INSTALLATION INSTRUCTIONS

Similar documents
INSTALLATION INSTRUCTIONS

Overview These instructions are presented as a guideline for installing and setting up the LX Series Breaker Control Panel.

QUICK START. Installation & Programming Guide

Lighting Control Panel 16 and 24 INSTALLATION INSTRUCTIONS

Blue Box BLUE BOX TM LTD PARTS REPLACEMENT GUIDE

SAVE THESE INSTRUCTIONS

Occupancy and Vacancy Sensors ROOM CONTROLLER* DAYLIGHT SENSOR WPP-INT INSTALLATION GUIDE

Installation Instructions

Resolver to Digital Expansion Board

SAVE THESE INSTRUCTIONS

PS/IO Circuit Board Retrofit

ENCELIUM EXTEND Manager Wiring and installation manual Light is OSRAM

Replacing a Precision Controller Circuit Board

A0/A1 Controller Assembly Operation/Installation Manual READ AND FOLLOW ALL SAFETY INSTRUCTIONS

Installation Notes TII Model 341 Protector

TraceTek Leak Detection Master Module Installation Instructions TOOLS REQUIRED STORAGE

FDS / FDS-R / FDS-PS

PV Rapid Shutdown device

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2

Specifications, Installation, and Operating Instructions

MCG Surge Protection

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

PowerLogic High Density Metering System 1-Meter Enclosure

Installation, Operation, and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET

ControlKeeper 4. General Information. Connecting Relay Loads. Installation Sheet. Getting Started. Power Supply Wiring. Mounting the Cabinet

Upgrading Legacy Iso-Gard Line Isolation Monitors and Remote Indicators

Models 120LS, 200LS, 300LS, 400LS, 560LS Installation Instructions

Series 3700 Screw Terminal Assemblies Installation Instructions

INSTALLATION INSTRUCTIONS STZ-R SERIES (ENGLISH)

ORB TM 4-20 ma Input Box Installation & Operation Manual

Rack Mount Power Supplies

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Hubbell Surge Protective DeviceS

Installation Instructions

BS 287 DUAL CHANNEL POWER SUPPLY. User Manual. January 2017 V1.0

Temperature. Power requirements. Weight. Dimensions

Measure Ø-N, Ø-Ø, Ø-Gnd with voltmeter to confirm application voltage prior to installation.

SEM3 - Embedded Micro Metering Module

RADEON /RADEON VE Getting Started...

Master Pulse Reference/ Isolated Pulse Follower Expansion Board

ADDENDUM FOR 20, 27, & 28 OPTIONS

IMPORTANT SAFETY INSTRUCTIONS

AC300/AC400 SERIES DYNAMIC BRAKING and ADDITIONAL FORM C RELAY. INSTALLATION INSTRUCTIONS Document Number:

Altivar 61/71 Adjustable Speed Drives Heatsink Fan Kits VZ3V1212 and VZ3V1216

72In LED Lit Nutcracker Item # CAUTION: IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL SAFETY INSTRUCTIONS

Active UTP Transceiver Hub with Integral Isolated Camera Power

Field Update Guide. for Raven Viper Pro

Model# CKM18 Model# CKM36 Model# CKM48 WARNING

Series Amp Pad Mount Quick Connect Input and Output Power Panels

Microprocessor Module Replacement Kit for Multi-Zone Leak Monitors Instruction Manual

Neets Switching Relay - 2. Installation manual

MAXIMA + Series ROTARY LEVEL CONTROL

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD)

KBMG MULTI-SPEED BOARD

E1135C PDU and Pod Upgrade Procedure

Panduit Basic Rack PDU

Satellite INSTALLATION GUIDE

ETC Installation Guide

MAXIMA+ Series Rotary Level Indicator

Intel NUC Kit NUC8i7HNK & NUC8i7HVK User Guide. Intel NUC Kit NUC8i7HNK Intel NUC Kit NUC8i7HVK User Guide

BS 181 SINGLE CHANNEL POWER SUPPLY USER MANUAL

Panduit Basic Rack PDU with Local Meter

FHOTON WI-FI MODULE Owner's Manual

DANGER DANGER: is used in this manual to warn of high voltages capable of causing shock, burns, or death.

MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL

UPS READY POWER DISTRIBUTION ASSEMBLY

ILC LightLEEDer MicroLite 1000P Retrofit Installation

Passive UTP Transceiver Hub with Integral Camera Power Installation Guide

Vapor Monitor Interface Module

XDBKITS5 Bus / DB Terminal Kit (Size 5) Installation Manual DPD00116

Power-Style QED-2, Series 2 Low Voltage Switchboards

Low-Voltage Wallstations Wiring and installation manual Light is OSRAM

PEREGRINE SERIES RETROFIT INSTALLATION GUIDE

C5C Cross-Connect System

GPIB-232CT-A IBCL EPROM Installation Guide

Installation RA5112-C-16A-C20. Basic Rack Power Distribution Unit

Installing and Configuring Rialto Analytic Appliances

Document Number: SL estrip 10 RGBW LED Luminaires User Manual

OPERATING PROCEDURES for the UPS-S2 Universal Power Supply Series 2

COMFORT CONTROL CENTER SERVICE INSTRUCTIONS

SCROLL GAS PRICE DISPLAY SYSTEM ROS SERIES INSTALLATION MANUAL REV 3.0

Intel NUC Kit NUC8i7HNK & NUC8i7HVK User Guide. Intel NUC Kit NUC8i7HNK Intel NUC Kit NUC8i7HVK. User Guide

4170 POS System Installation Guide

PNP415/417 POP 'N PLUG WITH CUSTOM TABLETOP SURFACE USER'S GUIDE

Active UTP Transceiver Hub with Integral Camera Power Installation Guide

Installing a Power over Ethernet injector

TARA CONTROLS AGC-5. UCI Random Start USER S GUIDE. With Optional Warning Flashes for the Hearing Impaired. TARA CONTROLS by Cartessa Corporation

SDM120 SERIES. SDM120 series User Manual. Single phase two wire DIN rail energy meter (One module)

Checking the compatibility with IT (ungrounded) and corner-grounded delta systems. EMC filter +E200 (690 V drives and drive modules)

Expandable Power Systems

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS

ICS Entrance Management Sign Installation Guide. Version 1.0

DTS 310. DIN Rail Mounted, Indoor Rated Revenue Grade Electrical Sub-meter. Page 1. Measurlogic MQ A

Linearray PD Retrofit Kit

H704-42(H)(E), H704-42/1(H)(E)

APPLICATION PROCEDURE HOUSING INSTALLATION AND EQUIPMENT LOCATION

Dual Relay Luminaire Control Module Wiring and installation manual Light is OSRAM

Series Amp Quick Connect Input and Output Power Panels

Transcription:

TM REPLACEMENT PARTS FOR USE WITH CX SERIES PANELS INSTALLATION INSTRUCTIONS Hubbell Control Solutions 9601 Dessau Road Building One Suite 100 Austin, TX 78754 Toll Free: 888-698-3242 Fax: 512-450-1215 www.hubbell-automation.com CONTENTS These instructions include information as follows: Precautions Description Installing Transformers in 4 and 8 Relay Panels Installing Power Supplies in 16 and 24 Relay Panels Installing Motherboards Installing CX Panel Controller Troubleshooting PRECAUTIONS READ AND FOLLOW ALL SAFETY INSTRUCTIONS. CAUTION - RISK OF ELECTRICAL SHOCK. To prevent electrical shock, turn off power at the circuit breaker before installing or servicing unit. Never wire energized electrical components. NOTICE: For installation by a licensed electrician in accordance with National and/or local Electrical Codes and the following instructions. CAUTION: USE COPPER CONDUCTOR ONLY, MINIMUM 75 C INSULATION. Be sure to read and understand all instructions before installing or servicing unit For Indoor use only. Do not use outdoors. Do not mount near gas or electric heaters. Disconnect switch or a circuit breaker must be provided and marked as the disconnecting device. The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition. Confirm that device ratings are suitable for application prior to installation. No user serviceable parts contained inside unit. Refer all service related questions to the factory. All servicing shall be performed by qualified service personnel. Equipment should be mounted in locations and at heights where it will not readily be subjected to tampering by unauthorized personnel. Use only approved materials and components (i.e. twist on connectors, electrical box, etc.) as appropriate for installation. NOTICE: Do not install if product appears to be damaged. If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired. Do not use this equipment for other than intended use. SAVE THESE INSTRUCTIONS! 9601 Dessau Road, Building One Austin, TX 78754 Toll Free: 888-698-3242 Fax: 512-450-1215 www.hubbell-automation.com 02.29.2016

