OLOGY HEIGHT-ADJUSTABLE DESKS AND BENCHES. Troubleshooting Guide

Similar documents
OLOGY HEIGHT-ADJUSTABLE DESKS. Troubleshooting Guide

OLOGY HEIGHT-ADJUSTABLE DESKS. Troubleshooting Guide

SERIES 7/9 TABLES & SERIES 8 BENCH. Troubleshooting Guide

SERIES 7 TABLES PRE-DECEMBER Troubleshooting Guide. IMPORTANT NOTE: This guide applies to models shipped prior to December 2015 only.

Power Cable. Low-Voltage Cable

SERIES 5 TABLES/BENCH

RISK OF SERIOUS INJURY OR DEATH

OV1001 Part No OV1001 HEIGHT ADJUSTABLE TABLE USER GUIDE

OV1000 Part No OV1000 HEIGHT ADJUSTABLE TABLE USER GUIDE

INCLUDED HARDWARE REQUIRED TOOLS GETTING STARTED DISCLAIMERS! 5/32 Allen Wrench (Provided)

OV1016 Part No OV1016 HEIGHT ADJUSTABLE BENCHING SYSTEM USER GUIDE

HEIGHT ADJUSTMENT. Manual Crank - Front/Top Mounted

UPLIFT 4-Leg Height Adjustable Standing Desk (Version v4.1 Control Box)

UPLIFT 2-Leg Height Adjustable Standing Desk (Version v4 Control Box)

200 lb (90.7 kg) 2 People Required. 250 lb (113.4 kg)

Holland Computers, Inc. Crane Kit Manual Part Number RA-CRANE-KIT

UPLIFT 3-Leg Desk Instructions for. Solid Wood Desktops. (Version v4 Control Box) pictured: Solid-wood top with right hand return TABLE OF CONTENTS

MY-HITE ADJUSTABLE TABLE

CHAPTER 3B: ELECTRONIC POWER STEERING

ELECTRICAL SUPPLY TROUBLESHOOTING QUICK GUIDE SAFETY PRECAUTIONS

Moving-Minds.com Treadmill Desk Operation

Hard Drive, 20-inch. Replacement Instructions

Installation and Operation Back-UPS BR1000G-IN / BR1500G-IN

Desk Control User Manual

CENTRO 6451/6452 LIFT DESK

Treadmill Embedded Touch Screen Won t Power Up

Trouble Shooting Leveling Control Box Electric Jacks. Touch Pad LED Probable Cause Solution

ALL-FLEX ELECTRIC TABLE BASE

Power Supply, 17-inch

DFR Troubleshooting Flowchart

INSTALLATION INSTRUCTIONS

Power. Document Part Number: This guide explains how the computer uses power. December 2005

KRONOS 6752 LIFT DESK

MCU-9201MT22 venetian blind controller

EMS. Electrical Management System. Progressive Industries Incorporated Morrisville, North Carolina

Repair and Replacement Instructions Genesis Desking Lift System

IMPULSE G2/PULSE HEIGHT ADJUSTABLE TABLE LIFTING COLUMN: DL17 CONTROL: DPF1C CONTROL BOX: CBD6S PART # CONTROL MECHANISM OVERVIEW PAGE 1 OF 6

SERVICE MANUAL For Universal Cook 'N' Vent Downdraft System. Models 30" UCV30 36" UCV36 45" UCV45

SEQUEL 6051/6052 LIFT DESK

Assembly Instructions

This document describes the procedure for doing a power trace on the SM5 and Gauntlet Stepmills.

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

Page/Talk Industrial Desk Sets

LED Maintenance Instructions

DNS User Manual. Version Dec DataON Storage, storage division of Area Data Systems.

Power. Document Part Number: This guide explains how the computer uses power. March 2006

InTouch Knowledge Guide

Quick Start Guide. January EAZ0081L02A Rev. A

MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL

VRp Three-Phase Precision AC Voltage Regulator

Models 120LS, 200LS, 300LS, 400LS, 560LS Installation Instructions

PREFACE. Thank you for choosing Zen Space Desks. We hope your desk helps you find your zen when being used. Zen Space Desks Team

User's Guide. Model W 3-in-1 Switching DC Power Supply

Operation Manual WARNING. Be sure to read this Operation Manual before use. Universal Space Amusement Equipment Ltd.

