15TH ANNUAL NORTH AMERICA PTV VISION TRAFFIC USER GROUP MEETING OCTOBER 7-8, 2014 IN ORLANDO, FLORIDA

Similar documents
15TH ANNUAL NORTH AMERICA PTV VISION TRAFFIC USER GROUP MEETING OCTOBER 7-8, 2014 IN ORLANDO, FLORIDA

15TH ANNUAL NORTH AMERICA PTV VISION TRAFFIC USER GROUP MEETING OCTOBER 7-8, 2014 IN ORLANDO, FLORIDA

15TH ANNUAL NORTH AMERICA PTV VISION TRAFFIC USER GROUP MEETING OCTOBER 7-8, 2014 IN ORLANDO, FLORIDA

OR 217,I-5 Experience Portland, OR

MESO & HYBRID MODELING IN

PTV VISUM - BASE. Introduction to macroscopic network modelling with PTV Visum. PRICE: ####,- DHS plus VAT SHORT DESCRIPTION TARGET GROUP

National Roundabout Conference 2005 DRAFT High-Capacity Roundabout Intersection Analysis: Going Around in Circles David Stanek, PE & Ronald T. Milam,

Traffic Management Enhancements Phase 3 City of St. Louis 3/8/2018 Missouri TEAM

Data Hub and Data Bus for Improving the

Ioannis Psarros Department of Civil Engineering and Intermodal Freight Transportation Institute, Memphis, TN

PTV VISSIM - BASE. Introduction to microscopic traffic simulation with PTV Vissim. PRICE: ####,- DHS plus VAT SHORT DESCRIPTION TARGET GROUP

An Integrated Model for Planning and Traffic Engineering

Using GPS Based Origin-Destination Data to Improve Traffic Studies. Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017

Panel Discussion ITS Roll-Out Plans from Road Authorities Across Canada

FIBER OPTIC RESOURCE SHARING IN VIRGINIA

APPENDIX E TRANSPORTATION

Chattanooga Regional ITS Architecture Update Project Overview. January 7, 2014

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014

An Analysis of TDM Impacts on a Corridor Segment

WHO KEEPS THE CITY S RHYTHM FLOWING?

Away from Isolation: Caltrans Arterial Management

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE

November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING

Addendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15, 2016 Open House Response to Comments

The Blue Line Extension

Public Outreach Overview Tuesday, September 27. COTA William J. Lhota Building 33 N. High St. Columbus, OH 43215

Project Summary. Feb. 2014

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Dulles Area Transportation Association

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for

Federal Railroad Administration Southeast Regional Rail Planning Study

SECTION 2 NAVIGATION SYSTEM: DESTINATION SEARCH

Getting Ready for Public-Private Partnerships (P3s)

Intelligent Transportation Systems (ITS)

Des Moines Area Regional Transit Non Rider Survey

MARTA BOARD OF DIRECTORS OCTOBER 4, 2018

Arterial data quality and traffic estimation

Upgrading Traffic Signals to Enable a Connected Vehicle Test Bed Somerville, Massachusetts

Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes

Managed Lane owner decision needed San Mateo County s options Understanding revenues & costs Pros & cons of County s options Proposed next steps

Travel Time on the Highway 7 Corridor YORK REGION. Robert Bruce President TPA North America Inc.

Western Canada Black Liquor Recovery Boiler Advisory Committee

Memorandum CITY OF DALLAS

Memorandum CITY OF DALLAS

Microscopic Traffic Simulation Model Calibration & Validation

Electronically Filed - City of St. Louis - May 27, :02 PM

STUDY REPORT #1 ADDENDUM

The Piedmont Corridor

UDOT Freeway and Traffic Signal Performance Metrics

City Spotlight- City of Santa Clarita ITS Efforts. Andrew Yi, P.E., P.T.O.E City Traffic Engineer

Traveler Information System

Downtown Bus Service Review

Data Integration for Integrated Corridor Management

Johnson City Regional ITS Architecture Update Review Workshop. March 12, 2015

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

I-35 FROM THE RED RIVER TO THE RIO GRANDE

Virginia Transit Update

Kansas Division. January 31, 2018

J.D. Power and Associates Reports: Overall Wireless Network Problem Rates Differ Considerably Based on Type of Usage Activity

A New Framework for Development of Time Varying OD Matrices Based on Cellular Phone Data

