Statement of Conditions. Instructions EQUIVALENCY INSTRUCTIONS

Similar documents
Pipeline Online Permitting System (POPS) External User Guide

Eligibility & Certification Process ELIGIBILITY CONFIRMING ELIGIBILITY ELIGIBILITY CRITERION 1: BUILDING CHARACTERISTICS

Q: Can we download a copy of the ICM/FSA video presentation for reference?

Missouri Housing Development Commission Certified Property Management Agent Program

Evidence of Standards Compliance (ESC) Tool Navigation Instructions

CHAP LinQ User Guide. CHAP IT Department Community Health Accreditation Partner 1275 K Street NW Suite 800 Washington DC Version 1.

Evidence of Standards Compliance (ESC) Tool Navigation Instructions

ASPEN Web: epoc 10.2

Provider Monitoring Process

Eforms Full Application Guide New Contractor

ASME Conformity Assessment: Statistics, Process, and CA Connect. Dan Sharp Manager, Process Management Dept. August 10, 2016

MCES Industrial Online Reporting System Annual Statement Submittal Instructions for Dental Offices

Eforms Full Application Guide Returning Contractor

Authorized Training Provider Application Process

Woolworths Limited. Contractor Safety Management System. Specialist Contractor Portal IT Contractor User Guidelines

HSE Health & Safety LANDesk User Guide Health and Safety user guide for HSE Staff This document explains LANDesk Service Desk features and functions

Greater Wattenberg Area (GWA) Wellbore Spacing Units Operators Guidance

Staff User Manual. Chapter 3 Contracts

Encounter Data Industry Update Q&A Documentation

INTERIM Reclamation Waiver Process per Rule 1001.c Last Updated December 17, 2015

SECTION.0900 LEAD-BASED PAINT HAZARD MANAGEMENT PROGRAM FOR RENOVATION, REPAIR AND PAINTING

SREC Registration Program (SRP) FAQs Updated

Orion Registrar, Inc. Certification Regulations Revision J Effective Date January 23, 2018

Log into the MCES Industrial Online Reporting System at:

PCORI Online: Awardee User Guide Research Awards

Woolworths Limited. Contractor Safety Management System. Specialist Contractor Portal IT Contactor User Guidelines

Battery Program Management Document

ICE. Office of Investigations SEVP. Recertification

User Manual Section 3 Admin Module Admin Module

1. IMPORTANT...KEEP YOUR COMPANY INFORMATION CURRENT This will ensure that your GC's have all the information they need to invite you to bid. a.

Getting Started Module I: Permitting Application Integration with ProjectDox... 8

INSTRUCTIONS. What are the steps to apply? What is this? Who can apply? How does it work? What does the test cover?

American Association for Laboratory Accreditation

EPA Research Programme EPA s Online Grant Application & Project Management Portal

ecms Processes and Procedures Contractor Users Update August 2017 Prepared by CACI International, Inc.

University of Northern Iowa Centric Project Web Site User Guide

ASBO International. SFO Recertification Guide One-Step Process. Updated February 1, 2018 Tel: x

CHEPP CERTIFIED HEALTHCARE EMERGENCY POWER PROFESSIONAL. Emergency Power Supply System (EPSS) Installation, Operation, Maintenance, and Testing

Systems Environment. Optional System Environments

Personnel Certification Program

If the provider is paid by Social Security Number, follow the registration procedure on pages 2-5.

California Code of Regulations TITLE 21. PUBLIC WORKS DIVISION 1. DEPARTMENT OF GENERAL SERVICES CHAPTER 1. OFFICE OF THE STATE ARCHITECT

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Log into the MCES Industrial Online Reporting System at:

Evaluation Report from a Florida Architect or Engineer Evaluation by Architect or Engineer

University of North Florida

LICENSE MANAGEMENT SYSTEM PUBLIC PORTAL USER GUIDE BUILDING CODE PLAN REVIEW PROJECT SUBMITTAL

Red Flags/Identity Theft Prevention Policy: Purpose

Risk Management & Patient Safety AIRS User Guide for Assisted Living Facilities

Instructions for Submitting Applications Using TCFOR

Fire Service Instructor II

Request for Proposal for Technical Consulting Services

BID. Electronically Submitting a Building Permit Application Using COJ s Building Inspection Division s Electronic Permitting and Plan Review System

European Code of Conduct on Data Centre Energy Efficiency

Timber Products Inspection, Inc.

