0 0 0 0 0 QUORUM STATUS NOTES: - HIGHLIGHTED ZERO = Must attend consecutive mtgs to be added to quorum list - NON-HIGHLIGHTED ZERO = Will be added to quorum list next mtg if they attend