1. Project Description

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES

Network Configuration Document Selection for New Substations Framework

Small Generator Interconnection System Impact Study Report. Completed For Q0047

REAL-TIME MONITORING DATA SPECIFICATION

ANCILLARY SERVICES BUSINESS MONITORING

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Balancing and Settlement Code BSC PROCEDURE

STCP19-3 Issue 006 Operational Notification & Compliance Testing

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

Relevant Electrical Standards (RES) Grid Code Review Panel January 2014

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

EDS SCADA NUMBERING SYSTEM

EDS KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Power System Network Simulator (PSNsim)

Recording and Reporting of High Voltage and Low Voltage Switching

Hybrid STATCOM / SVC Workgroup 15 th May 2014

Feasibility Study on Load Flow and Short Circuit Project

Awareness of the Situation

Large Embedded Generators Register of Completed Projects

Shabnam Rukhsar Electrical Engineering Department, Anjuman College of Engineering and Technology.India

GUIDELINES FOR THE CLASSIFICATION OF GRID DISTURBANCES ABOVE 100 kv

EDS MW AND MVAR TRANSDUCER CONNECTION

Busbar protection REB 670

PROTECTION REQUIREMENTS OF EMBEDDED GENERATORS < 5 MVA (LV + HV UP TO 22KV)

FREQUENCY RESPONSE MONITORING (ANCILLARY SERVICES BUSINESS MONITORING)

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

Generation, Transmission, and End User Facilities

7SG26 Tau Autoreclose and synchronization Answers for energy

PRC Coordination of Protection Systems for Performance During Faults

Landsnet-Icegrid. Requirements for protection and control systems. Principles for the Icelandic power transmission network.

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

2009 E09PS E09PS E09PS E09PS E09PS E09PS38 IEEE 2009 E09PS39 E09PS40 E09PS41 E09PS42 E09PS43 IEEE 2008 E09PS44

Distributed Generation Requirements Update

Lecture 5 Substation Automation Systems. Course map

CONFIRMATION OF VERIFICATION EVIDENCE REPORT (COVER) [Distribution Connected Generation (DCG)]

Protection, Monitoring, and Control System for Distribution Substations ALARM HISTORY SYSTEM COMM. On-Line Documentation TRANSFORMER 12 MW

Offshore BMU Configuration

Purpose of High Voltage Circuit Switchers

Branch Procedure. Document No. Issue No. : : 29/06/ /06/2021 (Supersedes CEOP8012, Generation Connection: Protection Guidelines, Issue 4.

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field

SIGMA. Advanced Generator Protection and Control. Short Form Catalogue

Description of the Application Process for Small Embedded Generators

2 Check that Public Safety has been considered (e.g. cabinet secured and locked, trip hazards removed where applicable).

Packaged Solutions. Grid Solutions. Value Added Solutions for Protection, Control and Automation Applications. Flexible and Expandable

Configuration and Interoperability Guide for IEC for the SEL-751 Feeder Protection Relay. July 10, 2015

ITC Facility Connection Requirements for Generation, Transmission and End-User Facilities Connected to the ITC Holdings Transmission Systems

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Power Transmission Division Link between power generation and distribution

Glencoe Light and Power

Company Directive STANDARD TECHNIQUE: TP18A/1. Application of Connection Control Panels for Soft Intertrip and/or Voltage Constraint Schemes

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

Application Notes on Generator Protection Schemes

Veesta World Co. V-SCADA2000 Product Series. The cross platform SCADA system

Si-TEC Xtend GSM DATA SHEET. Digital control range for grid parallel/bus tie. Key features. Description

Real-time Power System Operation. Energy Management Systems. Introduction

MONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS

SCADA and Central Applications An introduction

11 kv Indoor Switchgear - SCADA Controlled

IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

Supplemental Information

Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation

DEEP SEA ELECTRONICS PLC DSE334 Configuration Suite Software Manual

Standard Development Timeline

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Smart Distribution Technology

PG&E Transmission Interconnection Handbook

Switching Process and Rules Systems Operations Framework. Document Number:

Studies Overview and Data Requirements. Robert Pan

CAISO RIG Acceptance Test Procedure

POWER GRID AUTOMATION. Pág.. n. RMU Automation

Facility Connection Requirements

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

Revision 6.0. Transmission Interconnection Guide

Microgrids: Building Blocks of the Smart Grid Adaptive Protection Schemes for Microgrids

