PT Activity 2.6.1: Packet Tracer Skills Integration Challenge

Similar documents
Felix Rohrer. Lab 5.5.3: Troubleshooting Access Control Lists. Topology Diagram

Packet Tracer - Configuring a Zone-Based Policy Firewall (ZPF)

Packet Tracer - Skills Integration Challenge Topology

CCNA 3 Chapter 8 v5.0 Exam Answers 2015 (100%) CCNA 5 Page 1

SafeDispatch SDR Gateway for MOTOROLA TETRA

2. When an EIGRP-enabled router uses a password to accept routes from other EIGRP-enabled routers, which mechanism is used?

CCNA 1 Chapter v5.1 Answers 100%

2. Which command can be used to view the cable type that is attached to a serial interface?

ICND2 Lab Exercises Lesson Companion

All Academy Day: Home Networking Event Details

1. What is a characteristic of Frame Relay that provides more flexibility than a dedicated line?

CCNA course contents:

CCNA 1 Chapter v5.1 Answers 100%

CCNA Security v2.0 Chapter 9 Exam Answers

CCNA 3 Chapter 2 v5.0 Exam Answers 2015 (100%)

2. What is the most cost-effective method of solving interface congestion that is caused by a high level of traffic between two switches?

CCNA 1 Chapter v5.1 Answers 100%

Telkom VPN-Lite router setup User Manual Billion 800VGT

Interoperability between ProCurve WESM zl and HP ipaq Voice Messenger smartphone

CCNA 1 v5.1 Practice Final Exam Answers %

Gemini Intercom Quick Start Guide

VMware AirWatch Certificate Authentication for Cisco IPSec VPN

Telkom VPN-Lite router setup User Manual Billion 810VGTX

All Academy Day: Router Configuration and Troubleshooting Event Details

Enterprise Installation

Knowledge Exchange (KE) System Cyber Security Plan

Clearfly SIP Trunks Configuration Guide PBX Platform: KX-TDE/NCP

CCNA Security v2.0 Chapter 2 Exam Answers

vrealize Operations Management Pack for Storage Devices Release Notes

WorldShip PRE-INSTALLATION INSTRUCTIONS: INSTALLATION INSTRUCTIONS: Window (if available) Install on a Single or Workgroup Workstation

Max 8/16 and T1/E1 Gateway, Version FAQs

2. When logging is used, which severity level indicates that a device is unusable?

CONFIGURING UUM . Android. You will need the following information to set up UUM

Competitor fills in. Expert fills in. Time: 6.75h 39 - IT Network Systems Administration Danny Meier, Florian Meier, Tobias Meier

Virtual Office

To start your custom application development, perform the steps below.

IT Essentials (ITE v6.0) Chapter 7 Exam Answers 100% 2016

BMC Remedyforce Integration with Bomgar Remote Support

Campuses that access the SFS nvision Windows-based client need to allow outbound traffic to:

CCNA 1 Chapter v5.1 Answers 100%

DIVAR IP 3000 Field Installation Guide

CCNA 3 Practice Final v5.0 Exam Answers 2015 (100%)

BMC Remedyforce Integration with Remote Support

These tasks can now be performed by a special program called FTP clients.

USER GUIDE. Thanks for purchasing the igate! You ll need to follow these five Configuration Steps to get your igate up and running:

Date: October User guide. Integration through ONVIF driver. Partner Self-test. Prepared By: Devices & Integrations Team, Milestone Systems

Using CppSim to Generate Neural Network Modules in Simulink using the simulink_neural_net_gen command

Click Studios. Passwordstate. RSA SecurID Configuration

HARTING MICA Firmware 2.0 Release Notes

Xilinx Answer Xilinx PCI Express DMA Drivers and Software Guide

OpenScape Business V2

Launching Xacta 360 Marketplace AMI Guide June 2017

Firmware Upgrade Wizard v A Technical Guide

Connect+/SendPro P Series Networking Technical Specification

User Guide. Document Version: 1.0. Solution Version:

Dear Milestone Customer,

CCNA 1 Chapter 1 v5.03 Exam Answers 2016

ROCK-POND REPORTING 2.1

Kaltura MediaSpace Installation and Upgrade Guide. Version: 5.0

TSHOOT v2.0 Troubleshooting and Maintaining Cisco IP Networks

Smart Collector Embedded Assistant User Guide

Avigilon Control Center Server User Guide. Version 6.4

Dynamic Storage (ECS)

Frequently Asked Questions

CounterSnipe Software Installation Guide Software Version 10.x.x. Initial Set-up- Note: An internet connection is required for installation.

