Topic 3: Angle measurement traversing

Similar documents
Chapter -7- Traversing. 1/28/2018 Assistant Lecturer / Asmaa Abdulmajeed 1. Contents

HP-33S Calculator Program TM 1

Angles and Directions الزوایا و الاتجھات

CE 103. Surveying. Course Instructor. Shayok Ghosh. Senior Lecturer Department of Civil Engineering East West University.

Topic 5: THEODOLITE TABLE OF CONTENTS

ENGI 3703 Surveying and Geomatics

Module Four: Connecting Algebra and Geometry Through Coordinates

Complex Numbers, Polar Equations, and Parametric Equations. Copyright 2017, 2013, 2009 Pearson Education, Inc.

Section 10.1 Polar Coordinates

Plane Surveying Traverse, Electronic Distance Measurement and Curves. Introduction

ENGI3703- Surveying and Geomatics Fall Closed Traverse

Total station assignment

Theodolite and Angles Measurement

θ as rectangular coordinates)

CE 371 Surveying ANGLE MEASURING_3

CIS-331 Exam 2 Fall 2015 Total of 105 Points Version 1

DRONACHARYA GROUP OF INSTITUTIONS, GREATER NOIDA Department of CIVIL Engineering Semester: III Branch: CIVIL Session: Subject: Surveying Lab

R13 PART-A PART-B. 2. a) Explain method of intersection in Plane table surveying b) What is error of closure? How is it balanced graphically?

MATHEMATICS FOR ENGINEERING TRIGONOMETRY

Jim Lambers MAT 169 Fall Semester Lecture 33 Notes

Drill Exercise - 1. Drill Exercise - 2. Drill Exercise - 3

National 5 Portfolio Relationships 1.5 Trig equations and Graphs

Faculty:-Prof. Mrs. N. Soundarya Semester:-III Class: - C.E. Course Code:-CE -207-F

CHAPTER 40 CARTESIAN AND POLAR COORDINATES

For all questions, E. NOTA means none of the above answers is correct. Diagrams are NOT drawn to scale.

+ b. From this we can derive the following equations:

9.5 Polar Coordinates. Copyright Cengage Learning. All rights reserved.

Acute Angles and Right Triangles. Copyright 2017, 2013, 2009 Pearson Education, Inc.

GLOBAL EDITION. Elementary Surveying. An Introduction to Geomatics FOURTEENTH EDITION. Charles D. Ghilani Paul R. Wolf

If three points A (h, 0), P (a, b) and B (0, k) lie on a line, show that: a b 1.

4. The following diagram shows the triangle AOP, where OP = 2 cm, AP = 4 cm and AO = 3 cm.

Worksheets for GCSE Mathematics. Trigonometry. Mr Black's Maths Resources for Teachers GCSE 1-9. Shape

1ACE Exercise 17. Name Date Class. 17. Which figure does NOT have rotation symmetry?

6.7. POLAR COORDINATES

The Mathematics of Engineering Surveying (1)

CARIBBEAN CORRESPONDENCE SCHOOL

Not exactly the translation and rotation I mean

S56 (5.3) Higher Straight Line.notebook June 22, 2015

Chapter 2: Transformations. Chapter 2 Transformations Page 1

CIS-331 Fall 2014 Exam 1 Name: Total of 109 Points Version 1

TOPOGRAPHICAL AND SITE SURVEY (Standard Of Procedure)

Drill Exercise - 1. Drill Exercise - 2. Drill Exercise - 3

Surveying Laboratory

UNIT 5: GEOMETRIC AND ALGEBRAIC CONNECTIONS. Apply Geometric Concepts in Modeling Situations

Fundamentals of Surveying MSS 220 Prof. Gamal El-Fiky

Engineering Surveying - II CE313. Route Survey Lecture 03 Muhammad Noman

Unit 5 Triangle Congruence

ADVANCED SURVEYING (S-II)

Chapter 1. Linear Equations and Straight Lines. 2 of 71. Copyright 2014, 2010, 2007 Pearson Education, Inc.

Trigonometric Functions of Any Angle

11 cm. A rectangular container is 12 cm long, 11 cm wide and 10 cm high. The container is filled with water to a depth of 8 cm.

Prerequisite Skills Appendix

Review of Trigonometry

On Your Own. Applications. Unit 3. b. AC = 8 units y BD = 16 units C(5, 2)


Algebra II. Slide 1 / 162. Slide 2 / 162. Slide 3 / 162. Trigonometric Functions. Trig Functions

Maryland Standards Alignment Grades One through Six

PROPERTIES OF TRIANGLES AND QUADRILATERALS

UNIT 9 - RIGHT TRIANGLES AND TRIG FUNCTIONS

General Certificate of Secondary Education Higher Tier November Time allowed 1 hour 30 minutes

1. In chain surveying tie lines are primarily provided a) to check the accuracy of the survey b) to take offsets for detail survey c) to avoid long

Summary. Boolean Addition

Convert Local Coordinate Systems to Standard Coordinate Systems

Cambridge International Examinations CambridgeOrdinaryLevel

(a) Barometric levelling (b) Trigonometric levelling (c) Spirit levelling [16]

