Application of Transmission Line Surge Arresters to Reduce Switching Overvoltages

Similar documents
1278 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 21, NO. 3, JULY 2006

Transformer core modeling for magnetizing inrush current investigation.

High and Medium Voltage Substation Design, Testing and Maintenance. KSA, Jeddah, Holiday Inn Jeddah Gateway Hotel.

Collector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co.

Simulation of Series Compensated Transmission Lines Protected with Mov Abdolamir Nekoubin

Back-to-Back Energization of a 60kV Cable Network - Inrush Currents Phenomenon Silva, Filipe Miguel Faria da; Bak, Claus Leth; Hansen, M.

Main Components of a Static Var Compensator (SVC)

LIGHTNING DANGEROUS CAUSED BY POTENTIAL DIFFERENCES INSIDE STRUCTURES

Application of overvoltage protection to the Peruvian Power System

Reduction of Switching Surges in Large Industrial Motors Connected by Cables

Study on Power Transformer Inrush Current

Precise Algorithm for Nonlinear Elements in Large-Scale Real-Time Simulator. Olivier TREMBLAY*, Martin FECTEAU, Pascal PRUD HOMME Hydro-Québec CANADA

CIGRE STUDY COMMITTEE C4 BRANDON PETERSON SOUTH AFRICAN MEMBER SC C4 7 AUGUST 2017

Automatic simulation of IED measurements for substation data integration studies

Transient Stability Improvement of Long Transmission Line System by Using SVC

Today, utilities are focusing on improving or maintaining

Distributor Information Bulletin Distributed Generation (Codes, Publications & Standards)

Evaluation of different solutions of faulted phase earthing technique for an earth fault current limitation

Purpose of High Voltage Circuit Switchers

Zahra Moravej. Senior member, IEEE Ph.D., IIT, Varanasi, 2000

TRANSFORMER TAP CHANGER USING IEC61850

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS

Design and Implementation of IEC in Communication-Assisted Protection Strategy

ALLTEC PROTECTION PYRAMID TM FOR PHOTOVOLTAIC SOLAR FIELD

Improvements in Transmission Switching Reliability using SF 6 Interrupter Technology

Manual for overvoltage protection for LED luminaires rev 1

Overvoltage Protection Devices

Implementing the protection and control of future DC Grids

Development of an Intelligent Station HMI in IEC Based Substation

MONITORING ABSTRACT KEYWORDS. TRANSFORMERS MAGAZINE Special Edition: Bushings, 2017

Technical Requirements for High-voltage DC Power Feeding Interfaces of ICT equipment

On Line Diagnostics for Condition Based and Reliability Centered Maintenance

Mitigate Inrush Current of transformer with Prefluxing Technique

Limiting Sympathetic Interaction Between Transformers Caused by Inrush Transients

ABB static var compensator stabilizes Namibian grid voltage

OPTIMAL COORDINATION OF OVERCURRENT RELAYS IN AN INTERCONNECTED POWER SYSTEM

AN ADVANCED APPROACH TO IDENTIFY INRUSH CURRENT AND HARMONICS USING ARTIFICIAL INTELLIGENCE FOR POWER SYSTEM PROTECTION

C C CIRCUIT-BREAKERS Moulded-case (MCCB), general. 1. Introduction. 2. General description

ABB Surge Arresters Contribution to Power Quality Line Side Protection

Distribution Static Var Compensators and Static Synchronous Compensators for Suppressing Voltage Fluctuation

Increasing Security of Remote Control of Circuit Breakers from Intentional Destructive Impacts

Application of the Lightning Location System for the selection of Lightning Protection of Overhead Medium Voltage Lines using Long Flashover Arresters

SYMPATHETIC INRUSH PHENOMENA IN PARALLEL AND SERIES CONNECTED TRANSFORMERS USING PSCAD

Digital Simulator Applications in Protective Relay Testing

Final Report. Mini Project TET Group nr 7 - Project nr 4. Students: Hans Lavoll Halvorson, NTNU

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

Hardware Implementation of Overvoltage and Under voltage Protection

A Novel Digital Relay Model Based on SIMULINK and Its Validation Based on Expert System

Analysis of End-to-End Delay Characteristics among Various Packet Sizes in Modern Substation Communication Systems based on IEC 61850

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB

Externally Gapped Line Arresters Smart Solution for Stable Power Supply

Development of a Real-Time Simulator Using EMTP-ATP Foreign models for Testing Relays