Designing a new IEC substation architecture

User's guide SDMO Control unit KERYS TACTIL - S 9000 V 1.05 (29/06/06) _2_1

Automate and Preserve Electromechanical Relay Investment Part 3 of 3 Using the Bitronics 70 Series to Improve Remote Monitoring and Control

European Network Codes: RfG GB Grid Code Application Options

MEDIUM VOLTAGE PRODUCTS. UniSec Air-insulated medium voltage secondary distribution switchgear Informed choice for safety

INTERCONNECTION FACILITIES STUDY REPORT

THE CONNECTION AND USE OF SYSTEM CODE TEMPORARY TEC EXCHANGE RATE REQUEST FORM

Facility Connection Requirements. LST-FAC-001-PRO-Facility_Connection_Requirements

Transcription:

STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish Hydro Electric Transmission plc Offshore Transmission Owners STC Procedure Change Control History Issue 001 23/12/2004 BETTA Go-Live Version Issue 002 20/04/2005 Issue 002 incorporating STCPAP002 Issue 003 25/10/2005 Issue 003 incorporating PA034 and PA037 Issue 004 24/06/2009 Issue 004 incorporating changes for Offshore Transmission Issue 005 incorporating PM085 Page 1 of 14

1 Introduction 1.1 Scope 1.1.1 The provision of operationally significant alarms, indications and analogue data is essential for the effective and secure operation of the Transmission System. This document details the real time data that shall be provided by the TO (including User real time data) via the Datalink. 1.1.2 This procedure applies to NGET and TOs, for the provision of specified alarms, analogues and indications, in real time via the Datalink. 1.1.3 For the purposes of this document, TOs are: SPT; SHET; and All Offshore Transmission Licence holders as appointed by OFGEM In the event that specific conditions or exceptions are made in the document relating to an Onshore TO or Offshore TO these will be prefixed appropriately 1.1.4 The obligations on NGET and TOs on the receipt of alarms are specified in STCP 2.1 (Alarm and Event Management), and are outside the scope of this document. 1.1.5 Management of the Datalink is detailed in STCP 4-2 (Real Time Datalink Management) and is outside the scope of this document. 1.1.6 STCP 4-1 (Real Time Data Change Management), sets out the change management process and is related to, but outside the scope of, this document. 1.2 Objectives 1.2.1 The process specifies the responsibilities of NGET and TOs for the provision of real time data, including: generic alarms (specified in Appendix B1); other specified alarms that are operationally significant; alarms from new types of equipment that are operationally significant; digital status indications (specified in Appendix B2); analogue data (specified in Appendix B3); and real time data related to Users Systems (specified in Appendix B4). 2 Key Definitions 2.1 For the purposes of STCP04-3: 2.1.1 None 3 Procedure 3.1 Alarms 3.1.1 The TO shall provide to NGET, where available, operationally significant alarms associated with the Transmission System. These are outlined in the generic table in Appendix B1. Page 2 of 14

3.1.2 The TO shall provide any unique alarms associated with the Transmission System, that do not fall within the generic tables in Appendix B1, but which are agreed with NGET to be operationally significant. The schedules in Appendix B shall be updated to reflect the agreed TO/NGET provision of new generic types of alarms, or reflect changes triggered by STCP 19-2. 3.1.3 The TO and NGET shall agree to the provision of operationally significant alarms from new types of Plant and/or Apparatus associated with the GB Transmission System. 3.1.4 The TO shall inform other relevant Parties where planned work may interrupt real time alarm data, or result in the generation of spurious alarms or indications. Where agreed with NGET, the TO shall, in accordance with local procedures, suppress or inhibit the transmission of alarms from Plant and/or Apparatus removed from operational service since this could lead to excessive alarm information being sent to NGET. Any such suppression or inhibition shall be removed prior to the equipment being returned to service, unless otherwise agreed with NGET. 3.1.5 NGET shall procure that the User provides alarms from User equipment: as required by NGET pursuant to the Grid Code; as reasonably required by NGET; and as reasonably required by the TO. These alarms shall be documented in the Connection Site Specification between NGET and the TO. The TO shall then collect and forward these alarms to NGET. 3.1.6 NGET shall agree with Users, the provision of real time data from User s equipment and that it shall be collected by the TO on behalf of NGET. The data to be collected shall be (i) that required pursuant to the provisions of Grid Code, (ii) that reasonably required by NGET, and (iii) that reasonably required by the TO. All the data to be collected shall be documented in a schedule between NGET and the TO. The TO shall have access to the documented data. 3.1.7 Where the User s site is not a TO Connection Site, agreement shall be reached between NGET and the TO, as to the most appropriate and cost effective method of collecting the required User SCADA alarm data. At TO connection sites, the TO shall collect and forward required User SCADA alarm data to NGET. 3.2 Indications 3.2.1 The TO shall provide, where available, the telemetered digital status indications (including time tags where available), for equipment listed in Appendix B2. Where this cannot be reasonably achieved, NGET and the TO shall agree an appropriate solution. 3.2.2 Where status indications are not telemetered from site, or where the telemetered information is incorrect, the TO shall liaise with NGET and follow internal procedures for hand dressing actions on their SCADA system. These actions shall be reflected to NGET, via the Datalink and shall appear as telemetered indications on the NGET SCADA system. 3.2.3 The TO shall inform NGET before agreeing to any work that may interrupt real time indication status data, or result in the generation of spurious indications. Where appropriate, the TO shall, in accordance with local procedures, suppress or inhibit the transmission of indications from out of service transmission equipment, where this could lead to inaccurate representation of system conditions or excessive transmission of status information to NGET. Any such actions shall be removed, except otherwise agreed, prior to the equipment being returned to service. 3.2.4 NGET shall procure that the User provides telemetered digital indications as required by NGET pursuant to the Grid Code (see appendix B4.2); as reasonably required by NGET; and Page 3 of 14

