Rack Installation Instructions

Similar documents
IBM. Rack Installation Instructions

Rack Installation Instructions

Rack Installation Instructions

System Storage EXP3000 Rack Installation Instructions

Rack Installation Instructions

IBM TotalStorage NAS 200 Model 25T. Quick Start Instructions

4-Post and Universal Telco Frame (UTF) Rack Mount Kit Installation Instructions

Rack Installation Guide

System Storage DS3950 Quick Start Guide

IBM Systems. Quick start guide for IBM System p5 505 ( )

EXN4000 Storage Expansion Unit Installation and Setup Instructions

IBM TotalStorage NAS Gateway 300 Model G27. Quick Start Instructions

N3240 Installation and Setup Instructions

Quick start guide for i5 520 ( or )

IBM System Storage DCS3860 Quick Start Guide

N3150 Installation and Setup Instructions

Quick start guide for p5 520 ( )

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Hardware Replacement Guide

7403 K321. Display Wall Mount. Kit Instructions. Issue A

N3220 Installation and Setup Instructions

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

ThinkCentre. Hardware Removal and Replacement Guide Types 8143, 8144, 8146 Types 8422, 8423, 8427

EXN3000 Storage Expansion Unit Installation and Setup Instructions

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Trays. Apply Power. Connect Data Hosts. Choose Management Method

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

Sun StorageTek. 1U Rackmount Media Tray Reference Guide. Sun Doc Part Number: Second edition: December 2007

Removal and Installation8

Vertiv Local Rack Access 18.5" LED LCD Console

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

HP EVA4400 M6412 drive enclosure

1 Getting Started Installing & Configuring

TABLE OF CONTENTS SECTION 1 TABLETOP CONFIGURATION SECTION 2 TABLETOP CONFIGURATION ACCESSORIES SECTION 3 SLIDE CONFIGURATION

DIGITAL Server Rackmount Installation Guide

To connect the AC adapter:

Before you begin. Unpack & Prepare. Install Hardware. Connect Hardware. Apply Power. Choose Management Method. Install & Use SANtricity Software

Floor Standing Pedestal

Before you begin. Installation and Setup Instructions for E-Series 60-Drive Trays. Unpack & Prepare. Install Hardware. Connect Hardware.

Hardware Replacement Guide Types 8099, 8116, 8155, 8156 Types 8157, 8158, 8159, 8160 Types 8215, 9210, 9211

User s Guide. Mobile Rack Device Mounting Kit for Echo Express III-R and xmac Pro Server. Quick Start Guide Video Available Online!

Installation Job Aid for Avaya Virtual Services Platform 8400

ProLiant ML350 Tower-to-Rack Conversion Guide. First Edition (September 2000) Part Number Compaq Computer Corporation

Installing the Server into a Rack

Installation and Maintenance

H3C S12500 Routing Switch Series

Rear Consumer LCD Hinge Assembly Large Displays

5000, 7000 Series StorSimple Appliance. Rack Installation Guide

CONTENTS. 1. Motherboard installation Install 5¼ and 3½ drives Install PCI components Case fan setup...5

Instructions for SVC-KIT-0020

2U STORAGE ENCLOSURE QUICK INSTALL GUIDE FS4100, FS4500, SC4100, AND FC4100

IBM. Setup Instructions. RS/ Model B50 SA

Agilent N2916B 6000 and 5000 Series Oscilloscope Rack Mount Kit

Perle MCR200 Installation Guide

M5 and M10 Routers Power Supply and Power Cord Component Replacement Instructions

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

Hardware Replacement Guide Lenovo 3000 J Series. Types 8453, 8454, 8455, 8458, 8459, 8460

SGI InfiniteStorage 120

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables

Table of Contents Quick Install Guide page Introduction Safety Rack System Precautions ESD Precautions...

