MedFasee Project Development and Applications Department of Electrical Engineering Federal University of Santa Catarina (UFSC) 1
The Federal University of Santa Catarina MedFasee Project: First Prototype (2003) The main goals were: Development of a Synchronized Phasor Measurement System prototype Applications for power system monitoring and analysis Project sponsored by: Brazilian Government (Finep/CT-Energ) Reason Tecnologia S.A. (www.reason-international.com) First Prototype 3 PMUs installed in Southern Brazil universities Three-phase low voltage Data transmission using Internet The PDC is located in the Federal University of Santa Catarina 2
MedFasee Project Current configuration of the National Synchronized Phasor Measurement System (SPMS MedFasee BT) PMUs are installed in 23 universities, covering the 5 geographical regions Virtual Private Network over Internet for communication between PMU and PDC (LabPlan/UFSC) PDC PMU www.medfasee.ufsc.br/temporeal 3
Main MedFasee Projects in partnership with industry 2003 2007 2009 2011 2013 2015 First Prototype Eletrosul Project CTEEP Project (1) ONS Project CTEEP Project (2) UFSC UFSC UFSC UFSC UFSC Brazilian Government (Finep/CT-Energ) Reason Tecnologia Prototype of low voltage WAMS ELETROSUL Transmission Company R&D ANEEL Project WAMS prototype for the 500kV transmission system CTEEP Transmission Company R&D ANEEL Project WAMS prototype for the 440kV transmission system Official partnership between UFSC and the Brazilian ISO (ONS) Disturbance Analysis CTEEP Transmission Company R&D ANEEL Project Pilot system for automatic evaluation of dynamic security 4
MedFasee ELETROSUL Project (2006-2009) Sponsor ELETROSUL Transmission Company Objective Development of a SPMS prototype for the ELETROSUL transmission system Developments: Prototype with 4 PMUs and 1 PDC Development of a new PDC Evaluation of the prototype performance Application for system analysis 5
MedFasee CTEEP Project Partner: CTEEP Transmission Company / UFSC / HPPA Project 1 (2009-2011) Objective To implement a WAMS prototype for the 440kV transmission system of the CTEEP Company (São Paulo State) Main Developments Monitoring applications in real time Applications for off-line disturbance analysis 6 Project 2 (2013-2015) Objective Development of a system for automatic evaluation of dynamic security based on security regions and synchronized phasor measurements
MedFasee ONS Project (2011-2014) Partner National System Operator (ONS) Objective Application of synchronized phasor measurement data for the analysis of the dynamic performance of the Brazilian Interconnected Power System (BIPS) 7
MedFasee Project Applications Development Basic Applications (BA): Acquisition and processing of phasor data (PDC) Visualization tools for the dynamic behavior assessment using off-line and real time data Synchronized recording and analysis of perturbation data Monitoring Applications (MA): Off-line and real time analysis of electromechanical oscillations "Basic" Subsidies for other applications Specials Model Validations and Simulations Control and Protection Applications (CPA) Control for damping critical oscillation modes Special Applications (SA): Hybrid dynamic simulation Validation of simulation models Estimation of line parameters Fault location Monitoring Applications" Dynamic information of electrical systems " Control and Protection" Preventive, Corrective and Restorative Actions 8
Selected Cases 1 - Disturbance in BIPS (15/12/2012) Trip of 5 generation units in Itumbiara Hydroelectric Plant Load interruption (16,26% of BIPS) ~8.000 MW in S/SE ~1.704 MW in MG, MT, AC/RO e GO 9
Selected Cases 2 - Sustained oscillations in AC-RO November 12 th, 2014 Islanding 18h42min20s Resynchronization 18h45min10s 59,2 Hz 60,8 Hz PSS blocked PSS operation PSS blocked Resynchronization Zoom Islanding 10
Selected Cases 3 - Sustained oscillations in AC-RO November 12 th, 2014 Period: 19h08min21s 19h17min05s 11
Selected Cases 3 - Sustained oscillations in AC-RO November 12 th, 2014 Period: 19h08min21s 19h17min05s (UTC) Period 1: 19h10min00s 19h10min59s 0,58 Hz Period 2: 19h14min00s 19h14min59s 0,55 Hz 12
Selected Cases 3 - Sustained oscillations in AC-RO November 12 th, 2014 Period: 19h08min21s 19h17min05s (UTC) Period: 19h16min35s 19h17min05s 13 Prony Analysis Frequency: 0,53 Hz Damping Rate: 1,7 %
Dif. Angular (graus) Dif. Angular (graus) Dif. Angular (graus) Selected Cases 4 - Sustained oscillations in Mato Grosso do Sul Oscillations in Mato Grosso do Sul (MS), observed at the PMU installed in Campo Grande (State capital): May, 2012 Angle Difference: UFSC (Florianópolis) x UFMS (Campo Grande) Diferença angulares. Ref.:UFSC [10f/s] Diferença angulares. Ref.:UFSC [10f/s] 11 10.5 10 UFMS 10.2 10.1 UFMS 9.5 10 9 8.5 8 7.5 7 Início Fim 9.9 9.8 9.7 9.6 6.5 6 8 1.3 1.35 1.4 1.45 1.5 1.55 Tempo(h) - Início:05/05/2012 00:00:00 (UTC) Diferença angulares. Ref.:UFSC [10f/s] UFMS 9.5 9.4 9.3 12.162 12.164 12.166 12.168 12.17 12.172 12.174 12.176 Tempo(h) - Início:05/05/2012 00:00:00 (UTC) 7 6 5 First period: 1h27min + 30min (UTC) 4 3 14 Início 2.3 2.35 2.4 2.45 2.5 2.55 Tempo(h) - Início:05/05/2012 00:00:00 (UTC) Restart: 2h23min + 4,5 days (UTC)
Selected Cases 4 - Sustained oscillations in Mato Grosso do Sul Ambient Data acquired in 05/05/2012 DFT Stochastic Balanced Realization (SBR) Frequência 0.7 0.65 0.6 0.55 0.5 2 4 6 8 10 12 Amortecimento 0 0 2 4 6 8 10 12 Tempo(h) - Início:05/05/2012 00:00:00 (UTC) The DFT results are coherent with the SBR results 1.5 1 0.5 15 Importance of employing more than one methodology
Selected Cases 4 - Sustained oscillations in Mato Grosso do Sul Ambient Data acquired in: 06/05/2012 07/05/2012 16
Dif. Angular (graus) Selected Cases 4 - Sustained oscillations in Mato Grosso do Sul Ambient Data acquired in: 09/05/2012: Disappearance of oscillations at 13h58min (UTC) Diferença angulares. Ref.:UFSC [10f/s] 24 UFMS 23 22 21 20 19 18 Final das oscilações 17 17 13.75 13.8 13.85 13.9 13.95 14 14.05 14.1 14.15 14.2 Tempo(h) - Início:09/05/2012 00:00:00 (UTC) Cause: Associated with biomass driven generators in Mato Grosso do Sul