USE CASE 14 CONTROLLED ISLANDING

Similar documents
USE CASE 13 ADAPTIVE TRANSMISSION LINE PROTECTION

USE CASE 5 PROTECTION ENGINEER CHANGES SETTINGS ACROSS A NETWORK

USE CASE 8 MAINTENANCE ENGINEER MONITORS HEALTH OF PRIMARY EQUIPMENT

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

Table of Issues and Directives Project Relay Loadability: Stable Power Swings

Real Time Monitoring of

Smart Grids, Telecontrol and the New Standards. Reliable and secure communication with zenon Process Gateway

Load Management of Industrial Facilities Electrical System Using Intelligent Supervision, Control and Monitoring Systems

Relion 630 series. Load-shedding controller PML630 High performing load-shedding solution for industrial and utility power networks

1 Description of Methodology for Volt / Var Optimization

Smart Distribution Technology

POWERMAX [ˈpou (ə)r ˈmaks] noun: a system designed to maintain stability

Substation SCADA Monitoring

Flexible High-Speed Load Shedding Using a Crosspoint Switch

IEEE PES Swiss Chapter Workshop: Microgrids Evolution and Integration in Modern Power Systems

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc.

SCADA and Central Applications An introduction

Implementation of Wide Area Monitoring System for interconnected power system in India

Applying Intelligent Fast Load Shed Using IEC GOOSE

Wide Area Monitoring and Control

Chapter 2 State Estimation and Visualization

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

C I R E D 22 nd International Conference on Electricity Distribution Stockholm, June 2013

SCADA Training - T&D Automation

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS

Use Case Task 1-?: Convert Low Side Load Rollover from EMS application to Multi-Section Line Model used by the Planning application(s)

p. 1 p. 9 p. 26 p. 56 p. 62 p. 68

Reviewing Smart Grid Standards for Protection, Control, and Monitoring Applications

EMS / DMS. DISTRIBUTION MANAGEMENT SYSTEM- Functional Description

Chapter 2 Communication for Control in Heterogeneous Power Supply

POWER SYSTEM SECURITY CONCEPTS

It is the job of the protection system equipment to recognize and remove the fault.

Solutions for transmission network management

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

Power Distribution Automation Solution Smart Grid Data Aggregation. Patrick Pipet IEA/ADEME Workshop XVII may 18th, 2011

Small Generator Interconnection System Impact Study Report. Completed For Q0047

AUTOMATION OF POWER DISTRIBUTION USING SCADA

(to be centred) Coordination of Protection and Automation in Future Networks

Blackstart Hardware-in-the-loop Relay Testing Platform

POWER GRID AUTOMATION. Pág.. n. RMU Automation

1.2 Function ID Brief Description Narrative... 2

Modular Smart Grid Power Systems Simulators (Utilities)

Standard Development Timeline

Achieving Smarter Grid Operation With On-Line DSA Technology

INTERCONNECTION FACILITIES STUDY REPORT

Robust Topology Determination Based on Additional Substation Data from IEDs

Micro Grid Architecture for Line Fault Detection and Isolation

CIM, PI AF and SISCO CIM Adapter Create New Application Opportunities for Utilities

The bridge between green energy and the power grid CM-UFD grid feeding monitoring relays with Modbus RTU

Towards a Resilient Information Architecture Platform for the Smart Grid: RIAPS

Adaptive Protection in Distribution power networks

Your Power Grid Your Conditions

Microgrids: Building Blocks of the Smart Grid Adaptive Protection Schemes for Microgrids

Advanced SIPS using PMU and SCADA data

Rationale for the Use of Local and Remote (Zone 3) Protective Relaying Backup Systems A Report On The Implications And Uses Of Zone 3 Relays

Iowa State University

AUTOMATED FAULT AND DISTURBANCE DATA ANALYSIS. Special Report for PS#2. Special Reporter: Mladen Kezunovic * U.S.A.

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

CASE STUDY : Transient Stability Simulation Package

Simulation of Power System Faults for Protection Performance Analysis -Case Studies of Tata Power

WAProtector Power System Wide Area Monitoring Protection and Control

On-Line Transient Stability Assessment Scoping Study

CIM in the Middle. Dora Nakafuji Lauren Gouveia Hawaiian Electric Company. Alan McMorran Susan Rudd Open Grid Systems

Automation of Distribution Grid with FLISR using ZigBee Communication

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models

COLLABORATE TO WIN. 03/31/2017 Digital Substation Turning IEC61850 features into benefits. Peter Rietmann, Program Manager Digital Substation NA

Training simulation models and architectures in power system operation and control

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

Shabnam Rukhsar Electrical Engineering Department, Anjuman College of Engineering and Technology.India

Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1

Feeder Hosting Capacity and Impacts of Distribution Connected Generation. NGN Tutorial. Prepared for GOTF October 22, 2017

Grid Interconnection of Renewable Generation

SDG&E s EPIC Demonstration Projects on Emerging Communication Standards. IEC Europe 2017 Conference. Frank Goodman, SDG&E EPIC Program Manager

APPENDIX B-2. TECHNICAL CONNECTION REQUIREMENTS for LOAD DELIVERY FACILITIES. and SMALL GENERATION FACILITIES

Lecture 5 Substation Automation Systems. Course map

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia

Standard Development Timeline

How smart can the grid really be?