ASME Conformity Assessment: Statistics, Process, and CA Connect

Evaluation Report Evaluation Entity Method Evaluation by an Evaluation Entity

Mentor eirb Researcher User Manual

ANSI-CFP Accredited Food Protection Manager Certification Programs Education Outreach. Benefits of the ANSI-CFP Accredited Certification Programs

emedical How-To Guide for Interim (New USFS and Seasonal) Employees

The New IRB Form System Completing IRB Forms the IRB Application (Thesis/Dissertation)

PCI Compliance Assessment Module with Inspector

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH

AE On-Site Audit. Welcome to the AE On Site Audit training. Course #

EU Code of Conduct on Data Centre Energy Efficiency

Provider Portal Claim Features Training MHO

INSTRUCTOR HIRING CRITERIA

CERTIFICATION GUIDELINES FOR MANAGEMENT SYSTEM

Reporting Period Information SMR for Standard Discharge Permittees Help sheet for the Industrial Online Reporting System

Building Standards Department Markham eplan Applicant Handbook For Building Permits, Sign Permits and Zoning Preliminary Review

EARLY CARE AND EDUCATION PROVIDER S MEETING

Frequently Asked Questions (FAQ):

Commissioning In Healthcare

6/24/16 Version. Waiver Support Coordinator SAN/iBudget System Guide

Cork County Fire & Building Control Department. Information on Submitting Commencement Notices

Great Start to Quality STARS Quality Improvement Consultants User Manual STARS - Systematic Tiered Assessment and Rating Solution

FIRE CODE ADMINISTRATOR PROGRAM

HPE Energy Efficiency Certification Service

Interconnection Standards for Delmarva Power & Light Company s Delaware Operating Territory

CMS RETROACTIVE ENROLLMENT & PAYMENT VALIDATION RETROACTIVE PROCESSING CONTRACTOR (RPC) STATE AND COUNTY CODE UPDATE STANDARD OPERATING PROCEDURE

CYP-IMS Field User Guide

CaGBC Design and Construction Split Review Option

NAU Affiliation Agreements

Building Code Services, Education & Accreditation ,

S/M/WBE PARTICIPATION GOOD FAITH EFFORT FORM

Identity Theft Prevention Policy

MARPA DOCUMENT MARPA Revision 1.1

Patient Reported Outcome Measures (PROMs)

Regulation update Monitoring and Compliance

Version Effective 2/15/17. Waiver Support Coordinator SAN/iBudget System Guide

Industry Update QA Documentation

ASPEN Release Notes. ASPEN 11.5 Overview... 2 Changes and New Features: Across ASPEN Facility... 3 MDS Data... 8 Surveys...

Project Physical Security Directives Mapping Document

(b) Primary headwater stream habitat assessment.

Early Learning SF User Guide for Families

NFPA Edition

Have a question? Speak with a member of our team on

1 To complete the Ingenia Contractor Registration Process, please follow the outlined steps.

RFQ Response Submission

North Carolina Fire and Rescue Commission Certification Programs POLICY FOR TESTING

Transcription:

EQUIVALENCY INSTRUCTIONS The Time-Limited Waiver / Equivalency tab is a submittal page for organizations seeking additional time to complete a physical environment (EC or LS) Requirement for Improvement (RFI) outside of the 60 days provided within the evidence of standards compliance (ESC) allotted time or for Equivalency of an RFI Life Safety Code deficiency that cannot be corrected without major construction. A. Introduction: Occasionally building owners discover building features or deficiencies that are not compliant with the National Fire Protection Association (NFPA) Life Safety Code (LSC), also known as NFPA 101-2012. The preferred course of action is to immediately correct the deficiency. However, in some instances, the corrective action may pose a hardship to the organization and not directly impact patient, staff, or visitor safety. Under these conditions, the organization may submit a request for an equivalency to The Joint Commission for review. B. Two Equivalency Types: The accredited organization may submit either a Traditional Equivalency or an FSES-based Equivalency. 1. Traditional Equivalency: A Traditional Equivalency is based on field verification by either the local fire marshal responsible for fire safety of the building; a registered architect or Professional Engineer (PE); or a Certified Fire Protection Specialist (CFPS). 2. Fire Safety Evaluation System (FSES) Equivalency: The FSES Equivalency process was developed by NFPA. It objectively applies specific values to building features and allows deficiencies to be deducted from the building features numerical value. Once the calculations are completed, if the building score is zero or better, the building as evaluated would be considered compliant based on the FSES process and the identified deficiencies would not be considered a threat to occupants of the building. The NFPA 101A document does not specify qualifications of the submitter; however, The Joint Commission requires a thorough understanding of the Life Safety Code, NFPA 101A - 2013, Guide on Alternative Approaches to Life Safety, and the building(s) being evaluated. C. for Submitting an Equivalency Request: To accurately respond to your (SOC) request, the Standard Interpretation Group (SIG) Engineers require you to follow the submittal process exactly. Any Copyright, The Joint Commission 1