DESCRIPTION CX Series Panels have replacement parts available including transformers, power supplies, motherboards, and the CX Controller that can be replaced in the field by qualified electricians: Replacement Part # CX04081227XFMR LXTXFMR CX1624UNVPWR CX1624347PWR CX04MTHRBD CX08MTHRBD CX1624MTHBD CXMSTRCONTR Description CX 04/08 Panel Transformer, 120/208/240/277VAC Input, 24VAC Output LX/CX 04/08 Panel Transformer, 120/277/347VAC Input, 24VAC Output CX 16/24 Panel Power Supply, 120-277VAC Universal Input, 24VAC Output CX 16/24 Panel Power Supply, 347-480VAC Universal Input, 24VAC Output CX04 Panel Replacement Motherboard CX08 Panel Replacement Motherboard CX16/24 Panel Replacement Motherboard (for 8 Relays) CX Stand Alone/Master Panel Controller INSTALLING TRANSFORMERS IN 4 AND 8 RELAY PANELS Caution: Prior to transformer replacement verify and lock-out panel feed circuit breaker in the OFF position. Failure to do so may result in personnel injury, damage to the panel, and void its warranty Refer to Figure 1 below and install transformers in the CX 4 and 8 Relay Panels as follows: 1. Locate and lock-out the line voltage panel feed circuit breaker in the OFF position. 2. Disconnect the line voltage transformer input leads. Replace wire splicing devices on incoming voltage circuit wires for safety purposes. 3. Remove Panel Metal Barrier. Barrier is secured with two screws, one at the top and one at the bottom. 4. Disconnect Low Voltage Secondary Leads from the Low Voltage Control Input Plug located at the top of the Mother Board 5. Remove the four (4) transformer mounting screws. 6. Mount new Transformer with four (4) mounting screws and reconnect in the reverse order of the removal. Use caution to assure that the line voltage primary leads are connected to the appropriate supply voltage tap wires. Supply twist-on wire connectors individually on the unused tap leads. 7. Check for ground continuity and for circuit shorts prior to re-energizing line voltage supply circuit. All terminations within the panel enclosure require installation by a licensed electrician in accordance with National and/or local Electrical Codes Figure 1 CX04 and CX08 Panel Interior Page 2

INSTALLING POWER SUPPLIES IN 16 AND 24 RELAY PANELS Caution: Prior to transformer replacement verify and lock-out panel feed circuit breaker in the OFF position. Failure to do so may result in personnel injury, damage to the panel, and void its warranty Refer to Figure 2 below to install Power Supplies in the CX 16 and 24 Relay Panels as follows: 1. Locate and lock-out the line voltage panel feed circuit breaker in the OFF position. 2. Disconnect the line voltage power supply input leads. Replace wire splicing devices on incoming line voltage circuit wires for safety purposes. 3. Remove Panel Metal Barrier. Barrier is secured with two screws, one at the top and one ant the bottom. 4. Disconnect Low Voltage Secondary Leads from the Low Voltage Control Input Plug located at the top of the Mother Board 5. Remove the two (2) power supply mounting screws. 6. Mount new power supply with two (2) mounting screws and reconnect in the reverse order of the removal. 7. Check for ground continuity and for circuit shorts prior to re-energizing line voltage supply circuit. All terminations within the panel enclosure require installation by a licensed electrician in accordance with National Electrical Code (NEC) and/or local Electrical Codes Figure 2 CX16 and CX24 Panel Interior Page 3

INSTALLING MOTHERBOARDS The CX Panel Series uses 3 styles of motherboards based on panel size. The CX04MTHRBD is used in all CX04 Series 4-Relay panels; The CX08MTHRBD is used in all CX08 Series panels and the CX1624MTHBD is used to control up to 8 relays in the CX16 and CX24 Series panels. The CX16 Series Panels require 2 motherboards and the CX24 Series Panels require 3 motherboards. Refer to Figure 3 and 4 to install replacement motherboards as follows: WARNING: The Low Voltage Control Input Power Plug at the top of the motherboard must be DISCONNECTED prior to disconnecting or connecting any of the interior low voltage panel components. Making any connections with power on the motherboard will damage the panel and VOID Equipment WARRANTY. Procedure for replacement of Motherboard for 4 and 8 relay panels: 1. Locate and lock-out the line voltage feed circuit breaker(s) in the OFF position for all lighting circuits that are fed through the relays in the panel. Once locked OFF use a multi-meter to verify that all input line voltage terminals on each relay are unpowered. 2. Disconnect the Low Voltage Control Input Power Plug located at the top of the motherboard. 3. Disconnect the User Interface Ribbon Cable if this is a Master Panel. Disconnect any Input or Output plugs. 4. Remove Panel Metal Barrier. Barrier is secured with two screws, one at the top and one ant the bottom. 5. Remove all relay mounting screws (Up to a total of 8) and disconnect each Relay Card Multi-pin Connector 6. Remove Motherboard Mounting Screws (3). 7. One at a time, depress the locking tabs with needle nose pliers on the Nylon Snap-in Board Stand-offs (5) that retain the motherboard while applying lifting pressure from behind the board. 8. To install the new motherboard follow the instructions in reverse order. Be sure that all low voltage connections are in place before reconnecting power to the motherboard. Figure 3 CX04 and CX08 Panels Motherboard Replacement Page 4

