ETS: An Efficient Task Scheduling Algorithm for Grid Computing

Similar documents
An Improved min - min Algorithm for Job Scheduling using Ant Colony Optimization

QoS Guided Min-Mean Task Scheduling Algorithm for Scheduling Dr.G.K.Kamalam

Resource Allocation with improved Min Min Algorithm

Static Batch Mode Heuristic Algorithm for Mapping Independent Tasks in Computational Grid

An Efficient Job Scheduling Algorithm using Min- Min and Ant Colony Concept for Grid Computing

Simple Scheduling Algorithm with Load Balancing for Grid Computing

ADAPTIVE AND DYNAMIC LOAD BALANCING METHODOLOGIES FOR DISTRIBUTED ENVIRONMENT

Effective Load Balancing in Grid Environment

Task Scheduling Techniques for Minimizing Energy Consumption and Response Time in Cloud Computing

Two-Level Dynamic Load Balancing Algorithm Using Load Thresholds and Pairwise Immigration

Multiphase Scalable Grid Scheduler Based on Multi-QoS Using Min-Min Heuristic

An Improved Task Scheduling Algorithm based on Max-min for Cloud Computing

Computer Science and Engineering, Swami Vivekanand Institute of Engineering and Technology, India

A Heuristic Based Load Balancing Algorithm

Modified Hierarchical Load Balancing Algorithm for Scheduling in Grid Computing

Open Access LoBa-Min-Min-SPA: Grid Resources Scheduling Algorithm Based on Load Balance Using SPA

A STUDY OF BNP PARALLEL TASK SCHEDULING ALGORITHMS METRIC S FOR DISTRIBUTED DATABASE SYSTEM Manik Sharma 1, Dr. Gurdev Singh 2 and Harsimran Kaur 3

A New Checkpoint Approach for Fault Tolerance in Grid Computing

1 Gokuldev S, 2 Valarmathi M 1 Associate Professor, 2 PG Scholar

Australian Journal of Basic and Applied Sciences. Resource Fitness Task Scheduling Algorithm for Scheduling Tasks on Heterogeneous Grid Environment

FAULT-TOLERANCE AWARE MULTI OBJECTIVE SCHEDULING ALGORITHM FOR TASK SCHEDULING IN COMPUTATIONAL GRID

Incorporating Data Movement into Grid Task Scheduling

Experimental Model for Load Balancing in Cloud Computing Using Equally Spread Current Execution Load Algorithm

Clustering based Max-Min Scheduling in Cloud Environment

GRID SIMULATION FOR DYNAMIC LOAD BALANCING

A Partial Critical Path Based Approach for Grid Workflow Scheduling

Framework for Preventing Deadlock : A Resource Co-allocation Issue in Grid Environment

Keywords: Cloud, Load balancing, Servers, Nodes, Resources

Resource CoAllocation for Scheduling Tasks with Dependencies, in Grid

Skewness-Based Min-Min Max-Min Heuristic for Grid Task Scheduling

Scalable Computing: Practice and Experience Volume 8, Number 3, pp

LOAD BALANCING ALGORITHM TO IMPROVE RESPONSE TIME ON CLOUD COMPUTING

Tasks Scheduling using Ant Colony Optimization

Grid Scheduling Strategy using GA (GSSGA)

Efficient Task Scheduling Algorithms for Cloud Computing Environment

Load Balancing Algorithm over a Distributed Cloud Network

CLOUD WORKFLOW SCHEDULING BASED ON STANDARD DEVIATION OF PREDICTIVE RESOURCE AVAILABILITY

Various Strategies of Load Balancing Techniques and Challenges in Distributed Systems

Double Threshold Based Load Balancing Approach by Using VM Migration for the Cloud Computing Environment

Performance Analysis of Min-Min, Max-Min and Artificial Bee Colony Load Balancing Algorithms in Cloud Computing.