User s Guide. for Echo Express III-R Rackmount Thunderbolt -to-pcie Card Expansion Chassis

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

Snap Server 4400 Power Supply

TDM To MiniMech conversion ProceDure

N6000 Series Filer Installation and Setup Instructions

Power Systems. System processor assembly

Heat Containment System (HCS)

Eaton Heat Containment System (HCS) Installation Guide

SNOWBOARD RACK KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 25

Bull D20 I/O Drawer. Installation Guide ORDER REFERENCE 86 A1 39EG 01

Replacing the Power Supply

Agilent N2739A 1000 Series Oscilloscope Rack Mount Kit

CMA Installation Guide

Replacing the Gateway 200ARC Keyboard

Print Mechanism Maintenance Kit

TRC-190 User s Manual

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

IBM PC Server/Netfinity Racks. Type Type Hardware Maintenance Manual. August 1999

Brocade VDX Four-Post Flush and Recessed Mount Rack Kit

120Ra-1 Pentium III Processor Installation Insert

INSTALLATION INSTRUCTIONS

Megatouch FORCE Monitor Chassis Board Replacement

XCM8800 PSU Cover. Installation Guide. 350 East Plumeria Drive San Jose, CA USA. May v1.0

Dell SC460 Expansion Enclosure Getting Started Guide

Peel/Rewind Upgrade Kit

Cisco TelePresence VX Clinical Assistant TM

ASSEMBLY AND ADJUSTMENT

Dell Wyse Client VESA Mounting Bracket for Dell P Series Monitor Installation Instructions

Adding or Replacing a PCI Card

Installing the Cisco MDS 9020 Fabric Switch

TDM-100/150 TO NMD-50 CONVERSION PROCEDURES RL5000

Replacement Keyswitch Assembly

User s Guide. for RackMac Pro 4U Rack Enclosure for New Mac Pro

Installation of the POTS splitter card requires the following steps: Determining the cables you need. Installing the POTS splitter chassis

Thank you for purchasing this Factory Service Manual CD/DVD from servicemanuals4u.com.

ThinkCentre Hardware Installation and Replacement Guide. Machine Types 6062, 6065, 6071, 6076, 6089, 7103, 9011, 9014, 9071, 9089, 9162, 9182, 9303

TRC-190 User s Manual

Controller PC Hard Drive

Sun StorageTek SL48 Tape Library Getting started

Oracle <Insert Picture Here>

Removing Components from the MX960 Chassis Before Installing It Without a Lift

Transcription:

Rack Installation Instructions Review the documentation that comes with your rack cabinet for safety and cabling information. When installing your server in a rack cabinet, consider the following: v Two or more people are required to install the device in a rack cabinet. v You must have a NetBAY 25, NetBAY42, NetBAY42 Enterprise, NetBAY22 with Rack Extension Kit, Netfinity 9306 Model 900 with Rack Extension Kit, or similar rack cabinet. v Ensure the room air temperature is below 35 C (95 F). v Do not block any air vents, usually 15 cm (6 in.) of air space provides proper airflow. v Plan the device installation starting from the bottom of the rack cabinet. v Install the heaviest device in the bottom of the rack cabinet. v Do not leave open spaces above or below an installed server in a rack cabinet. To help prevent damage to server components, always install a blank filler panel to cover the open space and to help ensure proper air circulation. v Do not extend more than one device out of the rack cabinet at the same time. v Connect all power cords to properly wired and grounded electrical outlets. v Take precaution to prevent overloading the power outlets when you install multiple devices in a rack cabinet. Use safe practices when lifting. 18 kg (39.7 lb) 32 kg (70.5 lb) 55 kg (121.2 lb) Do not place any object weighing more than 50 kg (110 lb) on top of rack-mounted devices. 50 kg (110 lb)

You will need a flat-blade and a Phillips screwdriver during the installation. The following illustration shows the items that you need to install the server in your rack cabinet. If any items are missing or damaged, contact your place of purchase. cable-management assembly cable management arm hinge plate cable strap (6) cage nut (16) clip nut (16) M6 screw (16) M4 screw (10) slide rail (2) cage-nut-insertion tool Chassis support bracket M3.5 thumbscrew cable clamp (10) 1 2 T em p la Cage nuts t e Clip nuts Cage nuts Use the attached rack-mounting template to locate the holes on the front and rear rack-mounting flanges. Install cage nuts or clip nuts as required for your rack cabinet. Use the cage-nut-insertion tool or a flat-blade screwdriver to install cage nuts. 2