Exercise 1: Deploying Windows Server 2012

TPP: Date: October, 2012 Product: ShoreTel PathSolutions System version: ShoreTel 13.x

Upgrading Kaltura MediaSpace TM Enterprise 1.0 to Kaltura MediaSpace TM Enterprise 2.0

SolarEdge. Communication Options. Version 1.1

OASIS SUBMISSIONS FOR FLORIDA: SYSTEM FUNCTIONS

Configuring Database & SQL Query Monitoring With Sentry-go Quick & Plus! monitors

Your New Service Request Process: Technical Support Reference Guide for Cisco Customer Journey Platform

Cisco Tetration Analytics, Release , Release Notes

Configuring the McAfee Windows Event Collector Management Utility *Also can provide client transmission of other non-windows log files*

HPE BladeSystem c3000 Tower Enclosure Quick Setup Instructions

SANsymphony Installation and Getting Started Guide. November 7, 2016

Upgrade Guide. Medtech Evolution Specialist. Version 1.11 Build (October 2018)

First Aid and Choking, Fire Safety, Medication Administration, and Standard Precautions Roster Submission:

SmartPass User Guide Page 1 of 50

Policy Management Cloud Disaster Recovery 12.23

CCNA Security v2.0 Chapter 3 Exam Answers

IT Essentials (ITE v6.0) Chapter 8 Exam Answers 100% 2016

VMware EVO:RAIL Customer Release Notes

Demand Forecasting. For. Microsoft Dynamics 365 for Operations. Technical Guide. Release 7.1. December 2017

CCNA Security v2.0 Chapter 10 Exam Answers

Firmware Download Anybus X-gateway Modbus-TCP

Release Notes System Software

Questions and Answers

Technical Paper. Installing and Configuring SAS Environment Manager in a SAS Grid Environment with a Shared Configuration Directory

Dolby Conference Phone Support Frequently Asked Questions

Interoperability between ProCurve WESM zl and Siemens Gigaset SL75 wireless phone

Wave IP 4.5. CRMLink Desktop User Guide

I. Introduction: About Firmware Files, Naming, Versions, and Formats

CCNA Voice ICOMM: (4 Day Course)

ClassFlow Administrator User Guide

Integrating QuickBooks with TimePro

Refreshing Axiom TEST with a Current Copy of Production Axiom EPM June 20, 2014

HP Prime Exam Modes. HP Prime Graphing Calculator

HW4 Software version 3. Device Manager and Data Logging LOG-RC Series Data Loggers

Remote Document Delivery

Transcription:

PT Activity 2.6.1: Packet Tracer Skills Integratin Challenge Tplgy Diagram Addressing Table Device Interface IP Address Subnet Mask Default Gateway CENTRAL S0/0/0 10.1.1.2 255.255.255.252 S0/0/1 209.165.200.226 255.255.255.252 ISP S0/0/1 209.165.200.225 255.255.255.252 Fa0/0 209.165.201.1 255.255.255.252 Fa0/0.1 Fa0/0.15 BRANCH Fa0/0.25 Fa0/0.99 S0/0/0 10.1.1.1 255.255.255.252 S1 VLAN99 Custmer NIC Register NIC Laser NIC Web Server NIC 209.165.201.2 255.255.255.252 209.165.201.1 All cntents are Cpyright 2008 Cisc Systems, Inc. All rights reserved. This dcument is Cisc Public Infrmatin. Page 1 f 5

