You re in Total Command. Discover the awesome power Series generator paralleling. and communications

Similar documents
You re in Total Command DISCOVER THE AWESOME POWER OF THE ASCO LOW VOLTAGE 7000 SERIES GENERATOR PARALLELING CONTROL SWITCHGEAR

You re in Total Command

reliable company...caterpillar

GE Zenith ZDEC Modular Paralleling Switchgear

You re in Total Command

Series 2400 Paralleling Switchgear

SWITCHGEAR. XLM Switchgear

PGC 4000v2 POWER GENERATION CONTROLLER

7000 SERIES Power Switching Solutions. Closed Transition Transfer Switching. Delayed Transition Transfer Switching

ASCO Series 300 Generator Paralleling System

PLT. Breaker-based transfer switch open, closed or soft transition amps. Specification sheet

4000 SERIES Power Transfer Switches Product Features

ASCO 7000 SERIES Power Control Systems

SECTION 16496E ATS MOLDED CASE WITH ATC 900 CONTROLLER

PD-Series. Emergency Standby. General Description. Available Modes of Operation. Standard Features. User Interface. Communication and Controls

SIGMA. Advanced Generator Protection and Control. Short Form Catalogue

DGC-2000 DIGITAL GENSET CONTROLLER

Comprehensive Modular Genset Controller

PDI Modular Compact Remote Power Panel

Maximum Reliability & Excellent Value. Features. UL Listed Withstand & Close-On Ratings. Series 300 Power Transfer Switches

2.) Cabinet setup and preset data shall, as standard, be fully user programmable on a per cabinet or system wide basis.

The ASCO 7000 Series. Protecting data centers, hospitals, airports, retail stores and other facilities

Series 300 POWER TRANSFER SWITCHES MAXIMUM RELIABILITY & EXCELLENT VALUE FEATURES

Si-TEC Xtend GSM DATA SHEET. Digital control range for grid parallel/bus tie. Key features. Description

EMCP 4.4 GENERATOR SET CONTROLLER

soft load power transfer solutions for continuous, reliable power

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

JK Series POWER DISTRIBUTION. Solid State Starters Medium Voltage A

soft load power transfer solutions for continuous, reliable power

Sync Control. Installation/Operation Manual Rev. E

Power Control Systems

Synchronizing Systems

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

Power Meter PowerMonitor 500

ASCO SERIES 300 Service Entrance Power Transfer Switch

These specifications describe requirements for a power distribution unit (PDU) distributing power to sensitive loads.

POWER SYSTEM ACCESSORIES

InteliLite MRS17 Click Here to Learn More

Model KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units.

Model KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units.

Features. Application range. Si-TEC Xtend Recip interface. Accumulated data recording of engine running hours, kwatt hours, kvar hours, etc.

Series TS Amp. Automatic Transfer Switches

TT /12b INSTALLATION INSTRUCTIONS. Introduction

Si-TEC Xtend CGC ET DATA SHEET. Digital control range for extraction steam turbines. Key features. Models. Description

Zenith Series STS-3 Static Transfer Switches

Uninterruptible Power Systems

SECTION SOLID-STATE REDUCED VOLTAGE STARTERS

Power Switching & Controls for Business-Critical Continuity

Comprehensive Modular Genset Controller

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

PowerWizard 1.1, 1.1+ & & 2.1 Generating Set Control Technical Manual

Si-TEC Xtend CGC DATA SHEET. Digital control range for steam turbine generators. Key features. Models. Description

Galaxy VM. 160/200 kva Parallel capable up to 800 kva. Three-phase power protection. Galaxy VM trusted partner for your business continuity

Technical Specificaions. kwh Energy Meter

AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter

Industrial Generator Set Accessories

3 Uninterruptible Power Systems

Medium-Voltage Circuit Breaker-Type Automatic Transfer Switches and Bypass/Isolation Switches

Technical Specifications. Multi Function Meter

UPS. centric Hot scalable modular 3-phase UPS Delivers 25 up to 200 kva/kw INFINITE POWER. Mission Critical Applications

Product brochure. Cyberex. Remote Power Panel (RPP) Power distribution system

Keor HPE UPS THREE-PHASE UPS. from 60 to 200 kw GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

920 Remote Control (RC) Switches

SmartOnline 208/230V 2.2kVA 1.98kW Double- Conversion UPS, 2U, Extended Run, Network Card Options, LCD, USB, DB9, ENERGY STAR

3 Uninterruptible Power Systems

Galaxy VM. Three-phase power protection. Galaxy VM trusted partner for your business continuity

PRODUCT BROCHURE. Cyberex Remote Power Panel (RPP) Power distribution system

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

Guide Specification. Standby/Utility Parallel Power Generator Systems

Integration Fully integrated Controls, Power Monitoring, Generator Paralleling, and Switching Schemes as a complete turnkey solution.