International Journal of Current Trends in Engineering & Technology Volume: 02, Issue: 01 (JAN-FAB 2016)

A Fault Tolerant Scheduler with Dynamic Replication in Desktop Grid Environment

D. Suresh Kumar, E. George Dharma Prakash Raj

Multi-Criteria Strategy for Job Scheduling and Resource Load Balancing in Cloud Computing Environment

A Process Scheduling Algorithm Based on Threshold for the Cloud Computing Environment

Efficient Task Scheduling using Mobile Grid

APPLICATION LEVEL SCHEDULING (APPLES) IN GRID WITH QUALITY OF SERVICE (QOS)

A QoS Load Balancing Scheduling Algorithm in Cloud Environment

Scheduling Tasks in Grid Computing Environments

A Data-Aware Resource Broker for Data Grids

HETEROGENEOUS COMPUTING

Associate Professor, Aditya Engineering College, Surampalem, India 3, 4. Department of CSE, Adikavi Nannaya University, Rajahmundry, India

Efficient Dynamic Heuristic Task Scheduling Algorithm for Commercial Cloud Environment

Particle Swarm Optimization Approach with Parameter-wise Hill-climbing Heuristic for Task Allocation of Workflow Applications on the Cloud

Enhanced Round Robin Technique with Variant Time Quantum for Task Scheduling In Grid Computing

A new efficient Virtual Machine load balancing Algorithm for a cloud computing environment

Dynamic Resource Allocation on Virtual Machines

Modified Application Centric Load Balancing Algorithm for Satellitebased

LOW AND HIGH LEVEL HYBRIDIZATION OF ANT COLONY SYSTEM AND GENETIC ALGORITHM FOR JOB SCHEDULING IN GRID COMPUTING

Dept of Comp. Sci & IT,Jamal Mohamed College(Autonomous), Trichirappalli, TN, India.

Scheduling of Independent Tasks in Cloud Computing Using Modified Genetic Algorithm (FUZZY LOGIC)

Proffering a new Method for Grid Computing Resource Discovery based on Economic Criteria using Ant Colony Algorithm

A Time-To-Live Based Reservation Algorithm on Fully Decentralized Resource Discovery in Grid Computing

Mapping Heuristics in Heterogeneous Computing

A Comparative Study of Various Computing Environments-Cluster, Grid and Cloud

Optimization of Makespan and Mean Flow Time for Job Shop Scheduling Problem FT06 Using ACO

A Framework for User Priority Guidance based Scheduling for Load Balancing in Cloud Computing

Efficient Technique for Allocation of Processing Elements to Virtual Machines in Cloud Environment

A Comparative Study of Various Scheduling Algorithms in Cloud Computing

CLOUD COMPUTING & ITS LOAD BALANCING SCENARIO

Hybrid Improved Max Min Ant Algorithm for Load Balancing in Cloud

An Efficient Resource Management and Scheduling Technique for Fault Tolerance in Grid Computing

Prof. Darshika Lothe Assistant Professor, Imperial College of Engineering & Research, Pune, Maharashtra

Analysis of Various Load Balancing Techniques in Cloud Computing: A Review

PriDynSim: A Simulator for Dynamic Priority Based I/O Scheduling for Cloud Applications

Various Load Balancing Algorithms in cloud Computing

Resolving Load Balancing Issue of Grid Computing through Dynamic Approach

A PRO-ACTIVE FAULT TOLERANT DEADLINE HIT COUNT BASED SCHEDULING IN COMPUTATIONAL GRID

An Integration of Round Robin with Shortest Job First Algorithm for Cloud Computing Environment

Load Balancing Algorithms in Cloud Computing: A Comparative Study

Workflow Scheduling Using Heuristics Based Ant Colony Optimization

Task Scheduling Using Probabilistic Ant Colony Heuristics

DYNAMIC RESOURCE MANGEMENT USING ADAPTIVE WORKFLOW SCHEDULING AND NETWORK SECURITY VIRTUALIZATION TECHNOLOGY (NSVT) IN GRID COMPUTING

Task Scheduling Algorithms with Multiple Factor in Cloud Computing Environment

A New Heuristic Approach:Min-mean Algorithm For Scheduling Meta-Tasks On Heterogeneous Computing Systems

PERFOMANCE EVALUATION OF RESOURCE SCHEDULING TECHNIQUES IN CLUSTER COMPUTING

Job-Oriented Monitoring of Clusters

Grid Scheduler. Grid Information Service. Local Resource Manager L l Resource Manager. Single CPU (Time Shared Allocation) (Space Shared Allocation)

Load balancing with Modify Approach Ranjan Kumar Mondal 1, Enakshmi Nandi 2, Payel Ray 3, Debabrata Sarddar 4