M5 and M10 Routers Power Supply and Power Cord Component Replacement Instructions

TARA CONTROLS AGC-5. UCI Random Start USER S GUIDE. With Optional Warning Flashes for the Hearing Impaired. TARA CONTROLS by Cartessa Corporation

Cutter Option Installation Instructions

Ultegra Bench Scale SCB-R U USB Powered

!There are two kit models. The ZCTK-120 is designed to operate with.!the pulse output is isolated from the mains line voltage. A pull-up resistor

FlexiMotion. Owner s Manual

AC LEISURE PRO SHORE COMMANDER

KEYSTONE OM13 - EPI-2 3-WIRES MODULE INSTALLATION AND MAINTENANCE INSTRUCTIONS

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

THE CTB08D LIGHT CONTOLLER

E1135C PDU and Pod Upgrade Procedure

Replacement Instructions

********SERVICE MANUAL******** MODELS:

GOLANDER PUMP. Operation Manual. For Microflow Variable-Speed Peristaltic Pump BT50S/BT102S.

TDM To MiniMech conversion ProceDure

Sonoma Series PREMIUM. Electric Height Adjustable Tables USER GUIDE Technology Lane Petaluma, CA

Zonit μats TM Users Guide μats1-lv Version 1.2

Field Service Guide Supplement for the NS 7000/030

Xi4 Quick Reference Guide

TRC-190 User s Manual

TABLE OF CONTENTS SECTION 1 TABLETOP CONFIGURATION SECTION 2 TABLETOP CONFIGURATION ACCESSORIES SECTION 3 SLIDE CONFIGURATION

Portable Gas Monitor (PGM-IR) Infrared Sensor Replacement Instruction

Control Box Setup - PRSalpha

Flex Pro Series Assembly Guide

Draper Commissioner User Manual

S300i. Two Channel Integrated Audio Amplifier

Vertiv Local Rack Access 18.5" LED LCD Console

Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

HCS-3600 / 3602 / 3604 Laboratory Grade & High RFI Immunity Switching Mode Power Supply with Rotary Encoder Control

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

Autoranging True RMS Multimeter User Manual

Carl's Table : CT15 OWNER'S MANUAL & TROUBLE-SHOOTING GUIDE

Xpander Rack Mount 16 5U Gen 3 with Redundant Power [Part # XPRMG3-1625URP] User Guide

Installing the Cisco MDS 9020 Fabric Switch

MAINTENANCE MANUAL. EDACS REDUNDANT POWER SUPPLY SYSTEM 350A1441P1 and P2 POWER MODULE CHASSIS 350A1441P3, P4, AND P5 POWER MODULES TABLE OF CONTENTS

Mercury Helios ASSEMBLY MANUAL & USER GUIDE

This Datasheet for the IC660BBD110. Block 115Vac Input 16 Circuits.

EMS Electrical Management System

LENGTH-ANGLE-RADIUS-LOAD INDICATING SYSTEM

S-14 S-14. Compact Digital Multimeter. Compact Digital Multimeter

GV3000/SE Operator Interface Module (OIM) User Guide Version 2.0 M/N 2RK3000

245 Winch 50. User Manual

High Power over Ethernet Midspans PD Port Model PD Port Model

AF Upgrade Instructions

Network Controller. Installation/Troubleshooting Instructions NK220 COM1131C

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

Transcription:

Troubleshooting Guide Power Cable Cantilevers Control Box Active Touch Controller Lifting Column Foot Understructure OLOGY HEIGHT-ADJUSTABLE DESKS AND BENCHES HOW THEY WORK Each Lifting Column contains an individual motorized lift mechanism. The Control Box contains a power transformer. This converts high-voltage AC current from the wall outlet (120v or 240v) to low-voltage 18v DC current, which powers the Lifting Columns. Only the main power cable carries high voltage. All other cables are low voltage. The Control Box contains a computer processor with embedded software controllers. The Control Box controls all aspects of Desk motion, and synchronizes motion of the individual Lifting Columns. The Control Box will shut down the entire Desk if a fault is detected. For example, if one Lifting Column is binding or trapped, it will draw significantly more current than the other Lifting Column, and the Control Box will shut down the entire Desk to prevent further damage. The Controller is the user interface to the Desk, and directs all Desk movements by lifting or pressing down until the desired height is reached. Preset data is stored in the Controller itself, not the Control Box. Published 6/2018