Technical Specifications. Dual Source Energy Meter (EB / DG)

Uninterruptible Power Supplies

SECTION SWITCHBOARDS

OC IEEE IAS/PES Meeting February 21, 2013

Keor HPE UPS. THREE-PHASE UPS from 60 to 300 kw GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

AcquiSuite Ally 48 Advanced Branch Circuit Monitor

R E C T I F I E R I N V E R T E R C O N V E R T E R MP7

Genset Controller Unit Model EMS - GC10. Installation Manual Section

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MP7. Uninterruptible Power Supply

Authorized Systems Integrator. Automation Systems Telemetry & SCADA

Product Specifications

Model #: SU1500RTXL2U

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

MAJOR VA Power Inverter

S&C 6801M Automatic Switch Operator

M-5072 Retrofit Kit For M-4272 Digital Motor Bus Transfer System

I/A Series HARDWARE Product Specifications

Electrical Demand Specification (Reference SOP: )

Quick Start Guide TS A

HYBRID PV INVERTERS HySpirit Series. 4kW-10kW. Hybrid Inverter with Battery Backup Smart Energy for Smart Home

SMARTONLINE E3 UPS SYSTEMS

The quality management system is. Mitsubishi Electric Corporation Kobe Works has been approved to ISO9001:2000.

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

ASCO 920 Remote Control (RC) Switches

SmartOnline V 10kVA 7kW Online, Double-Conversion UPS, 6U Rack/Tower, Extended Run, Pre-installed SNMP port, RS232, 3 Phase in-single Phase out

Application Note (Revision NEW) Original Instructions. EGCP-2 Differences

4.3. Switchboards. Contents Description Pow-R-Line Drawout Molded Case Circuit Breaker Switchboards Product Selection...

Installation, Operation, and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET

Transcription:

Discover the awesome power of the Low Voltage 7 Series generator paralleling Control Switchgear You re in Total Command The 7 Series Generator Paralleling Control Switchgear is the world s most intelligent and advanced multiple-engine power control system. It can be custom engineered to meet today s specific requirements for a wide range of emergency power applications... from industrial/commercial to large healthcare and business-critical facilities. The 7 Series system is based on state-of-the-art digital control technology to synchronize, manage and parallel engine-generator sets. It provides sophisticated engine control, load management and communications capabilities, including unsurpassed power system monitoring and protection. 1

Operational Modes : Prime Power Emergency/Automatic Standby Power Utility Paralleling System Highlights 7 Series Generator Paralleling Control Switchgear For Mission-Critical and Healthcare Applications Standard Integrated Features : 115-6V, 3-phase, 4-wire, 1% neutral, 25% copper ground bus, 5/6 Hz, AC system UL 1558 construction, listing and labeling Master control: 12 color touch screen operator interface panel Generator PLC redundancy Two manual paralleling provisions Load control for up to 128 power transfer switches/circuit breakers Load demand and bus load optimization controls No traditional (external) load share components are required Serial modbus RTU ( Master/slave RS485/RS232 ports or Ethernet communication capability with power transfer switches and SCADA system) Event log and historical date trending Custom Configuration Design Options : Up to 1,A silver plated main bus with up to 2kAIC bracing level for four cycles Generator breaker frame size up to 5,A Enclosure types: NEMA 1; NEMA 3R Bus duct risers up to 6,A Top or bottom conduit entry Unlimited number of engine generators for parallel operation Color touch screen panels for the generator controls Master PLC redundancy: Hot standby or hot standby synchronized 42-in. LCD graphic display panel integrated into the switch- gear line-up and/or stand alone - wall mounted Two types of the remote annunciation panels available (LED or touch screen type) Up to two remote annunciation panels for each system, located up to 6,56 feet from switchgear Any specified circuit breaker brand Electrically and/or manually operated distribution circuit breakers Communication with building management network for monitoring via Data Concentrator or firewall Internet/intranet connectivity via Thin Web Server Extended switchgear warranty up to 5 years 2