PT Activity 2.6.1: Packet Tracer Skills Integratin Challenge Learning Objectives Cnfigure static and default ruting. Add and cnnect a ruter. Design and dcument an addressing scheme. Add and cnnect devices in an address space. Cnfigure basic device settings. Cnfigure PPP encapsulatin with CHAP. Cnfigure OSPF ruting. Cnfigure VLANs. Verify cnnectivity. Task 1: Cnfigure Static and Default Ruting Step 1. Cnfigure static ruting frm ISP t CENTRAL. Use the passwrds cisc and class t access EXEC mdes f the CLI fr ruters. Cnfigure tw static rutes n ISP using the exit interface argument t the fllwing netwrks: 10.1.1.0/30 192.168.1.0/24 Step 2. Cnfigure default ruting frm CENTRAL t ISP. Cnfigure a default rute n CENTRAL using the exit interface argument t send all default traffic t ISP. Step 3. Test cnnectivity t Web Server. CENTRAL shuld be able t successfully ping Web Server at 209.165.201.2 Yur cmpletin percentage shuld be 4%. If nt, click Check Results t see which required Task 2: Add and Cnnect a Ruter Step 1. Add the BRANCH ruter. Click Custm Made Devices and add an 1841 ruter t the tplgy. Use the Cnfig tab t change the Display Name t BRANCH. Display names are case-sensitive. D nt change the hstname yet. Step 2. Cnnect BRANCH t CENTRAL. Chse the crrect cable and cnnect BRANCH t CENTRAL accrding t the interfaces shwn in the tplgy. Step 3. Check results. Yur cmpletin percentage shuld be 9%. If nt, click Check Results t see which required If yu changed the hstname in Step 2, then yur percentage will be higher. All cntents are Cpyright 2008 Cisc Systems, Inc. All rights reserved. This dcument is Cisc Public Infrmatin. Page 2 f 5

PT Activity 2.6.1: Packet Tracer Skills Integratin Challenge Task 3: Design and Dcument an Addressing Scheme Step 1. Design an addressing scheme. Using the tplgy and the fllwing requirements, design an addressing scheme: Addressing is prvided fr all WAN links. Fr the VLANs attached t BRANCH, use the address space 192.168.1.0/24. Starting with the largest hst requirement, assign subnets in the fllwing rder fr all VLANs. VLAN 15 needs space fr 100 hsts VLAN 25 needs space fr 50 hsts VLAN 1 needs space fr 20 hsts VLAN 99 needs space fr 20 hsts Step 2. Dcument the addressing scheme. Cmplete the addressing table using the fllwing guidelines. Yu will add the remaining devices in the next task. Assign the first address in each VLAN t the crrespnding BRANCH subinterface. The subinterface numbers match the VLAN numbers. Assign the secnd address in VLAN 99 t S1. Assign the secnd address in VLAN 15 t the Custmer PC. Assign the secnd address in VLAN 25 t the Register PC. Assign the last address in VLAN 25 t the laser printer. Be sure yu recrd the apprpriate subnet mask and default gateway fr each address. Task 4: Add and Cnnect the Devices in the Address Space Step 1. Add S1, Custmer PC, Register PC, and the laser printer in the 192.168.1.0/24 address space. S1 is a 2960 switch. Add it t the tplgy and change the Display Name t S1. Display names are case-sensitive. D nt change the hstname yet. The PCs and printer are listed under End Devices. Add tw PCs and a printer. Change the display names f the PCs and printer accrding t the tplgy. Step 2. Cnnect S1 t BRANCH. Chse the crrect cable and cnnect S1 t BRANCH accrding t the interfaces shwn in the tplgy. Step 3. Cnnect Custmer PC, Register PC, and the laser printer t S1. Chse the crrect cable and cnnect the PCs and printer t S1 accrding t the interfaces shwn in the tplgy. Yur cmpletin percentage shuld be 22%. If nt, click Check Results t see which required If yu changed the hstname f S1 in Step 1, then yur percentage will be higher. All cntents are Cpyright 2008 Cisc Systems, Inc. All rights reserved. This dcument is Cisc Public Infrmatin. Page 3 f 5