GEOMETRY SPRING SEMESTER FINALS REVIEW PACKET

HP-35S Calculator Program Closure 1

3 Geometric inequalities in convex quadrilaterals Geometric inequalities of Erdős-Mordell type in the convex quadrilateral

Transformation a shifting or change in shape of a graph

10.7. Polar Coordinates. Introduction. What you should learn. Why you should learn it. Example 1. Plotting Points on the Polar Coordinate System

Geometry Midterm Review 2019

IT 201 Digital System Design Module II Notes

1.6 Applying Trig Functions to Angles of Rotation

Ch. 2 Trigonometry Notes

Pack 12. Surveying processes. Equipment 12.1 Method 12.2 Checklist 12.3 Calculations 12.4

Similar Polygons. These rectangles are not similar. In the investigation, you will explore what makes polygons similar.

Get Ready. Solving Equations 1. Solve each equation. a) 4x + 3 = 11 b) 8y 5 = 6y + 7

4. Specifications and Additional Information

ANGLES 4/18/2017. Surveying Knowledge FE REVIEW COURSE SPRING /19/2017

Extra Practice 1A. Lesson 8.1: Parallel Lines. Name Date. 1. Which line segments are parallel? How do you know? a) b)

THE INVERSE GRAPH. Finding the equation of the inverse. What is a function? LESSON

Instructors Manual. for. Construction Surveying and Layout. Third Edition. Part Two - Officework and Calculations. Chapters

Polar Coordinates. 2, π and ( )

5200/7200 Fall 2007 Concurrence theorems for triangles

Chapter 7 Coordinate Geometry

PE Exam Review - Surveying Demonstration Problem Solutions

Math For Surveyors. James A. Coan Sr. PLS

Maryland State Standards Alignment Grades One through Twelve

Medium Term Plan Year 4

To graph the point (r, θ), simply go out r units along the initial ray, then rotate through the angle θ. The point (1, 5π 6. ) is graphed below:

Digital Logic Design (CEN-120) (3+1)

Double Integrals over Polar Coordinate

A lg e b ra II. Trig o n o m e tric F u n c tio

Math 231E, Lecture 34. Polar Coordinates and Polar Parametric Equations

GCSE-AS Mathematics Bridging Course. Chellaston School. Dr P. Leary (KS5 Coordinator) Monday Objectives. The Equation of a Line.

ENGI Parametric & Polar Curves Page 2-01

2.6 BOOLEAN FUNCTIONS

Lecture 5. If, as shown in figure, we form a right triangle With P1 and P2 as vertices, then length of the horizontal

Casio TI-80 fx-7700ge Casio fx-9700ge Casio CFX-9800G. Systems of Linear Equations Program. Quadratic Formula Program

Chapter 2: Properties of Angles and Triangles

Transcription:

Topic 3: Angle measurement traversing

Aims -Learn what control surveys are and why these are an essential part of surveying -Understand rectangular and polar co-ordinates and how to transform between the two -Learn how to carry out a traverse

Control Surveys All measurements taken for engineering surveys are based on a network of horizontal and vertical reference points called control points. These networks are used on site in the preparation of maps and plans, they are required for dimensional control (setting out) and are essential in deformation monitoring. Because all surveying needs control points at the start of any engineering or construction project a control survey must be carried out in which the positions of the control points are established. The positions of horizontal control are usually specified in rectangular (x and y) coordinates.

Rectangular co-ordinates Any point P, has the coordinates known as easting E p and northing N p quoted in the order E p, N p.

Calculation of rectangular co-ordinates On a coordinate grid, the direction of a line between two points is know as its bearing. The whole circle bearing of a line is measured in a clockwise direction in the range 0 to 360.

The following figure shows the plan of two points A and B on a rectangular grid. If the coordinates of A(E A, N A ) are known, the coordinates of B (E B, N B ) are obtained as follows: Where: EAB = the eastings difference from A to B NAB = the northings difference from A to B DAB = the horizontal distance from A to B θab = the whole circle bearing from A to B

Example: The coordinates of point A are 311.617mE, 447.245mN. Calculate the coordinates of point B, where D AB = 57.916M and θ AB = 37 11 20 and point C where D AC = 85.071m and θ AC = 205 33 55 Polar co-ordinates Another coordinate system used in surveying is the polar coordinate system. Here a point B is located with reference to point A by a polar coordinates D and θ.

D is the horizontal distance from A to B and θ is the whole circle bearing of the line A to B. For the reverse of the previous example where the coordinates are know for both points it is possible to compute the whole circle bearing and horizontal distance of the line between the two points. This is known as rectangular to polar coordinate conversion. Example: The coordinates of A and B are EA = 469.721m, N A = 338.466m and E B = 501.035m, N B = 310.617m. Calculate the horizontal distance D AB and the whole circle bearing θ AB. D AB = E 2 AB + N 2 AB = ( E B E A ) 2 + ( N B N A ) 2 = (501.035 469.721) 2 + (310.617 338.446) 2 = 41.906m

To calculate θ AB a sketch of the line AB must be made in order to identify which quadrant the angle is in (as different equations apply for each quadrant):

θ AB = tan 1 E N AB AB + 180 o = tan 1 31.314 + 180 27.849 o = 131 38 53 Traversing A traverse is a means of providing horizontal control in which the rectangular coordinates of a series of control points located are a site are determined from a combination of angle and distance measurements.