42 Fig. 1 A Smart 24 x 7 x 365 Power Guard The 7 Series Generator Paralleling Switchgear Stands Ready 24 x 7 x 365, Ensuring Immediate and Reliable Response to a Loss of Utility Power. When normal source power fails the switchgear power control system (PCS) will start all enginegenerators when the power transfer switches sense a power outage. The first generator to achieve an acceptable level of voltage and frequency connects to the emergency bus. A PCS signal initiates connection of the priority one loads to the emergency bus. The switchgear then synchronizes the remaining generator(s), connects each to the bus and signals all power transfer switches to connect priority loads to the emergency source in a userdefined priority sequence. If a generator fails the system automatically disconnects it from the emergency bus, shuts it down and signals the associated lowest priority loads to shed. 3

Typical Applications: The elevation (Fig. 1) and one-line diagram (Fig. 2) show a typical, four enginegenerator paralleling system for automatic standby operational mode. (Figs. 3-4) show typical systems with four enginegenerators for utility paralleling operational mode. Fig. 2 Fig. 3 Fig. 4 Load Demand is a load management feature that automatically determines and keeps the minimum required number of generators online to carry the actual kw load, conserving fuel and reducing engine run time. Bus Load Optimization automatically sheds blocks of load to prevent overloading of the remaining generators, and automatically re-adds individual loads to the bus per a prescribed sequence according to their priority value if any generator fails. Parallel with Utility can be added to the standby and prime power PCS automatic closed-transition operational mode that helps reduce energy costs by shaving your facility s peak energy demand and/or export/import power to/from the electric utility. When Normal Source Power Is Restored each ATS senses a utility source that is within tolerance and, after a time delay, individually re-transfers to the normal position. When the last ATS has re-trans- ferred to the normal position, the PCS will simultaneously open the generator breakers and allow running to their programmed cooldown period PCS is now back to Automatic Standby/ (or Utility) Mode. 4

is the global leader in power switching and controls Creative, responsive, customer - focused and competitive. Our Innovative Design and Development Engineering Team is a carefully selected combination of experienced engineers with decades of accomplishments and advanced degrees, and the most recent college graduates in power engineering. As one team, they successfully apply cutting-edge technology to research, develop and quickly implement new paralleling switchgear/power switching and controls solutions. s state-of-the art large power laboratory allows new equipment prototype and performance testing under real conditions. This helps qualify designs under listing agency standards. Dependable Project Management is provided by more than 2 regional project managers. Each project manager is accountable for the total satisfaction of customers electrical contractors, owners, construction managers, consulting engineers, engine-generator dealers, channel partners and others. He ensures that all of his projects are completed accurately, ontime and meet the quality standards expected by his customers at each stage submittals, approvals, all drawings, changes, deliveries, interfaces, start-ups, etc. Our Professional Product Management teams are a vital bridge between engineering and sales. That s why every Power Switching and Controls product line has a dedicated manager. Product Managers have experience in power switching and control design and applications engineering. They also know how to develop products that respond to evolving customer needs so they can effectively drive our design teams to create the next-generation of PCS switchgear technology, ensuring our continued market leadership. Knowledgeable Applications Engineering and Sales Forces are large enough to cover all regions nationwide and internationally. Applications engineers are well-trained, highlyskilled and ready to satisfy your particular power control requirements. Every member of the applications engineering team provides technical support and quotations for any power switching and controls product regardless of voltage class, product type or application. Best-in-the-Industry Field Service is provided by more than 1 skilled technicians who properly maintain and test power control systems and transfer switches coast to coast. Emergency service is dispatched and technicians are available 24/7 in most areas. Fully stocked vans support them during on-site visits, including switchgear startups. 5

