Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS.

Similar documents
20 December All TSOs of the Capacity Calculation Region Hansa, taking into account the following: Page 1 of 7

An Introduction to Network Codes & The Links Between Codes

CORESO A CENTRALIZED REGIONAL SECURITY COORDINATION INITIATIVE. Leading coordination for enhanced reliability of supply

Standard Development Timeline

Available Transfer Capability Definitions and Determination

PRC Coordination of Protection Systems for Performance During Faults

EUTurbines comments to. ENTSO-E Public consultation on Connection Codes Implementation Guidance Documents (Overview of questions answered)

Standard INT Dynamic Transfers

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

Standard INT Dynamic Transfers

Feasibility Study on Load Flow and Short Circuit Project

Network Code on Operational Security. User s Group System Operations 06/11/2013

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS)

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper

NET T RANSFER TRANSFER CAPACITY CAP ASSESSMENT

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

Standard Development Timeline

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

Contacts. CEDEC Marc Malbrancke, Coordinator CEDEC WG Network Code

Network Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements. Final VERSION

BRS (BUSINESS REQUIREMENT SPECIFICATION)

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

Cybersecurity. Quality. security LED-Modul. basis. Comments by the electrical industry on the EU Cybersecurity Act. manufacturer s declaration

Introduction to transmission network characteristics - technical features. Slobodan Markovic Danka Todorovic EKC Tirana,

Response to Draft Guidelines of Good Practice on Electricity Grid Connection and Access (E08-ENM-09-03)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

WHERE THE DIGITAL TRANSFORMATION OF THE EUROPEAN ELECTRICITY SYSTEM STARTS:

ENTSO-E working to fulfill the 3 rd Package

Seminar on African Electrical Interconnection. Module 1. The feasibility of Regional Electricity Cooperation and Integration

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14

DRIVING REGIONAL COOPERATION FORWARD: FROM PROJECT TO POLICY AND BACK BOELL STIFTUNG 26 APRIL 2016, BRUSSELS

STCP22-1 Issue 003 Production of Models for GB System Planning

Final Determination: Criteria for Assessing Material Inter- Network Impact of Transmission Augmentations

Motorola Mobility Binding Corporate Rules (BCRs)

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

We appreciate your feedback

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Task Force Code System Dynamic Issues for the synchronous zone of Continental Europe

Open Access Transmission Tariff of Southern Companies

MOD Transmission Reliability Margin Implementation Document

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

REGIONAL COOPERATION AND GOVERNANCE IN THE ELECTRICITY SECTOR

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

ACTIVE NETWORK MANAGEMENT FACILITATING THE CONNECTION OF DISTRIBUTED GENERATION AND ENHANCING SECURITY OF SUPPLY IN DENSE URBAN DISTRIBUTION NETWORKS

Explanatory document concerning the Nordic TSOs proposal for establishment of fallback procedures in accordance with Article 44 of the Commission

IMPLEMENTATION GUIDE

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor

EU Harmonisation of Maintenance Publications at Interconnection Points 13/11/2015

Project Consideration of Commission Directives in Order No. 693

ETNO Reflection Document on the EC Proposal for a Directive on Network and Information Security (NIS Directive)

Day Ahead Fallback proposal Explanatory note

Data Protection and Privacy Policy PORTOBAY GROUP Version I

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

Business Requirements Specification For the. Network Code

MIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION

Explanatory document concerning the Nordic TSOs proposal for establishment of fallback procedures in accordance with Article 44 of the Commission

FNM Expansion Training Webinar

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference

Standards Authorization Request Form

TRULY INDEPENDENT CYBER SECURITY SPECIALISTS. Cyber Major

IMPLEMENTATION GUIDELINE FOR NETWORK CODE Demand Connection

Google Cloud & the General Data Protection Regulation (GDPR)

EDISON S COMMENTS ON ERGEG PUBLIC CONSULTATION ON PILOT FRAMEWORK GUIDELINES ON ELECTRICITY GRID CONNECTION

Explanatory document to the coordinated redispatching and countertrading methodology for Capacity Calculation Region Hansa in accordance with Article

TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER

The future role of DSOs in the context of the Clean Energy for All Europeans package

USE CASE 13 ADAPTIVE TRANSMISSION LINE PROTECTION

Power System Interconnection and Energy Security

Electricity Market Integration 2.0 in Central and South East Europe Potential benefits: markets and institutions

This report was prepared by the Information Commissioner s Office, United Kingdom (hereafter UK ICO ).