deviation will result in our denying your request and requiring your re-submittal. All references to the Life Safety Code (LSC) are to the NFPA 101-2012 edition. 1. Add New Equivalency (Traditional and FSES): a. Select the Time-Limited Waiver /Equivalency tab and select Add New Time- Limited Waiver / Equivalency. b. A Summary of Time-Limited Waiver / Equivalency Items form will open. c. All fields within the form are required to be filled out, including: i. Organization Information, including the organization s CMS Certification Number (CCN) number*, if applicable. Please note, that an organization s CCN number can be found in their secure Joint Commission Connect page. For instructions on how to locate a CCN number, refer to Annex A. * Only applicable to deemed status organizations. ii. Submitter Information iii. Request Information, including: a. Request Type select, Traditional Equivalency or FSES Equivalency b. Survey Date, enter the last day of survey date found on final survey report c. SPFI Unique ID that was utilized when creating the SPFI d. Document the LSC* Chapter and LSC* Section. Refer to NFPA 101 for guidance as to the LSC Chapter and LSC Section if not automatically populated. *Life Safety Code e. Construction Type, select New or Existing Copyright, The Joint Commission 2

iv. ILSM/ Mitigation Actions Implementation as per Policy that includes any ILSMs or other mitigation actions that are currently being implemented for the SPFI. (Maximum 250 Characters) IMPORTANT When deficiencies are identified that require management in the Statement of Conditions as a Plan for Improvement (PFI) or Survey-related Plan for Improvement (SPFI) they must clearly identify the deficiency, describe the plan to correct, establish how long the corrective action will take and follow organization policy for Interim Life Safety Measures (ILSM) or Risk Assessment. Non-compliance may place the building occupants at risk, so it is important that the PFI/ SPFI is detailed in the identification of the deficiencies and clearly describes the corrective actions and ILSM/mitigation actions as appropriate. TIP v. Request Summary must include (Maximum 250 Characters): a. Summary of the deficiency. Please note b. Summary of request of equivalency the character limitations in any of the free text boxes. vi. Proposed Corrective Action must include (Maximum 250 Characters): a. Summary timeline of proposed corrective action, if applicable b. Any other information that may be relevant to the decision making process, if applicable c. If the above d. Select Save at the bottom of the page. 2. Upload Documents Based on Equivalency Type: Please refer to Annex B for required documentation for Traditional Equivalency and Annex C for FSES Equivalency. a. How to Upload Documentation: i. Select Upload a New Document The Equivalency submission ii. Enter a File Description for the document you are about to upload MUST be saved before you can upload any documents! iii. Select Browse and locate the file TIP Copyright, The Joint Commission 3

iv. Once you have selected the document to upload select Insert or select Cancel to cancel the request. v. Verify in the Upload New Document field that all documents were successfully uploaded. vi. vii. Select Save. a. If you have completed uploading all required documentation select Submit. b. If you have additional documentation continue to upload, but select Save after each document is uploaded so no work is lost. c. The organization may edit the equivalency request up until its submission. After you have submitted your request, select View All from the Menu on the left side of the page to verify the submission of your Equivalency. The Status will list Submitted to TJC. A notification has been submitted to the Department of Engineering at the Joint Commission for processing. viii. ix. Once received by the Joint Commission Department of Engineering, and email of receipt with a case number will be sent to the submitter email address listed in the Equivalency request form. A summary of Time-Limited Waivers and An Equivalency is Equivalencies submitted on or after NOT guaranteed! August 1, 2016 may be viewed in the View All screen. TIP Copyright, The Joint Commission 4

D. Equivalency Review Process: 1. Once an equivalency submission is received by the Joint Commission, an email of receipt with a case number will be sent to the submitter of the equivalency request. 2. If any of the above documentation is not provided, the organization will be notified once to make the necessary corrections and to resubmit the equivalency request. If the required documentation is not received within two weeks, or no communication related to the required missing documentation has been received by the Joint Commission within two weeks from the notification, then the equivalency request will be rejected. 3. Once an equivalency submission is received by the Joint Commission, an email of receipt with a case number will be sent to the submitter of the equivalency request. 4. Approval/Rejection Process: After receiving a request for an equivalency, The Joint Commission will conduct the required analysis. a. Deemed Status: i. Joint Commission Action: a. If found to be acceptable by the Joint Commission, the review will be documented in the SOC by modifying the status of the equivalency request to Submitted to CMS and noting the status in the History/Audit Trail. b. An email of the Joint Commission approval and notification of submission of the equivalency request to the relevant regional office (RO) of CMS for their approval or rejection will be sent to the submitter of the equivalency request. c. During this period of RO review, the organization is still required to resolve any pending issues associated with the equivalency request, including appropriate Interim Life Safety Measures (ILSM). ii. CMS Approval: Once approved by the RO, the approval will be documented in the SOC by modifying the status of the equivalency request to Approved by CMS and noting the decision in the History/Audit Trail. An email of approval will be sent to the submitter of the equivalency request. Copyright, The Joint Commission 5