Maximum reliability and excellent value PCS Switchgear Design Supports Reliable Operation Dedicated Master Controls send engine start signals to generators and provide load management within entire emergency power system. In the event the Master PLC fails, the master controls will still issue engine start signals allowing all loads to be energized by closing breakers manually or by initiating ATS s transfer automatically Master PLC Redundancy is available for hot standby or hot standby synchronized Two Manual Paralleling Provisions are a touch screen with a synchroscope and additional push-buttons mounted on the Master Section door Best Battery System circuitry selects the best DC source among the generator starting batteries to provide regulated control power to the Master and all Generator controls, including PLC s (even during engine cranking). Also, any engine battery can feed the paralleling circuit breaker shunt trip if that engine battery has failed Priority Load Control automatically adds load to the generator bus as generators come online, and shed load as kw load capacity decreases. Loads are added in an optional stepping fashion to minimize transients on the engine generator and the system bus Manual Load Shed Bypass allows operator to manually re-add previously shed load via push-buttons. In the event of operator error, the controls will protect the power system subsequent overload will automatically re-shed load detected by bus under frequency Bus Load Optimization allows automatic shed block(s) of load shedding when any generator online fails to prevent overloading of remaining generators and re-add loads to the system bus according to their priority value and a prescribed user selectable sequence Generator Controls can be designed within dedicated individual generator sections or dual generator sections. In both approaches, the controls enable generator PLC redundancy if one generator PLC fails the second generator PLC takes over. The generator PLC provides engine start/ stop, cranks the engine, monitors engine alarms and shutdowns and controls the paralleling breaker Multiple (Master OIP type) Touch Screens are available for the generator controls Firewalled Communication facilitates communication with building management monitoring networks via Ethernet data and/or Concentrated (Gateway PLC) Modbus 6

The heart of s Power Control System is a fully integrated Digital Paralleling Controller with cutting-edge technology Digital Paralleling Controller (DPC) Front Rear The controller uses a real-time operating system and offers the following advantages: Hot-backup programmable logic controller (PLC) capability. True RMS sensing for power metering with the two, 3-phase 6VAC and two, 3- phase -5A inputs. Customized programming including screens using ladder logic from a single software package. Complete generator control logic with ATS intelligent power transfer, soft loading and unloading, base load and import/export operations. Manual paralleling with graphical synchroscope. Graphical 27-degree gauge-type meters for power instrumentation. Compare two generators together and generator with a total bus on one screen. Electrical one-line diagram representation showing circuit breaker positions on generators, feeders and ties. Programmable 3-phase generator and utility relay protection functions. Data trending up to 16 parameters, with auto/manual triggering of data storage on compact flash. Compact flash slot and card for capturing screen displays and data for remote analysis. Remote monitoring via building management network (Modbus RTU Serial RS485 and/or Modbus TCP/IP Ethernet). Remote diagnostics using industrial-grade analog modem or Ethernet IP connection. Peer-to-Peer networking between units, supporting CAN, DeviceNet, Modbus or Ethernet protocols. 7

