Presented by Sustainable Energy Development Section Customer Service Department Distribution Division, TNB PRIMARY DRIVER OF GREEN ENERGY IN MALAYSIA
GENERAL INFORMATION OF RENEWABLE ENERGY DEVELOPMENT IN PENINSULAR MALAYSIA
Residential Kumpulan Wang Tenaga Boleh Baharu RM 3.39 (Except Resindential < 300kWh) Commercial Industrial
Technology FiT Duration Range of FiT Rates (RM/kWh) Biomass (palm oil waste, agro based) Biogas (palm oil waste, agro based, farming) Annual Degression 16 0.27 0.35 0.5% 16 0.28 0.35 0.5% Mini hydro 21 0.23 0.24 0% Solar PV & PP 21 0.85 1.78 8% Solid Waste & Sewage 16 0.37 0.45 1.8%
TNB S BASIC FIT PROCESSES & REQUIREMENTS
STEPS RE DEVELOPER / FIAH SEDA MALAYSIA TNB 9
FiAH downloads REPPA document from SEDA website FiAH submits complete REPPA documents with attachments to TNB SEDS submits REPPA to Legal Service Department for signing off FiAH submits stamped REPPA each to TNB & SEDA TNB returns the signed REPPA to FiAH for stamping TNB authorized signatory signs REPPA
REPPA form - A contract for energy purchase under RE Act 2011 Documents required during submission of REPPA RE Application form - To create new account for FiAH Vendor Master Data Maintenance Form - To create Vendor No. for payment Receivable from Monday to Wednesday every week (9.00am till 12.00 noon only) Customer Master Data Form - To create RJO for meter purchase
PREPARATION OF REPPA: 1. Download the standard REPPA form from SEDA website. 2. Fill in (in typing mode & not hand writing) for page 1, page for Para 18 (Notices) and signatures page only. The other pages leave as it is and no amendment is allowed at all. Please ensure the information given are checked and correct. 3. FiAH shall put his/her signature on each page of REPPA form except the signing page (last page of form) 4. Each document i.e FiT Approval certificate must be certified true copy by Commissioner of Oath. 5. FiAH and his/her witness shall put their signatures on the signing page (last page of REPPA form) 6. Make three (3) copies of REPPA form and put them in 3 separate Management File. 7. Each File should has separator (index divider) for each document. The documents are:- a) REPPA form b) Appendixes i) For generation capacity <= 425kW (low voltage connection), use Appendix A ii) For generation > 425kW up to and including 1MW, use Appendix B iii) For generation capacity > 1MW, use Appendix A, B, C, D and E Reminder: If FiAH/Service Provider realize any errors occurred on the Feed-in Approval certificate i.e premise address, FiAH s name, IC, ROC, FiAH/Service Provider shall refers that matter to SEDA Malaysia for correction & approval or gets new certificate. Please refer to the existing electricity bill for the premise if any to ensure the address is correct and similar. This is crucial for TNB to create new account for FiAH in TNB s billing system later on. Any inconsistency of address and/or any other info will caused delay in creating new account.
Keep blank for TNB < FiAH initial > < FiAH initial > Name of Service Provider I/C No: Name of FiAH I/C No:
REPPA form Management File (with separator) SAMPLE ONLY FiA certificate (certified true copy) Appendix
NEW ACCOUNT FORM: Complete the RE Application Form and submit to TNB with all supported documents as shown below:- Individual Non-individual FiA certificate A copy of IC A copy of Q form (EC) A copy of electricity bill A copy of CCC approval A copy of undertaking or approval letter by SEDA Malaysia for case of error in FiA certificate Note: All this documents do not require certified true copy FiA certificate A copy of Borang 44 A copy of Borang 24 A copy of Borang 49 A copy of Q form (EC) A copy of electricity bill A copy of CCC approval report (12kW up to & including 425kW) A copy of PSS approval and its report (> 425kW) A copy of undertaking or approval letter by SEDA Malaysia for case of error in FiA certificate Note: All this documents do not require certified true copy except for Borang 24 and Borang 49.