Real Time Requirements and Closed-Loop Testing of Wide Area Protection and Control Schemes

empowering power system engineers

PUBLIC SERVICE OF NEW HAMPSHIRE. Technical Requirements for Non Utility Generation Interconnecting to the PSNH Distribution System

EPRI GIS Interest Group GIS Data Correction

The Application of a Redundant Load-Shedding System for Islanded Power Plants

Blackout 101. Dr. B. Don Russell Texas A&M University. Dr. Bruce Wollenberg University of Minnesota. Mr. John McDonald KEMA, Inc.

Standard EOP Disturbance Reporting

April Oracle Spatial User Conference

Intelligent Load Shedding Using TCP/IP for Smart Grids *

Hitachi s Smart Grid Solutions

Fortum SGEM Program Presentation of ongoing research activities

Busbar protection REB 670

Implementation of Dijkstra s Algorithm in a Dynamic Microgrid for Relay Hierarchy Detection

COGENERATION INTERCONNECTION REQUIREMENTS. Parallel Operation of Connecting Parties Generation

WHY GO DIGITAL? Evolving from Conventional to Intelligent Digital Substations. GE Grid Solutions. White Paper by: imagination at work

Glencoe Light and Power

ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER

PRC Coordination of Protection Systems for Performance During Faults

MONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS

REQUIREMENTS FOR CONNECTION OF EMBEDDED GENERATORS UP TO 5MW TO THE EVOENERGY NETWORK VERSION SM3201

MiCOM Agile P746. Grid Solutions. Key Benefits. Numerical Busbar Protection. A Combination of Speed, Security and Selectivity. About MiCOM P40 Agile

Transcription:

I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve the handling of electric power system disturbance and reduce their effect on sensitive customers. It requires information at the system level of the system configuration and the steady state of the system. A CIM model of the system is required for the definition of the points of separation of an island from the rest of the system. Generation and load information needs to be continuously provided in order to determine the need for load or generation shedding to establish a balance following the islanding. When a wide area system disturbance is detected and a decision for some preventive actions are made, the controlled islanding system will make a decision to reduce loads and increase or reduce generation in an area of the system followed by commands to trip breakers of transmission lines in order to form an island isolated from the rest of the system with a loadgeneration balance. This system can be applied at different levels of the system depending on the availability of power plants or distributed energy resources. The controlled islanding system will also need to be modeled both in CIM and in IEC 61850 (no such model exists today). This use case follows from the wide area protection definition through the analysis of the different possible modes of operation. The objective is to stress the 61850/CIM interface to discover aspects of the seams which exist between these two standards or to identify missing objects in both standards. The CIM and 61850 must both be used at least at both ends of the process for this use case to be of practical use. Use Case Detailed Narrative The experience from the August 2003 blackout showed that operation of some distance relays during the initial phases of the wide area disturbance resulted in the formation of islands that I-1

were able to reach a stable balance between load and generation thus limiting the effects of the disturbance and avoiding blackout in the area. Considering the large number of generators that tripped during the disturbance, it becomes clear that there are better ways to control the system in case of a wide area disturbance and keep in service as many generators as possible. Another factor that needs to be considered is the current practice to disconnect from the grid any non-utility generators in case of a system disturbance in some cases based on direct commands from the utility protection and control systems, in other based on local detection of the disturbance using frequency and voltage relays. The increasing use of wind turbines and other different distributed energy resources (DER) is another development that needs to be taken into account. The difference between controlled islanding and the conventional remedial action schemes is that it does not monitor the state of specific transmission lines and generating facilities, but looks at the system topology and the loads and generation in areas of the system. In some cases this concept can be implemented at the transmission system level, while in other it can be done locally at the substation level, all the way down to a distribution feeder. The system needs to continuously monitor the load-generation balance in a designated area and when it receives a signal from the upper level will send a command to trip the required breakers to form one or more islands. The system needs to determine based on the known topology and the state of different transmission lines and power transformers what are the points where switching may be required in order to form a balanced island. It continuously runs optimization procedures in order to select the size of the island and the isolation points. In case of detection of events that may lead to a wide area disturbance, the system sends signal for the formation of the islands to the pre-selected locations in the system. These signals are of two types: To create a balance between the load and generation before the isolation from the system To isolate the island from the system This is required to ensure that there will be no loss of generation in case that the created island has an unbalance between load and generation that may result in dynamic instability within it. The system requires bi-directional communications between multiple substations and power plants in the electric power system and the system data acquisition and control level. The operation of the controlled islanding system is based on the continuous monitoring of the state of the system and its individual components. This includes information related to either generation or load in different parts of the system, all the way down to the distribution feeders in substation that are part of the system. I-2