CGM and Energy Data Architecture a TSO Perspective

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Draft Applicant Guidebook, v3

LORAIN-MEDINA RURAL ELECTRIC COOPERATIVE, INC. NORTH CENTRAL ELECTRIC COOPERATIVE, INC.

Please let us know if you have any questions regarding this Policy either by to or by telephone

ENTSOG update and view on Germany

Policy and regulatory framework: what are the next challenges to tackle?

Project Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives

Policy drivers and regulatory framework to roll out the Smart Grid deployment. Dr. Manuel Sánchez European Commission, DG ENERGY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs)

Regulating and pricing network access

Elia Grid International Your expert in power system solutions

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Reliability Coordinator Procedure

Telecom Italia response. to the BEREC public consultation on

Transcription:

PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS October 2001 1/13

Table of contents 1 INTRODUCTION... 4 2 GENERAL GUIDELINES... 5 3 BASE CASE CONSTRUCTION... 6 3.1 NETWORK MODEL... 6 3.1 INPUT DATA... 6 4 GUIDELINES FOR LOAD FLOW CALCULATIONS... 7 4.1 CROSS-BORDER EXCHANGES SIMULATION... 7 5 TRANSMISSION RELIABILITY MARGIN... 9 5.1 TRM EVALUATION... 9 5.2 TRM FIGURE COMPUTATION... 10 6 UNCERTAINTIES IN TTC COMPUTATION... 10 7 TREATMENT OF DIFFERENT RESULTS AMONG TSOS... 10 7.1 DIFFERENCES CONCERNING TECHNICAL ASPECTS... 11 7.2 DIFFERENCES CONCERNING LEGAL ASPECTS... 11 7.3 REFERENCES:... 12 Appendix 1 : Scheme of A to B NTC assessment when TSO A runs calculations... 13 October 2001 2/13

SUMMARY The European Transmission System Operators Association (ETSO) has issued common definitions of cross-border transmission capacities for international exchanges of electricity within the Internal Market of Electricity of Europe (IEM) [1]. They offer an harmonised basis to assess the Net Transfer Capacities among interconnected countries, suitable for allocating commercial exchanges to market actors. The NTC assessments are performed by the TSOs through load flow calculations. This document summarises the main guidelines that ETSO proposes to be applied by each concerned TSO during this process. It provides a harmonised framework and ensures that calculated values relay on comparable principles and practices resulting in an improvement of the consistency of cross-border transmission capacity calculations. TSOs are responsible for calculating cross-border transmission capacities, as they have always to guarantee the secure operation in their networks. This task is performed by the TSOs on the basis of the national Grid Codes and/or additional guidelines issued by National Authorities or Regulators. The proposed guidelines for cross-border transmission capacities assessments include the following main aspects: - The calculations are based always upon the best available input data coming from the best estimates. Each TSO is responsible to provide for its own network area the necessary input data sets. - The load flow calculations are performed using a real network representation as wide as possible. - The TSOs exchange the input data sets in order to start from the same scenarios (base cases). To be realistic the base cases have to rely on historical recorded data (snapshots of network conditions in the past), adapted in order to take into account the foreseeable electric system changes. - Several possibilities exist on how to simulate the power exchanges between two areas. The choice has to be done by each TSO. He will also take into consideration the security constraints and the transmission reliability margin. The aim is always to reach the most realistic results. - The needs of transparency regarding the exchange of technical input data and assumptions as well as of co-operation in order to agree the relevant studied scenarios are outlined. ETSO publishes twice a year indicative and non-binding NTC-values on its website in order to provide a general European overview. TSOs are responsible for calculating and publishing net and available cross-border transmission capacities more frequently, as often as requested by national rules, market actors or allocation mechanisms. The principles described in this document will form a basis also for these assessments. October 2001 3/13