Externally Gapped Line Arresters Smart Solution for Stable Power Supply

Automation of Distribution Grid with FLISR using ZigBee Communication

ekorrps MULTIFUNCTIONAL PROTECTION UNIT CONFIGURATION AND GENERAL CHARACTERISTICS LIB

Coordination of Surge protection devices

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online):

Short-Circuit Calculation Methods

ATV310H075N4E variable speed drive ATV kw - 1 hp V - 3 phase

International Journal of Engineering Trends and Applications (IJETA) Volume 4 Issue 2, Mar-Apr 2017

THE INTEGRATED TESTING SOLUTION

Generation Interconnection Feasibility Study Report

Switching Control Sentinel (SCS) TM For all ABB independent pole operated circuit breakers

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

Study Committee SC A3

An Artificial Intelligence Based Approach for Bus Bar Differential Protection Faults Analysis in Distribution Systems

Your partner in energy solutions. Systems Division. Automation & services. (Formerly Pauwels Canada Inc)

Automated Analysis of Digital Relay Data Based on Expert System

ELG4125: System Protection

Micro physical simulation system of electric power systems

Development trends in Substation Design

TECHNICAL SPECIFICATION

Real Time Requirements and Closed-Loop Testing of Wide Area Protection and Control Schemes

Improving Real-time Fault Analysis and Validating Relay Operations to Prevent or Mitigate Cascading Blackouts

IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems

Extensive Study of Earthing Grids

Overvoltage Protection Devices

High-Voltage Link for Transmitting Discrete Commands in Relay Protection, Automation and Control Systems

An Inrush Current Elimination Technique for Line-Interactive UPS Systems During Switching-in of an Auxiliary Load While Feeding a Main Load

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE

ABL8WPS24400 regulated SMPS - 3-phase V - 24 V - 40 A

A Genetic Based Fault Location Algorithm for Transmission Lines

Suppressing Transients: A New Approach

Distance Protection Of Transmission Line

ATV310HU30N4E variable speed drive ATV310-3 kw - 4 hp V - 3 phase

Teaching Protective Relaying Design and Application Using New Modeling and Simulation Tools

Substation to substation (ss2ss) GOOSE exchange for critical relay operations

A Hybrid Intelligent System for Fault Detection in Power Systems

ATV12P075M3 variable speed drive ATV kW - 1hp V - 3ph - on base plate

ATV340D75N4E variable speed drive - 75kW- 400V - 3 phases - ATV340 Ethernet

Data Warehouse and Analysis Agents

Simulation of FACTS Devices as Reactive Power Compensators and Voltage Controllers in the Smart Grid

Network Configuration Document Selection for New Substations Framework

ATV12P037F1 variable speed drive ATV kW hp V - 1ph - on base plate

INCREASING electrical network interconnection is

ATV340D18N4E variable speed drive - 18kW- 400V - 3 phases - ATV340 Ethernet

Residual overvoltage relay

Quantum Chargers Enhanced AC Line Transient Immunity

Power Transmission Division Link between power generation and distribution

Integrating Electromagnetic Transient Simulation with Other Design Tools

Transcription:

Application of Transmission Line Surge Arresters to Reduce Switching Overvoltages H. Seyedi, M. Sanaye-Pasand, M. R. Dadashzadeh Abstract-- In this paper switching overvoltages of an actual transmission line are studied. Simulations are executed using Electro Magnetic Transients Program. Analyses are performed in two stages. In the first stage the conventional system without any arresters along the transmission line is modeled in EMTP. The results of simulations show that in this case switching overvoltages exceed the Protection Level of the transmission line insulators. Therefore the overvoltages must be reduced. In the second stage one set of surge arresters are installed along the transmission line and its impact on the switching overvoltages are analyzed in different situations. Keywords: Switching overvoltages, transmission line surge arresters, temporary overvoltages. I. INTRODUCTION witching overvoltages are among the important factors to S be considered in the design of transmission lines and their overvoltage protective devices, particularly in the systems with rated voltages above 300 kv [1]. Traditionally, switching overvoltages of the transmission line are calculated in different locations of the transmission line. Afterwards, maximum switching overvoltage is compared with the Protection Level of the transmission line. If the maximum overvoltage exceeds Protection Level then it must somehow be reduced. The traditional method to reduce switching overvoltages is to install pre-insertion resistors in parallel with transmission line circuit breakers. Most companies do not use this method anymore, because in addition to its cost and complex technology its failure rate is sometimes unacceptably high. Consequently using this method, reliability of the whole system is decreased [2]. Another method to reduce switching overvoltages is controlled switching with switch synch relays [3]. The last important method, introduced in this paper, to reduce switching overvoltages is the installation of surge arresters in one or two suitable locations along the transmission line. In [4] this method has been analyzed using surge arresters at two locations along the transmission line each for switching at one end of the line. The method proposed in this paper is to use only one set of surge arresters and then looking for the optimum point of installation by switching from both ends. Simulations of this paper are executed using EMTP, and the studied transmission line is Isfahan power plant to Soormag 400 kv, 200 km line, one transmission line from the Iranian national grid. II. SYSTEM MODELING The system modeled in EMTP is shown in Fig.1. Switching studies are executed on the Isfahan power plant to soormag transmission line by switching from both ends of the line. For the transmission lines JMARTI model is used which is a frequency dependent model and thus suitable for switching transients studies [5]. All surge arresters are modeled appropriately according to their V-I characteristics. III. PRINCIPLES OF ANALYSIS Diagram of the simulated network in EMTP is shown in Fig. 1. The modeled system includes some part of the national grid and the line under study. Principles of analysis to study switching overvoltages of the transmission line are mainly according to [1]. For each transmission line shown in Fig.1 the line circuit breaker at one end is closed while the circuit breaker at the other end of the line is open and the maximum overvoltage is obtained. The network is divided into internal and external sections. The former comprises of the network from switching point to the next substation through all possible roots. For this section JMARTI model is used for modeling transmission lines. The latter is modeled by thevenin equivalent, parameters of which are obtained by simulation of the Iranian grid in CYMFAULT software. These parameters are listed in TableI. Thevenin equivalent point Chelstn FooladM TABLE I THEVENIN EQUIVALENTS OF EXTERNAL NETWORK R +(Ω) 7.52 1.6 X +(Ω) 70.08 19.68 R 0(Ω) 0.48 3.84 X 0(Ω) 20.32 24.96 H. Seyedi is with power system studies group, Moshanir Power engineering Consultants, Iran. He is also a Ph.D. student at the Electrical and Computer Engineering Dept., University of Tehran, (e-mail: h.seyedi@moshanir.com). M. Sanaye Pasand and M. R. Dadashzadeh are with the Electrical and Computer Engineering Dept., University of Tehran, (e-mail: msanaye@ut.ac.ir) Tiran Karun3 IsfhanPP Soormag 0.64 0.64 0.8 7.2 8.32 6.72 13.28 76.64 3.2 0.64 0.48 1.76 13.44 4.8 17.28 36.8 Presented at the International Conference on Power Systems Transients (IPST 05) in Montreal, Canada on June 19-23, 2005 Paper No. IPST05-082

Foolad M Soormag Chelstn Tiran Karun3 IsfhanPP Fig. 1. Diagram of the simulated network using EMTP Foolad M Chelstn TIRAN I I I KARUN3 IsfhanPP Fig. 2. Diagram of the network for switching at Isfahan power plant substation B8 B7 B6 B5 B4 B3 B2 B1 B0 Soormag I I I Fig. 3. Diagram of the network for switching at Soormag substation