The topological model of the system, including each substation, is required at the system level in order to determine the load-generation balance, as well as the state of the different transmission lines and transformers for determination of the islanding strategy. The global system topology is updated every time when a change of state of a switching device is indicated from the available at the system level signals or reports. The configuration of the system is limited to the settings of the starting functions. The operation of the controlled islanding system can be described in the following steps: 1. Definition of starting functions 2. Configuration of the system based on topology and settings 3. Continuous monitoring of state of system elements (transmission lines and power transformers), loads and generators 4. Optimized selection of areas with load-generation balance 5. Selection of breakers to trip in case of emergency 6. Definition of actions to achieve true balance in case of emergency in selected areas 7. Check for operation of disturbance detection elements 8. Sending of commands to balance load-generation in a selected area emergency condition is detected) 9. Sending of commands to trip breakers to form islands emergency condition is detected) 10. Back to step 3 Each of the above steps imposes specific requirements for the harmonization between IEC 61850 and CIM. 1. Running dynamic stability studies for different system topologies and determining conditions that can detect the initial phase of a potential system disturbance. Determining starting criteria at the system level and at the execution levels based on the studies. Requires a complete system topology model, including also the generators and loads. The existing CIM models should support this. Requires also definition of functional elements for the starting functions. Some existing IEC 61850 logical nodes can be re-used and some new will need to be created. Harmonization between CIM and IEC 61850 will be required. 2. Selecting criteria to detect a system disturbance The functional elements defined in 1 above will be configured. I-3

3. Continuous monitoring of state of system elements (transmission lines and power transformers), loads and generators Harmonization of the measurements and status monitoring functional elements between CIM and IEC 61850 is required. 4. Optimized selection of areas with load-generation balance No harmonization required 5. Selection of breakers to trip in case of emergency No harmonization required 6. Definition of actions to achieve true balance in case of emergency in selected areas No changes required. 7. Check for operation of disturbance detection elements No changes required. 8. Sending of commands to balance load-generation in a selected area emergency condition is detected) The CIM model needs to be harmonized to be able to send commands for load-generation balance 9. Sending of commands to trip breakers to form islands emergency condition is detected) The CIM model needs to be harmonized to be able to control the breakers at the island formation points Harmonization Tasks Based on the analysis of the above use case, the following harmonization tasks have been identified: Development of controlled islanding starting functions object models for CIM and IEC 61850 Load and generation models required in IEC 61850 Harmonization of measurements and status monitoring/control models I-4

Business Rules and Assumptions ACTORS Actor Name Actor Type Actor Description (person, device, system etc.) Controlled Islanding Detects potential system disturbance and issues commands for controlled islanding Load monitor Device Monitors the load of a system area Generator monitor Device Monitors the output of a generator Load-shedding device Device Sheds load to balance the load-generation within an area before islanding Breaker control device Device Trips the breaker in order to form an island Element monitor Device Monitors the state of transmission line or power transformer CIM Model Server IED database Device database Contains the settings for each setting group for each device in the controlled islanding system Operator Person Performs system islanding studies and operation. STEP BY STEP ANALYSIS OF EACH SCENARIO Scenario Description Primary Scenario: Successful test Triggering Event Primary Actor Pre-Condition Post-Condition (Identify the name of the event that start the scenario) (Identify the actor whose point-of-view is primarily used to describe the steps) (Identify any pre-conditions or actor states necessary for the scenario to start) (Identify the post-conditions or significant results required to consider the scenario complete) is capable of segmented into balanced islands. Controlled Islanding model. Balanced islands are created in the network I-5

Steps for this scenario Step # Actor Description of the Step Additional Notes # What actor, either primary or secondary is responsible for the activity in this step? Describe the actions that take place in this step including the information to be exchanged. The step should be described in active, present tense. Elaborate on any additional description or value of the step to help support the descriptions. Short notes on architecture challenges, etc. may also be noted in this column.. 1 Operator Operator performs islanding analysis using system topology model and potential system conditions. 2 Operator Operator creates system configuration to support 3 Controlled Islanding 3.1 Controlled Islanding 3.2 Controlled Islanding 3.3 Controlled Islanding 4 Controlled Islanding 5 Controlled Islanding 5.1 Controlled Islanding 5.2 Controlled Islanding islanding Controlled Islanding monitors in parallel with other operational systems the state of the power network Controlled Islanding selects areas with balanced load and generation Controlled Islanding determines breakers which should be tripped in event of emergency to create balanced island areas Controlled Islanding determines additional system operations that will need to be performed to balance island areas Controlled Islanding detects emergency condition amenable to islanding Controlled Islanding transmits current contingent islanding operations to field devices Controlled Islanding transmits commands to balance load and generation. Controlled Islanding transmits commands to trip breakers and create balanced islands Use system CIM model Use Cases 5 & 13 are similar to this step Continuous monitoring of system and updating of contingent islanding operations Distributed Generation, Load Shedding, etc. I-6

REQUIREMENTS Functional Requirements Functional Requirements Scenario # Step # Non-functional Requirements Non-Functional Requirements Scenario # Step # I-7