as reasonably required by the TO. These telemetered digital indications shall be documented in a Connection Site Specification between NGET and the TO. The TO shall then collect and forward these indications to NGET. 3.2.5 Where telemetered indications from User equipment are not provided or are incorrect, the TO shall liaise with NGET and follow internal procedures for hand-dressing actions on their SCADA system. These actions shall be reflected to NGET via the Datalink and shall appear as telemetered indications on the NGET SCADA. 3.2.6 Where the User s site is not a TO Connection Site, agreement shall be reached between NGET and the TO, as to the most appropriate and cost effective method of collecting the required User SCADA indication data. At TO connection sites, the TO shall collect and forward required User SCADA indication data to NGET. 3.3 Analogues 3.3.1 The TO shall provide where available, real time analogue data, as defined in Appendix B3, from each transmission site. Where this cannot reasonably be achieved, NGET and the TO shall agree an appropriate solution. 3.3.2 The TO shall inform NGET when analogue values are incorrect or manually overridden for any reason, the TO shall adopt procedures for hand dressing actions on their SCADA system. These actions shall be reflected to NGET via the Datalink and shall appear as telemetered indications on the NGET SCADA. Any such actions shall be removed once the analogue is returned to normal. 3.3.3 The TO will inform NGET before agreeing to any work that may interrupt real time analogue data or result in the generation of spurious analogue data. Where appropriate the TO will, in accordance with local procedures, suppress or inhibit the transmission of analogue data from out of service Plant and Apparatus, where this could lead to inaccurate representation of system conditions or excessive transmission of status information to NGET. Any such actions shall be removed, except otherwise agreed, prior to the Plant and Apparatus being returned to service. 3.3.4 NGET shall procure that the User provides analogue data from the User s system as required by NGET pursuant to the Grid Code (see appendix B4.1); as reasonably required by NGET; and as reasonably required by the TO. This analogue data shall be documented in a Connection Site Specification between NGET and the TO. The TO shall then collect and forward this analogue data to NGET. 3.3.5 Where the User s site is not a TO Connection Site, agreement shall be reached between NGET and the TO, as to the most appropriate and cost effective method of collecting the required User SCADA analogue data. At TO connection sites, the TO shall collect and forward required User SCADA analogue data to NGET. 3.4 TO Data Acquisition 3.4.1 At NGET sites that connect with a TO s site, provision shall be made for the relevant TO to install, repair, maintain or replace appropriate data transmission equipment or related equipment, for the purpose of relaying agreed Plant status indications and analogue data associated with the connecting transmission circuits to the relevant TO. Page 4 of 14