WARNING: The Low Voltage Control Input Power Plug at the top of the motherboard must be DISCONNECTED prior to disconnecting or connecting any of the interior low voltage panel components. Making any connections with power on the motherboard will damage the panel and VOID Equipment WARRANTY. Procedure for replacement of Motherboard for 16 and 24 relay panels: 1. Locate and lock-out the line voltage feed circuit breaker(s) in the OFF position for all lighting circuits that are fed through the relays in the panel. Once locked OFF use a multi-meter to verify that all input line voltage terminals on each relay are unpowered. 2. Disconnect the Low Voltage Control Input Power Plug located at the top of the motherboard. 3. Disconnect the User Interface Controller Ribbon Cable if this is a Master Panel and the top relay card is being replaced. Disconnect any Input or Output plugs. 4. Disconnect the motherboard interconnecting ribbon cable. 5. Remove Panel Metal Barrier(s) on each side of the panel. Each Barrier is secured with two screws, one at the top and one at the bottom. 6. Remove all relay mounting screws (Up to a total of 8 per motherboard) and disconnect each Relay Card Multi-pin Connector 7. One at a time, depress the locking tabs with needle nose pliers on the Nylon Snap-in Board Stand-offs (6) that retain the motherboard while applying lifting pressure from behind the board. 8. To install the new motherboard follow the instructions in reverse order. Be sure that all low voltage connections are in place before reconnecting power to the motherboard. Figure 4 CX16 and CX24 Panels Motherboard Replacement Page 5

CX16 AND CX24 PROCESSOR BOARD TRANSFER Power must be off to the panel prior to ALL hardware changes. Failure to follow this instruction voids all warranties. When adding the processor boards (I/O) cards to an existing panel or changing the function, ie. Master Panel to a Secondary Panel, or a Secondary Panel to a Master Panel, it is important that all connections are snug and that the DIP switches are configured correctly. The DIP switches referred to in this document are located on the bottom right hand corner of the Processor Boards. Master Panels will all have the no.1 (M/S) DIP switch ON. Secondary Panels will all have the no.1 (M/S) DIP switch OFF Dip Switch Settings 1. In Master Panels: The number one Ppocessor board (the top board) will have the number 4 (TERM) and the number 1 (M/S) DIP switch ON. DIP switches 2 (BS1) and 3 (BSO) will need to be in the OFF position. In Secondary Panels: The number 4 (TERM) will be the only dip-switch ON. All other DIP switches will be in the OFF position. 2. In Master Panels: The number two processor board (the middle board) will have the number 3 (BSO) and the number 1 (M/S) DIP switch ON. DIP switches 2 (BS1) and 4 (TERM) will need to be in the OFF position. In Secondary Panels: The number 3 (BSO) will be the only DIP switch ON. All other DIP switches will be in the OFF position. 3. In Master Panels: The number three processor board (the bottom board) will have the number 2 (BS1) and the number 1 (M/S) DIP switch ON. DIP switches 3 (BSO) and 4 (TERM) will need to be in the OFF position. In Secondary Panels: The number 2 (BS1) will be the only DIP switch ON. All other DIP switches will be in the OFF position. Page 6

INSTALLING THE CX PANEL CONTROLLER The CX04 Stand Alone Panels and CX08, CX16, and CX24 master panels have a CX Controller mounted on the face of the CX Panel Door. To replace the controller due to inoperability or damage follow the instructions below and see figure 5. WARNING: The Low Voltage Control Input Power Plug at the top of the motherboard must be DISCONNECTED prior to disconnecting or connecting any of the interior low voltage panel components. Making any connections with power on the motherboard will damage the panel and VOID Equipment WARRANTY. Procedure for replacement of CX Controller for 4 relay stand alone and 8, 16, or 24 relay master panels: 1. Disconnect the Low Voltage Control Input Power Plug located at the top of the motherboard. 2. Disconnect the User Interface Controller Ribbon Cable from the motherboard. NOTE the location of the PIN 1 red stripe on the cable for reconnection after the new controller is installed. 3. Remove the three screws and controller cover plate on the inside of the panel door behind the controller. 4. Disconnect the User Interface Controller Ribbon Cable from the controller. NOTE the location of the PIN 1 red stripe on the cable for reconnection after the new controller is installed. 5. Remove the three metal standoffs that hold the controller to the door. And remove the controller. 6. Keep and re-use Controller Ribbon Cable. 7. To install the new controller follow the instructions in reverse order. Be sure that all low voltage connections are in place before reconnecting power to the motherboard. NOTE: Since the controller holds all panel programming, the panel will require re-programming once the new controller is operational. If the current program had been saved to an SD card the program can be restored by using the SAVE/RESTORE Program function in the System Tools menu. Figure 5 CX Panels Controller Replacement TROUBLESHOOTING If the Master or Secondary panel relays, inputs, and outputs are not available in the user interface menus, or any of the functions present prior to parts replacement occurs, contact Hubbell Building Automation Technical Service at (888) 698-3242 for assistance as required. A complete Troubleshooting Guide is contained in the CX Panel User Manual provided as a downloadable document at www.hubbell-automation.com. 72-00477 Rev B Page 7