Installation Instructions

Similar documents
Installation Instructions. Ecast Mojo B75B Motherboard Upgrade Kit Kit #

Installation Instructions. Ecast View B75B Motherboard Upgrade Kit Kit #

Installation Instructions. Rock-Ola Ecast B75B Motherboard Upgrade Kit Kit #

Section. Service & Maintenance. - Core & Hard Disk Drive (HDD) - Amplifier - Monitor - UPS - Dollar Bill Acceptor - Fan Filter G - 1

Installation Instructions

Service & Maintenance

PoE/FPR Kit for Auto-Sync Time Clock. The Auto-Sync Time Clock is a validated time system with a Web interface and auto discovery.

To connect the AC adapter:

How To Install: C4000 EMV Upgrade Kit

Power Supply, 17-inch

System Storage EXP3000 Rack Installation Instructions

Kit# KOV ModBox IR REMOTE CONTROL KIT

Replacing the PanelMate Power Pro 1785 Series, PanelMate epro 7585x-8 and 7685x-8 Series Backlight Assembly

How to add a Second Drive to a Mac mini (2012) using the OWC Data Doubler SSD/2.5 Installation Kit

Codonics Virtua Virtua-2 Optical Drive Replacement

Installation Instructions

Gateway Profile 4 service guide

Replacement Keyswitch Assembly

Star Trac Fitness E-ST 5090 Stepper. Install Guide

Ion Memory Upgrade. Visit the AMI Entertainment Web site PM

Replacement Instructions. Backplane PCA for the HP Router 650

Smart Multivariable Transmitter (SMV 3000) Electronics Module Replacement Kit Instruction

Removing and Replacing Parts

TDM To MiniMech conversion ProceDure

How To Install: G2500 EMV Upgrade Kit

Rack Installation Instructions

Voice Evacuation Control Panel Main Circuit Board Replacement Product Installation Document

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

REMOVE COVERS. 1. Remove three screws from the Side Panel (L). 2. Slide the Side Panel (L) backward, and raise it to remove from the printer.

ThinkCentre. Hardware Removal and Replacement Guide Types 8143, 8144, 8146 Types 8422, 8423, 8427

INSTALLATION INSTRUCTIONS

FC-25/50DA Main Circuit Board Replacement Product Installation Document

EMC 10T "CE" Mechanical Upgrade Procedure

Royal RVV-500 (B) Retrofit Kit

CAMERA ASSEMBLY. Removal/Replacement of the Camera Box Assembly APR-CA. Install Camera Assembly. Remove Camera Assembly

Dell Latitude C800 Service Manual

Replacement Instructions

Hard Drive, 20-inch. Replacement Instructions

Installation Instructions

TIVO DVR UPGRADE INSTRUCTIONS (#80-HD)

CRESCENDO /7200 G3. Quick Start Guide for Crescendo /7200. Processor Upgrade Card for Power Macintosh 7200/8200 Computers

User s Guide. Mobile Rack Device Mounting Kit for Echo Express III-R and xmac Pro Server. Quick Start Guide Video Available Online!

E2460GS Oscilloscope Upgrade Kit

Oracle <Insert Picture Here>

Tim Hortons EI30 Ethernet Interface Circuit Board

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

Megatouch FORCE Monitor Chassis Board Replacement

Seeburg JCU-DEC Kit Convert Your Seeburg DEC Wallbox Into a Jukebox

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

7403 K321. Display Wall Mount. Kit Instructions. Issue A

Instructions to Install Retrofit Kit 6/7000 Machine

Kit K Instructions. V8700 to Alpha Conversion Instructions

TIVO UPGRADE INSTRUCTIONS (c) , Adberg Consulting LLC. All rights reserved.