TRACY HILLS SPECIFIC PLAN RECIRCULATED DRAFT SUBSEQUENT ENVIRONMENTAL IMPACT REPORT VOLUME III OCTOBER 2015

Performance Measurement, Data and Decision Making: A Matter of Alignment. Mark F. Muriello Assistant Director Tunnels, Bridges & Terminals

Planning Partners Meeting

Fairfax County Comprehensive Transit Plan and Transit Development Plan

Pennsylvania Safety Transportation and Research Track (PennSTART) April 10, 2018

Travel Demand Modeling for Planners. Matt Grabau & Mike Davis Urban Transportation Planners

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

C Line Rapid Bus 90% Design

Honorable Mayor and Members of the City Council. Memorandum of Understanding: Interstate 80 Integrated Corridor Mobility (I-80 ICM) Project

Denver Moves: Transit Task Force

Metropolitan Council Transportation Committee. September 12, 2016

Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT

PERFORMANCE EVALUATION OF MOHAKHALI FLYOVER BY USING VISSIM SIMULATION SOFTWARE

GTA West Corridor Review

Arizona Emergency VII (E-VII) Program Overview and Focus Areas

Using Empirical (real-world) Transportation Data to Extend Travel Demand Model Capabilities

Northwest Needs Improvements Survey

PROJECT TIMELINE. Next steps. Plan. Start of Service

Developing Consistency in ITS Safety Solutions: Intersection Conflict Warning Systems E N T E R P R I S E

Building Success through Partnerships

NC SWANA Managers Training Center

The Control Effect of Traffic Information on Traffic Assignment. Junqiang Guo,Bingzhong Ren

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

Palm Beach TPA TAC September 5, 2018

Bellevue s Traffic Adaptive Signals

Manufactured Home Production by Product Mix ( )

STATEWIDE INTEGRATED TRANSPORTATION RELIABILITY PROGRAM

National Operations Center of Excellence. Douglas W. Wiersig, P.E. Director of Transportation and Public Works, City of Fort Worth, Texas

Appendix D Supportive Transportation Materials

2014 REPORT. Distracted Driving. on I-95 in Northern Virginia

The Practical Side of Cell Phones as Traffic Probes

Multimodal TOD Principles for Denver Union Station Rail~Volution November 7, 2006

Core Capacity Transit Study. San Francisco County Transportation Authority October 17, 2017

METRO SHORT RANGE TRANSIT PLAN FY Executive Summary May 2009 DIVERSIFIED TRANSPORTATION SOLUTIONS

Transportation Improvement Program. Project Lookup Lists

The Australian Network of Structural Health Monitoring 8th Annual Workshop. Invitation & Call for Abstracts

DOWNTOWN TUNNEL / MIDTOWN TUNNEL / MLK EXTENSION PROJECT PROCUREMENT PROCESS

Transcription:

15TH ANNUAL NORTH AMERICA PTV VISION TRAFFIC USER GROUP MEETING OCTOBER 7-8, 2014 IN ORLANDO, FLORIDA

2014 PTV Vision Traffic User Group Meeting Preliminary Schedule Monday, October 6 10:00am- 10:00pm Epcot day including UGM Welcome Dinner & Fireworks show Shuttle departs venue hotel for Epcot at 10am, Noon, 2pm and 4pm Dinner at 6pm in Future World & Fireworks at 9pm Return shuttle back to hotel leaving Epcot at 9:30pm 7:30-8:30am Tuesday, October 7 Registration and fast Block 1: Presentations by PTV Group 8:30-8:45am Welcome Remarks 8:45-10:00am 10:00-10:15am 10:15-11:30am 11:30-12:15pm 12:15-1:15pm 1:15-3:00pm 3:00-3:15pm 3:15-4:30pm 4:30-5:00pm 5:30-10:00pm New Developments in PTV Vissim & PTV Viswalk New Developments in PTV Visum New Developments in PTV Vistro Lunch Technical Sessions Instructed by PTV Group PTV Vissim PTV Visum PTV Vistro PTV Viswalk Presentations by PTV Group Real Time PTV Products PTV Product Management Panel with Q&A Discussion Social Event at Downtown Disney, including dinner at Fulton s Crab House on Pleasure Island and Cirque du Soleil s La Nouba show

