CALLS FOR TENDER AND MARKET SURVEYS ROLES AND PROCEDURES

Similar documents
Market Survey. Technical Description Dismantling and Supply of Electrical Overhead Travelling (EOT) Cranes with a capacity up to 10 Tonnes

Step-by-Step Guide to using etenders For Procuring Consultants for Summer Works and Small Devolved projects

Open call for tender ECHA/2010/124 - Web services Lot 1 Web design, Lot 2 Web development, Lot 3 Web consultancies

Procedures for nomination and involvement of EQUASS auditors

Level 4 NVQ Qualifications in Business & Administration

ELECTRICAL NETWORK SUPERVISOR STATUS REPORT

UNOPS esourcing vendor guide. A guide for vendors to register on UNGM, and submit responses to UNOPS tenders in the UNOPS esourcing system

UNOPS esourcing vendor guide. A guide for vendors to register on UNGM, and submit responses to UNOPS tenders in the UNOPS esourcing system

INDUSTRIAL ELECTRICIAN

EUROPEAN LABORATORY FOR PARTICLE PHYSICS LABORATOIRE EUROPEEN POUR LA PHYSIQUE DES PARTICULES

CHARTERED MEMBER ASSESSMENT. Candidate Handbook LEADING GOVERNANCE

Support-EAM. Publishable Executive Summary SIXTH FRAMEWORK PROGRAMME. Project/Contract no. : IST SSA. the 6th Framework Programme

6. Environmental Assessment Framework

Clarification Note 2 GSA internal reference: Procurement procedure: GSA/01/01/17 General ICT Support to the GSA

Returnable Schedules

ISO/IEC TR TECHNICAL REPORT. Software engineering Product quality Part 4: Quality in use metrics

Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017

REQUEST FOR TECHNICAL AND FINANCIAL PROPOSAL

Screening Contractor Qualification Framework

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)

The Swirl logo is a trade mark of the Cabinet Office ITIL is a registered trade mark of the Cabinet Office

Honeywell Integrated Security YOUR PARTNER OF CHOICE. Integrator Service Certification Programme

EVALUATION AND APPROVAL OF AUDITORS. Deliverable 4.4.3: Design of a governmental Social Responsibility and Quality Certification System

Internal Audit Report. Electronic Bidding and Contract Letting TxDOT Office of Internal Audit

Smart Metering Forum: The DCC Roadmap. Chris Rowell 30 November 2011

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

Continuing Professional Development (CPD)

Assignment front sheet

Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme. Version 1.2

AMENDMENT NO.: 3 INVITATION FOR BID. IFB FQ16005 requesting bids for the above referenced project is hereby changed in part as listed below:

SSC Transformation Initiative Fairness Monitoring Services

Saving the Project Brief document under its own name

Compile together the individual QA Testing Checklists for your team site.

UNITED NATIONS DEVELOPMENT PROGRAMME TERMS OF REFERENCE

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center

Lifelong Learning Programme. Selection On-line assessment tool Expert manual

Stakeholder consultation process and online consultation platform

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1

Personnel Certification Program

ASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II TERMS OF REFERENCE FOR

European Code of Conduct on Data Centre Energy Efficiency

S. Scholz / K. Meyer / J.E. Nielsen / Harald Drück/J.Fernández/E.Prado/L.Nelson Page 1 of 7

Configuration Management Certification Courses

CERTIFICATE IN LUXEMBOURG COMPANY SECRETARIAL & GOVERNANCE PRACTICE

ILPO55 REFERENCE FRAMEWORK - EMPLOYABILITY PORTFOLIO TOOL

Chartered Member Assessment

The Council Information Assurance sector seeks a national expert to reinforce the area of 'security of EU classified information'.

IMI Level 3 Award in Automotive Refrigerant Handling (EC ) I.D NO: 500/6771/0

CEN and CENELEC Position Paper on the draft regulation ''Cybersecurity Act''

Application for Professional Registration

The fast and efficient, online solution to manage all of your projects pre-induction Health & Safety forms, filing and archiving

PCS-Tender. Supplier Response Guide

Consolidation Team INSPIRE Annex I data specifications testing Call for Participation

ICRM Market Survey MARKETING. Preliminary Project Outline Draft A. Institute of Certified Records Managers RESOURCES LTD.