READ THE ASSEMBLY DIRECTIONS AND USER GUIDE Many times, problems can be the result of improper assembly. Reference the Assembly Directions document to ensure the Desk or Bench is assembled correctly. If so, reference the troubleshooting steps throughout this document. TROUBLESHOOTING PARTS KIT Having a spare part that is known to work will quickly lead to accurate identification of faulty components. Without this, it can be little more than guesswork. Steelcase strongly recommends that every Dealer maintain a small kit of parts for troubleshooting purposes. This kit of parts should include: QTY DESK PART NO. BENCH PART NO. BASIC HEIGHT: Lifting Column 1 1106409001SR 1112273001SR (LH) 1112273002SR (RH) EXTENDED HEIGHT: Lifting Column 1 24465401SR 1041141001SR (LH) 1041141002SR (RH) ALL: Control Box 1 841364900SR (2-leg) 841300004SR (3-leg) 841364900SR (2-leg) 841300004SR (3-leg) Active Touch Controller* 1 1093247001SR (North America) 1093247001SR (North America) 1093247002SR (International) 4 Preset Controller* 1 24316101SR (North America) 24316102SR (International) Low-Voltage Cable (2m) 2 24012602SR 24012602SR Power Cable 1 22047301SR (North America) 25380201SR (International) 22047301SR (North America) Always maintain a complete kit of troubleshooting spare parts that are known to work properly, to quickly identify the root cause of problems and resolve customer issues on the first try. *Desks shipped prior to December 18, 2017 with a Control Box with outdated software (see Fig. 4 on page 4) use the 4 preset controller. Desks shipped after December 18, 2017 use the Active Touch controller. TROUBLESHOOTING STEPS Step 1: Step 2: Step 3: Step 4: Check for power at the wall outlet; ensure the Desk or Bench is properly assembled, and all cables are securely connected. Check all connections of Low-Voltage Cables. Are any of the pins in the connectors damaged or not making contact? (see Fig. 2 on page 4) Obtain a Control Box, Controller and Power Cable that are known to work. TIP: Verify that the Control Box software is current when using the Active Touch controller. (See Fig 4 on page 4.) Using the known-good components, test the Lifting Columns one by one (see Common Procedures). Replace any faulty Lifting Columns. 2

Between each of the following steps, be sure to initialize the Control Box. Step 5: If all Lifting Columns operate properly, progressively swap out parts in the test setup as follows: A. Swap the known-good Power Cable with the original from the non-functioning Desk. If it stops working, the Power Cable is faulty. B. Using the original Power Cable, swap the known-good, Low-Voltage Cable with the original from the non-functioning Desk. If it stops working, the Low-Voltage Cable is faulty. Some Desk disassembly may be required. C. Using the original Power and Low-Voltage Cables, swap the known-good Controller with the original from the non-functioning Desk. If it stops working, the Controller is faulty. D. Using the original Power and Low-Voltage Cables and Controller, swap the known-good Control Box with the original from the non-functioning Desk. If it stops working, the Control Box is faulty. Be sure to go through all of the steps above to fully identify all faulty components. There could be more than one! COMMON PROCEDURES POWER-SAVING CONTROL BOX: The Control Box automatically powers down into Standby mode after approximately 10 seconds of inactivity. During Standby mode, the Control Box only consumes 0.1 watt of power. With the Control Box in Standby mode, the Desk can lose power without affecting the synchronization of the Lifting Columns. However, if the Control Box is still active and not in Standby mode, a power loss will require that the Lifting Columns be re-synchronized. Power fluctuations and brownouts can also cause the need for re-synchronization. SETTING THE ACTIVE TOUCH DISPLAY HEIGHT: Upon first time install of the Active Touch controller or after a Power Cycle, the text will blink SELECT, HEIGHT. Lift up or press down on the controller to scroll through the starting height options. Once the correct height has been chosen, pause for 2 seconds. The light guide will fill. When all three bars are full, the starting height is saved. SYNCHRONIZE THE LIFTING COLUMNS: Operate the Desk all the way down to the lowest position, and release the Controller or Down button. Press down on the controller or the down button again, and hold. After a few seconds, the Desk will move up and down, settling to its correct bottom position. The Lifting Columns are now synchronized via the software in the Control Box. Operate the Desk all the way up and down to confirm proper function. POWER CYCLE THE CONTROL BOX: In the unlikely event that an error occurs, and the desk is unresponsive, disconnect power to the Desk for at least 10 seconds to reset the Control Box. Reconnect power to the desk and synchronize the Lifting Columns as outlined above. RESETTING THE ACTIVE TOUCH DISPLAY HEIGHT: Press 1, 2, 1, 2. The text will begin blinking SELECT, HEIGHT. Lift up or press down on the controller to scroll through the starting height options. Once the correct height has been chosen, pause for 2 seconds. The light guide will fill. When all three bars are full, the starting height is saved. 3

