OpenFabrics Alliance Interoperability Logo Group (OFILG) January 2016 Logo Event Report

Similar documents
UNH-IOL 121 Technology Drive, Suite 2 Durham, NH OpenFabrics Interoperability Logo Group (OFILG)

OpenFabrics Alliance Interoperability Logo Group (OFILG) May 2014 Logo Event Report

UNH-IOL 121 Technology Drive, Suite 2 Durham, NH OpenFabrics Interoperability Logo Group (OFILG)

OpenFabrics Alliance Interoperability Logo Group (OFILG) January 2014 Logo Event Report

OpenFabrics Alliance

OpenFabrics Alliance Interoperability Logo Group (OFILG) May 2014 Logo Event Report

Enclosed are the results from OFA Logo testing performed on the following devices under test (DUTs):

OpenFabrics Alliance Interoperability Logo Group (OFILG) May 2012 Logo Event Report

Interoperability Logo Group (OFILG) July 2017 Logo Report

OpenFabrics Alliance Interoperability Logo Group (OFILG) Dec 2011 Logo Event Report

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Logo Group (OFILG) May 2013 Logo Event Report

OpenFabrics Alliance Interoperability Logo Group (OFILG) January 2014 Logo Event Report

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Logo Group (OFILG) May 2011 Logo Event Report

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

Data Center Bridging Consortium

40 and 100 Gigabit Ethernet Consortium Interoperability Test Report

Wireless LAN Consortium abgn Infrastructure Interoperability Test Suite v4.4 Report

UNH-IOL MIPI Alliance Test Program

UNH-IOL MIPI Alliance Test Program

Wireless LAN Consortium Wireless WPA AP MAC Test Suite v2.4 Report

Gigabit Ethernet Consortium Point-to-Point Interoperability Test Suite v2.3 Report

OpenFabrics Alliance Interoperability Working Group (OFA-IWG)

Open Networking Consortium Open Network Systems Interoperability Test Report

10 Gigabit Ethernet Consortium 10GBASE-R PCS Test Suite version 0.4

Open Networking Consortium Open Network Systems Interoperability Test Report

Gigabit Ethernet Consortium Clause 36 PCS Conformance Test Suite v2.1 Report

OSPF NSSA Operations Test Report Revision 1.7. InterOperability Lab 121 Technology Drive, Suite 2 Durham NH,

Bridge Functions Consortium Spanning Tree Protocol Operations Test Suite Version 2.0

Open Networking Testing Service Open Network Systems Interoperability Test Report

Active-Active LNET Bonding Using Multiple LNETs and Infiniband partitions

University of New Hampshire InterOperability Laboratory Ethernet Consortium

RIPv2 Interoperability Test Report Revision 1.1

HP BLc Intel 4X QDR InfiniBand Switch Release Notes. Firmware Version

Open Networking Testing Service Open Network Systems Interoperability Test Report

UNH-IOL NVMe Test Consortium

UNH IOL NVMe Test Consortium

UNH-IOL Open Networking Consortium

UNH-IOL NVMe Testing Service

UNH-IOL NVMe Test Consortium

InfiniBand OFED Driver for. VMware Virtual Infrastructure (VI) 3.5. Installation Guide

InfiniBand OFED Driver for. VMware Infrastructure 3. Installation Guide

Mellanox InfiniBand Training IB Professional, Expert and Engineer Certifications

New Storage Architectures

University of New Hampshire InterOperability Laboratory Ethernet Consortium

OFA Interoperability Working Group

InfiniBand and Mellanox UFM Fundamentals

HP BLc QLogic 4X QDR InfiniBand Switch Release Notes. Firmware Version

Company Rep. February 8, 2006 Company Name Report Rev. 1.0 Address Line 1 Address Line 2

Avnu Alliance Certification Process Overview

OFED Storage Protocols

InfiniBand Administration Tools (IBADM)

Power over Ethernet Consortium Interoperability Test Report

University of New Hampshire InterOperability Laboratory Ethernet Consortium

Implementing Storage in Intel Omni-Path Architecture Fabrics

UNH IOL iscsi CONSORTIUM

Windows OpenFabrics (WinOF)

