Appendix 1 Interconnection Request INTERCONNECTION REQUEST

Similar documents
January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

July 26, Dear Mr. Millar:

Grid Interconnection of Renewable Generation

Interconnection Re-MAT September 11, 2013

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM

Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements

From: Laura Manz, Vice President of Market & Infrastructure Development

Agreements and Queue Management

Business Practice Manual For. Generator Interconnection and Deliverability Allocation Procedures (GIDAP) BPM)

Agreements and Queue Management

Generator Interconnection Process. Wholesale Transmission Overview

Agreements & Queue Management

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

Feasibility Study on Load Flow and Short Circuit Project

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

Checklist for Submission to Utility

Small Hydro Regulatory and Permitting Requirements California

Interconnection and Transmission

Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)

Interconnection Application

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

Stakeholder Comments Template

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE INVITING POST-TECHNICAL CONFERENCE COMMENTS. (June 3, 2016)

Feel free to scan and return the attached paperwork to or fax to HealthComp at (559) IMPORTANT:

HEALTHCOMP (85729) ERA ENROLLMENT INSTRUCTIONS

Generation Interconnection Feasibility Study Report

Overview. IHCP Provider Name and Address Maintenance. indianamedicaid.com

ATTACHMENT I: Generator Interconnection Procedures (GIP)

CUMBRE VISTA HOMEOWNERS ASSOCIATION, INC. RECORDS INSPECTION AND COMMUNICATIONS POLICY AND PROCEDURE. 1-Pl) ~ \ 1

Clean Power Call BC Transmission Corporation & BC Hydro Joint Information Session July 8, 2008

Phillips Edison Grocery Center REIT II, Inc. Account Modification Form

ELECTRONIC FILING INSTRUCTIONS

MEMORANDUM. Robert Kreszswick, Director, Membership Services Department. Web CRD Electronic Procedures for Forms U4 and U5

Specific topics covered in this brief include:

Robin Hood Energy Feed-In Tariff Application Form

ELECTRONIC FILING INSTRUCTIONS

MBC BUSINESS SERVICES, INC. AGREEMENT FOR REGISTERED AGENT SERVICES

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011

Electronic Value Transfer Administrator Form EVTA-2, Key Merchant Services (KMS) Work Order Contract PS65792

Memorandum. This memorandum requires Committee action.

Electronic Filing Instructions Pfizer Securities Litigation Settlement

Legal Name of the Customer (or, if an individual, individual's name):

AETNA BETTER HEALTH AETNA BETTER HEALTH KIDS 2000 Market Street, Suite 850 Philadelphia, PA Fax

March 15, 2011 VIA ELECTRONIC FILING

Midwest Energy, Inc. Distributed Generation Interconnection Expedited & Standard Process Application

Electronic Filing Instructions New York State Teachers Retirement System v. General Motors Company

Instructions. Interconnection Customer declares its intention to interconnect with the AEP Distribution System.

APPENDIX LETTER CODE DESCRIPTION Appendix D2 Scheduled ENROL/ 3PENR

For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form)

ELECTRONIC FUNDS TRANSFER (EFT) For Provider Payments

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. REPLY BRIEF OF SOUTHERN CALIFORNIA EDISON COMPANY (March 19, 2009)

2018 Interconnection Process Enhancements (IPE) Webconference November 12, 2018, :00 p.m. 4:00 p.m. (Pacific Time)

Electronic Filing Instructions In re Barrick Gold Securities Litigation

RESOLUTION NO. 14-R-

Solar*Rewards Community MN Application Manual

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Robin Hood Energy Feed-in Tariff Application Form

Electronic Filing Instructions Manulife Financial Corporation Securities Class Actions


AETNA BETTER HEALTH OF NEW YORK

ELECTRONIC FUNDS TRANSFER FOR PROVIDER PAYMENTS

ARKANSAS HIGH COST FUND 2013 CARRIER REVENUE REPORT& SELF INVOICE INSTRUCTIONS

Electronic Filing Instructions Manulife Financial Corporation Securities Class Actions

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION

In re Allergan, Inc. Proxy Violation Securities Litigation

Stem Beach Solar 1041 Application

Site Modification Request Form 2018

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Arizona Public Service ) Docket No. ER Company )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Electronic Filing Instructions In re Weatherford International Securities Litigation

QNB Bank-ONLINE AGREEMENT

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

INSTRUCTIONS FOR THE ON-LINE APPLICATION

User Guide. March 2017

FEED IN TARIFF APPLICATION FORM

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

EXTRUTECH PLASTICS, INC. Custom Extruder of Close Tolerance Profiles

Generation Interconnection Process. NEMSTF Education Session 1 January 19, 2012

You may use the Service to either access, establish or change the following:

NESCOE Request For Information Supplemental Information Form Due: Close of business on Friday February 25, 2011

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

isupplier Portal User Guide

APPLICATION DEADLINE Postmarked by January 12, 2018

TransWest Express Transmission Project Interregional Transmission Project Submittal

STATE OF MINNESOTA PROFESSIONAL FUNDRAISER SOLICITATION NOTICE INSTRUCTIONS

Railroad Medicare Electronic Data Interchange Application

132 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Phillips Edison Grocery Center REIT I, Inc. Account Modification Form

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Change Healthcare ERA Provider Information Form *This form is to ensure accuracy in updating the appropriate account

Transcription:

Appendix 1 Interconnection Request INTERCONNECTION REQUEST NO HARD COPY REQUIRED FOR INTERCONNECTION REQUESTS SUBMITTED ELECTRONICALLY VIA RIMS 5 Provide one hard copy of this completed form pursuant to Section 7 of this Appendix 1 below for non-electronic submissions. If submitting hard copy, please use a binder clip to keep pages together. No staples, binders, paper clips or other forms of binding. Thank You! 1. The undersigned Interconnection Customer submits this request to interconnect its Generating Facility with the CAISO Controlled Grid pursuant to the CAISO Tariff (check only one): Fast Track Process. Independent Study Process. Queue Cluster Process. Annual Full Capacity Deliverability Option pursuant to GIDAP Section 9.2. (Required fields: 3, 4a Project name including Q#, 4e, 8, and 9 only.) Deliverability from Non-Participating TOs pursuant to GIDAP Section 9.4. 2. This Interconnection Request is for (check only one): A proposed new Generating Facility. An increase in the generating capacity or a Material Modification to an existing Generating Facility. 3. Requested Deliverability Status is for (check only one): Full Capacity (For Independent Study Process and Queue Cluster Process only) (Note Deliverability analysis for Independent Study Process is conducted with the next annual Cluster Study See GIDAP Section 4.6) Partial Deliverability for % of electrical output (for Independent Study Process and Queue Cluster Process ONLY) Energy Only Comments: 4. The Interconnection Customer provides the following information: a. Address or location, including the county, of the proposed new Generating Facility site or, in the case of an existing Generating Facility, the name and specific location, including the county, of the existing Generating Facility; Prohibited Project Name Project Features Names Not List: Allowed: http://www.caiso.com/documents/prohibitedprojectnames.xlsx Project Company Name names Features or types Not Allowed: (i.e., LLC) Special Characters Project Name: Company Duplications names or types (i.e., LLC) Special Abbreviations Characters similar to those used by CAISO Duplications values Abbreviations Use of the word similar Phase to those or Expansion used by CAISO More values than two digits Use License of the plate word Phase looking configurations or Expansion More Roman than numerals two digits License plate looking configurations Roman numerals Queue #: Project Location: Street Address: County: (Only for existing projects requesting Annual Deliverability Assessment in item 1.)

Zip Code: GPS Coordinates (decimal format): Latitude: Longitude: b. Provide the following project megawatt values. - The values must match Attachment A Items 2A thru 2E - If project is an increase to an existing project, provide values based on the increase only. Total Generating Facility Gross Output: Generating Facility Auxiliary Load: Maximum Net Megawatt Electrical Output: * OR Net Megawatt increase: ** Total Generating Facility Output less Generating Facility Auxiliary Load **This is for an increase or Material Modification to *This is for a proposed new Generating Facility an existing Generating Facility Anticipated losses between the Generating Facility and POI: Desired net at POI Maximum Net Megawatt Electrical Output less Anticipated Losses This value is the basis for delineation between large (>20 ) and small projects ( 20 ), and the pro rata basis for cost allocations of Reliability Network Upgrades (RNUs) except short circuit related RNUs in the Cluster Phase I and Phase II interconnection studies. This is the value that will appear in the ISO Generation Interconnection Queue Report. Your TP Deliverability Allocations will not be able to exceed this value. c. Type of project (i.e., gas turbine, hydro, wind, etc.) and general description of the equipment configuration (if more than one type is chosen include gross for each). - If project is an increase to an existing project, provide values based on the increase only. Cogeneration Select Fuel Type Combined Cycle Select Fuel Type Fuel Cell Select Fuel Type Gas Turbine Hydro Photovoltaic Reciprocating Engine Select Fuel Type Solar Thermal Steam Turbine Select Fuel Type If more than one: Select Fuel Type Wind Turbine Storage Select Fuel Type