New Optimal Load Allocation for Scheduling Divisible Data Grid Applications

Implementation of Dynamic Level Scheduling Algorithm using Genetic Operators

Iteration Reduction K Means Clustering Algorithm

Global Journal of Engineering Science and Research Management

Hybrid Bee Ant Colony Algorithm for Effective Load Balancing And Job Scheduling In Cloud Computing

LOAD BALANCING IN CLOUD COMPUTING USING A NOVEL MINIMUM MAKESPAN ALGORITHM

The Study of Genetic Algorithm-based Task Scheduling for Cloud Computing

A New Intelligent Method in Brokers to Improve Resource Recovery Methods in Grid Computing Network

Load Balancing in Cloud Computing Priya Bag 1 Rakesh Patel 2 Vivek Yadav 3

Reconfigurable Architectures in Collaborative Grid Computing: An Approach

A Resource Discovery Algorithm in Mobile Grid Computing Based on IP-Paging Scheme

Transcription:

Advances in Computational Sciences and Technology ISSN 0973-6107 Volume 10, Number 10 (2017) pp. 2911-2925 Research India Publications http://www.ripublication.com ETS: An Efficient Task Scheduling Algorithm for Grid Computing S. Vaaheedha Kfatheen* and Dr. A. Marimuthu Research Scholar, Bharathiar University, Coimbatore, Tamil Nadu, India. Associate Professor, P.G & Research Department of C.S, Government Arts College, Coimbatore, TN, India. Abstract Grid computing is a form of distributed computing to solve large-scale scientific problems. Scheduling is found to be a rigorous area of research in grid computing. Scheduling is defined to be a decision process that could assign relatively large number of tasks to the available resources in order to execute the tasks in a short span of time and thereof achieving effective and efficient performance. A mark of better performance may be said as effective utilization of resources by balancing the load across them and less makespan. However, the heterogeneity and dynamic nature of grid makes the development of the scheduling algorithms very difficult. Task scheduling is one of the NP-Complete problems and it becomes the focus of many researchers. The main goal of task scheduling is to minimize the makespan and optimal utilization of resources. In this paper, a new task scheduling algorithm named as ETS (An Efficient Task Scheduling Algorithm for Grid Computing) has been proposed. The proposed ETS algorithm is found to manage load among the available resources and result in better schedules than the compared algorithm. The proposed algorithm has been tested using GridSim Simulation toolkit [1] and various sets of outcomes show that the proposed ETS algorithm produces the minimum makespan and the load on the resources is optimally balanced. Keywords: Grid Computing, Scheduling, NP-Complete Problem, Makespan, Resource Utilization.

2912 S. Vaaheedha Kfatheen and Dr. A. Marimuthu 1. INTRODUCTION Grid computing is a high performance computational system which consists of a large number of geographically distributed heterogeneous resources, linked through the Internet. According to Foster and Kesselman [2], Grid computing has both hardware and software infrastructure which offer a cheap, distributable, coordinated, and reliable access to powerful computational capabilities. Scheduling[3] is a very important problem in grid computing, to map the tasks on to the collection of heterogeneous resources available in a massive geographic spread. There are different stages of grid scheduling. First stage is resource discovery, which provides a list of available resources. Stage two is resource allocation, which involves the selection of possible resources and the mapping of tasks to the resources. This resource allocation stage is an NP-Complete problem [4]. The third stage includes task execution. Many heuristic algorithms have been devised to solve the task scheduling problem. Two important metrics for measuring the efficiency of the task scheduling are makespan and resource utilization. Makespan [5] is the time when grid computing system completes its latest task. An efficient scheduling algorithm is one which minimizes the idle processing time and maximizes the resource utilization. In this paper, a new task scheduling algorithm for static mapping is presented to achieve better performance. The proposed algorithm has been tested using GridSim Simulation toolkit and the simulation results show that the proposed ETS algorithm produces minimal makespan; also load across the resources is optimally balanced. 2. PROBLEM DEFINITION In this paper, the problem of scheduling M tasks on N resources is focused. The main goal of task scheduling algorithm is to allocate efficiently the task to the appropriate resource and hence the makespan is minimized. The concept of ETC (Expected Time to Compute) matrix introduced by Shoukat et al., is used to formulate the problem [6]. Each row of ETC matrix contains the estimated execution times of a given task on each resource and each column of the ETC Matrix consists of estimated execution time of a given resource for each task. To solve the problem mathematically, let Ti be the number of independent tasks, where i=1,2,3 m and Mj be the number of resources, where j=1,2,3, n and this can be represented as M x N matrix format. Eij is the Expected Time to Complete a task i (Ti) on resource j (Rj).