1 INTRODUCTION ETSO has issued a set of definitions of cross-border transmission capacities for international exchanges of electricity within the Internal Market of Electricity of Europe (IEM) [1] that gives a harmonised instrument for the TSOs to manage the electricity transactions over their networks. The definitions are applicable for the planning and as well as for the allocation phases for different time frames, from year ahead to day-ahead. The most important definitions are the Net Transfer Capacities (NTC) and the Available Transfer Capacities (ATC). Both values are important for market participants to anticipate and plan their cross-border business and to participate in the different capacity allocation processes. ETSO has thus decided to publish twice a year in its Intranet system (www.etsonet.org) a table Indicative Values for Net Transfer Capacities (NTCs) in Europe [2]. TSOs publish more frequently information on transfer capacities, i.e. as a basis for the capacity allocations at their respective borders. The proposed procedures described in this document aim at ensuring as much as possible consistency of NTC assessments by TSOs all through the IEM. They detail how to calculate the NTC values in Europe. The procedure follows the principle of providing the best information to market participants considering the present state of the art in this matter in constant progress in the whole world. The following procedure is therefore related to the experience of the TSOs in this field up to now and to the resulting practice recommended at present within ETSO members considering methodological, technical and organisational possibilities. It will be updated and revised as much as necessary to take into account any future progress or to overcome any unforeseen difficulty that may occur in its implementation. NTCs are calculated by couples of neighbouring areas 1 for all commercially significant directions. In case of stronger electrical interdependencies in addition to values between two areas/countries TSOs may provide further information by calculating cross-border transmission capacities between one area and a group of areas/countries 2. ATC s are worked out from NTC values through allocation mechanisms that are out of the scope of this paper that is entirely dedicated to the assessment of the maximum cross-border transmission capacity values. The value of using European wide the harmonised ETSO-definitions of cross-border transmission capacities will only become effective for the market if the assessment procedures are as well harmonised in the necessary degree. The procedures described in this document are therefore one important element for the well functioning electricity market in Europe. 1 2 Neighbouring areas (often but not necessarily neighbouring countries) means that the networks of the respective TSOs having a common interconnected electrical border An aggregation of two or more areas. October 2001 4/13

2 GENERAL GUIDELINES Cross-border transmission capacity assessments are performed through load flow calculations. The main prerequisites are: - A suitable network model that allows determining the influences of the neighbouring areas. - Estimated generation and load patterns to simulate cross-border exchanges (base case). - A procedure to harmonise and to agree the input data among the concerned TSOs - Guidelines to perform the simulations of cross-border exchanges in a most realistic and understandable way. The responsibilities for cross-border transmission capacity assessments rely on the TSOs. According to national Grid Codes or to national regulatory frameworks TSOs are bound legally to operate the transmission networks, always respecting operational security, to monitor its network conditions and cope with congestions. Often the TSOs have the task to implement and to execute capacity allocations as well. Therefore the subsidiarity principle is applied in some step during the cross-border transmission capacity assessment process. Each concerned TSO is thus responsible to provide the necessary input data for the load flow calculations for its network: - Relevant network model and topology - Technical network data - Estimated generation and load patterns - Technical and operational limits The capacity assessments are based on common data sets, the so-called commonly agreed base cases. They have been until now established by TSOs or TSO-organisations like NORDEL and UCTE. NORDEL and UCTE are currently issuing at least twice a year a European load flow forecast for winter and summer peak hours. Additional snapshots of load flow situations may be provided if requested. In order to reach a sufficient level of consistency and harmonisation the TSOs organisations will provide interconnected network base cases. The TSOs will treat all data as confidential in accordance with the Code of Conduct established within ETSO The assessment procedure shall guarantee that each NTC value is reachable without compromising the security of the European electrical network. The TTC/NTC-assessments are performed for each pair of electrical adjacent countries. In case of strong interdependencies among different groups of countries (zones), calculations between these zones and the neighboring countries will be performed. It has to be borne in mind that in these cases the pairwise computed TTC/NTC values can not all be reached simultaneously without compromising system security. October 2001 5/13

