ELECTRICAL SAFETY INSPECTION REPORT

Similar documents
ELECTRICAL SAFETY INSPECTION REPORT

SECTION PANELBOARDS

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

Meter Enclosure and Equipment Standards

PV Module Installation Instructions

Thanks for shopping with Improvements! Lighted Canterbury Christmas Greenery Doorway Arch Item #548443

ICS Entrance Management Sign Installation Guide. Version 1.0

Installation Notes TII Model 341 Protector

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

MICHIGAN DEPARTMENT OF TRANSPORTATION

Installation Instructions

Computer Network Design Guide Existing Systems 1 / 6

BA684DF-P PROFIBUS PA Field mounting Fieldbus Display

ReachFree ID Installation Instructions for Wash Select II. Unitec

Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS

Spring Test 17 due 06/14/2013

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD)

Target Interface / Construction Compliance Inspection Checklist

UNDERGROUND CONSTRUCTION MANUAL SERVICES

SECTION PROJECTOR LIFTS AND MOUNTS. A. Refer to Section [ Submittal Procedures] [Insert section number and title].

The JODEL Piglet System Installer s Manual

Series Amp Pad Mount Quick Connect Input and Output Power Panels

STR-3 STANDARD 3-PHASE 230 VAC TRANSFORMER CONTROLLER. Mounting and operating instructions

PEREGRINE SERIES RETROFIT INSTALLATION GUIDE

SECTION SWITCHGEAR

SECTION DISCONNECT SWITCHES

CONTROL PANEL WIRING SPECIFICATIONS

Pressure switches and thermostats, types KP and KPI

Installation Guide for America Solar Wholesale Photovoltaic Modules

1/2 Introduction. SIMBOX LC 1/7 Introduction 1/8 Flush-mounting and surfacemounting. 1/9 Dimensional drawings

TP&N DISTRIBUTION BOARD TYPE B RANGE

Digital I/O Module. Impro (DIO) Digital I/O Module INSTALLATION MANUAL

(Above 100km Distance) (Streetlight Pole) (Above 100km Distance) (Streetlight Pole)

QUICK START GUIDE FOR THE TRANZEO WIRELESS TR CPE-80

SECTION N -- ELECTROSTATIC DISCHARGE (ESD)

ALPHA Small Distribution Boards SIMBOX 63/SIMBOX WP

60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application

SECTION DISTRIBUTION SWITCHBOARDS

SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation

Product Pricing List 2009

PRO-1250D CT MID DIN rail three phase four wire energy meter.

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

Webb Core Cleanroom Wall System

Sapling Converter Box

IECEx Certificate of Conformity Annexe

OPERATING MANUAL FOR THE 30KV A.C. TEST SET P123. Bicotest High Voltage Products Ltd

R-LB R-LX Series Installation, Operation & Maintenance Manual

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

WINSTA. Full Line Catalog 2008/2009

Electrical Components and Equipment for General Use Self Inspection Checklist

Wiring Best Practices

National Light Sources Pty Ltd Electrical Accessories - Date 8th April, Coombes Drive, Penrith, NSW, 2750 Australia

Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium

SUN2000-(2KTL-5KTL)-L0. Quick Guide. Issue: 01 Part Number: Date: HUAWEI TECHNOLOGIES CO., LTD.

PowerLogic High Density Metering System 1-Meter Enclosure

1510 MOTOR CONTROLLERS

User s Manual. ACS550-PD Stock 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

QUICK START GUIDE FOR THE TRANZEO WIRELESS TR-CPE90

Preparing to Install the VG248

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625


MASTERLINE Ultimate Hybrid High Voltage 4/12 (MLUH HV 4/12) blunt cut at BTS side

UNIQUE DESIGN FEATURES

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

SEQUESTR PREfERREd-CUToUT disconnects Mild STEEl SEQUESTR ExTERnal disconnect PaCkagE, TyPE 12 industry STandaRdS application finish SPECifiCaTionS

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

nls Product List 1st February, 2014 Tel: Fax: Coombes Drive, Penrith, NSW, 2750 Australia

MODEL K INSTRUCTION MANUAL CONTENTS

DEB 575/1200. Electronic Flicker Free Ballast DMX MOD INSTRUCTION AND MAINTENANCE MANUAL

Line Interactive 1000VA/1400VA/2000VA Uninterruptible Power System

Appendix D. EMC Installation Guidelines. Safety Considerations. Ferrite Absorbers and P-Clips. General Product Philosophy

Model HM-535 Power Supply Installation and Service Instructions

Installation NOTICE. S&C IntelliCap Automatic Capacitor Control. Table of Contents. Instruction Sheet