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2913 In order to minimize the makespan and maximize the resource utilization, the tasks of a parallel application have to be efficiently scheduled on the available grid resources. Using ETC matrix model, the proposed algorithm is developed under a set of assumptions: ETC Matrix of size m x n, where m represents the number of tasks and n represents the number of resources. Tasks have no priorities associated with them. Tasks have no deadlines among them. Independent tasks have to be allocated on to the available resources. Scheduling process can be performed in batch mode fashion. The availability of grid resources and the number of tasks to be executed are known in prior. 3. RELATED WORKS Many heuristic algorithms have been proposed by various researchers for static task scheduling in grid environment to minimize the makespan [7,8,9,10,11,12]. Due to the dynamic nature and heterogeneity of grid, most of the well known scheduling algorithms are not suitable for large scale systems. Resource utilization aims to increase the busy time of resources. In this proposed algorithm, we focus on resources that are not properly utilized. To start with, the algorithm identifies the resources that are highly loaded and tries to share the load to other less loaded resources or idle resources. Then, the algorithm removes the task from heavily loaded resource and allocates to leisurely loaded resources. Hence, parallelism in resource utilization is considerably increased and makespan could be reduced; also load on resources may get balanced. Doreen D et al., [13] have proposed an efficient Set Pair Analysis (SPA) based task scheduling algorithm named Double Min-Min algorithm which performs scheduling to enhance system performance in Hypercubic P2P Grid (HPGRID). The simulation result shows that the SPA based Double Min-Min scheduling minimizes the makespan by balancing the load and guarantees high system performance. Kamalam et al.,[14] have presented a new scheduling algorithm named Min-Mean heuristic scheduling algorithm for static mapping to achieve better performance. The proposed algorithm reschedules the Min-Min produced schedule by considering the mean makespan of all the resources. The algorithm deviates in producing a better schedule than the Min-Min algorithm when the task heterogeneity increases. Sameer Singh et al., [7] have presented two heuristic algorithms namely QoS Guided Weighted Mean Time-Min(QWMTM) and QoS Guided Weighted Mean Time Min- Min Max-Min Selective(QWMTS). Both algorithms are found to be proposed for

2914 S. Vaaheedha Kfatheen and Dr. A. Marimuthu batch mode independent tasks scheduling. The network bandwidth is taken as QoS parameter. Sadegh Nejazadeh et al., [15] have presented a new method to schedule the tasks in computational grids. The goal of the scheduler is to minimize the makespan and execution time. This algorithm and various existing algorithms have been tested using the benchmark simulation model for distributed heterogeneous computing systems. Gaurang Patel et al., [16] have presented a two-phase load balancing policy for the multi-cluster grid environment where, computational resources are dispersed in different administrative domains or clusters which are located in different local area networks. This algorithm is based on Min-Min Strategy and it uses rescheduling parameter to make use unutilized resources in an efficient way. The Model A. Assumptions The problem considered in this paper consists of scheduling a set of m tasks that need to be processed by a set of n resources. The assumptions of the proposed model are described as follows, 1. Processing time of each task is known in advance. 2. All tasks are available for processing at time zero. 3. Each resource can perform only one task at a time. 4. Once the task has begun on a resource, it must not be interrupted. B. Mathematical Model The notations and description used in this mathematical model. Assume Notations m n Cij Aj T Sij Xij Description Number of Task Number of Resource Completion time of assigning task i on Resource j Number of units of processing that resource j has available Total Completion Time Starting time of task i on resource j Boolean Function Xij = {0, if the i th task is not assigned to the j th resource 1, otherwise}