iii. Rejection: a. If found to not be acceptable during the Joint Commission review, the rejection will be documented in the SOC by modifying the status of the equivalency request to Rejected by TJC. An email of rejection will be sent to the submitter of the equivalency request. b. Once rejected by the RO, the rejection will be documented in the SOC by modifying the status of the equivalency request to Rejected by CMS. An email of rejection will be sent to the submitter of the equivalency request. b. Non-Deemed Status: i. Approval: If the equivalency is found acceptable, the approval will be documented in the SOC by modifying the status of the equivalency request to Approved by TJC and noting the decision in the History/Audit Trail. An email of approval will be sent to the submitter of the equivalency request. ii. Rejected: If found to not be acceptable, the rejection will be documented in the SOC by modifying the status of the equivalency request to Rejected by TJC. An email of rejection will be sent to the submitter of the equivalency request. If you have any questions or need further guidance on submitting an equivalency request, please contact the Department of Engineering at The Joint Commission at (630) 792-5900 or via email at Engineer@jointcommission.org. Copyright, The Joint Commission 6

Annex A: Accessing CCN 1. Log into your organization s secure Joint Commission Connect page. 2. Select the Survey Process tab and select General Application 3. This will open the organization s Dashboard 4. Select the green button, Update Application 5. Select Tab 6 Survey Details 6. From the Menu on the left side of the page, select CCN Information 7. The CCN will be located in the table header, column 3, Hospital CCN Copyright, The Joint Commission 7

Annex B: Traditional Equivalency Required Documentation The following documentation is required: 1. Final Survey Report 2. An Executive Summary on organization/company letterhead must: a. Define the deficiency or condition that the equivalency is being requested for b. Include the justification for why this is an unreasonable hardship* c. Indicate the total cost and describe the source, availability, and commitment of funds for the proposed alternate solutions (if work is required for proposed alternate solutions). Provide a timetable of events from present through completion. d. Include detailed justification to show that the equivalency will not adversely affect occupant health and safety (Occupant Safety Assessment) e. Propose an alternate solution that shows an equivalent condition or additional steps being taken to ensure occupant health and safety 3. Supporting Evidence to be included with the Equivalency Request: a. Provide detailed drawings showing existing conditions and proposed solutions, if applicable b. Include photos of proposed placement of equipment, if applicable c. Include photos of the deficiency or condition that the equivalency is being requested for, if applicable d. Include a letter from an Authorized Agent: Have one of the following certify, in writing, that to the best of their knowledge, the organization s proposed alternate solution meets either the intent of the LSC identified in the Executive Summary or provide an equivalent level of life safety. i. Registered Architect ii. Licensed/Certified Fire Safety Professional PE or CFPS iii. Local authority having jurisdiction (i.e. fire marshal or building official) e. Field verification of the conditions is required and must be identified in the written documentation submitted. *Unreasonable Hardship exists when an implementing agency finds that compliance with the building standards would make the specific work of the project affected by the building standard unattainable, based on an overall evaluation of the following factors: the cost of providing access, the cost of all construction considered, the financial impact of proposed improvements of the project, the nature of the accessibility which would be gained or lost, and the nature of the use of the facility under construction and it accessibility to persons with disabilities. Copyright, The Joint Commission 8

Annex C: FSES Equivalency Required Documentation The following documentation is required: 1. Final Survey Report 2. An Executive Summary on organization/company letterhead must: a. Include details of the deficiencies/conditions being equivalized and validation of onsite survey results b. Include any corrective actions necessary to achieve a passing score, if applicable c. Include justification explaining why this is an unreasonable hardship* d. Include detailed justification to show that the equivalency will not adversely affect occupant health and safety (Occupant Safety Assessment) e. Submit on organization/company letterhead. 3. Supporting Evidence that must be included with the Equivalency Request: i. FSES Worksheets for each building zone for the entire building. ii. Provide detailed drawings showing existing conditions and proposed solutions. iii. Indicate the total cost and describe the source, availability, and commitment of funds for any necessary corrective actions required (if work is required to achieve passing scores). Provide a timetable of events from present through completion. *Unreasonable Hardship exists when an implementing agency finds that compliance with the building standards would make the specific work of the project affected by the building standard unattainable, based on an overall evaluation of the following factors: the cost of providing access, the cost of all construction considered, the financial impact of proposed improvements of the project, the nature of the accessibility which would be gained or lost, and the nature of the use of the facility under construction and it accessibility to persons with disabilities. Copyright, The Joint Commission 9