Northwest Needs Improvements Survey

Similar documents
A state-of-the-art class A warehouse opportunity

Appendix D Supportive Transportation Materials

FDOT District Six ITS Annual Report (Fiscal Year ) READY FOR TOMORROW

MOST TRUSTED ADVISER IN THE TOLL INDUSTRY

Gaston County GIS. Interactive Mapping Website

Data Entry Style Guide for FL-ATIS RELEASE VERSION 1.6 (FINAL) MARCH 31, 2011

Cedar Rapids ITS Deployment Project

Transportation Improvement Program. Project Lookup Lists

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

Northern Virginia Transportation Authority

8a: Road Projects Time Horizon 1: (Funded TIP) Page 81

Kansas Division. January 31, 2018

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for

Transportation Improvement Program. Project Lookup Lists

KANSAS MAP CHANGES KANSAS DEPARTMENT OF TRANSPORTATION ROUTE COUNTY PROJECT WORK TYPE I 635 WYANDOTTE K GR&SU

Calipatria Solar Farm TIA

STUDY REPORT #1 ADDENDUM

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

TMC of the Future. Matt Lee Associate Vice President

Bellevue s Traffic Adaptive Signals

Addendum: Final Design Noise Analysis Study Noise Sensitive Area (NSA) 11 Post March 15, 2016 Open House Response to Comments

Using Geographical Information Systems to Enhance Public Finance Analyses

Cornerstone of downtown; Gateway to the state

CASE 1 TWO LANE TO FOUR LANE DIVIDED TRANSITION GEO-610-C NOT TO SCALE GEOMETRIC DESIGN GUIDE FOR MATCH LINE LINE MATCH. 2 (0.6m) shoulder transition

Dallas Horseshoe ATM Design. Mike Holt, PE, PTOE Senior ITS/Traffic Engineering Manager

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE

I-95 Express Toll Lanes

Traffic Impact Analysis Shotwell Road Residential Clayton, NC

West Seattle and Ballard Link Extensions. Downtown Open House and Neighborhood Forum September 11, 2018

Appendix D. Transportation Study

Engaging Maryland toward CAV advancements Christine Nizer, Administrator

6.9 Intelligent Transportation Systems

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

SMART 2017 ANNUAL REPORT. TP Miami-Dade Transportation Planning Organization STRATEGIC MIAMI AREA RAPID TRANSIT PLAN

EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF DOWNTOWN LOS ANGELES/ARTS DISTRICT

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission

Pueblo City-County Addressing Standards May 2010

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway

Metropolitan Council Transportation Committee. September 12, 2016

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel

Municipal Service Park 3 December Consolidation of City services to one centralized complex

Corridor Management Committee. December 17, 2014

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

I-35 FROM THE RED RIVER TO THE RIO GRANDE

An Analysis of TDM Impacts on a Corridor Segment Research Findings

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS

Transportation & Mobility

TRANSPORTATION DEPARTMENT Business Plan

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

Final Major New Program List

Mike Mollenhauer. Director of the Center for Technology

TEXAS DEPARTMENT OF TRANSPORTATION NORTH TARRANT EXPRESS PROJECT ETC & ITS EQUIPMENT STRAIGHT LINE DIAGRAMS

Dakota County Transportation CIP Process Requests from cities/townships

Site 40. Recreational Center

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

APPENDIX E. Expenditures by Department

Lee District Summary Report

APPENDIX F. Expenditures by Year

STATE STREET CORRIDOR

Upgrading Traffic Signals to Enable a Connected Vehicle Test Bed Somerville, Massachusetts

HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis

ARIZONA-SONORA BORDER MASTER PLAN

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

M50 Demand Management Study

Honorable Mayor and Members of the City Council. Memorandum of Understanding: Interstate 80 Integrated Corridor Mobility (I-80 ICM) Project

INDUSTRIAL LAND FOR SALE

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

Escambia-Santa Rosa Regional ATMS. Escambia-Santa Rosa Regional Advanced Traffic Management System (ATMS) Florida Alabama TPO

MAJOR PROJECTS STRATEGY

NORTH SIDE IMPACT ANALYSIS

SIS 2045 ABM Zonal DATA Projections

ITS Wisconsin Transportation Conference October 23, 2018

Appendix 2. Capital Funding Source Summary Table of Contents

S T A P L E T O N YEAR 2035 TRANSPORTATION NETWORK. Exhibit 1A MAY 2018 I th Ave. Ulster St. Smith Road. 36th Ave. Havana St.