Rack Installation Instructions

Dell Inspiron N5110 Service Manual

IBM. Rack Installation Instructions

into the EMU E4 Classic and E4 Platinum Samplers

Encore XT Manual Gun Upgrade Kit

E1135C PDU and Pod Upgrade Procedure

SCSI Cable Installation Instructions

C40 Console Upgrade Kit Installation PN Kit, C5 to C40 Console Upgrade PN Kit, C5 to C40 Console Upgrade with Contact Heart Rate

TDM-100/150 TO NMD-50 CONVERSION PROCEDURES RL5000

imac Intel 27" EMC 2639 Hard Drive

Hardware Replacement Guide Types 8099, 8116, 8155, 8156 Types 8157, 8158, 8159, 8160 Types 8215, 9210, 9211

SECURITY MODULE UPGRADE

PC9/P9 CPU Card Replacement

Ribbon Supply Spindle Maintenance Kit

Upgrading and Servicing Guide

REMOTE HEAD ADAPTER INSTALLATION GUIDE

DynoWare EX+ Upgrade Installation Guide for Motorcycle Dynamometers.

1500SE UPGRADE DOCUMENT

Printhead alignment. 1. Turn the printer off. 2. Remove the top cover. See Additional information top cover removal on page 8.

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

EMC 10/4 "CE" Mechanical Upgrade Procedure

Upgrading and Servicing Guide

EMV 330 CARD READER UPGRADE

Rack Installation Instructions

INSTRUCTION BULLETIN

Ag Leader Technology Insight. Direct Command Installation Spra-Coupe 7000 Series

SERVICE INSTRUCTIONS CONVERT OLD SFC TO NEW SFC WARNING WARNING WARNING

INSTRUCTIONS FOR THE INSTALLATION OF THE INFINITY "L" DISPLAY HOOD (INTO PREVIOUSLY INSTALLED INFINITY "L" SYSTEMS)

Dell Latitude C800 SERVICE MANUAL. support.dell.com

Installation Instructions

CREDIT CARD READER for ROWE CD100I CD100J Jukeboxes Installation Instructions Manual

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

HARMONi G3. Quick Start Guide for HARMONi G3. imac Processor/FireWire Upgrade

Instructions to Install Retrofit Kit RVMC 4/5000 Machine (MDB Only)

FRU Installation Notes Virtuo Monitor Glass Replacement

FreeNAS Mini and Mini XL Network Upgrade Kit

Inspiron 22. Service Manual Series. Regulatory Model: W17B Regulatory Type: W17B001

Dell XPS 14z Owner s Manual

RAM Rail Mount Kit RAM 201U 5 Arm RAM 2461U Monitor Mount RAM 235U Base, Double U-Bolt

HP EVA4400 M6412 drive enclosure

WEASEL N/B MAINTENANCE

FITTING INSTRUCTIONS

Galaxy Rectifier Shelf Field Replacement

EPROM Replacement for Contrbl Systems

Rack Installation Instructions

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

Transcription:

Installation Instructions Ecast EQ to AMI hardware conversion KIT #26683701 This kit is for use in Ecast EQ jukeboxes. Tools Required #2 Phillips screw driver, #1 Phillips screw driver, Small flat blade screw driver Parts Included with this Kit Item # Part Number Description Quantity 1. 22219007 Hard Drive Assy. (Grey dot) 1 2. 61196906 CBA Core I/O Ecast Mojo 1 3. 61200702 CBA Digital Preamp 4 Channel 1 4. 40981002 CBA SATA/PATA Converter 1 5. 22328901 Bracket, Mounting SATA/PATA 1 6. 80402304 #6-32 x 1/4 Phillips Head Screw 2 7. 80401604 #4-40 x 1/4 Phillips Head Screw 2 8. 22188403 Card Trigger Code 1 These Instructions 2 1 3 4 5 8 Page 1 of 8

1. Turn the jukebox off and unplug it from the wall outlet. 2. It is much easier to perform this conversion with the EQ laying on a bench or other suitable work space. Remove the metal overlay. Swing the EQ panel assembly forward and disconnect all wires between the EQ panel and the cabinet. Mark wires or otherwise note where the wires are connected so they can be reconnected after the conversion. 3. Disconnect and remove the EQ panel from the cabinet. Lay the EQ panel on your work surface component side up. I/O Board and Preamp replacement 4. Start by disconnecting the plugs (four places) connected to the preamplifier. 5. Remove (4) small Phillips screws from the preamplifier mounting brackets (2 front, 2 rear). Remove the preamp and bracket assembly. Retain the mounting screws. Mounting Screws Mounting Screws 6. Transfer the two mounting brackets from the old EQ preamp to the new preamp, Item 3, as shown. Set the preamp assembly aside for now. The old preamp will not be reused. 7. Disconnect all the wires plugged into the COIM board and position them out of the way. 8. Remove (6) Phillips screws holding the COIM board. Carefully remove the COIM board. The COIM board will not be reused. Page 2 of 8