Fig. 2 shows the network used for switching of Isfahan power plant to Soormag transmission line from Isfahan power plant substation side. Fig. 3 shows the network used for switching of the line from Soormag substation side. The following points are also included in the modeling: 1. Three phase autoreclosure is modeled in switching in order that closing operation occurs at the instant of maximum source voltage and maximum trapped charge with opposite polarities. This way the worst case is obtained. 2. In the simulation results 1 p.u. is equal to: 420 * 2 = 342.928 kv (1) 3 3. Switching operations are performed statistically using the statistic switch of EMTP. For each case 100 switching operations at instants of t are performed. t is a random variable with uniform distribution. Mean and Standard Deviation of t are according to (2). Mean= 0.05s SD = 0.005s (2) 4. According to [1] the environmental conditions for the maximum overvoltage are obtained using (3). V = K K a = e K V a s ov H m 8150 (3) In this equation H is altitude above sea level, K s is a safety factor usually equal to 1.05 and m is derived from the curve shown in Fig. 4. 1.3 1.2 1.1 1 0.9 m 0.8 0.7 0.6 0.5 0.4 M=1.137-0.0004755*MaxV+4.24e-8*MaxV 2 0.3 0 200 400 600 800 1000 1200 1400 1600 1800 2000 Maximum Switching Voltage Fig. 4. Derivation of parameter m IV. SIMULATION RESULTS A. Simulations Without Surge Arresters Along the Line In the first stage of the studies, simulations are executed without surge arresters along the transmission line. A thorough analysis is performed. Some results are shown in Table II. The overvoltages indicated in table II and other parts of the paper are 2% statistical overvoltages. TABLE II MAXIMUM SWITCHING OVERVOLTAGES IN STAGE A KaKsV0V (kv) V0V(kV) Surge arrester type 1137 929.3 EXLIM336 1176 963.69 EXLIM360 1202 987.02 EXLIM372 The surge arresters used in Table II are those installed at the ends of the transmission line. As the results of this table show, if the Protection Level of the line is considered 1050 kv (420*2.5) then maximum overvoltage exceeds the Protection Level. Therefore some efforts to reduce these overvoltages are necessary. B. Simulations With Surge Arresters Along the Line According to the extensive amount of simulations performed in this research work if a surge arrester is installed at a point along the transmission line, it results in a local minimum for the switching overvoltage at that point. Moreover, there always exist two maxima at both sides of the local minimum, one of which is absolute maximum while the other is local. The trend is to reduce the absolute maximum. The absolute maximum reaches a minimum level when the two maxima at either side of the arrester are equal. The point of arrester installation satisfying this condition is the optimum installation point for switching at one end. For switching at the other end, there is another optimum installation point which is not necessarily the same as to the previous point. The final optimum is a point between these two sub-optimums. If the maximum switching overvoltage for the final optimum point is below the Protection Level of the line it is acceptable. Otherwise, another method like two sets of surge arresters or controlled switching by switchsynch relays must be used. C. Simulation Results for U r =336 kv Simulation studies are performed using surge arresters installed at one location along the transmission line. The rated voltages for the surge arresters used in the 400 kv national grid are 336, 360 and 372 kv. In this stage rated voltage of all arresters is considered 336 kv. According to the results obtained, in this case the suboptimum point for switching at Isfahan power plant substation is located at 142 km from the switching point and the suboptimum point for switching at Soormag substation is located at 75 km from the switching point. Thus the final optimum point for this case is chosen at 137.5 km from Isfahan power plant substation. Fig. 5 shows voltage profiles for switching at both Isfahan

and Soormag substations when surge arresters are installed at 142 km from Isfahan power plant substation. K a and K s factors introduced in section III have been considered in this figure as well as all other voltage profiles shown in the paper. The maximum switching overvoltage increases Protection Level of the line which is considered as 1050 kv, when the line is switched from Soormag substation. Fig. 6 shows voltage profiles for switching at both Isfahan and Soormag substations when surge arresters are installed at 75 km from Soormag substation. As shown in this figure, the maximum overvoltage approaches almost 1150 kv for switching at Isfahan substation. Fig. 7 shows voltage profiles for switching at both substations when surge arresters are installed at 137.5 km from Isfahan power plant substation, i.e. the final selected optimum point. As shown in Fig. 7, the maximum switching overvoltage is below Protection Level of 1050 kv. A more flat voltage profile on the transmission line is obtained using the surge arresters installed at this point. kv. In this case extensive amount of simulation studies were performed. It was found that the sub-optimum point for switching at Isfahan power plant substation is located at 143 km from the switching point and the sub-optimum point for switching at Soormag substation is located at 80 km from the switching point. Thus, in this case the final optimum point is chosen at 131.5 km from the Isfahan power plant substation. Fig.7. Voltage profiles for surge arresters installed at optimum point Fig. 8 shows voltage profiles when surge arresters are installed at 143 km from Isfahan power plant substation for switching at both Isfahan and Soormag substations. Fig. 9 shows voltage profiles when surge arresters are installed at 80 km from Soormag substation for switching at both substations. Fig. 5. Voltage profiles for surge arresters at 142 km from Isfahan power plant Fig. 8. Voltage profiles for surge arresters at 143 km from Isfahan power plant Fig. 6. Voltage profiles for surge arresters at 75 km from Soormag substation D. Simulation Results for U r =360 kv In this stage rated voltage of all arresters is considered 360