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

DIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY

Fox River Grove, 20 Years Later. Brian Vercruysse, PE November 3, 2015 Arlington, TX

Core Capacity Transit Study. San Francisco County Transportation Authority October 17, 2017

ROADWAY LIGHTING CURFEW

APPENDIX E TRANSPORTATION

Prepared for: Rocklin. Prepared by:

SW 8th Avenue Corridor & Financing

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT

Dulles Area Transportation Association

DRAFT INVESTMENT CORRIDORS

Transcription:

PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes to existing 4-lane road PW8 SW 117th Ave SW 40th St SW 8th St Add 2-lanes to existing 2-lane road PW25 Perimeter Rd NW 20th St NW 72nd Ave Add 2-lanes to existing 2-lane road PW27 NW 72nd Ave NW 122nd St NW 138th St Add 1-lane to existing 2-lane road PW28 West 68th St W 21st Ct W 19th Ct Add 1 eastbound lane PW29 West 76th St W 36th Ave W 20th Ave Add 3-lanes to existing 2-lane road PW42 NW 97th Ave NW 74th St NW 90th St Construct new 4-lane road PW44 NW 107th Ave NW 138th St NW 170th St Construct new 4-lane road PW45 NW 154th St NW 87th Ave NW 107th Ave Construct new 2-lane road PW46 NW 97th Ave NW 138th St NW 186th St Construct new 4-lane road PW47 NW 90th St NW 107th Ave NW 87th Ave Construct new 2-lane road PW49 NW 107th Ave NW 41st St NW 25th St Add 2-lanes to existing 4-lane road H1 NW 170th St HEFT I-75 Construct new 6-lane road MDX1 SR 924 (Gratigny Expressway) Extension (west) SR 826/I-75 MDX3 Connect 4Xpress Central Miami-Dade County North Miami-Dade County HEFT Construct new road connecting HEFT, I-75, SR 924, and SR 826 Construct new limited access road connecting northern and central Miami-Dade County MDX4 US 27 SR 826 Krome Ave Convert US 27 to a toll road

Please rate each project listed below MDX7 SR 836/SR112 SR 826 I-95/I-395 Managed Lanes MDX11 SR 836 HEFT SR 826/836 Interchange Managed Lanes in median of SR 836 MDX16 SR 836 NW 87th Ave Improve Interchange MDT2 East-West/Dolphin Corridor Premium Transit MIC Vicinity of FIU, Florida s Turnpike, or NW 137th Ave New east-west premium transit service running parallel to SR 836/Dolphin Expressway MDT4 Miami Gardens Drive at NW 73rd Ave Construct Park-and-Ride lot TP1 HEFT I-75 Turnpike Mainline Widen to 8-lane road TP2 HEFT SR 836 I-75 Widen to 8-lane road TP6 HEFT Kendall Dr (SW 88th St) SR 836 Widen to 10-lane road TP9 HEFT I-75 Modify/improve interchange TP13 HEFT NW 170th St Construct new Interchange TP14 HEFT US 1 Turnpike Mainline Convert toll booths to electronic toll collection FP3 NW 25th St 89th Ct HEFT FP4 NW 87th Ave SR 836 NW 58th St FP7 NW 87th Ave Extension NW 58th St NW 95th St Improve traffic signals and intersections for truck movements. Provide connection from NW 25th St to HEFT Improve connections to SR 836/NW 12th St/ NW 87th Ave for truck movements Construct new freight hub connection between Doral and Medley FP8 NW 87th Ave NW 36th St NW 58th St Add 2-lanes to existing 4-lane road FP10 SR 826/I-75 Interchange Add 1-lane to ramp from NB I-75 to SB SR 826 FP13 NW 12th St at NW 87th Ave Traffic signal improvement