TEST INDIVIDUAL LIFTING COLUMNS: Lifting Columns can be operated individually, even if they are sitting on a table, not assembled into a Desk. Obtain a Control Box that is known to work. Be sure the Control Box is unplugged, or plugged in but in Standby mode. Connect the Low-Voltage Cable of the targeted Lifting Column to the known-good Control Box. Connect only to 1 (farthest from the Power Cable). Obtain a Controller that is known to work, and connect it to the Control Box. TIP: Verify that the Control Box software is current when using the Active Touch controller. (See Fig 4 on page 4.) If the Control Box is unplugged from the wall outlet, plug the Power Cable back in. With the system hot, operate the individual Lifting Column. A. Can the Lifting Column be operated through its full range of motion? B. Does the Lifting Column appear to function normally? Any faulty Lifting Column must be replaced. There are no field-serviceable parts inside the Lifting Column. UNRESPONSIVE INTERFACE: If the 4 Preset Programmable Controller is unresponsive, unplug the controller from the control box for 10 seconds. Plug the controller back in with nothing touching the faceplate. This will reset the calibration of the faceplate. If the Active Touch Controller is unresponsive, verify that the Control Box software is current. (See Fig. 4 on page 4.) OBTAINING REPLACEMENT PARTS Contact your local Steelcase dealer to help identify and order Service Parts. If you need help, call 888.STEELCASE. PROBLEM ILLUSTRATIONS Fig. 1 - Power Cable not fully seated in Control Box Fig. 2 - Damaged pins in the low-voltage wiring connectors WRONG DAMAGED CORRECT CORRECT Fig. 3 - Frayed/damaged Low-Voltage Cables (damaged Lifting Column wiring harness shown) DAMAGED Fig. 4 - Software 03002000 v1.37 (shown below) is not compatible; needs to be 03002000 v1.57. WRONG 4