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

IS-DM220/IR/HB IS-DM220

Greenlite Cashless In-Field Hardware Installation Instructions

SECTION [13200] FRAMED 2000 CLEANROOM WALL SYSTEM

Copper Riser And Intrabuilding Cabling

Model 7416LED

PRO1250D CT MID DIN rail three phase four wire energy meter. User manual Version 1.5

Conveyor Belt Alignment Switches from IDEM

Model 2657A-LIM-3 LO Interconnect Module

Square D Meter Centers. A Comprehensive. Selection. Time-Saving, Reliable. Solutions

Installation, Operation and Maintenance Manual

Illustrated Parts List

SDM120 SERIES. SDM120 series User Manual. Single phase two wire DIN rail energy meter (One module)

UL 508A Listed; Type 12; File No. E61997 cul Listed per CSA C22.2 No. 94; Type 12; File No. E CSA File No : Type 12

Hubbell Surge Protective DeviceS

NOW AVAILABLE AT IP66 RATING. Fast Fit. 3 phase distribution boards. clipsal.com. Designed for easy installation and fast wiring

OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS

Avanti HP Series Centrifuges Preinstallation

Illustrated Parts List MODEL. Reproduction Not for. 8,000 Watt Generator Systems

Installation and Operation Manual

NZQA registered unit standard version 2 Page 1 of 7. Demonstrate basic knowledge of electronic security data protocols and cabling

HT2000 Transverter Installation & Operation Manual

1993 SPECIFICATIONS CSJ , ETC. & SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM

DANGER DANGER: is used in this manual to warn of high voltages capable of causing shock, burns, or death.

Transcription:

ELECTRICAL SAFETY INSPECTION REPORT CHITTAGONG FASHION WEAR LTD. SOUTH HALISHAHAR, CHITTAGONG, BANGLADESH Factory List: 1. Chittagong Fashion Wear Ltd. 2. H & W Apparels Inspected on May 5, 2014

SUMMARY The factory is in a six storied building without a basement. The building was was constructed in1995 as a commercial building. There are multiple tenants in the building including commercial shops and banks besides RMG production lines. Chittagong Fashion Wear started production started in 1995. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design / installation constraints, shall be submitted to the Accord for approval. Chittagong Fashion Wear Ltd. Page 2 of 13

FINDINGS AND RECOMMENDATIONS Finding #: E- 1 Phase barrier/separators between different phases are not installed Phase barriers between different phases must be installed to avoid arc flashing. Phase separators missing Finding #: E- 2 Wooden distribution panel. Wooden distribution panels must be removed and replaced by IP rated inflammable panel. Wooden box mounted on wall Finding #: E- 3 CABLE RACEWAY & DUCTS Wooden planks used in cable duct to support lighting ballast. Provide duct cover made of non-combustible material preferably metallic sheet on the duct to prevent ingression of dust and lint. Any form of wooden materials in cable duct must be removed and lighting ballast to be installed on cable duct cover. Wooden block in cable duct Chittagong Fashion Wear Ltd. Page 3 of 13

Finding #: E- 4 HT cables dropping from 11kV OH line, not supported firmly and protected to the pole. HT cable dropping from 11kV pole must be protected in steel pipes clamped with saddle at least 2m from ground level. 11kV service line not supported and protected Finding #: E- 5 Breaker(s) fixed directly on wall and exposed. Breaker(s) must be housed inside the IP rated panel and the connections must not be exposed. Breaker exposed Finding #: E- 6 Rewirable kit Kat fuse used instead of the breaker in distribution panels Rewirable kit Kat fuses must be replaced by proper rated MCCBs. Rewirable kit Kat fuse in use Chittagong Fashion Wear Ltd. Page 4 of 13

Finding #: E-7 Accessibility to distribution board obstructed. Avoid fabrics storage (temporary) near distribution board (any electrical panel) Fabric storage around MDB panel Finding #: E- 8 TRANSFORMER ROOM Transformer breather broken, silica gel deteriorated and oil cup empty. Repair/replace the breather, replace with new silica gel and fill the oil cup with new transformer oil. Breather broken Finding #: E- 9 Combustible material stored near HT cable. Any combustible material must be removed from the cable trench and stored far from HT cable. Combustible material stored near HT cable. Chittagong Fashion Wear Ltd. Page 5 of 13