9. Verify all jumpers on the new I/O board, Item 2, are configured in position 1 except the P4 jumper which should be in the 4dev position as shown. Install the new I/O board and secure with (6) Phillips screws from step 8. 10. Reconnect all the plugs to the I/O board as shown below. The new I/O board supports only one hard wired remote. If your machine uses two hard wired remotes, one will have to be left unused. 11. Install the new preamplifier and secure the mounting brackets using (4) Phillips screws left over from step 5. Page 3 of 8

12. Reconnect the 6 pin power cable and connect the modular cable from the preamp to the new I/O board. The black 10 pin plug and the white 12 pin plug will not be reused. Simply position these out of the way. Mic Volume Unused Plugs Hard Drive bay modification 13. Unplug and retain the two wire power connector going to the hard drive connector on the back of the hard drive mounting bracket. Unplug the 80 pin hard drive IDE cable from the hard drive connector and position it out of the way. 14. Remove the two #4 Phillips screws holding the hard drive connector to the mounting bracket. Discard the two screws and the hard drive connector. 15. Position the new mounting bracket, Item 5, as shown and secure with (2) #4-40 x 1/4 Phillips screws, Item 7. 16. Install the SATA/PATA Converter, Item 4, and secure the board to the bracket with (2) 6-32 x 1/4 screws, Item 6. Page 4 of 8

17. Connect the IDE data cable and the power cable to the SATA/PATA Converter board. Hard Drive Install 18. Your hard drive has a black plastic cover and edge connector interface board, remove (2) screws securing the interface board. Discard the interface board. Remove the black plastic cover, discard the cover. 19. Using a small flat blade screw driver carefully bend (4) retaining tabs of the hard drive tray slightly outward to release the hard drive. Remove the hard drive from the tray. The hard drive will not be reused. Please return the hard drive to AMI. 20. Use the small flat blade screw driver to push the tabs of the hard drive tray back into position. The bottom of the tabs should protrude slightly into the hard drive tray. 21. Install your new AMI hard drive in the hard drive tray. Be sure the retaining tabs line up with the mounting screw holes on the sides of the hard drive. 22. When first installing the hard drive and hard drive tray into the mounting bracket, be sure the SATA/PATA Converter board is aligned properly. Loosen (2) screws holding the SATA/PATA Converter board. Align the hard drive with the converter board and plug them together. Tighten the SATA/PATA Converter board mounting screws. 23. Double check that all harnesses are properly connected and all mounting screws are tight. Remount the EQ panel and reconnect all harnesses between the EQ panel and the cabinet. Page 5 of 8

Power up Testing 24. Plug the jukebox back into the wall then power up the jukebox and ensure the jukebox UI comes up. This will take some time and may include one or more reboots. 25. In order for the jukebox to connect to the AMI network, the MAC address of the computer core must be entered into the AMI database and the jukebox will have to be added to your operating contract. This will require a phone call to the AMI Tech Support line, 1-877-ROC-N-ROL (1-877-762-6765). a. The MAC address is found on a Service Mode screen. b. If the jukebox is not in the Service Mode, push the Service Console button on the core computer I/O board. c. Push the Calibrate button and calibrate the touch screen. d. Touch Diagnostics then touch System Information. The MAC address will be displayed in the third block down from the top right. e. To help the AMI Tech Support technician configure your jukebox in the AMI system, please have the jukebox model and serial number along with the MAC address when you call. 26. After Tech Support has entered the MAC address of the jukebox, you will need to enter the Trigger Code. a. From the main menu in the Service Mode, touch System Setup then touch Enable/Extend Features. b. Using the on-screen keypad, enter the trigger code found on the Trigger Code Card then touch the Send Code button. Page 6 of 8

This page intentionally left blank. Page 7 of 8

Page 8 of 8