TROUBLESHOOTING: CAUSES AND SOLUTIONS PROBLEM POTENTIAL CAUSE POTENTIAL SOLUTION No power to Desk No power at wall outlet Check outlet with another device; check circuit breakers/fuses/wiring. Desk will not go up or down Power Cable not plugged into wall outlet Power Cable not plugged into Control Box Faulty Power Cable Desk wiring not properly assembled No power Desk is severely overloaded Control Box requires reset Damaged pins inside multi-pin connectors (Low-Voltage Cable/ connector) Damaged Lifting Column wiring harness Faulty Lifting Column Faulty Low-Voltage Cable Faulty Control Box Control Box software is outdated Blown fuse in Control Box Confirm proper cable engagement into wall outlet. Check that Power Cable is fully seated into Control Box. (see Fig. 1 on page 4) Inspect the Power Cable for damage; replace any damaged cables. Check that all cables are connected per the Assembly Directions. See above. Base supports a maximum distributed weight capacity of 314 lbs/142.4 kg* (2-leg) and 471 lbs/213.6 kg* (3-leg). Overloading the Desk could lead to damage that would not be covered by warranty. Tip: When calculating lifting capacity, subtract the weight of the worksurface, understructure and options (i.e. integrated rail, power and data access door or soft edge). See spec guide for weight of each feature. Perform initialization procedure. Lower Desk all the way down, and perform synchronization procedure. Ensure the Desk is in Standby mode (>10 seconds of inactivity). Unplug each multi-pin connection point and inspect the pins. Are they all straight and making good contact? If not, try using a pushpin to straighten them. (see Fig. 2 on page 4) (Otherwise, replace necessary components with undamaged versions.) Carefully check the condition of the Low-Voltage Cable of each Lifting Column. (see Fig. 3 on page 4) If any Low-Voltage Cables are damaged, the entire Lifting Column must be replaced. To prevent further damage, the Control Box will shut the whole Desk down if one Lifting Column is faulty. Test Lifting Columns individually, and replace any faulty Lifting Columns. Swap with Low-Voltage Cable known to work. Swap with Control Box known to work. Software 3002000 v1.37 is not compatible with the Active Touch Controller (see Fig. 4 on page 4). Replace with a compatible Control Box with software that is labeled SW 3002000 v1.57. In order to prevent control box failures at installation, please use a volt meter to ensure that every outlet into which a height-adjustable desk will be connected has 120 volts, plus or minus 10 volts, between the hot and neutral contacts (the parallel openings) BEFORE the height adjustable desk is plugged in. If this voltage reading is above 130 volts, please contact the building electrician for correcting the building wiring. 5

TROUBLESHOOTING: CAUSES AND SOLUTIONS PROBLEM POTENTIAL CAUSE POTENTIAL SOLUTION Desk goes up, but not down (or vice versa) Desk does not go through full range of motion Lifting Columns not synchronized (one is higher than the other) Desk movement is not smooth; Lifting Columns jerk or hop while raised or lowered Error Code displayed on Digital-Display Controller Height display is inaccurate Damaged pins inside multi-pin connectors (Low-Voltage Cable/ connector) Re-synchronize Desk Faulty Lifting Column Re-synchronize Desk Faulty Lifting Column Faulty Lifting Column Lifting Columns are not parallel with one another, causing them to bind Refer to Error Code listing The desk height is shown in centimeters instead of inches (or vice versa) The desk height is inaccurate Unplug Power Cable from wall. Unplug each multi-pin connection point, and inspect the pins. Are they all straight and making good contact? If not, try using a pushpin to straighten them. (see Fig. 2 on page 4) (Otherwise, replace necessary components with undamaged versions.) Refer to synchronization procedure. Test Lifting Columns individually, and replace any faulty Lifting Columns. Be sure to test all Lifting Columns! Why? Because another Lifting Column may have the same problem at a different height. Refer to synchronization procedure. Test Lifting Columns individually, and replace any faulty Lifting Columns. Be sure to test all Lifting Columns! Why? Because another Lifting Column may have the same problem at a different height. Test Lifting Columns individually, and replace any faulty Lifting Columns. Be sure to test all Lifting Columns! Why? Because another Lifting Column may have the same problem at a different height. First ensure that glides are properly adjusted and the Desk is level. Loosen (but do not remove) all of the screws attaching the Lifting Columns to the Worksurface. Operate the Desk through a complete up/down cycle and then re-tighten Worksurface attachment screws. Still binding? Take everything off the Desk, flip it upside down, and remove the Worksurface screws completely. Run the Desk through another up/down cycle. The position of the LIfting Columns may shift slightly; re-install Worksurface screws in the adjusted position. Follow instructions on Error Code listing; is Desk functioning normally? Try initializing the Control Box. Follow instructions in the Ology User Guide to switch from inches to centimeters, or vice versa. Follow instructions in the Ology User Guide to adjust the height displayed. If using the Active Touch controller, refer to page 3, Resetting the Active Touch Display Height. 6