3 BASE CASE CONSTRUCTION As outlined in the general guidelines, cross-border transmission capacity calculations require a set of data, common for all IEM countries. This set of data, called base case, includes a network model and input data describing load and generation patterns forecast and network topology at the studied time frame. The TSOs or a TSO organisation would provide the harmonisation of the TSO s individual inputs in order to set up the common data sets in due time. 3.1 NETWORK MODEL The network model should as far as possible contain a full representation of the network elements. It can be split in several geographical parts: One for the NORDEL area, one for Continental European countries synchronously interconnected network (first and second synchronous area of UCTE) and one for each of the countries connected by DC links (Great Britain, Greece, Ireland). The studied area has to be as wide as possible to allow an accurate comprehension of physical flows distribution on tie-lines resulting from international exchanges since some important part of the power flowing from one area to another can circulate through third countries depending on the interconnection. For instance, the Continental European base case part corresponds to the interconnected European network file provided yearly by UCTE. The effect of DC links with other part of IEM, is represented through injection or sinks at the relevant nodes. The calculation area (i.e.: the subset of the network model) for NTC assessment between two neighbouring countries, or zones, will be determined case by case following the above principles. Each partner can ask for an extension of the calculation area if necessary. 3.1 INPUT DATA Load-flow calculations have to be performed using an AC load flow model. For cross-border transmission capacity assessments for each time frame being considered the following input data are needed: - The thermal ratings of network elements as well as the electrical parameters. Thermal ratings shall be addressed in Amps, not in MW. According to the time frame studied, the corresponding seasonal values of thermal ratings are to be used. - The maximum and minimum output power values for the generating units being included into the network model. - The intended network topology at the time frame considered. The generation pattern by the means of the net injection at each node at the time frame considered. - The load pattern by the means of the net sink at each node at the time frame considered. - The common set of programs of cross-border transactions and the net balances of each TSO area at the time frame considered. The common set of cross-border transactions considered in the base case (BCE) relates to the best forecast for exchanges at the time frame considered. October 2001 6/13

- The maximum power expected available at the time frame considered. Each TSO commits itself to provide always the best estimated available input data for its own area, reflecting as much as possible realistic scenarios, previously agreed within its country or, with reference to the observed reality, being the best possible assumption and according to their experience and knowledge of the national market behaviour and of the availability of primary energy sources. The base case can be built up starting from: - Real observed operation situations - Forecasts. While the observed operation situations offer a true scenario of the electrical system behaviour, forecasts can give a better database because they include the expertise of each TSO about the expected behaviour of generation and load in its own country and the knowledge about the scheduled maintenance works on the transmission network/generators. These two alternative views on base case construction may be combined in the following way. The base case would be built starting from a real observed situation (snapshots of the power system at selected scenarios). Then each TSO will update the information regarding his system taking into account foreseeable differences about: - Load level, according to the demand forecasts over the time frame being analysed - Generation pattern based on forecasts of primary energy sources (i.e.: hydro reserves, fuels availability ); - Network and generation planned or forced (long lasting) outages. No definite rules may be set up to perform these tasks that can only be carried out according to the best practices of each TSO. Then it is left to subsidiarity the specific procedure that each TSO uses to modify the starting base case provided that these modifications are consistent at control area level (i.e. real generation limits/possibilities) and at the control block level (i.e. base case exchanges). However each TSO has to explain the nature and extent of any modification performed on the starting base case when sending to the other partners the results of modifications which shall be integrated into the common base case used for NTC computations. 4 GUIDELINES FOR LOAD FLOW CALCULATIONS 4.1 CROSS-BORDER EXCHANGES SIMULATION In order to determine the cross-border transmission limit between two neighbouring countries or zones, cross-border exchanges are gradually increased while maintaining the loads in the whole system unchanged until security limits are reached. Starting from the common base case exchanges, the additional exchange is performed through an increase of generation on the exporting side and an equivalent decrease of generation on the importing side. This generation shift is to be made stepwise until a network constraint is violated. The generation increase/decrease has to be performed according to some predefined criteria. The general criteria as well as any exceptions are to be known by the TSOs, involved in the calculation of a given cross border capacities. Some possible ways to distribute the generation increase/decrease in a given control area or zone over the different generating sets in this area are the following: October 2001 7/13