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2915 Minimum completion time can be achieved by m n Min(T) Z = Cij Xij (1) i=1 j=1 subject to m>0, n>0 and Xij=1 Xij= 1 (2) j Ni Cij >= 0; Xij {0,1} (3) m n Cij Xij <= Aj (4) i=1 j=1 Sij + Cij <= Xij. L (5) With the reference to constraint (1), minimizing the completion time is main objective. Constraint (2) make sure that task i is assigned to only one resource. In constraint (3), the value of Cij ensures that the completion time of task i on resource j is executed or not. Constraint (4) shows that all the tasks have been allocated. If task i is not assigned to resource j, the constraint (5) set the starting and completion times of it on resource j equal to zero. 4. METHODOLOGY OF ETS ALGORITHM The methodology of Task scheduling algorithm (ETS) is presented in Figure 1. The algorithm starts by identifying the tasks of minimum execution time and the respective grid resources in order to assign the task with minimum execution time on to the resource to execute first. On considering the ETC values, if the number of the smaller tasks is more than the number of the larger tasks then this schedule may not be

2916 S. Vaaheedha Kfatheen and Dr. A. Marimuthu suitable to schedule them appropriately and therefore the makespan may result in a relatively large value. Then makespan, Completion Time (CT) of all the resources, Average Resource Utilization (ARU), Mean square deviation (d), Maximum Loaded Resource (MLR), and Tasks assigned to MLR are identified. Load balancing is an important factor to be focussed seriously as it keeps all the resources active; which means that all the resources should get utilized and hence task execution would be done in parallel fashion. When parallelism is found more then, it can be said that execution of tasks is done at a faster rate. Scheduling heuristics like Min-Min and Max-Min schedules different tasks to different resources efficiently and it is found that load balancing among the resources is not maintain properly. Therefore, it is focussed to incorporate load balancing in ETS algorithm. Min-Min algorithm is found to select tasks with minimum execution time for allocation and due to this approach; tasks with longer execution times remain unassigned even when there is availability of resources. This causes the resources to remain in idle state for considerable period of times. The tasks are allocated to the grid resources with respect to minimum execution time. The load balancing method is applied on the previous allocation in order to assign certain task to other resources rather than continuing in the same resource as per the previous step. For the reallocation process, the ETS algorithm is designed to identify the Next Earliest Completion Time (NECT) of all tasks in MLR and the corresponding resources. Remove the first task from MLR and allocate it to the corresponding resource which produces the NECT. Then, calculate the makspan and mean square deviation (d); if the makespan is found less than the previous allocation then the tasks are reassigned on to the resource that are identified. If the value of d is closely related to one, then the optimal load balanced is achieved. Otherwise the previous step is repeated until it finds a minimum makespan and optimal load balance. ALGORITHM 1 1. Start ETS ALGORITHM 2. For all tasks Ti in meta-task Mv 3. For all resources Rj 4. Cij=Ej+rj 5. Do until all tasks in Mv are mapped 6. Assign task Tk to the resource Rl that gives the i. earliest completion time

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2917 7. Delete task Tk from Mv ii. Calculate the makespan, Aru, Ru, d. 8. Find MLR and their tasks 9. NECT(Ti) = Min (ETij) where Rj not already scheduled for Ti 10. Assign task Tk to the resource Rj 11. Verify the makespan with previous makespan & d 1 12. If MKi+1 > MKi & d value is tightly closed to 1 then stop the process iii. Else proceed to step 8 13. Stop where, Aru Average Resource Utilization Ru Resource Utilization MLR - Maximum Loaded Resource NECT Next Earliest Completion Time d Mean Square Deviation

2918 S. Vaaheedha Kfatheen and Dr. A. Marimuthu Start ETC Matrix Calculate the makespan, CT of All task, d, MLR & resource n j produce it Identifies the tasks m i in MLR Find NECT of task m i & resource n j in MLR If CT(m i) < makespan Yes Reassigning task m i to n j No Find next task m i in MLR No If d 1? Yes Loads are balanced Stop Figure 1. Methodology of ETS Algorithm Here, the results are evaluated on the basis of following performance metrics. Makespan: - Makespan is the measure of the throughput of the Grid. It can be calculated using equation (1). A better scheduling algorithm produces less makespan values. Makespan = Max (CT (ti, mj)) CTij = RTj+ETij (1)

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2919 Where, CT completion time of resources, ETij expected execution time of task i on resource j, RTj ready time of resource j. Average resource utilization rate: Average resource utilization rate of all resources can be computed as follows Aru = m j=1 Ru j m (2) Here Ruj is the resource utilization rate of resource rj and m is the total number of resources. Resource Utilization Percentage: Resource utilization Percentage of all resources can be computed as follows, n Ruj= Where ti has been executed on rj (tfi tsj) (3) i=1 Here, tfi is the finish time and tsi is the start time of task ti on resource rj. Load Balancing Level: The mean square deviation of ru is given by, d = m i=1 (Aru ru j) 2 m (4) 5. EXPERIMENTAL RESULTS Assume the grid environment with three resources. The execution times of the resources are shown in Table 1. Eight tasks T0 through T7 are in the meta-task Mv and the grid manager is supposed to schedule all the tasks within Mv on three resources R0, R1 and R2.