IEC Quality Assessment System for Electronic Components (IECQ System)

SAI GLOBAL PRODUCT SERVICES

Web Page. Advertisement for SCADA System Manager post

FSC STANDARD. Standard for Multi-site Certification of Chain of Custody Operations. FSC-STD (Version 1-0) EN

Business Information Systems

Higher National Unit Specification. General information for centres. Unit title: Communication: Using Information Technology and Desktop Publishing

Reference Framework for the FERMA Certification Programme

CERN - ST Division ACCESSING THERMODYNAMIC FLUID PROPERTIES IN LABVIEW. Steffen Grohmann, ST-CV. Abstract

Software Quality Assurance Text and Readings

SLHC-PP DELIVERABLE REPORT EU DELIVERABLE: Document identifier: SLHC-PP-D v1.1. End of Month 03 (June 2008) 30/06/2008

Programs that Work. March 7,

Summary. Program Overview. Notice Type: Request for Proposal. Short Title: CEI Industrial Refrigeration Technical Support

Regulation update Monitoring and Compliance

Terms of Reference. Certificate for Quality in Internationalisation

RFP UNFPA/CPH/12/035. Questions and Answers

Request for Expressions of Interest: The EU mhealth Hub

Civil Engineering, Civil Engineering with Industrial Placement. School of Mathematics, Computer Science and Engineering

A6 Training. A6.1 General. A6.2 Extract from the Health and Safety in Employment Act Training and supervision

SPECIFIC PROCUREMENT NOTICE IT SERVICES

TxDOT Internal Audit Materials and Testing Audit Department-wide Report

UK-led international standards for BIM

D3.1 Validation workshops Workplan v.0

IMO MEASURES TO ENHANCE MARITIME SECURITY. Outcome of the 2002 SOLAS conference. Information on the current work of the ILO

Request For Quotation from Service Providers. for. Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL

SCAFFOLDER. Code: SCAFFOLDER

Part 5: Requirements for ABs FOOD SAFETY SYSTEM CERTIFICATION Part V: Requirements for Accreditation Bodies

MPM210: Introduction to Project Management 1. MPM210: Introduction to Project Management. Project Plan for Learning Modules.

IECRE OPERATIONAL DOCUMENT

Guideline No 3:2003. European Guideline. Certification of thermographers

ISO/IEC INTERNATIONAL STANDARD

NIAC Membership Application Checklists

MTR CORPORATION. User Guide for E-Tendering System R3.16 TABLE OF CONTENTS SYSTEM REQUIREMENT... 1 NEW SUPPLIER / CONTRACTOR REGISTRATION...

Quality Management System (QMS)

Help for Suppliers. (UK Public Sector)

Indian Institute of Technology Kanpur Samtel Centre for Display Technologies

"Energy and Ecological Transition for the Climate" Label Control and Monitoring Plan Guidelines

Introduction. Content. Training Course NAA Inspectors Training Course - Initial Airworthiness. Location(s) / Date(s) List price September 2019

Rules for Operators. Version 6 / Version 6, 13 May 2011 Page 1/12

General Rules for Product Certification by the co-operation of certification bodies (GRPC)

Manual for Validation of Individual. Continuing Professional Development Programme. for. Registered Medical Laboratory Technologists

Request For Proposal ONWAA Website & E-Learn Portal

CASA External Peer Review Program Guidelines. Table of Contents

Revised November EFESC Handbook

On Campus. Computing. School of Architecture, Computing and Engineering 11 November Taught by UEL staff

Form 4: New Work Item Proposal. Reference number: ISO/IEC NP TS Circulation date: (to be given by Central Secretariat)

datasheet Certificate/Diploma in Business and Administration Main features of the qualifications Introduction Target audience

Transcription:

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN - Division CERN--2000-010 February, 2000 CALLS FOR TENDER AND MARKET SURVEYS ROLES AND PROCEDURES L. Annila Abstract division has implemented certain procedures to handle the calls for tender and market surveys. In January 1998, the division leader set up the call-for-tender coordination office to check and approve each technical document leaving the division. The mandate of the call-for-tender co-ordination office is to check the quality of the documents, in order for these documents to be as clear as possible in terms of both content and structure. The role of this office is to contribute positively and give service to the people writing the documents, and not to give negative criticism. The aim of this paper is to present the mandate of the office, how papers are processed, and to draw up a first result summary. Presented at the 3 rd Workshop Chamonix, France, January 25-28, 2000

1 BACKGROUND To assure the quality of the outgoing -division technical documents, the division leader set up the call-for-tender co-ordination office in January 1998 to check and approve each of them. The idea was to make sure that the technical documents are understandable/readable and do not contain errors when they reach the people outside of division. The need for this office arose because many of the people in the division are at present quite young and therefore professionally still inexperienced and may need assistance in writing technical documents. Another reason was that many of the CERN documents are nowadays written in English, whereas the division's main language is French. 2 OBJECTIVES The mandate of the call-for-tender co-ordination office is to check the quality of the documents, in order for these documents to be as clear as possible in terms of both content and structure. A further objective is to harmonize the -division documents wherever possible, for example by always having a similar introduction to CERN or the same document format. -division templates for market surveys and calls for tender are currently under development. 3 APPROVAL CIRCUIT The call-for-tender co-ordination office checks and approves each technical document leaving the division. The approval circuit is presented on the following web site: http://nicewww.cern.ch/st/di/coordination/circuit.htm. The circuit presented in Fig. 1 is an English version of the one presented on the web. The different people and their roles in the circuit are given in Table 1 below. Table 1: Roles of different people in the approval circuit People Writer Group secretary Division secretary Sylvie Prodon Reader Roles Creates the document Controls the format and spelling, forwards the document to the division secretary Circulates the document between the writer and reader until it is approved, keeps a record of each version Checks and approves documents before they are sent out of the division Leena Annila Katy Foraz Yvan Jacquemyns English/Translations (French Æ English) French/English French 2