- Proportional increase/decrease: For example, the factor which distributes the generation increase/decrease in a given control area over the different generators in this area could be the ratio of base case schedule of each generator to the total of internal generation scheduled and involved in the shift. - Increase/decrease according to previously observed behaviour of generators. For example, the factor which distributes the generation increase/decrease in a given control area could take into account the usual response pattern of generation to different system loads. - Increase/decrease according to a well-known merit order: Whenever economic dispatch is applied the increase/decrease of generation shall be applied according to the merit order. The shift is to be performed taking into account the technical operation constraints of each generator and its technical limits (maximum/minimum power, optimal use of a power plant, water or fuel available). The choice among different shift possibilities or even a combination of shifting strategies is left to the responsibility of each TSO but has to be explained and communicated to the other TSOs involved in computing a given cross border capacity. The party who is making the calculations is responsible at least for the contingency analysis in its transmission system and cross-border tie lines including some well known contingencies in the neighboring system, which influence the security of its own system. 4.2 LIMITATION DUE TO SECURITY CONSTRAINTS The cross-border exchanges increase/decrease goes on until security rules are violated in the network and the interconnection tie-lines of the TSO performing the calculation or inside another country at least regarding the respect of thermal ratings of network elements. Security problems can result in thermal, voltage, or stability limitations that are to be defined by the country which performs the calculation, and must be coherent with the rules published in its grid code. If the constraint occurs within the control area of the country that runs the calculation, first it shall be checked if the congestion is in real operation condition effective or if it could be relieved, e. g. by corrective measures, without reducing the electric system security level. If the constraint remains, then the limit is directly effective. If the constraint occurs in another country, its effectiveness has to be confirmed by the TSO in which network the congestion takes place, before the limit is considered as effective (see diagram in appendix). Thus, the TSO running calculations has to: 1) Notify other involved TSO 2) Have some discussions about the physical reality of this constraint, 3) Take it into account in its security analysis only if the involved TSO agrees on its consistence. In other words, to have a NTC value limited by a security constraint within another TSO s grid implies an explicit agreement with this latter TSO on the reality of this constraint. Once all constraints are recognised by both partners, they have to be taken into account. The last value of additional exchange that does not involve any security problem forms the value E. It represents the extra amount of power over the base case that can be exchanged continuously from one country to another while ensuring the safe operation of both interconnected electricity systems. This value, added to the initial transaction value October 2001 8/13

BCE taken in account between the concerned countries or zones, gives the total transfer capacity (TTC) between these countries or zones: TTC = BCE + E = NTC + TRM Where: - TRM is the transmission reliability margin defined in the following paragraph. - NTC is the net transfer capacity. If the whole physical generation shift between the two concerned countries or zones according to their really available generation is reached and no security rules breaching has occurred, no realistic limitation to the cross-border transmission capacity for the base case studied is found. If this is the case, the NTC between these two countries would take the meaning of a realistic attainable value (NTC equals to the shift of available generation). 5 TRANSMISSION RELIABILITY MARGIN Some cross-border transmission capacity margin related to the deviations occurring both in real operation state and in the capacity assessment process has to be considered. This capacity refers particularly to the unintended deviations due to power-frequency (secondary) control (Ur) and frequency (primary) control, needs for common reserve and emergency exchanges to cope with unbalanced situations (U E ). These sources of uncertainty are used to calculate the TRM factor for a given direction of transfer. Each TSO calculates its own TRM values according to the need of ensuring its network operation security. Finally, each pair of neighbouring countries should agree on a unique value for the TRM factor for a given direction of transfer. In case of disagreement, each TSO will maintain its final value of TRM in operation according to the safeguard of its own electric system for which it is the solely responsible. 5.1 TRM EVALUATION TRM is determined by unintended load-frequency regulation deviations and needs for common reserve and emergency exchanges. Load-frequency control margin can be estimated through statistical analysis of past data using the estimated variance of a one or more years deviation historical series. These time series have to be previously filtered to avoid the bias which may be introduced by large deviations occurring as the result of sudden load imbalances (like the ones induced by generator trips), that have to be considered in the emergency exchanges. The assumption that the result is independent of the volume of programmed exchanges seems to be reasonable because these deviations are rather dependent on the quality of the spinning reserve acting for load frequency control in each control area considered. As far as common reserve and emergency exchanges are concerned, their amount is to be previously evaluated and agreed by the involved countries; in some cases, they have the form of reserve contracts or mutual assistance agreement. October 2001 9/13