Finding #: E- 10 SERVICE LINE HT cable drawn with LT cables without proper separation and supports HT cable must be separated from the LT cables and supported while drawing into electrical room 11kV service cable with LT cables Finding #: E- 11 Excessive lint deposit on transformer. Clean the transformer periodically as part of Routine maintenance. Lint and dust on transformer Finding #: E- 12 Unused cable entry holes/openings are not Closed/sealed. Close/seal the excess holes/openings in the Panels/distribution boards. Unsealed openings Finding #: E- 13 SERVICE LINE Chittagong Fashion Wear Ltd. Page 6 of 13

Working space surrounding power transformer is Not enough. Sufficient working space must be provided around the power transformer Transformer room cramped Finding #: E-14 Wiring inside panel randomly placed. Wiring inside panel must be arranged and firmly fixed. Wiring inside MDB panel Finding #: E- 15 Cables and wires in PVC flexible conduit connecting to Sub-Distribution Boards are not Supported. Wires and wiring used for electrical connection(s), in the factory, must be supported, throughout its length, at safe height or Concealed. Cables not supported Finding #: E- 16 EQUIPMENTS & MACHINES Chittagong Fashion Wear Ltd. page 7 of 13

Power outlet sockets and water pump close to each other. Provide sufficient space between water pump and water pipe line from the power outlet socket Water pump and power outlet close to each other Finding #: E- 17 CABLE RACEWAY & DUCTS Excessive lint deposit in cable tray/raceway without cover Clean the tray/raceway and provide tray cover Made of non-combustible materials. Lint deposit in cable tray Immediate Finding #: E- 18 Cable glands are not used and the panel base is not sealed Cable glands must be used and the panel Base plate must be placed. Cable glands not used Finding #: E- 19 Chittagong Fashion Wear Ltd. Page 8 of 13

Phase barrier/separators between different phases are not installed. Phase barriers between different phases must be installed to avoid arc flashing. Phase separator not used Finding #: E- 20 Control device(s) mounted on wall without enclosures. Control devices must be enclosed in noncombustible protective covers. MCB mounted on wall Finding #: E- 21 Wires and cables inside distribution panel not arranged and firmly fixed. Cables and wiring inside panels must be arranged and firmly fixed away to avoid unintendedly touching other parts. Wiring inside LT panel Finding #: E- 22 Chittagong Fashion Wear Ltd. Page 9 of 13

Panel doors not connected with earth bond Provide earth connection for body and door of metallic distribution board using green cables.. No earth bond in panel door Finding #: E- 23 CABLE RACEWAY & DUCTS The connection nuts, bolts and washers are rusted All the connection nuts, bolts and washers must not be rusted and worn out. Replace them with new rust-free nuts, bolts and washers Connection rusted Finding #: E- 24 TRANSFORMER ROOM HT cable terminating at the transformer not supported. HT cable terminating to the transformer bushing must be supported on firmly fixed riser to reduce stress at the termination. Service cable not supported Finding #: E- 25 Chittagong Fashion Wear Ltd. page 10 of 13

Phase barrier/separators between different phases are not installed. Phase barriers between different phases must be installed to avoid arc flashing. No phase separator in changeover switch Finding #: E- 26 CABLE RACEWAY & DUCTS Wirings in the panels is unnecessarily lengthy and filling the space Unnecessarily lengthy wirings in the panels must be trimmed off and dressed well Panel board Finding #: E- 27 Mid span wire joints not insulated properly and protected. Mid-span joints in cables must be avoided to the extend possible. All joints must be tightly connected using cable joints or jointing kits. Mid-span wire joint Finding #: E- 28 Chittagong Fashion Wear Ltd. Page 11 of 13

Power cables terminating at distribution panels Are not installed with required size of cable lugs. Power cables must be terminated providing individual lug according to the respective cable size for termination at bus bar. Power cable terminated without cable lugs in bus bar Finding #: E- 29 Combustible materials used in generator room. Remove excess reserved fuel and other combustible items stored in the generator room. Excess fuel in Generator room Finding #: E- 30 Finished goods stocked very close and higher than cable raceways. Cottons/flammable materials and cable raceways/trays must not be close to each other. Sufficient space has to be maintained in between them. Finished goods stocked near to raceway Finding #: E- 31 Chittagong Fashion Wear Ltd. page 12 of 13

Panels not fixed on the foundation. All panels in operation must be fixed with anchor bolts on the foundation. Distribution panel not fixed Finding #: E- 32 Bus-bars inside panel exposed and not screened. Naked and exposed bus-bars in the panel must be screened and protected using non-conductive materials such as ebonite sheet. Bus bar inside PFI panel Chittagong Fashion Wear Ltd. Page13 of 13