130.5 km from Isfahan power plant substation. Fig. 11 shows voltage profiles for switching at both Isfahan and Soormag substations when surge arresters are installed at 143 km from Isfahan power plant substation. Fig. 12 shows voltage profiles when surge arresters are installed at 82 km from Soormag substation. Fig. 13 shows voltage profiles when surge arresters are installed at 130.5 km from Isfahan power plant substation, i.e. the selected optimum point. Comparing Fig. 13 with Figs. 11 and 12, it is found that a more flat voltage profile is obtained by installing the surge arresters at the optimum point. However, a higher voltage profile is obtained in this case in comparison to the voltage profiles obtained in subsections C and D for them the arrester voltage was U r =336 and U r =360 kv, respectively. As shown in Fig. 13 this design is acceptable only if Protection Level of the line is above 1175 kv. Fig. 9. Voltage profiles for surge arresters at 80 km from Soormag Fig. 10 shows voltage profiles when surge arresters are installed at 131.5 km from Isfahan power plant substation, i.e. the final selected optimum point, for switching at both Isfahan and Soormag substations. Fig. 11. Voltage profiles for surge arresters at 143 km from Isfahan power plant Fig. 10. Voltage profiles for surge arresters at optimum point As shown in Fig. 10 this design is acceptable only if Protection Level of the line is designed to be above 1070 kv. Comparing Fig. 10 with Fig.7, it is found that a higher voltage profile is obtained in this case. This is due to the fact that a higher rated voltage of is selected for the arresters used in this case. E. Simulation Results for U r =372 kv In this stage rated voltage of all arresters is selected 372 kv. In this case the sub-optimum point for switching at Isfahan power plant substation is located at 143 km from the switching point and the sub-optimum point for switching at Soormag substation is located at 82 km from the switching point. Thus in this case the final optimum point is located at Fig. 12. Voltage profiles for surge arresters at 82 km from Soormag

[6] J. Martinez, R. Natarjan and E. Camm, "Comparison of statistical switching results using Gaussian, uniform and systematic switching approaches," in Proc. 2000 IEEE Power Engineering Society Summer Meeting, vol.2, pp. 884-889. [7] H. W. Dommel, Electromagnetic Transients Program, Reference Manual ( EMTP Theory Book ), Bonnovile Power Administration, Portland 1986. VII. BIOGRAPHIES Seyedi, H. is with power system studies group, Moshanir Power Engineering Consultants, Iran. He graduated in electrical engineering in 2001 and received his M.Sc in 2003, university of Tehran, Iran. He is a Ph.D. student at the Electrical and Computer Engineering Dept., University of Tehran, (e-mail: h.seyedi@moshanir.com). Fig. 13. Voltage profiles for surge arresters at optimum point V. CONCLUSIONS Sanaye-Pasand, M. graduated in electrical engineering in 1988, Tehran, Iran, and received his M.Sc. and Ph.D. in 1994 and 1998, Calgary, Canada, respectively. His areas of interest include power system analysis and control, digital protective, relays and application of AI. He is at present an assistant professor at University of Tehran. Mohammad Reza Dadashzadeh was born in Iran. He obtained B.S. and M.S. degrees in electrical engineering from Tehran University. He is currently working in Moshanir Power Engineering Consultants, and serves as a system study senior engineer. His areas of interest include power system analysis, control, and digital protection. In this paper switching overvoltages of an actual transmission line were studied in two stages. In the first stage, simulations were performed without surge arresters along the transmission line and the necessity of reducing the overvoltages was verified. In the second stage, a set of surge arresters was installed along the transmission line at an optimum point, which is a point between two sub-optimum points for switching at both ends of the line. The effect of surge arresters in reducing switching overvoltages is verified for different types of surge arresters. It was found that this method could provide a more flat voltage profile along the transmission line. Using this method could eliminate the necessity of installing pre-insertion resistors in parallel with transmission line circuit breakers and its associated problems. If SWIL of the line is low, two sets of surge arresters at two locations along the transmission line could be installed. The optimum installation points for these two arrester sets should be determined. VI. REFERENCES [1] Insulation Coordinations, part 2, IEC Standard 71-2-1996. [2] "Controlled Switching Application Guide," ABB, 2004. [3] K. Froehlich,C. Hoelzl, M.Stanek, A. C. Crarvalho, W. Hofbauer, P. Hoegg, B. L. Avent, D.F. Peelo and J. H. Sawada, "Controlled switching on shunt reactor compensated transmission lines Part I: closing control device development," IEEE Trans. Power Delivery, vol. 12, pp. 734-740, Apr. 1997. [4] L. Stenstrom and M. Mobedjina, "Limitation of switching overvoltages by use of transmission line surge arresters," in Proc. 1998 CIGRE SC 33 International Conf., Zagreb. [5] J. R. Marti, "Accurate modeling of frequency dependent transmission lines in electromagnetic transient simulations," IEEE Trans. Power Apparatus and systems, vol. PAS-101, Jan. 1982.