PT Activity 2.6.1: Packet Tracer Skills Integratin Challenge Task 5: Cnfigure Basic Device Settings Step 1. Cnfigure BRANCH and S1. Using yur dcumentatin, set the basic cnfiguratin fr BRANCH and S1, including addressing. Use cisc as the line passwrd and class as the secret passwrd. Use 64000 as the clck rate. Graded prtins f the basic cnfiguratin include: Hstnames, which are case-sensitive. Interface addressing and activatin. Set clcking t 64000 bps. Fr interface Fa0/0.99, cnfigure VLAN 99 as the native VLAN. Interface VLAN 99 creatin and addressing n S1. Activating VLAN 99 is dne after the trunk is cnfigured later in the activity. Step 2. Cnfigure remaining devices. Using yur dcumentatin, cnfigure the PCs and printer with the crrect addressing. Step 3. Test cnnectivity between BRANCH and CENTRAL. CENTRAL shuld nw be able t successfully ping BRANCH. S1 cannt ping until trunking is cnfigured. Yur cmpletin percentage shuld be 63%. If nt, click Check Results t see which required Task 6: Cnfigure PPP Encapsulatin with CHAP Authenticatin Step 1. Cnfigure CENTRAL t use PPP with CHAP fr the link t BRANCH. The passwrd fr CHAP authenticatin is cisc123. The link ges dwn. Step 2. Cnfigure BRANCH t use PPP with CHAP fr the link t CENTRAL. The passwrd fr CHAP authenticatin is cisc123. The link cmes back up. Step 3. Test Cnnectivity between BRANCH and CENTRAL. It may take Packet Tracer a little lnger than real equipment t bring the interfaces back up. Once the interfaces cme up, CENTRAL shuld be able t successfully ping BRANCH. Yur cmpletin percentage shuld be 71%. If nt, click Check Results t see which required Task 7: Cnfigure OSPF Ruting Step 1. Cnfigure OSPF n CENTRAL. Cnfigure OSPF using the prcess ID 1. Add nly the netwrk shared with BRANCH. Prpagate the default rute t OSPF neighbrs. Disable OSPF updates t ISP. All cntents are Cpyright 2008 Cisc Systems, Inc. All rights reserved. This dcument is Cisc Public Infrmatin. Page 4 f 5

PT Activity 2.6.1: Packet Tracer Skills Integratin Challenge Step 2. Cnfigure OSPF n BRANCH. Cnfigure OSPF using the prcess ID 1. Add all active netwrks that BRANCH rutes. Disable OSPF updates t the VLANs. Step 3. Test cnnectivity t Web Server. BRANCH shuld nw be able t successfully ping Web Server at 209.165.201.2. Yur cmpletin percentage shuld be 86%. If nt, click Check Results t see which required Task 8: Cnfigure VLANs Step 1. Add VLANs t S1. VLAN names are case-sensitive. Add and name the fur VLANs using the fllwing specificatins: VLAN 15; name is Custmers(Default) VLAN 25; name is Emplyee VLAN 99; name is Management&Native Step 2. Assign prts t the apprpriate VLANs and activate interface VLAN 99. Using the VLAN Prt Assignments shwn in the tplgy diagram, cnfigure the access prts attached t the end devices and assign each t the crrect VLAN. Enable trunking n the Fa0/1 prt and cnfigure it t use VLAN 99 as the native VLAN. Activate interface VLAN 99, if necessary. It shuld already be up. Step 3. Check results. Yur cmpletin percentage shuld be 100%. If nt, click Check Results t see which required Task 9: Verify cnnectivity Step 1. Verify that Custmer PC, Register PC, and the laser printer can ping each ther. Step 2. Verify that Custmer PC, Register PC, and laser printer can ping Web Server. All cntents are Cpyright 2008 Cisc Systems, Inc. All rights reserved. This dcument is Cisc Public Infrmatin. Page 5 f 5