2014 PTV Vision Traffic User Group Meeting Preliminary Schedule Wednesday, October 8 7:30-8:30am 8:30-9:00am 9:00-9:30am fast Block 4 Integration of VISSIM and VISUM I-4 Beyond Ultimate Experience Hari Salkapuram, P.E. and Jessica Kessinger, P.E., HDR, Inc. An Integrated Approach for Express Toll Lane Modeling in Florida Andrew Velasquez, P.E., PTOE, URS Corporation 9:30-10:00am 10:00-10:30am 10:30-10:45am 10:45-11:15am Block 5A A Microscopic Traffic Simulation for Congested Freeway Operation: I-290 Traffic Study Minchul Park, P.E., PTOE, Parsons Brinckerhoff I-270 North Corridor Study in St. Louis, MO Joe Blasi, P.E., PTOE and Jared Miller, HNTB Corporation Block 6A Traffic Simulator-based Surrogate Safety Measure for Red-light Running Jason So, Ph.D., Florida Atlantic University Block 5B Microsimulation Model Calibration Using High Resolution Detector Data Nithin Agarwal, Ph.D., Kentucky Transportation Center, University of Kentucky VISSIM Trajectory Data - And Why You Should Use It! Bastian Schroeder, Ph.D., P.E., Institute for Transportation Research & Education, North Carolina State University Block 6B Keeping City Traffic Engineers Happy While Designing a Streetcar Adam Lynch, P.E., HDR, Inc. 11:15-11:45am 11:45-12:45pm Modeling FHWA's Connected Vehicle Speed Harmonization Prototype in Vissim Anxi Jia, Ph.D., Kittelson & Associates Lunch Determining Optimal Traffic Signal Location Using Vissim Dhruva Lahon, P.E., PTOE, Kimley-Horn

Wednesday, October 8 Block 7A Block 7B 12:45-1:15am Multi-Resolution Modeling: Case Study - Development of an Interchange Modification Report for Fairfax County, Virginia David Kline, Fairfax County DOT Evaluation of the Impacts of Light Rail Transit Predictive Priority on Multimodal Operations in Salt Lake City Downtown Marija Ostojic, Florida Atlantic University 1:15-1:45pm To Meter, or Not to Meter, That is the Question (for Philly): A Two Tiered Approach in Assessing the Applicability of Ramp Metering for Southeast Pennsylvania's Major Interstates Kavita Boddu, P.E., CH2M Hill Impact of Random Number Seed on Intersection Performance: Investigation and Alternative Methods Zeeshan Abdy, Ph.D., P.Eng., City of Calgary, Canada Block 8A Block 8B 1:45-2:15pm Optimization and Modeling of Corridor Operations in the Vicinity of a Diverging Diamond Interchange Using Vistro & Vissim Shannon Warchol, E.I., Institute for Transportation Research and Education, North Carolina State University Cross-County Multi-Modal Vissim Analysis Vivek Hariharan, P.E., PTOE, STV, Inc. 2:15-2:45pm Meta-Heuristic Optimization of Diverging Diamond Interchange Signal Timing in Vissim Environment George Lu, Ph.D., Institute for Transportation Research and Education, North Carolina State University Southwest Light Rail Transit Vissim Modeling Jiaxin Tong, P.E., Kimley-Horn and Associates 2:45-3:00pm

Wednesday, October 8 Block 9A Block 9B 3:00-3:30pm Pembina- Emerson Border Crossing Microsimulation Kshitij Sharma, Upper Great Plains Transportation Institute, North Dakota State University The Use of Microsimulation Models in the Planning of Open Cast Mining "Buenavista del Cobre" Sandra Paolo Montes Soriano, Cal y Major y Asociados 3:30-4:00pm Using the Flexibility of Dynamic Assignment in Vissim to Model the Changing Assumptions of Traffic Generated by a Proposed Theme Park Anne Warnick, P.E., Parsons Brinckerhoff Modeling a Cable Transit System and Passenger Station with PTV Vissim Alejandro Saniger, PTV América Latina Block 10: Best Abstracts 4:00-4:30pm Mesoscopic Modeling Approach for Performance Based Planning Kofi Wakhisi, Esq., AICP, Atlanta Regional Commission 4:30-5:00pm A Multi-Resolution Modeling Approach for Supporting Bus Rapid Transit Design Randy Johnson, P.E. PTOE and Sai Sirandas, P.E., DKS Associates 5:00pm Closing Remarks

PTV GROUP 9755 SW Barnes Road, Suite 550 Portland, Oregon 97225 USA Phone +1 (503) 297-2556 E-Mail usersgroup.us@ptvgroup.com www.ptvgroup.com