2920 S. Vaaheedha Kfatheen and Dr. A. Marimuthu Table 1: Sample ETC Matrix ETC Tasks Resource R0 R1 R2 T0 3 4 7 T1 4 5 8 T2 9 3 10 T3 4 6 5 T4 7 19 18 T5 6 3 5 T6 6 7 4 T7 7 5 2 Figure 2. Execution of Min-Min Algorithm Figure 2 shows the schedules of Min-Min algorithm. The completion time of R0 is 18 and R1, R2 results 6. From the above implementation, it is found that R0 is highly loaded and the remaining resources such as R1 & R2 are loaded less.

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2921 18 Ma ke sp an - sec T4 T3 7 4 6 6 T1 4 T5 3 T7 T0 T2 T6 T2 3 3 4 R0 R1 R2 Resources Figure 3: Chart of Schedules produced by Min-Min Algorithm Figure 3 depicts the schedules of Min-Min algorithm on executing the tasks described in Table 1. Figure 4. Execution of ETS algorithm The execution time of proposed ETS algorithm is shown in Figure 4. The proposed algorithm ETS achieves a minimum makespan of 11 when compared to Min-Min Heuristic.

2922 S. Vaaheedha Kfatheen and Dr. A. Marimuthu Make span Sec 11 11 7 10 T7 2 T5 T4 3 T6 4 T2 3 4 4 T3 5 T1 T0 R0 R1 R2 Resources Figure 5. Gantt chart using ETS Algorithm for the Sample ETC Matrix Figure 5 shows the schedules of proposed ETS algorithm which utilizes all the available resources. The following values are observed from the proposed, ETS algorithm: Aru = 10.67 ruj = { R0 = 11, R1 = 10, R2 = 11} d = (0.9 1 ) The mean square deviation is 0.9, which is more or less equal to 1.0. It is clearly observed from the results that the ETS algorithm utilizes all the resources effectively and produces less makespan value than Min-Min algorithm. Improvement Percentage of Performance (IPP) can be calculated as: IPP = (MSMM MSETS / MSMM) * 100 (7) where MSMM is the Makespan of Min-Min and MSETS is the makespan of ETS. Table 2 Problem Set Min-Min ETS Improvement Percentage of ETS 4x2 9 7 22.22 8x3 18 11 38.89 20x10 42 35 16.67 30x10 68 60 11.77 50x10 96 84 12.5

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2923 Table 2 shows the various makespan for various ETC with various range of tasks and resources. It also shows the Improvement percentage of ETS algorithm compared to Min-Min heuristic. M a k e s p a n ( s e c. ) 120 100 80 60 40 20 0 Makespan Min-Min ETS 4x2 8x3 20x10 30x10 50x10 Problem Set Figure 6. Makespan R U e t s i o l u i r z c a e t i o n 60% 50% 40% 30% 20% 10% 0% Resource Utilization R0 R1 R2 Resources Min-Min ETS Figure 7. Resource Utilization The graphical representation of the results between Min-Min and ETS in terms of makespan in Figure 6 and resource utilization ion in Figure 7 are the proof for the performance of the proposed ETS algorithm. 6. CONCLUSION AND FUTURE WORK Traditional existing heuristic algorithms like Min-Min and Max-Min are applicable in small scale distributed systems. When the number of the little task is greater than the