Informatix Solutions INFINIBAND OVERVIEW. - Informatix Solutions, Page 1 Version 1.0

The following InfiniBand products based on Mellanox technology are available for the HP BladeSystem c-class from HP:

UNH-IOL NVMe Test Consortium

IPv6 Application Test Service

University of New Hampshire InterOperability Laboratory Ethernet Consortium

ETHERNET OVER INFINIBAND

University of New Hampshire InterOperability Laboratory Gigabit Ethernet Consortium

The following InfiniBand products based on Mellanox technology are available for the HP BladeSystem c-class from HP:

Reducing Network Contention with Mixed Workloads on Modern Multicore Clusters

UNH-IOL FIBRE CHANNEL CONSORTIUM

ROUTING CONSORTIUM. Routing Information Protocol Version 2 (RIP) Multi-System Interoperability Test Suite. Technical Document. Revision 2.

UNH-IOL PCIe CONSORTIUM

Mellanox OFED for FreeBSD for ConnectX-4/ConnectX-4 Lx/ ConnectX-5 Release Note. Rev 3.5.0

SPC BENCHMARK 1 EXECUTIVE SUMMARY

SunDual Port 4x QDR IB Host Channel Adapter PCIe ExpressModule

The following InfiniBand adaptor products based on Mellanox technologies are available from HP

HPC Customer Requirements for OpenFabrics Software

QuickSpecs. HP InfiniBand Options for HP BladeSystems c-class. Overview

Mellanox Connect-IB Firmware (fw-connectib) Release Notes

UNH IOL iscsi CONSORTIUM

Workshop on High Performance Computing (HPC) Architecture and Applications in the ICTP October High Speed Network for HPC

OpenADR 2.0b Protocol Implementation Conformance Statement (PICS)

Performance monitoring in InfiniBand networks

QLogic in HPC Vendor Update IDC HPC User Forum April 16, 2008 Jeff Broughton Sr. Director Engineering Host Solutions Group

Transcription:

OpenFabrics Alliance Interoperability Logo Group (OFILG) January 2016 Logo Event Report Cover Page Abdel Sadek NetApp 3718 N. Rock Road Wichita, KS 67226-1308 UNH-IOL 121 Technology Drive, Suite 2 Durham, NH 03824 +1-603-862-0090 OpenFabrics Interoperability Logo Group (OFILG) ofalab@iol.unh.edu Date: 10 March 2016 Report Revision: 1.0 OFED Version on Compute Nodes: 3.18-1 Operating System on Compute Nodes: Scientific Linux 7.1 Enclosed are the results from OFA Logo testing performed on the following devices under test (DUTs): E-Series E5400 The test suite referenced in this report is available at the UNH-IOL website. Release 2.04 (2015-Jul-23) was used. http://iol.unh.edu/ofatestplan The following table highlights the Mandatory test results required for the OpenFabrics Interoperability Logo for the SRP Target over InfiniBand device class per the Test Plan referenced above and the current OpenFabrics Interoperability Logo Program (OFILP). Test Procedures IWG Test Status Result/Notes 11.1: Link Initialization Mandatory 11.2: Fabric Initialization Mandatory 11.5: SM Failover and Handover Mandatory 11.6: SRP Mandatory Mandatory Test Summary Summary of all results follows on the second page of this report. For Specific details regarding issues, please see the corresponding test result. Testing Completed March 10, 2016 Reviewed & Issued March 15, 2016 Stefan Oesterreich soesterreich@iol.unh.edu Bob Noseworthy ren@iol.unh.edu