OLOGY DESK ERROR CODES Error codes are only available with the Active Touch or 4 Preset Programmable Controllers. ERROR CODE ERROR CODE NAME DESCRIPTION POTENTIAL CAUSE SOLUTION/TROUBLESHOOTING E01 INITIALIZATION The table has an unknown position and needs to be initialized E08 Watchdog Software failed to activate routine that checks calculations E09 LIN Collision Collisions detected on the LIN bus Position error New Lifting Column added Program fault Multiple Controllers being activated at the same time Unplug Power Cable for 15 seconds Replace Control Box Test Controllers one at a time, and then together. One Controller is likely faulty E10 Power fail Power fail happened Power Cord pulled during driving Internal fault Check Power Cord is not caught, and is allowed to freely travel Plug table into reliable 120v/240v outlet and test Replace Power Cable or Control Box E11 mismatch Change in number of Lifting Columns since initialization Disconnection Lifting Column added Check Low-Voltage Cable connections and integrity Change Low-Voltage Cable or Lifting Column E12 Position error One has a different position than others E13 Short circuit One of the motor outputs has short-circuited E15 Power limit System has reached its power limitation Too much back drive occurred Squeezed Low-Voltage Cable Short in motor Low-Voltage Cable pulled during driving Internal fault Move table to lowest position Check Low-Voltage Cable connections Isolate and replace Low-Voltage Cable Isolate and replace Lifting Column Check Low-Voltage Cable is not caught, and is allowed to freely travel Use strain-relief loop built into control box E16 Button error Illegal buttons pressed Hitting multiple buttons simultaneously Check Controller E17 Safety missing LIN bus unit does not support safety feature Controller does not have up-to-date software Try a Controller with a more recent software version (see Fig. 4) E23, E24, E25 1, 2, 3 missing 1, 2, 3 are detected missing Disconnection Check Low-Voltage Cable connections and integrity Change Low-Voltage Cable or Lifting Column E29, E30, E31 1, 2, 3 type error 1 is not same type as when initialized 2, 3 are not same type as when initialized or not same type as 1 Change in Lifting Column type Check Lifting Column type Change Lifting Column E35, E36, E37 1, 2, 3 pulse fail 1, 2, 3 had too many pulse errors Loose/faulty Low-Voltage Cable Hall sensor PCB inside Lifting Column Check Low-Voltage Cable connections and integrity Replace Lifting Column E41, E42, E43 OVERLOAD Overload up occurred on 1, 2, 3 Hit obstruction Leg is overloaded Reached end stop (before initialization at upper end-stop occurs) Remove obstruction Remove load (see Common Procedures), if necessary 7

OLOGY DESK ERROR CODES Error codes are only available with the Active Touch or 4 Preset Programmable Controllers. ERROR CODE ERROR CODE NAME DESCRIPTION POTENTIAL CAUSE SOLUTION/TROUBLESHOOTING E47, E48, E49 OVERLOAD Overload down occurred on 1, 2, 3 Reached end stop Hit obstruction Remove obstruction (see Common Procedures), if necessary E53, E54, E55 COLLISION Anti collision triggered on 1, 2, 3 Hit obstruction Remove obstruction (see Common Procedures), if necessary E59, E60, E61 COLLISION Safety limit switch activated on 1, 2, 3 Hit obstruction Remove obstruction (see Common Procedures), if necessary E65, E66, E67 1, 2, 3 pulse direction Pulses counted wrong direction in 1, 2, 3 Motor poles are crossed Hall sensor cables crossed inside Lifting Column Check Low-Voltage Cable connections and integrity Replace Lifting Column E71 Ch1A short Short circuit on channel 1 circuit on 1A) E72 Ch1B short Short circuit on channel 1 circuit on 1B) E73 Ch2A short Short circuit on channel 1 circuit on 2A) E74 Ch2B short Short circuit on channel 1 circuit on 2B) E75 Ch3A short Short circuit on channel 3 circuit on 3A) E76 Ch3B short Short circuit on channel 3 circuit on 3B) Inspect cable exiting, Inspect cable exiting, Inspect cable exiting, Inspect cable exiting, Inspect cable exiting, Inspect cable exiting, Visit Steelcase.com facebook.com/steelcase twitter.com/steelcase youtube.com/steelcasetv 6/2018 2018 Steelcase Inc. All rights reserved. All specifications subject to change without notice. Trademarks used herein are the property of Steelcase Inc. or of their respective owners. Part No. 939501823 Rev. H