VENDOR REGISTRATION FORM: Complete the Vendor Master Data Maintenance Form and submit to TNB with all supported documents as shown below:- Individual Non-Individual A copy of IC A copy of Bank statement Note: Bank statement shall clearly state the owner name and IC. A copy of Borang 9 (SSM) A copy of Borang 13 (for case of company name changed) A copy of Bank statement Note: Bank statement shall clearly state the company name and ROC. All documents are to be submitted in two (2) copies
METER PURCHASE FORMS: 1. Customer Master Data Form 2. Meter Purchase Form 3. Attached a copy of FiA certificate (first page only) 4. Borang Maklumat Awal (BMA) Large Power Metering
Conditions For Connection to Grid TNB- 1. FiAH & TNB have entered into a RE Power Purchase Agreement (REPPA) 2. REPPA has been registered by SEDA 3. FiAH submit written application for connection to TNB 4. The connection has been made at the location approved 5. Method of connection approved. 6. The connection is carried out by the distribution licensee
Testing & Commissioning (T&C) REPPA METER NC T&C PAYMENT Time Frame For Connection by TNB - Subject to the compliance and completeness of installation at site by Competent Person Low Voltage: Within 30 days from the application received for T&C by Sustainable Energy Section Medium Voltage: Within 60 days from the application received (Initial Operation Date) by Sustainable Energy Section
Testing & Commissioning (T&C) REPPA METER NC T&C PAYMENT Available Low Voltage Connection Points at TNB Grid System Cut-out fuse existing at site, old model where there are two cable slots Junction box typically for new connection at 5 foot mains Black box for overhead system or transition between overhead and underground systems. Feeder pillar for underground system. Either existing or new installation. FiAH to provide Information Signage at Connection Point and Grid source (substation) 25
Testing & Commissioning (T&C) REPPA METER NC T&C PAYMENT Available Low Voltage Connection Points at TNB Grid System Substation 0.4 kv Substation 0.4 kv TNB FiAH Meter Panel Existing service cable Export Meter A B Load 0.4 kv Connection Point TNB FiAH Meter Kiosk Existing service cable Export Meter A B Load Load 0.4 kv Connection point RE PLANT Capacity <=60kWp = ~ Inverter 0.4 kv RE PLANT Capacity >60kWp = ~ Inverter 0.4 kv Solar PV panels Solar PV panels 26
27
Action by FiAH: 1. Ensure all requirements stated in the T&C checklist are fulfilled for meter purchase and T&C. 2. Make a copy of each document for T&C (hardcopy) except the REPPA. 3. Burn all the documents in a compact disc (CD) as pdf file inclusive of stamped REPPA. 4. Submit the documents and a CD to SEDS TNB. 5. Bring along the T&C form during T&C, get the signature of TNB local station after T&C successfully done. 6. Forward the T&C form either by hand or email to RE@tnb.com.my for SEDS TNB acknowledgement. 7. Received complete T&C form and upload to efit SEDA Malaysia. 28
29
Solar PV 30
Solar PV 31
Solar PV TO MSB Consumer 32
33
34
582kWh/(5.5kW*28 days) = 3.78 hour/day (ok) VERIFICATION PROCESS
Available 36
Nos Officer in-charge Email / Contact No 1 Dafit Duli Hera dafit@tnb.com.my 019-664 3456 2 Shyamini A/P Kanagaratnam shyamini.kanagaratnam@tnb.com.my 012-925 4090 Selventhiran A/L Jai Komar selventhiran.jai@tnb.com.my 03-7967 9000 ext 1349 Nos Officer in-charge Accounts Email / Contact No 1 Norhazila bt Mohammad Hussin All RE accounts NorhazilaMH@tnb.com.my 019-357 7421 Azrin Hakimi bin Jaafar Kedah & Penang azrin.jaafar@tnb.com.my 03-7967 9000 ext 1802 Norlinda bt Faisal Rizal Selangor (except PJ & Klang) norlinda.rizal@tnb.com.my 03-7967 9000 ext 1802 Muhamad Faidhi bin Ibrahim Perlis, Perak, Kelantan, Terengganu, Pahang faidhi.ibrahim@tnb.com.my 03-7967 9000 Natasha bt Mohamad Jumli PJ & Klang natasha.jumli@tnb.com.my 03-7967 9000 ext 1349 2 Noraina bt Tahir Kuala Lumpur & Putrajaya NorainaTa@tnb.com.my 019-959 9738 Suhaida bt Mohamed Supian Negeri Sembilan, Melaka & Johor suhaida.supian@tnb.com.my 03-7967 9088 Nos Officer in-charge Email / Contact No 1 Siti Rohayu Md Ali rohayumd@tnb.com.my 019-330 3279 2 Maisarah Che Ros maisarah.ros@tnb.com.my 03-7967 9000 3 Vellasamy Karupiah vellasamy.karupiah@tnb.com.my 03-7967 9000 ext 1349 4 Norhazila Mohd Yunus NorhazilaMy@tnb.com.my 03-7967 9000
www.e-services.tnb.com.my -View & print the payment advice - Notification to FiAH when the payment advice is verified Guidelines for renewable energy processes & procedures practiced by TNB
THANK YOU