5.2 TRM FIGURE COMPUTATION Let U r be the considered margin for the regulation deviations. If U r is a statistical estimate it can be expressed in terms of the respective pdf variance estimates σ 2 r. Then U r = K σ r being a choice depending on the probability threshold considered (usually K=3). Let U E be the margin for common reserve and emergency exchanges which is known beforehand. To combine margins into a TRM value several rules might be applicable: i. To add margins (worst case combination): TRM i = U r + U E ii. To take the maximum of the retained uncertainty margins (i.e. assuming that these cannot happen simultaneously) plus the common reserve margin: TRM ii = max (U r, U E ) Obviously TRM ii < TRM i. The choice of the appropriate criteria to combine the two terms of TRM remains a matter of subsidiarity. However the combination criteria as well as the retained values for U r and U E are part of the information exchanged amongst the TSOs involved in the computation of a given cross border capacities. 6 UNCERTAINTIES IN TTC COMPUTATION During the process of calculating TTC the physical model inaccuracies, i. e. in data collection and measurements, as well as uncertainties arising from unintended deviations of physical flows due to the load-frequency-regulation and emergency exchanges are taken into consideration [1]. Uncertainties regarding the bases case exchanges BCE, which means uncertainties on a scenario regarding the expected behavior of market participants, may translate into more substantial uncertainties about cross-border transmission capacities. TTC and NTC assessments are based always on calculations taking into account specific assumptions regarding base case exchange scenarios. Uncertainties in base case scenarios may be considered when allocating NTC in different time frames. Separately from the assessment of cross-border transmission capacities and the calculation of the transmission reliability margin TRM, TSOs may decide whether additional margins have to be considered, i.e. in cases of strong uncertainties in generation scenarios. I. e. in a yearly planning procedure the uncertainties on the scenarios may be quite substantial allowing only a partial allocation of NTC in advance. When getting closer to the operating horizon these uncertainties may diminish gradually with the consequence that further parts of cross-border transmission capacities may be allocated to market participants. Generally subsequent calculations of TTC and NTC at different time frames (yearly, monthly, weekly, day ahead) will be necessary to allocate at each moment the maximum value of cross-border transmission capacities. Further remarks concerning the allocation phases are given in [1]. 7 TREATMENT OF DIFFERENT RESULTS AMONG TSOS UCTE recommends the N-1 security deterministic criterion to perform the contingency effects assessment. This criterion should be adopted by all TSOs who are members of UCTE. October 2001 10/13

In the case that national Grid Codes and/or additional guidelines issued by National Authorities or Regulators oblige TSOs to different security criteria, the concerned TSOs have to apply them; so decisions in this matter are taken according to the principle of subsidiarity. Before applying the TTC assessment procedure, each TSO has to declare which are the security rules (security criteria and security thresholds) adopted, the worst outage case it has to take into account in order to safeguard its own system security and the technical constraints limiting the power shift to assess the NTC value for a given direction. Each TSO is responsible to decide on its own network topology and the way it intends to perform the generation shift from its side, that is to be declared previously. In case of agreement on the previous items, the two countries (or zones) A and B who calculate capacities should come to the same or very similar result. 7.1 DIFFERENCES CONCERNING TECHNICAL ASPECTS If the involved TSOs reach different TTC results, no deviation - concerning the interpretation of the security rules, the network contingency or topology, or the exchange scenarios from those previously declared - will be accepted. The only difference may come from the way to perform its own generation shift while searching the TTC limit. Indeed, according to the principle that each TSO may have its own appreciation about the most probable generation move in its country. In these cases the concerned TSOs have to exchange the information allowing them to recognise that the base case is the same, to identify the units in which the generation shift has been performed, the contingency or set of contingencies which set the computed TTC values, the security limit which has been breached and the corresponding network element. This information is the minimum required to start a discussion leading to a possible agreement. If during the calculation process, deep changes somewhere in the whole interconnected electric system studied occur, the concerned TSO can ask for taking them into account. 7.2 DIFFERENCES CONCERNING LEGAL ASPECTS If different results come from legal matter, due to national law obligations, national Grid Codes regulations and/or decision issued by National Authorities or Regulators the concerned TSOs have to decide according to the principle of subsidiarity. If no final agreement is reached, both NTC values calculated on the same border will be taken for the ETSO publication. October 2001 11/13

REFERENCES [1] Definitions of Transfer Capacities in liberalised Electricity Markets, ETSO, March 2001 [2] Indicative values for Net Transfer Capacities (NTC) in Europe, winter and summer, working day, peak hours, ETSO-publication twice a year [3] NTC an ATC in the IEM, information for user, ETSO, March 2000 October 2001 12/13

Appendix 1 Scheme of A to B NTC assessment when TSO A runs calculations ETSO BASE CASE COMMONLY AGREED BASE CASE LOAD FLOW BCE = base case exchange from A to B INCREASE of A GENERATION DECREASE of B GENERATION one step YES Security rule breached in A? NO YES Confirmation by other TSO? YES Security rule breached elsewhere? NO Generation limit reached in A? NO Last Value = E TRM assessment NTC = BCE + E - TRM October 2001 13/13