3 Rear mounting flanges 4 Rear slide-rail bracket Right slide rail Front slide-rail bracket Tab Left slide rail Rail-length-adjusting screws Use the tab on the rear of each slide rail to align the slide rail to the rear mounting flanges. If the front slide rail bracket does not align with the front mounting flange, slightly loosen the rail-length-adjusting screws and adjust the length of the rail. 5 Rack-support wheels Install the slide rails, ensuring that the front and rear slide rail brackets for both slide rails are vertically aligned. Insert and partially tighten the four rear M6 screws; then, insert and fully tighten the four front M6 screws. If you loosened the rail-length-adjusting screws, tighten them; then, fully extend the rails out of the rack cabinet until they lock into place. 6 Rack-support wheels Handles Handles Thumbscrew Attention: To avoid injury, do not place your fingers around the rack-support wheels when positioning the server on the rails. Ensure that the handles are fully upright as shown in the illustration above; then, use the handles to position the server in front of and level with the rails, aligning the channels on the sides of the server with the rails. Slide the server onto the rails, resting the rack-support wheels on the rails, until the release latches contact the rails. Use four M4 screws per side to secure the server to the rails; then, remove the rack-support wheels and the handles and store them in a safe place. Also remove the blue thumbscrew from the left side of the server and store it in a safe place. Note: The rack-support wheels and the handles are required if you remove the server from the rack cabinet. You must also install the blue thumbscrew if you intend to remove the server from the rack cabinet and move the server to a new location. 3

7 Hinge plate 8 Rear slide-rail bracket Insert the tab on the bottom edge of the cable-management-arm hinge plate into the slot at the rear-left side of the server; then, attach the plate to the server with the M3.5 thumbscrew. Press in on the slide-rail-locking latches and slide the server fully into the rack cabinet. Slide the cable-management-arm bracket over the right-rear M6 screws. Ensure that both rear slide-rail brackets are vertically aligned; then, fully tighten the four rear M6 screws. 9 10 Hinge pins Handles Front slide-rail bracket Slide the server halfway out of the rack cabinet; then, loosen but do not remove the four front M6 screws. While one person supports the front of the server by lifting it slightly, ensure that the front slide-rail brackets are vertically aligned; then, fully tighten the four front M6 screws. Slide the server fully into the rack cabinet until it locks into place. Using the handles on the free end of the cable-management arm, retract the spring-loaded hinge pins; then, rotate the handles to lock the pins in the retracted position. 4

11 Tab Slot 12 Slide the tab on the cable-management arm into the slot in the hinge plate; then, release the hinge pins into the holes in the plate. Attach cables to the rear of the server (such as keyboard, mouse, and monitor cables if required). Route the cables toward the left side of the server. Use the cable clamps to secure cables along the way. Insert clamps only in the column of ventilation holes immediately to the right of the ac power connectors. If you insert the clamps in columns elsewhere, they will interfere with the removal of internal components. 13 Power cable straps 14 Cable straps Screw Release latch Route the cables through the cable-management arm, securing them with cable straps. Use two cable straps (one on each side of the hinge) to secure the power cords to the hinge plate. See the documentation that comes with your server and optional devices for complete cabling instructions. Slide the server into the rack cabinet until the release latches lock into place. Note: If you move the rack cabinet or install it in a vibration-prone area, insert the M6 screws; then, install the chassis-support bracket (see step 15). If the server comes installed in the rack cabinet, the bracket also comes installed and need not be removed. 5

15 Tab Chassis-support bracket Screws Important: The chassis-support bracket must be installed if you move the rack cabinet after you install the server. Align the bracket so that the tab engages the lower rear of the server. Install cage nuts or clip nuts, depending on your rack cabinet, on the rear mounting flanges in holes that align with the holes in the bracket; then, insert and fully tighten four M6 screws. Store this information with your server documentation for future use. First Edition (June 2003) Printed in the U.S.A. IBM, NetBAY, and Netfinity are trademarks of the IBM Corporation in the United States, other countries, or both. Copyright International Business Machines Corporation 2003. All rights reserved. US Government Users Restricted Rights Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. (1P) P/N: 02R2762