Figure 1: Approval circuit of technical documents in the division. 3

4 REQUIREMENTS FROM DIVISION 4.1 Market surveys Table 2 gives a list of the documents a CERN market survey must contain and the division ( or ) responsible for submitting them. Table 2: Market survey documents Technical description Qualification criteria Document name Responsibility Questionnaire Cover letter Selection and adjudication criteria for supply/industrial service contract documents 4.2 Calls for tender Table 3 gives a list of the documents a CERN call for tender must contain and the division ( or ) responsible for submitting them. Table 3: Call-for-tender documents Cover letter Document name Responsibility Technical specification The general conditions governing invitations to tender and tenders Set of criteria to be used in the assessment of tenders For industrial services full information about the amount of work to be carried out Tender form General conditions of CERN contracts Specific/special conditions Other required documents that enable bidders to draw up clear and precise tenders + + + 4.3 Important points Some important aspects to consider when writing technical documents can be summarized. Regarding market surveys, the qualification criteria state the conditions to be fulfilled by companies in order to be eligible to receive the call for tender following the market survey. In the questionnaire the requirements specified in the qualification criteria should be verified, and other things can be asked as well. In the technical description the scope of the survey should be clear so that the people receiving it understand immediately what it is about. The technical part of the market survey should not go into small details, but rather give an overview of the supply. The technical specifications for calls for tender should be made such that the tenders received at CERN are comparable with each other. Important things to be included in technical specifications are outlined below. 4

- Introduction: to CERN; to the technical domain concerned. - Scope of the project: stating clearly and briefly what the project is about, where it takes place. (It should be noted that there is a difference between what the user wants and what the division wants from the supply.) - Technical description: clearly technical, giving references to the applicable technical standards. - Limits of the supply between CERN and the contractor. - Rules and standards to be followed. e.g. TIS safety rules, French/Swiss norms to be followed. - Quality requirements. - Procedures before awarding the contract, including: documents to be provided (possible quality plan); visit to CERN; subcontractors. - Execution of the contract, including: documents; work procedures, management; security, hygiene; transport; commissioning. - Tests/inspection. - Schedule. - Relevant annexes. - Possible questionnaire. 5 ANALYSIS AFTER 1.5 YEARS OF OPERATION Between the start in 1998 and the end of 1999, 157 documents went through the approval circuit. Many of them were approved after the first check, but there have been cases where the documents have passed between the writer and reader 5 6 times before approval. Table 4 indicates how many documents each reader has controlled and of which type. Reader Table 4: Number of documents controlled by the readers by the end of 1999 Number of French documents Number of English documents Number of translations Annila, Leena 50 40 Foraz, Katy 49 6 Jacquemyns, Yvan 52 5

The average time taken to control a document is quite difficult to define. It depends on the length, content, the way it has been written, whether it is a market survey or a call for tender, and so on. However, the readers spent at least 20% of their working time on this job. Table 5 shows the number of documents created in the different groups. Table 5: Number of documents created in the groups by the end of 1999 Document type AA CE CV DI EL HM MO TFM Market surveys 4 6 18 0 8 8 0 3 Share of all market surveys 9% 13% 38% 0% 17% 17% 0% 6% Calls for tender 4 11 20 0 7 25 1 43 Share of all calls for tender 3.5% 10% 18% 0% 6% 22.5% 1% 39% 6 CONCLUSIONS AND FUTURE PROSPECTS During the past 1.5 years that the call-for-tender co-ordination office has been operating, the quality of the documents has improved with regard to their structure and readability. Partially this is because of the LHC template, which is better known now and which many people use even in other projects documents. It is also because of the feedback from the division leader and readers, who have been able to point out the possible deficiencies in the documents or things to which special attention must be paid. A very positive aspect is that once these deficiences have been pointed out, the writers have clearly taken note, and avoided the same mistakes in their later documents. The reading procedure is relatively well known nowadays inside the division and the approval circuit operates faster than in the beginning. However, it is obvious that even though there is a template for the LHC documents, we also need a template for pure documents. These are currently under development and will be based on Section 4 of this paper. The templates will be released on the web after the group leaders approval. The attitude inside the division towards the reading procedure is ambivalent. Some people think it is a waste of time, some think it is of great help. A couple of times deficiencies in the operation of the approval circuit have also been noted: There seems to be a particular need to refresh memories from time to time with regard to who is supposed to do what so that the final version ends up with the division secretary. Anyhow, this is a quality-assurance procedure comparable to the one that exists in the LHC division, and if our division intends to move towards the quality-assurance system, this procedure is likely to stay. 6