3.4.2 At NGET sites that connect a TO s site, access to the relevant TO data transmission equipment or related equipment described in 3.4.1 shall be granted by NGET as appropriate between NGET and the relevant TO. Any proposal to install or relocate such equipment shall be discussed and agreed by the two parties. 3.4.3 User SCADA data shall not be transmitted between TOs without the approval of the User and NGET. 3.4.4 Each TO shall provide to the other TO real time data, as specified in Schedule 3 of the STC, with respect to specific inter TO circuits and other circuits or equipment, where the TO can reasonably demonstrate that such data is required to discharge its TO obligations. Where User data is required this shall be requested from NGET. 3.4.5 NGET shall procure for the purposes of 3.4.4 above any required data from a User or Users, and shall agree the provision of such data. Page 5 of 14

Appendix A - Flow Diagram Note that the Process Diagrams shown in this Appendix A are for information only. In the event of any contradiction between the process represented in this Appendix and the process described elsewhere in this STCP, then the text elsewhere in this STCP shall prevail. STCP 4-3 Real Time Data Provision - Alarms External NGET TO Parties agree operationally significant alarms associated with the Transmission System: that are not part of Appendix B1; and, from new types of Plant and/or Apparatus Receives operationally significant alarms associated with the Transmission System TO provides, where available, operationally significant alarms associated with the Transmission System Receives details of planned work that may result in false alarms TO informs all other relevant Parties where planned work may interrupt real time alarm data, or result in the generation of spurious alarms Discuss the suppression of or inhibit the transmission of alarms from Plant and/or Apparatus removed from service to prevent excessive transfer of alarms NGET procure that User provides alarms that are documented in the Connection Site Specification TO will suppress or inhibit transmission alarms from out of service equipment NGET agree with Users the provision of real time data from User's equipment and that it shall be collected by the TO on behalf of NGET The data to be collected shall be documented in schedule between NGET and TO TO is party to documented schedule of data to be collected from User's equipment Agreement is reached between NGET and TO the most appropriate and cost effective means of collecting User SCADA data where the User's site is not a TO Connection site User provides alarms from User equipment TO collects and provides alarms from User equipment in accordance with Connection Site Specification NGET receive User SCADA alarm data Page 6 of 14

STCP 4-3 Real Time Data Provision - Indications External NGET TO No Agreement reached on an appropriate solution for the provision of telemetered digital status indications Are telemetered digital status indications available? Yes Yes Are indications not telemetered at site or incorrect? TO will liaise with NGET for hand dressing actions via SCADA system No TO follows internal processes to hand dress their SCADA system NGET receives telemetered and non telemetered indications for TO and User's equipment TO provides telemetered digital status indication NGET procure that User provides telemetered digital indications Yes NGET agree with Users the provision of telemetered indications from User equipment and that it shall be collected by the TO on behalf of NGET Telemetered status indications to be collected by the TO from User's equipment to be documented in a schedule between TO and NGET.Where the User's site is not a TO Connection Site the most appropriate and cost effective method of collection will be agreed Where available User provides telemetered indications from User equipment Are indications from User not telemetered at site or incorrect? No TO collects and provides telemetered indications from User equipment Receives details of planned work that may result in spurious indications or interrupt real time indication status data TO informs NGET prior to starting work that may interrupt real time indication status data, or result in the generation of spurious indications. TO may suppress or inhibit indications during such work where this is appropriate Page 7 of 14

STCP 4-3 Real Time Data Provision - Analogues External NGET TO No Agreement reached on an appropriate solution for the provision of analogue data Is real time analogue data available? Yes Are analogue values incorrect or manually overridden? Yes NGET informed of analogue values that are incorrect or manually overridden TO follows internal processes to hand dress their SCADA system and inform NGET No NGET receives real time analogue data TO provides analogue data to NGET NGET procure that User provides analogue data from User's system NGET agree with Users the provision of analogue data from User's system and that it shall be collected by the TO on behalf of NGET Analogue data to be collected by the TO from User's systems to be documented in a schedule between TO and NGET. Where the User's site is not a TO Connection Site the most appropriate and cost effective method of collection will be agreed Where available User provides analogue data from User's system TO collects analogue data from User's system Receives details of planned work that may result in spurious analogues or interrupt real time analogue data TO informs NGET prior to starting work that may interrupt real time analogue data, or result in the generation of spurious analogues. TO may suppress or inhibit analogues during such work where this is appropriate Page 8 of 14

