Bulletin Installation of solar photovoltaic systems Rules , , , , and

Similar documents
Bulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010

Microinverters And The Solar Industry

PV Rapid Shutdown device

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

SECTION DISCONNECT SWITCHES

Stalking the Elusive and Somewhat Strange PV System

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D.

Rapid Shutdown Requirements for NEC 2017

Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN

Solar Combiner Enclosure

Standards Update Notice (SUN) Issued: July 28, 2017

More Questions from Inspectors Numerous PV Systems Pose Issues

Installation Manual. APEX Series. Silicon and MOV Panel Protection. APEX Series

An Urgent Bulletin from CSA Group

Electrical Components and Equipment for General Use Self Inspection Checklist

Line reactors SINAMICS. SINAMICS G120P Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation 4

PowerLogic High Density Metering System 1-Meter Enclosure

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

Three Phase Residential Solution for Australia, System Design and Installation Guidelines

FAQ about Drives Technology

SECTION PANELBOARDS

Installation and Operations Manual INVOLAR MAC250 Microinverter

SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Xcel Energy Telemetry Requirements for Distributed Energy Resource Interconnections: Revision 3.1

Selection Guide. Control Circuit and Load Protection. Allen-Bradley 1489-M2C020

Installation Guide for America Solar Wholesale Photovoltaic Modules

sonnen Installation Practical

Product Details. Contents. Features and Mounting Options for SUNNY STRING-MONITOR SSM24-11

Application Techniques CENTERLINE 2100 Motor Control Centers

Oncor Residential/Small Commercial Project Requirements

Replacing the Power Supply

HT2000 Transverter Installation & Operation Manual

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

SOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY

Model 2657A-LIM-3 LO Interconnect Module

CenterPoint Energy P O Box 1700 Houston, TX

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

Power Supply Installation

System Design Guide. APsystems YC Photovoltaic 3-Phase Grid-connected Microinverter. APsystems. Version 1.1 3/15

920 Remote Control (RC) Switches

Distributor Information Bulletin Distributed Generation (Codes, Publications & Standards)

AC Solar Warehouse Installation and Commissioning Checklist

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

one cool inverter. GT Series Solar Inverter Quick Install Guide v1.4

Installation Instructions

FS Series PV Modules Reverse Current Overload

ASCO 920 Remote Control (RC) Switches

Standards Update Notice (SUN) Issued: January 11, 2016

Want to make your inspectors happy?

Electrical Demand Specification (Reference SOP: )

Superseding REVISED SHEET NO. 34D-8 REVISED SHEET NO. 34D-8 Effective May 27, 2010 Effective December 3, 2011

Meter Enclosure and Equipment Standards

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

Power Supply and Fan Module Installation

VRp Three-Phase Precision AC Voltage Regulator

INSTALLATION INSTRUCTIONS

DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

Installation/User Manual

Installation and Operations Manual Micro-Inverter M S

1492-SP Supplementary Protectors

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2

Document C0. Use for:

Lightning and Surge Protection for PV Systems

BLUE 3 INSTALLATION GUIDE

Installation Notes TII Model 341 Protector

SDM120 SERIES. SDM120 series User Manual. Single phase two wire DIN rail energy meter (One module)

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

INSTITUTE OF TESTING AND CERTIFICATION (INDIA) PVT. LTD.

Series Amp Quick Connect Input and Output Power Panels

M215 (M215-60) Safety

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS

ADDENDUM FOR 20, 27, & 28 OPTIONS

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

Common Departures Interconnecting Facilities Requirements

Model 8020-KHV. Kelvin Keithley Triaxial Connector Card. Description / October 2014 *P * 1

Rev1 QP-10-IM21UL/Rev Rev2 QP-10-IM21UL/Rev Rev3 QP-10-IM21UL/Rev Rev4 QP-10-IM21UL/Rev4

SERIES RATED COMBINATIONS

1. Coordination of series-rated devices is permitted where indicated on Drawings.

Product and functional description

Designing with Thermally Protected TCMOV Varistors for Type 1 and Type 2 UL1449 3rd Edition Applications

Series Amp Pad Mount Quick Connect Input and Output Power Panels

Protection against electric shock

Line reactors SINAMICS. SINAMICS G130 Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation

FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

700 Series 200 Amp Clamp Meters

Product and functional description

Installation Instructions

Model 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1

Surge Protective Devices Installation, Operation and Maintenance Manual. LoadTrack LTL

M250 (M LL) Safety


SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

INVERTER COMMISSIONING CHECKLIST

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

Solarlok PV BAR Junction Box Assemblies

SIMATIC. ET 200S distributed I/O Power module PM-E DC24..48V/AC V (6ES7138-4CB11-0AB0) Preface. Properties 1. Parameters 2.