Each point on a traverse is called a traverse station and these must first be located well and marked with ground markers before surveying commences:

Procedure for Traversing When angle ABC is measured: At A a tripod target is set up centred and levelled, at B a theodolite or total station is set up, levelled and centred as normal. At C another tripod target is set up as for A. This enables the horizontal angle at B to be recorded and if a total station is being used the distances BA and BC can be measured. When the angle BCD is measured: At A the tripod target are moved to D, where the target is centred and levelled as before. At B the total station or theodolite is unclamped and interchanged with the target at C (the tripods can remain in the same place and there is no need to recentre them). The horizontal angle at C can now be measured along with the distances CB and CD. The distance CB will provide a check for error in the previous BC measurement.

When the angle CDE is measured: At B the tripod and target are moved to E. The theodolite or total station at C is interchanged with the target at D. The process is repeated for the whole traverse, if 4 or more tripods are used this speeds up the process. Traverse Calculations Traverse calculations involve the calculation of the 1) whole circle bearings 2) the coordinate differences and 3) the coordinates of each control point. To illustrate these calculations we will use the traverse ABCEDFA below throughout:

Errors and Misclosure The first part of a traverse calculation is to check that the observed angles sum to their required value. Sum of internal angles = (2n - 4) x 90o Sum of External angles = (2n + 4) x 90o, n is the number of angle measured If on summing these values a misclosure is found, it is divided equally between the station points if it is acceptable. Acceptability of misclosure E for traversing is given by: E = ±KS n Where K is a multiplication factor from 1 to 3 depending on weather conditions. S is the smallest reading interval on the theodolite (e.g. 20, 5 or 1 ) and n is the number of angle measured. Taking our traverse ABCDEFA the misclosure is calculated and redistributed as follows:

Calculation of Whole Circle Bearings To calculate the coordinates of a control point the WCB must be known as we saw earlier. This is done according to the following formulae:

Calculation of Whole Circle Bearings To calculate the coordinates of a control point the WCB must be known as we saw earlier. This is done according to the following formulae:

Forward bearing YZ = Back bearing YX + (for the above example) In general Forward bearing = back bearing + left hand angle A forward bearing is a bearing in the direction of the traverse e.g. XY and YZ, a back bearing is a bearing in the opposite direction to the traverse e.g. YX and ZY. Forward and back bearing differ by ±180. The left hand angle is the angle between the bearing lines at a control station that lies to the left of the station relative to the direction of the traverse, i.e. the internal angle for anticlockwise traverses and the external angle for clockwise traverses.

Example: WCB at station A of the ABCDEFA traverse The calculation of WCBs must start with a known bearing or an assumed arbitrary bearing. Here the first bearing AF is known to be 70 00 00. Because the internal angles have been measured the traverse is calculated in an anticlockwise direction and AF is a back bearing.

Forward bearing AB = back bearing AF + adjusted left hand angle at A = 70 00 00 + 115 11 10 = 185 11 10 (WCB at A) Example : WCB at station B of the ABCDEFA traverse

Forward bearing BC = back bearing BA + adjusted left hand angle at B To convert the forward bearing AB into a back bearing BA we add or subtract 180. Back bearing BA = 185 11 10 ±180 = 05 11 10 Forward bearing BX = 05 11 10 + 95o 00 00 = 100 11 10 (WCB at B) The WCBs of all other stations are carried out in a similar manner. To finalise this section of the calculations the final forward FA bearing must equal the first back bearing AF (250 is equivalent to 70 in this case as shown in the next slide).

Calculation of Coordinate Differences The next stage of the traverse calculation is to determine the coordinate differences of the traverse lines E, N. Example: Traverse ABCDEFA, line AB + BC

Error Check! In order to assess the accuracy of the traverse E (should) = 0 and N (should) = 0, since the traverse starts and finishes in the same place. The errors in this summation e E and e N are:

Coordinate Differences : Bowditch Adjustment Method Following calculation of E, N and the misclosure errors ee and en an adjustment of those errors δe, δn must be made. This method is most suitable for traverses carried out using steel tapes Adjustment to E (or N) for a traverse line = δe (or δn) = - ee (or -en) x length of traverse line / total length of traverse

Coordinate Differences : Equal Adjustment Method This adjustment method is most suited for traverses carried out with total stations Calculation of Coordinates Recalling from earlier that the coordinates of a point are calculated as follows for points B and C: EA, NA were given as 350.000mE, 500.000mN EB = EA ± EAB = 350 7.768 = 342.232mE NB = NA ± NAB = 500 85.517 = 414.483mN This process is repeated until point A is rechecked as shown on the next slide:

Further Examples Below the angles and distances for traverse A1234A are shown. The coordinates of A are 642.515mE, 483.980mN. the traverse is oriented to existing control point B (548.005mE, 594.279mN). Calculate the coordinates of stations 1-4.