FP17 Okeechobee Rd/US 27 NW 138th St 79th Ave FP18 Truck Parking Improvement at Okeechobee Rd FP19 North River Dr NW 107th Ave NW 74th Ave FP20 Integration of Truck Route System and Regional ITS Network Improved operations and access along Okeechobee Rd and HEFT Long term truck parking and staging near Okeechobee and HEFT Widen to include shoulders and improve access ITS improvements specifically geared toward truck movements FP21 Medley Freight Hub Improvements Add street lights to local roads in Medley to increase safety and help to facilitate expanded hours of operation. Improve local roadway infrastructure to and from businesses in the Medley area FP22 Way-Finding Sign Improvement Program Wayfinding sign improvements county-wide for movements to/from regional freight hubs FP23 Freight Rail Safety and Security Projects that enhance safety and security of freight transportation, including grade crossing improvements, grade separation projects, signal upgrades, etc. FP28 Okeechobee Rd Operations/Access Improvements NW 138th Ave 79th Ave FP30 SR 826 Interchange Improvements SR 874 Okeechobee Rd FP34 FP35 Medley Bridge/Canal Improvement Program Medley Gateway Establishment NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave FP37 NW 12th St NW 87th Ave SR 836 Ramps FDOT3 SR 826 NW 103rd St I-75 Traffic signal and signage improvements for truck movements Upgrade interchanges on SR 826 between SR 874 and Okeechobee Rd Bridge/Canal improvements to connect Medley and Okeechobee Rd Provide business and wayfinding signage, including a Medley area business inventory Provide grade separation to facilitate through movements on NW 12th Street Operational improvements - add special use lanes FDOT5 I-75 SR 826 I-595 (Broward County) Add 2 special use lanes FDOT11 SR 826 I-75 Golden Glades Interchange Reconstruct and add 2 lanes

Please rate each project listed below FDOT19 I-75 at 154th St Construct new Interchange FDOT20 SR 826 NW 103rd St I-75 Provide right of way for new transit service FDOT21 SR 826 Palmetto Station NW 103rd St Provide right of way for new transit service FDOT23 I-75 SR 826 I-595 (Broward County) Provide right of way for new transit service FDOT28 Okeechobee Rd/US 27 79th Ave Krome Ave Construct new expressway overpass at major intersections FDOT30 Krome Ave/SR 997 US 1 Okeechobee Rd/US 27 Add 2-lanes to existing 2-lane road FDOT41 I-75 (EB) at SR 826 Ramp Add double lane ramp from EB I-75 to SB SR 826 FDOT52 Red Road SR 826 NW 135th St Congestion Management improvements FDOT54 SR 826 (NB) Okeechobee Rd NW 103rd St Construct 1 auxiliary lane FDOT55 SR 826 (WB) NW 47th Ave NW 67th Ave Construct 1 auxiliary lane FDOT58 NW 25th St Viaduct SR 826 NW 87th Ct Phase 2: complete construction of Viaduct and road widening FDOT61 NW 138th St NW 57th Ave NW 67th Ave Add 2-lanes to existing 3-lane road FDOT62 SR 826 SR 836 NW 87th Ave on I-75 Special use lanes SFRTA5 FEC South Spur/Ludlam Trail Premium Transit Miami Intermodal Center Dadeland Area Premium transit service and non-motorized facility NC5 SR 826/US 27 Interchange Interchange improvements NC7 NW 36th St/NW 41st St HEFT NW 42nd Ave Capacity Improvement NC26 NW 135th St NW Red Rd Douglas Rd Congestion management NC31 I-75/SR 826 County Line Rd. NW 74th St Improve/implement transit service

NC38 NC41 SW 200th Street SW 137th Ave SW 88th St SR 821 US-1 (South Dixie Highway) SW 200th Street SW 157th Ave SW 88th St SW 137th Ave SR 836 US-1 (South Dixie Highway) SW 8th St Improve/implement transit service Premium transit service NC46 HEFT Transitway Snapper Creek Service Plaza I-75 Provide infrastructure for new transit service NC48 NW 107th Ave NW 170th St Broward County line Extend NW 107th ave to County Line NC50 SW 8th St and NW 36th St Grade Separations at SW 8th St/SW 87th Ave, SW 8th St/SW 107th Ave, NW 36th St/NW 72nd Ave