B60 Domestic Voltage Optimisation Unit

Transcription:

Bulletin 64-5-0 Installation of solar photovoltaic systems Rules 64-060, 64-200, 64-214, 84-020, 84-024 and 84-030 Scope (1) Introduction (2) Disconnecting means (a) Disconnecting means for solar photovoltaic source circuits (b) Disconnecting means for overcurrent protection devices (c) Disconnecting means for combiner boxes (3) Single-line diagram and labels (a) Single-line diagram of the interconnected renewable system (b) Labels (4) Electricity meters (a) Neutral connection for electricity meters (b) Generator metering connection (c) Tapping to the load side of the service box for a parallel metering connection (5) AC modules and micro-inverters (a) Disconnecting means (b) Overcurrent protection (c) Marking of photovoltaic circuit (1) Introduction The intent of this bulletin is to clarify some of the solar photovoltaic installation rules. Issued May 2016 Supersedes Bulletin 50-1-2 In addition to this Bulletin, the following documents provide additional information on the installation of solar photovoltaic systems: ESA SPEC-004 Electrical Guidelines for Inverter-Based Micro Generation Facilities (10 kw and smaller) ESA SPEC-005 Process Guideline for the Installation of Parallel Generating Systems greater than10 kw Bulletin 6-7-* Hot splitters/tapping existing services Bulletin 64-2-* Grounding and Bonding of Solar Photovoltaic Systems Bulletin 64-3-* Voltage rating of a photovoltaic source circuit Bulletin 64-1-* Connection of utility-interactive inverters on the load side of service disconnecting means Bulletin 84-1-* Interconnection of Electric Power Production Sources (2) Disconnecting means (a) Disconnecting means for solar photovoltaic source circuits Question 1 Does Rule 64-060(1) require disconnecting means for each photovoltaic source circuit (panel or modules connected in series)? Answer 1 No. Having said that, Rule 64-060(7) requires means to disable and isolate PV output circuits greater than 48 V. According to Appendix B Note, an opaque covering is an acceptable means of disabling the array. Servicing the equipment on the photovoltaic side of disconnecting means, such as overcurrent devices or modules, may require disabling all or portions of the array, since PV modules or panels are always energized when exposed to any light source. Electrical Safety Authority Page 1 of 7

(b) Disconnecting means for overcurrent protection devices Question 2 Does the Code require disconnecting means for overcurrent devices, that may be required by Rule 64-214? Answer 2 Based on Section 14 and depending on the type of overcurrent protection used, the disconnecting means may or may not be required. It should also be noted that disconnecting means may not be rated as load break devices and should not be operated without first disabling the current source. See Diagram B1: Fuses (in non finger safe fuse holders): Disconnecting means is required Circuit breakers: Disconnecting means is not required Finger-safe fuse holders & fuses OR Supplementary protectors: Disconnecting means is not required* (*) Note: Not rated to be opened under load. Diagram B1 Requirements for disconnecting means Question 3 Where disconnecting means is required for fuse holders and fuses (not designed to be finger safe), and is not integral with the combiner box in which fuses are located, what is meant by adjacent to for these types of installations? Answer 3 If the disconnecting means is not integral with the fuses, then it shall be installed within sight and within 9 m from the fuse holder. A warning sign is required to indicate that all switches must be opened to de-energize from all sources before replacing fuses. Electrical Safety Authority Page 2 of 7

Question 4 When fuses are used as PV source circuit overcurrent protection, does a disconnecting switch for the output circuit satisfy the requirements for disconnecting means for fuses? Answer 4 No, Rule 14-402 requires circuits protected by fuses to be equipped with disconnecting means in order to safely replace fuses. Diagram B2 Disconnecting means for fuses used for PV source circuit overcurrent protection (c) Disconnecting means for overcurrent protection devices As per Rule 64-060(12), a disconnecting means for the combiner box is required for the PV output circuit and shall be: rated to interrupt the load; be integral with the combiner box; or installed within 2 m of the PV combiner. If the combiner box is equipped with fuses, a disconnecting means is required to be interlocked with the door. The enforcement of the interlocking requirement will not be enforced until further notice, Note: Rule 64-060(12) is not applicable to re-combiners. (3) Single-line diagram and labels (a) Single-line diagram of the interconnected renewable system Question 5 Does Diagram B3 meet the requirements of Rule 84-030(2) for the single-line diagram of the interconnected system that is located at the supply authority disconnect switch? Electrical Safety Authority Page 3 of 7