Result Summary The Following table summarizes all results from the event pertinent to this IB device class (SRP Target over InfiniBand). Test Procedures IWG Test Status Result/Notes 11.1: Link Initialization Mandatory 11.2: Fabric Initialization Mandatory 11.5: SM Failover and Handover Mandatory 11.6: SRP Mandatory Digital Signature Information This document was signed using an Adobe Digital Signature. A digital signature helps to ensure the authenticity of the document, but only in this digital format. For information on how to verify this document s integrity proceed to the following site: http://www.iol.unh.edu/certifydoc/ If the document status still indicated Validity of author NOT confirmed, then please contact the UNH-IOL to confirm the document s authenticity. To further validate the certificate integrity, Adobe 9.0 should report the following fingerprint information: MD5 Fingerprint: 39 96 A4 8C 02 E0 38 DA F7 AB E1 ED BD E9 B5 F0 SHA-1 Fingerprint: 41 EE 65 F4 8A 6A 3A A6 3D AF 63 F4 78 7D 97 7B 48 49 C9 DD Report Revision History v1.0 Initial working copy Configuration Files Description Attachment Scientific Linux 7.1 Configuration File OFED 3.18-1 Configuration File OpenFabrics Interoperability Logo Group 2 UNH-IOL Report Revision: 1.0

Result Key The following table contains possible results and their meanings: Result: with Comments Qualified FAIL Warning Informative Refer to Comments Not Applicable Not Available Borderline Not Tested Description: The Device Under Test (DUT) was observed to exhibit conformant behavior. The DUT was observed to exhibit conformant behavior however an additional explanation of the situation is included. The DUT was observed to exhibit conformant behavior, with the exception of fault(s) or defect(s) which were previously known. The DUT was observed to exhibit non-conformant behavior. The DUT was observed to exhibit behavior that is not recommended. Results are for informative purposes only and are not judged on a pass or fail basis. From the observations, a valid pass or fail could not be determined. An additional explanation of the situation is included. The DUT does not support the technology required to perform this test. Due to testing station limitations or time limitations, the tests could not be performed. The observed values of the specific parameters are valid at one extreme and invalid at the other. Not tested due to the time constraints of the test period. OpenFabrics Interoperability Logo Group 3 UNH-IOL Report Revision: 1.0

DUT and Test Setup Information Figure 1: The IB fabric configuration utilized for any tests requiring a multi-switch configuration is shown below. DUT #1 Details Manufacturer: NetApp Firmware Revision: 08.20.08.00 Model: E-Series E5400 Hardware Revision: 1.0 Speed: QDR Located in Host: N/A Firmware MD5sum: N/A Additional Comments / Notes: OpenFabrics Interoperability Logo Group 4 UNH-IOL Report Revision: 1.0

Mandatory Tests IB Device Test Results: 11.1: Link Initialization Results Part #1: Discussion: All links established with the DUT were of the proper link speed and width. Link Partner SFA10K SFA7700 SFA12K Intel 12200 (Switch) QDR Mellanox SX6025 (Switch) FDR Mellanox SX6036 (Switch) FDR Mellanox IS-5030 (Switch) QDR Mellanox SX6036G (Switch) FDR DataDirect Networks SFA12K (SRP Target) FDR NA NA NA DataDirect Networks SFA7700 (SRP Target) FDR NA NA NA NetApp Soyuz (SRP Target) QDR NA NA NA NetApp Pikes Peak (SRP Target) QDR NA NA NA Host: hati HCA: MCX354A-FCBT (FDR) Host: titan HCA: MCX354A-FCCT (FDR) Host: phoebe HCA: MCB194A-FCAT (FDR) Host: pandora HCA: MCB192A-FCAT (FDR) Host: pan HCA: QLE7342 (QDR) Host: daphnis HCA: QLE7340 (QDR) 11.2: Fabric Initialization Subnet Manager OpenSM Result Result Discussion: All subnet managers used while testing with OFED 3.18 were able to correctly configure the selected topology. 11.5: SM Failover and Handover SM Pairings OpenSM Result Discussion: OpenSM was able to properly handle SM priority and state rules. Result OpenFabrics Interoperability Logo Group 5 UNH-IOL Report Revision: 1.0

11.6: SRP Subnet Manager OpenSM OFA Logo Event Report January 2016 Result Result Discussion: Core and extended SRP communications between all HCAs and all SRP targets succeeded while OpenSM was in control of the fabric. OpenFabrics Interoperability Logo Group 6 UNH-IOL Report Revision: 1.0