Digital Paralleling Controller 12:12 PM Logged In-2 BUS Generator 1 3 6 Metering Generator Bus Total 3 6 BUS GEN 1 2 4 58 62 2 4 58 62 GEN 1 GEN 2 1 VOLTS 5 56 HERTZ 64 1 VOLTS 5 56 HERTZ 64 GEN 2 Single Metering Dual Metering Manual Paralleling GEN 3 48V 5 6.Hz 45 48V 1 6.Hz 9 GEN 3 System Setup Gen Setup Gen Protection GEN 4 25 75 AMPERES 1 3 6 15 KILOWATTS 75 5 15 AMPERES 2 6 12 3 KILOWATTS 15 GEN 4 kw Trending Multi - Trending ATS Status One - Line Event Log Alarm Status 452A 6 4 8 VOLT. AMPERES 2 x1 1 375kVA 3kW -2 2-4 4 KILOVARS -6 6 225kVAR LOW S FAST 94A 12 8 16 VOLT. AMPERES 4 x1 2 75kVA 6kW -4 4-8 8 KILOVARS -12 12 45kVAR A B C SYNCHROSCOPE A B C Log In VOLTS AMPS 48 452 481 45 481 45 VOLTS AMPS 48 94 481 9 481 9 PF.8 kwh 1 PF.8 kwh 2 Main Menu. Easily navigate through all screen displays from the Main Menu. Log in here to gain access to various levels of information. Dual Metering. Simultaneously view metering for any two generators. When viewing bus metering on the right side, a synchroscope will show if the source on the left side is in phase with the bus. 12:12 PM Logged In-2 1 of 2 ATS Status NEXT ATS-1 Engine Start Norm. Emer. Priority Source Avail. 11 ATS Position Bypass Pos. kw Byp. Act. 5 Load Shed Time Dly. Hand Off Auto. ATS-4 Engine Start Norm. Emer. Priority Source Avail. 14 ATS Position Bypass Pos. kw Byp. Act. 5 Load Shed Time Dly. Hand Off Auto. ATS-2 Engine Start Norm. Emer. Priority Source Avail. 12 ATS Position Bypass Pos. kw Byp. Act. 5 Load Shed Time Dly. Hand Off Auto. ATS-5 Engine Start Norm. Emer. Priority Source Avail. 15 ATS Position Bypass Pos. kw Byp. Act. 5 Load Shed Time Dly. Hand Off Auto. ATS-3 Engine Start Norm. Emer. Priority Source Avail. 13 ATS Position Bypass Pos. kw Byp. Act. 5 Load Shed Time Dly. Hand Off Auto. ATS-6 Engine Start Norm. Emer. Priority Source Avail. 16 ATS Position Bypass Pos. kw Byp. Act. 5 Load Shed Time Dly. Hand Off Auto. 12:12 PM Logged In-2. GEN 1 Volt Setpt PF Setpt GEN 2 GEN 3 GEN 4 GEN 48.8 BUS 48.8 Sync Mode OFF Gen Status RUN Not in Auto CHECK Auto Start PERM Running Manual Paralleling Generator 1 Manual Control. Manual Control Voltage PF Freq Setpt KW Setpt Frequency Load RAISE RAISE RAISE RAISE LOWER LOWER LOWER LOWER VOLTS PF FREQ kw LOW S FAST SYNCHROSCOPE. o GEN 6 3 BUS 6 6 CB Status CB Control EMERGENCY STOP OPEN CLOSE OFF ATS Status. If the ATS s are provided with communications capability, this advanced ATS Status screen provides additional information, such as source availability and ATS position. Manual Paralleling. Manually adjust the voltage and frequency of the on-coming generator and manually initiate the closing of the paralleling breaker. 1 of 2 NEXT 12:12 PM Logged In-2 Multi Trending 12:12 PM Logged In-2 Generator One-Line 1 K W A T T S kw Trending 1 K V A R S kvars 1 Time (sec) 29.68 1 Time (sec) 29.68 3 V o l t s 1 STOP Voltage L - N Time (sec) 29.76 6 5 F r e q u e n c y 5 5 Gen 1 - Red Gen 3 - Blue Gen 2 - Yellow Gen 4 - Green Frequency Time (sec) 29.76 AUTO SCREEN CAPTURE OFF Generator 1 Not in Auto Auto Start Running VOLTS 48 AMPS 452 FREQ 6 kw 3 kvars 225 PF.8 Generator 2 Not in Auto Auto Start Running VOLTS 48 AMPS 452 FREQ 6 kw 3 kvars 225 PF.8 Generator 3 Not in Auto Auto Start Running VOLTS 48 AMPS FREQ kw kvars PF. Generator 4 Not in Auto Auto Start Running VOLTS AMPS FREQ kw kvars PF. Multi-Trending. Trend up to four parameters per screen at the same time with the option to automatically perform a screen capture to a compact flash card every five minutes. One Line. See up to four generators on a single screen with power flow indication, metering, and status information. 8

N e t w o r k Y o u r E m e r g e n c y Power System* communications products make it easy to monitor your prime power, emergency and/or standby power distribution systems onsite or remotely. Local area networks and remote networks are supported with either single or multiple points of access. Web-enabled communications allow access to your power system from anywhere in the world. PCS Remote Annunciator Utility Power Engine-Generator RS485 MODBUS Engine-Generator RS485 MODBUS PCS Remote Annunciator Fiber Optic Ethernet Ethernet Modbus TCP/IP 522 Power Manager Building Management System or RS485 7 Series Power Control System or RS485 MODBUS and/or RS485 MODBUS RS485 511 Serial Module (72A) 7 Series Power Transfer Switch 9