Other (please describe): Generator Type: Comments: Fuel Type: General description of the equipment configuration (e.g. number, size, type, etc): If project is an increase to an existing project, describe the entire facilities here d. Proposed In-Service Date (first date transmission is needed to the facility), Trial Operation Commencement date and Commercial Operation Date in MM/DD/YYYY format and term of service (dates must be sequential, proposed Commercial Operation Date may not be more than seven (7) years from date of application): Proposed In-Service Date: (MM/DD/YYYY) Proposed Trial Operation Commencement Date: Proposed Commercial Operation Date: Proposed Term of Service (years): e. Name, address, telephone number, and e-mail address of the Interconnection Customer s contact person (primary person who will be contacted); Company Name: Street Address: Zip Code: Phone Number: Fax Number: Email Address: f. Approximate location of the proposed Point of Interconnection (i.e., specify transmission facility interconnection point name, voltage level, and the location of interconnection); Substation or Transmission Line Name: Voltage Level: kv g. Interconnection Customer data (set forth in Attachment A) The Interconnection Customer shall provide to the CAISO the technical data called for in GIDAP Appendix 1, Attachment A. NO HARD COPY REQUIRED FOR INTERCONNECTION REQUESTS SUBMITTED VIA RIMS 5 One (1) hard copy is required for non-electronic submissions.

5. Applicable deposit amount made payable to California ISO. Send check or wire funds to CAISO (see section 7 for details) along with the: a. Interconnection Request for processing. Study Deposit for Cluster and ISP projects if $150,000 regardless of b. Attachment A (Interconnection Request Generating Facility Data). size. 6. Evidence of Site Exclusivity as specified in the GIDAP and name(s), address(es) and contact information of site owner(s) (check one): Is attached to this Interconnection Request If attaching evidence of Site Exclusivity, please answer the following: a. Type of Site Exclusivity Provided: (Note that letters of intent or similar agreements are not acceptable as proof of Site Exclusivity) Proof of Ownership (Deed) Lease Agreement Option to Purchase Option to Lease Other? Please Explain b. Is Site Exclusivity granted to the Interconnection Customer (i.e. to the same entity with the same name) identified in Section 9 of this Interconnection Request? Yes No If No, please explain relationship between entities: c. Term of Agreement? Including agreement effective upon and execution of option (If applicable)? Years d. Term of Option, including renewals? (If applicable) Years e. Acreage acquired or reserved for project site? Deposit in lieu of Site Exclusivity via check or Fed Wire, Site Exclusivity will be provided at a later date in accordance with this GIDAP Deposit in Lieu of Site Exclusivity = $250,000for projects greater than 20, $100,000 for projects equal to or less than 20. ISP and FT projects must submit valid documents. 7. This Interconnection Request shall be submitted to the CAISO via RIMS 5 or sent to the representative indicated below. California ISO Attn: Grid Assets P.O. Box 639014 Folsom, CA 95763-9014 OR Overnight address: California ISO Attn: Grid Assets 250 Outcropping Way Folsom, CA 95630 Deposit can be made via Fed Wire transfer or check ACH is not accepted. Please be sure and reference the project name in the notes area of wire transfer or check for easy matching. Wiring information: Wells Fargo Bank (LGIP) ABA 121000248 Acct 4122041825 Federal Tax ID # 94-3274043 CAISO is a Corporation. Funds must be received no later than close of cluster window for cluster projects. 8. Representative of the Interconnection Customer to contact: [To be completed by the Interconnection Customer] Company Name:

Street Address: Zip Code: Phone Number: Fax Number: Email Address: 9. This Interconnection Request is submitted by: Legal name of the Interconnection Customer: (Punctuation and spelling of Legal name must match Secretary of State document exactly) State of Origin for Secretary of State Document: Name of Parent Company (if applicable): These boxes must be checked for electronic submission By executing this Interconnection Request, Interconnection Customer hereby consents to CAISO s disclosure of its confidential information during the evaluation of this request to those Affected Systems who have entered into an appropriate non-disclosure agreement with CAISO and pursuant to Appendix DD of the CAISO Tariff, including Sections 3.7 and 15.1.2. Your electronic signature below indicates your agreement with the following statement: By typing my name in the following line and clicking on the submission box below, the Interconnection Customer identified above certifies that the information contained in this Interconnection Request is true and correct to the best of its knowledge. By (original signature if submitting hard copy): Date (MM/DD/YYYY): Link to required Generating Facility Data Form (Attachment A to Appendix 1): http://www.caiso.com/publisheddocuments/generatingfacilitydata-attachmentatoappendix1.xlsm The Generating Facility Data (Attachment A to Appendix 1) is a separate Excel file (.xlsm) and is a required element of a project s Interconnection Request submission.