Diagram B3 Typical single-line diagram of the interconnected system with parallel meter connection Service Meter Generation Meter LDC Disconnect Inverter Source Disconnect Solar Panels Customer Distribution Panel Answer 5 Yes, this meets the minimum single-line diagram requirements of Rule 84-030(2). Note: The system ratings required by Rule 64-200 are not required to be displayed at the supply authority disconnect or on the single-line diagram. The label required by Rule 64-200 shall be posted at the generator (Source) disconnecting means. (b) Labels Question 6 What Codes or Standards provide requirements for labels, e.g. DG SOURCE DISCONNECT, UTILITYINTERCONNECTED, DG SYSTEM DISCONNECT WARNING TWO POWER SOURCES? Does the code require specific wording? Answer 6 Rules 2 100 and 84 024 require the labels. The Rules do not specify the specific wording. The wording provided in ESA SPEC 004 can be used as an example. The following markings are applicable CSA Part 2 Standard requirements and can be used as guidance: CSA Standard C22.2 No. 257 defines Distributed generation (DG) as an electric generation facility connected to a distribution system through the point of common coupling. In Annex B of Standard C22.2 No. 257 that is informative, it shows similar labels as in ESA SPEC 004, i.e. DG - source disconnect means. CSA Standard C22.2 No. 107.1, Clause 15.4.1.1 requires When the unit complies with Clause 15, it shall be marked: UTILITY - INTERCONNECTED, or the equivalent, and Clause 15.4.1.3 specifies; A utility interconnected inverter shall be marked: WARNING - POWER FED FROM MORE THAN ONE SOURCE, or the equivalent. Question 7 What is considered acceptable for exterior, weatherproof labels required by Section 84? Does the code specify letter size? Answer 7 The Code does not provide specific requirements; the labels need to be able to withstand the elements, be permanent and legible, for example: lamacoid, engraved metal plate, or equivalent. Additionally, the label has to satisfy the local supply authority requirements. Electrical Safety Authority Page 4 of 7

(4) Electricity meters (a) Neutral connection for electricity meters Question 8 For a parallel metering connection, where the generation meter is on the supply side of the service disconnecting means, do all 4-jaw revenue meters require a neutral conductor to be terminated in the meter base? Answer 8 No. According to Rule 10-624(4), the grounded conductor on the supply side of the service disconnecting means is permitted to be used as a bonding conductor for the revenue meter device. In this case, the grounded conductor is required to be bonded to the meter mounting device. However, when the grounded conductor is not used as a bonding conductor for the revenue meter device, the grounded conductor can be run through the meter base without being terminated and a separate bonding conductor shall be provided between the service and the meter. (b) Generator metering connection Direction The requirement in ESA SPEC-004 is to always have the Line side of the metering cabinet connected to the utility and the Load side connected to the customer, to ensure consistency and safety, as per Diagram B4. Diagram B4 Generation meter connection LINE To LDC Or Host Facility Panel LOAD To Inverter And Generation Rationale When pulling a meter, the standard practice is that the Load side of the metering cabinet will be de-energized and caution is taken around the Line side, as it may be energized. The ESA guideline is consistent with the Independent Electricity System Operator (IESO) microfit Contract which requires bi-directional metering for the generator facility. Electrical Safety Authority Page 5 of 7

(c) Tapping to the load side of the service box for a parallel metering connection Question 9 In installations where the existing customer load meter is downstream of the main service disconnect, does the Code permit tapping to the load side lugs of the service disconnect for a FIT or microfit installation with a parallel metering configuration, as per Diagram B5? Diagram B5 Tapping to the to the load side lugs of the service disconnect Generation Meter Main Service Disconnecting Means Disconnecting Means Distributed Generation System Metering Cabinet Distribution Equipment New renewable energy source with parallel metering configuration Rule 12-3032 (2) requires connectors to provide independent clamping means for each conductor Answer 9 Yes. According to Bulletin 6-7-*, a maximum of one tap is permitted per service box. Therefore, the generator meter in a parallel configuration is allowed to be connected to the load side lugs of the service disconnect and be terminated in accordance with Bulletin 6-7-*. (5) AC modules and micro-inverters Rule 64-002 defines an ac module as a complete, environmentally protected assembly of interconnected solar cells, inverter, and other components designed to generate ac power from sunlight. AC modules are designed to generate ac power when exposed to sunlight and do not have accessible, field installed dc wiring (as shown in the Photo B1). (a) Disconnecting means For ac modules where the inverter is an integral part of the generator (as shown on Photo B1), and the combined unit is approved, there is no requirement for a disconnecting means for the integral inverter. If, however, any other electric power production source is interconnected with an ac module, the disconnecting means, in accordance with Rule 84-020, is required for all production sources. Photo B1 AC module where the inverter is an integral part of the generator Electrical Safety Authority Page 6 of 7

For micro-inverters, inverters plugged into the photovoltaic panels (as shown in Photo B2), no additional disconnect switch is required. Photo B2 Micro-inverter (b) Overcurrent protection The output circuits of ac modules shall have overcurrent protection according to Rule 64-214 requirements. (c) Marking of photovoltaic circuit Question 10 Does the OESC require marking of a PV system with ac modules, when interconnecting to the supply authority? Answer 10 Yes. Although requirements of Rule 64-200 for marking of the photovoltaic output circuit at the generator disconnecting means are not applicable to ac modules, according to Rule 2-100, PV installations utilizing ac modules connected to the supply authority shall be marked to identify the PV system rating and suitability for the particular installation. Question 11 What is the required marking for a PV system with ac modules? Answer 11 According to Rule 2-100 and the intent of Rule 64-200, the required marking for PV installations utilizing ac modules connected to the supply authority are: rated ac output current nominal operating ac voltage Question 12 Where is the marking for a PV system with ac modules required to be located? Answer 12 The required marking for PV installations utilizing ac modules connected to the supply authority shall be located at the supply authority disconnect; or be included in the single-line diagram required by Rule 84-030(2). Electrical Safety Authority Page 7 of 7