HUB Ethernet Connectivity to Facility Network ATS Remote Annunciator E-mail Server E-mail Pager Internet Remote Access PC PCS Remote PowerQuest (SCADA) Thin Web Server HUB Firewall 515 Connectivity Modules (72E) RS485 and/or 511 Serial Module (72A) To Additional Power Transfer Switches Legend RS232 Ethernet Fiber Optic Ethernet RS485 RS485 MODBUS * Exemplary diagram 7 Series Power Transfer Switch 7 Series Closed-Transition - Transfer/Bypass Switch 1

World-class technology for reliable power transfer Typical Network Configurations 7 Series Generator Paralleling Switchgear can be interfaced with the downstream power transfer switches by using the serial based, Ethernet and/or hybrid (serial/ethernet) network communication methods as shown in the diagrams below: Switchgear Remote Annunciation 7 Series PCS Switchgear design offers two types of Remote Annunciation Panels in NEMA 1 enclosures. Both types of Remote Annunciation Panels are capable of communicating with the paralleling SWGR via Ethernet. Serial (Acc. 72A on each ATS) Ethernet (Acc. 72E on each ATS) LED type Remote Annunciator has traditional discrete LED status tiles to provide system and individual generator s remote status, alarm (horn with silencing push-button) and display functions. Touch screen type Remote Annunciator with one 12-15 in. color display, which fully duplicates the Master OIP to provide system and individual generator s remote status, alarm (horn with silencing push-button) and display functions. Ethernet Cables (4) #14AWG Hybrid - serial/ethernet (Acc. 72A on each ATS and Acc. 72E in the Switchgear for each serial loop) 11

Dimensions At Main Bus, A Master Controls Master/ Generator Controls Generator Controls (Single, Dual) Utility Tie Breaker Controls Distrib. with 8-2AF CB Distrib. with 32AF CB Graphic with 42 LCD Up to 6,A 7-1,A 32/72 32/84 32/72 32/72 32/72 26/72 32/72 32/72 32/84 32/84 32/84 26/84 32/84 32/84 Master/Generator Dimensions in(mm) 72 (1829) 84 (2134) 72 (1829) 84 (2134) 72 (1829) 84 (2134) 94 (2388) Master 94 (2388) Master/Gen or Gen 94 (2388) Dual Gen 32 (813) 32 (813) 32 (813) Distribution Dimensions in(mm) 72 (1829) 84 (2134) 72 (1829) 84 (2134) 94 (2388) 26 (66) 26 (66) 32 (914) Notes: 1) Dimensions are for NEMA 1 type enclosures only 2) Section that includes 4/5AF Circuit Breaker(s) will be 36 in. in width 3) A SWGR line-up consisting of a 5AF CB will not be UL 1558 listed 4) For NEMA 3R (outdoor) type enclosure each SWGR section width will increase four inches. 5) Dimensions above are typical. They may vary depending on custom specifications and design limitations 6) Dimensional data is approximate and subject to change. Specified dimensions available upon request. 12