STCP 4-3 Real Time Data Provision - Data Acquisition External NGET TO User contacted and provides data NGET receive request to procure User data. NGET procures such data where the TO has demonstrated such data is required for the TO to discharge its TO obligations. Where User data is required TO will request that NGET procure such information from the User. Data may also be provided to the other TO where the TO can reasonably demonstrate that such data is required to discharge its TO obligations NGET receive User data and provide to requesting TO Receive User data and, if agreed with NGET and where necessary provide to other TO Provision made for the TO to access appropriate data transmission or related equipment for relaying Plant status indications and analogue data associated with Interface circuits TO able to install, repair, maintain or replace appropriate data transmission equipment. TO relay agreed plant status indications and analogue data to TO control centre NGET/TO discuss & agree before implementation [6.2] Yes Does TO propose to install or relocate equipment? [6.2] No End Page 9 of 14

Appendix B: Standard Forms/Certificates B1 Generic Alarm Requirement Protection and Sequence Alarms Condition Alarms Transformer Protection Operated Alarms Quad Booster Protection Operated Alarms Reactive Compensation Protection Operated Alarms Trip Relay Operated Alarms Transformer Protection / Cooling Faulty Alarms Quad Booster Protection/ Cooling Faulty Alarms Reactor Protection/ Cooling Faulty Alarms Trip circuit Faulty Alarms Circuit Main Protection Operated Circuit Main Protection Faulty Alarms Circuit Back up Protection Operated Inter trip Receive Alarms Circuit breaker Operating / Insulating medium pressure Alarms Inter trip Faulty Alarms Protection Signalling Faulty Alarms DAR Sequence / In Progress/ Operated/ Reset/ Incomplete / Locked out Alarms Mesh Corner Protection Operated Alarms DAR Scheme Faulty Alarms Mesh Corner Protection Faulty Alarms Busbar Protection Operated Alarms Busbar Protection Faulty Alarms Cable Protection Operated Alarms Busbar Gas pressure Alarms Cable Pressure Alarms Circuit Breaker Fail / Interlocked Over current Operated Alarms Circuit Breaker Fail / Interlocked Over current Faulty Alarms Circuit Breaker / Switch Disconnector Trip and Close lockout Alarms Page 10 of 14

B2 Digital Status Indications Requirement Plant/ Apparatus /Equipment Circuit Breaker Isolator Switch disconnector / Isolator Protection Equipment DAR Equipment/ schemes Auto Schemes Switching Demand/System/Ge nerator tripping schemes Fault thrower / ferroresonance earth switch Blocking Ferro-resonance scheme Zone 2 over ride Zone 1 extension Acceleration Status Indication Open / Closed / DBI Open / Closed / DBI Open / Closed / DBI In / Out In / Out In/ Out and Selections In / Out and Selections Open / Closed (where available) In / Out In/ Out In / Out In / Out In / Out Page 11 of 14

B3 Analogue Data Requirement Plant / Apparatus / Equipment Analogue Data Feeder MW / MVAr / Volts / Amps* from each end Transformer Quad Booster Low Voltage MW / MVAr / Amps* Volts: Winding temp / Tap position / MVAr from tertiary winding where compensation is fitted On both LV windings where applicable MW / MVAr / Volts / Amps* Winding temp / Tap position Bus Section / Coupler CB Shunt / Series Reactor Reactive compensation General Site Amps Mw / MVAr / Winding Temp MVAr Frequency / Transmission Voltage / User Interface Voltage Cables Interface Point (Embedded Transmission Only) Dynamic thermal rating in MVA MW and MVAr from High Accuracy Settlement Meters * AMPS required if no other analogue readings are available Page 12 of 14

B4 User s Data Requirements (Grid Code CC.6.5.6) B4.1 Analogues / Metering Item Power Stations Balancing Mechanism Unit Individual Alternator Interface with Transmission System Individual Unit Transformer Site TGO Power Available Analogue Data _ HV MW MVAr Frequency HV MW MVAr Voltage HV MW MVAr HV MW MVAr MW Other Users At Interface with Transmission System MW MVAR Voltage B4.2 Digital Status Indications Item Power Stations Digital Status Indication All Generator circuits LV and HV circuit breakers and disconnectors. Unit Transformer Circuit breaker Each Generator Transformer Tap Position Indicator Other Users At Interface with Transmission System Circuit Breakers and Disconnectors Page 13 of 14

Appendix C: Abbreviations & Definitions Abbreviations SHET Scottish Hydro Electric Transmission plc SPT SP Transmission plc TO Transmission Owner Definitions STC definitions used: Apparatus Connection Site NGET Plant Transmission System User Definition used from other STCPs: Datalink: STCP04-2: Real Time Data Management Page 14 of 14