2924 S. Vaaheedha Kfatheen and Dr. A. Marimuthu number of the bulky task, the Min-Min algorithm cannot schedule tasks, appropriately, and the makespan of the system gets relatively large and it does not provide a load balanced schedule. To overcome these limitations, a new task scheduling algorithm, ETS, is proposed. The experimental results obtained by the proposed algorithm for various problem sets shows that it outperforms the existing scheduling algorithms. This study is only concerned with the number of the resources and task execution time. The study can be further extended by taking into account of machine heterogeneity and task heterogeneity. Also, applying the proposed algorithm on actual grid environment and considering the cost factor can be other open problem in this region. In future, research will be directed towards the factors such as CPU workload, communication delay and so on. REFERENCES [1] Rajkumar Buyya and M. Murshed, GridSim: a toolkit for the modeling and simulation of distributed resource management and scheduling for Grid Computing, CONCURRENCY AND COMPUTATION: PRACTICE AND EXPERIENCE Concurrency Computat.: Pract. Exper. 2002; 14:1175 1220 (DOI: 10.1002/cpe.710). [2] Ian Foster, Carl Kesselman, Steven Tuecke, The Anatomy of the Grid Enabling Scalable Virtual Organizations International Journal of Supercomputer Applications, 2001. [3] Siriluck Lorpunmanee, Mohd Noor Sap, Abdul Hanan Abdullah, and Chai Chompoo-inwai, An Ant Colony [4] Optimization for Dynamic Job Scheduling in Grid Environment, World Academy of Science, Engineering and Technology 29, pp. 314-321, 2007. [5] Garey, M. R., & Johnson, D. S. (1979). Computers and intractability: A guide to the theory of NP-completeness. Basingstoke: Macmillan Higher Education. [6] Florin Pop and Valentin Cristea. Intelligent strategies for dag scheduling optimization in grid environments. In Proceedingsof the 16th International Conference on Control Systems and Computer Science (CSCS16 07), May 22-25, Bucharest,Romania, Printech, ISBN 978-973-718-743-7, pages 98 103,2007. [7] H. Singh and A. Youssef, Mapping and scheduling heterogeneous task graphs using genetic algorithms, in 5th IEEE Heterogeneous Computing Workshop (HCW '96), (1996), pp. 86-97. [8] He. X, X-He Sun, and Laszewski. G.V, "QoS Guided Minmin Heuristic for Grid Task Scheduling," Journal of

ETS: An Efficient Task Scheduling Algorithm for Grid Computing 2925 [9] Computer Science and Technology, Vol. 18, pp. 442-451, 2003. [10] Sameer Singh Chauhan,R. Joshi. C, QoS Guided Heuristic Algorithms for Grid Task Scheduling, International [11] Journal of Computer Applications (0975 8887), pp 24-31, Volume 2, No.9, June 2010. [12] Dong. F, Luo. J, Gao. L and Ge. L, "A Grid Task Scheduling Algorithm Based on QoS Priority Grouping," [13] In the Proceedings of the Fifth International Conference on Grid and Cooperative Computing (GCC 06), IEEE, 2006. [14] Etminani.K, and Naghibzadeh. M, "A Min-min Max-min Selective Algorithm for Grid Task Scheduling," The Third IEEE/IFIP International Conference on Internet, Uzbekistan, 2007. [15] Ranganathan, K. and Foster, I., Decoupling Computation and Data Scheduling in Distributed Data Intensive [16] Applications, Proceedings of the 11th IEEE Symposium on High Performance Distributed Computing (HPDC-11), Edinburgh, Scotland, July 2002. [17] Ullah Munir. E, Li. J, and Shi. Sh, 2007. QoS Sufferage Heuristic for Independent Task Scheduling in Grid. [18] Information Technology Journal, 6 (8): 1166-1170. [19] Doreen Hephzibah Miriam. D and Easwarakumar. K.S, A Double Min Min Algorithm for Task Metascheduler on [20] Hypercubic P2P Grid Systems, IJCSI International Journal of Computer Science Issues, Vol. 7, Issue 4, No 5, July 2010. [21] Kamalam.G.K and Muralibhaskaran.V,, A New Heuristic Approach:Min- Mean Algorithm For Scheduling Meta- [22] Tasks On Heterogenous Computing Systems, IJCSNS International Journal of Computer Science and Network Security, VOL.10 No.1, January 2010. [23] Sadegh Nejatzadeh et. al., 2013, A New Heuristic Approach for Scheduling Independent Tasks on Grid Computing Systems, International Journal of Grid and Distributed Computing, 6: 97-106. [24] GaurangPatel, Rutvik Mehta, Upendra Bhoi, 2015, Enhanced Load Balanced Min-Min Algorithm for Static Meta Task Scheduling in Cloud Computing, 3 rd International Conference on Recent Trends in Computing 2015 (ICRTC - 2015) published by Elsevier.

2926 S. Vaaheedha Kfatheen and Dr. A. Marimuthu