7 Series Generator Paralleling Co System Operational Modes Automatic standby Prime power Parallel with utility System Control Load management control (automatic generator load demand and bus load optimization) for up to 128 ATS s or electrically operated feeder circuit breakers Manual load shed bypass control with bus under-frequency protection Hard-wired engine start and load shed relays System test without load (off-line) Test with load (on-line) Emergency stop Audible alarm horn Automated manual paralleling provisions Engine Generator Control Automatic engine start Automatic synchronizing and paralleling Engine governor control, load sharing, soft loading/unloading No external load share components required Adjustable engine cool-down timer System Controls Redundancy Master PLC redundancy: hot standby or hot standby synchronized Multiple (Master OIP type) touch screens for the generator controls Real time clock Two automated manual paralleling provisions: via touch screen with a Synchroscope or via push-buttons, mounted on the master door The Master Control Touch Screen Operator Interface Panel (OIP) DPC 12 or 15 (optional) TFT color Real time clock Customized screens with JCAHO records capability Basic OIP Screens: Main menu System overview screen with the one-line diagram Metering (bus and generators) Manual paralleling control ATS status System setup control Bus protection and setup Engine generator protection and setup Utility control and setup Utility metering Utility protection and setup Utility status and alarms Engine generator alarms and shutdowns kw trending Multiple parameter service trending Event data log Full range of service Log in Compact flash card portable memory capability for storing and capturing any of displayed screens, including event data logs. The Generator Control Touch Screen DPC 12 or 15 TFT color (optional) Screens to control and monitor each or each pair of generators Compact flash card portable memory capability for storing and capturing any of displayed screens, including event data logs. Metering Voltage ( A-B, B-C, C-A or A-N, B-N, C-N) Current A,B,C kw, kwh kva kvar Power factor Synchroscope Engine battery voltage Running time meter System Bus Protective Relaying.25% accuracy Based on true RMS sensing Device 27/59 - bus under/over voltage relay (three phase) Device 81O/U bus over/under frequency relay Generator Protective Relaying.25% accuracy Based on true RMS sensing Device 27/59 - under/over voltage relay (three phase) Device 81O/U over/ under frequency relay Device 32 reverse power relay Device 4Q loss of excitation (reverse VAR) relay Device 15/25V auto and manual synchronizing relays Engine Protection Alarms (if properly equipped) Low coolant temperature pre-alarm High coolant temperature pre-alarm Low oil pressure prealarm and shutdown Low fuel alarm Low engine battery alarm Over-crank shutdown Over-speed shutdown Utility Protective Relaying (for parallel with utility mode with utility-tie controls only).25% accuracy Based on true RMS sensing Utility grade type, discrete or multi-functional solid state, field adjustable relays Device 32 reverse power relay (three phase) Device 27/59 - under/over voltage relay (three phase) Device 81O/U over/ under frequency relay Device 47 negative sequence voltage relay Device 67 - directional overcurrent relay Device 86 lockout relay 13

ntrol Switchgear Specifications* PCS Power Supply Best DC source selector system Power from 24VDC engine start batteries DC-DC converter System Communications Serial modbus RTU master/slave (RS 485/232 ports) Ethernet 1-base-T supporting modbus TCP/IP CAN network peer-topeer protocol DeviceNet master/slave Remote Power Monitoring Options Standard or customized PC based SCADA ( PowerQuest ) remote power monitoring system via Ethernet 42 in. LCD mimic graphic panel (mounted in the switchgear lineup or stand alone) to display the emergency power system elements, including ATS s. Firewalled communication capability with building management system network via Ethernet or data concentrated (Gateway PLC) modbus slave Remote Internet/intranet connectivity via internal or external Thin Web Server Remote Generator Alarm & Status Annunciation Up to two optional Remote Annunciator panels, touch screen type or LED lamp type, with monitoring capability to provide the total system and individual generators status, alarms and display functions Capability to locate Remote Annunciation panels up to 65 feet (2 m) from the paralleling switchgear via fiber optic Ethernet communication Compliance with NFPA 99 Additional Optional Features Breaker lifting devices (portable or overhead) Load bank circuit breaker Electrically or manually operated distribution breakers Spare parts Circuit breaker test kit Custom sized 24VDC station battery system (including batteries, rack and charger). Extended (up 5 years) Warranty. Circuit Breakers UL 166 ( ANSI C37) rated, drawout, power circuit breakers (any specified brand) with frame size up to 5A. Up to 2 kaic rated (including fused breakers) Electrically operated on generators and distribution 5 cycle closing Auxiliary and bell alarm contacts Electronic trip units with LSIA functions on generators and LSIG or LSI trip functions on distribution Power metering and communication capability Enclosure and Bus UL 1558 constructed, listed & labeled Up to 6V, 3-phase, 4-wire AC system, 1% copper neutral and 25% ground bus Up to 1,A main bus Silver plated copper bus with up to 2kAIC bracing level for 4 cycles Bus duct risers available up to 6A Top and bottom conduit cable entry Mechanical set screw type or compression type lugs Enclosure types: NEMA 1, NEMA 3R, (consult for design limitations) Pull Boxes for NEMA 1 type enclosure ANSI gray Shipping splits at each section to ease installation Environment Temperature range o F to 125 o F (-18 o C to 52 o C) Humidity range to 95%, non-condensing * For detailed specifications please request publication 3179 14