Multidiscipline CAD Usage at an EPC Company Jimmy Bergmark Pharmadule Emtunga AB / JTB World

Similar documents
Beyond the Limits: Using Autodesk Revit and Navisworks Manage for Design Collaboration on Large-Scale Projects

Effective Collaboration using Autodesk Revit Structure and Autodesk Building Systems

Managing a complete site over multiple AutoCAD Plant 3D Projects

What s new in SketchUp Pro?

Questions and Answers

Autodesk Architectural Desktop Real-World Workflow Methodology

Welcome to this IBM podcast, Realizing More. Value from Your IMS Compiler Upgrade. I'm Kimberly Gist

Revit MEP. Autodesk Navisworks

Fast Content for AutoCAD MEP 2015

Questions and Answers

LEAP into the New Project Paradigm

Cross-Discipline Coordination in Autodesk s Revit Platform

Cracking Vault with AutoCAD Plant 3D and AutoCAD P&ID

In Union There Is Strength: AutoCAD and Autodesk Revit in Concert

Achieving Contentment with the AutoCAD Architecture Content Browser Douglas Bowers, AIA

Autodesk University Collaborative Multidisciplinary Workflows Between AutoCAD Plant 3D, Revit, and AVEVA PDMS

BIM MEPAUS PRACTICES Issued By: Revision: Date

Revit MEP basics. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Technology Happens! BICSI Winter Conference. Orlando Florida January 20, Presented by. Chip Chapman, RCDD. Principal

Course BIM MEP Diploma Revit MEP Navis Works

Contents. AutoCAD Plant 3D Managing Large Projects Page 2

SNC Supplier quick guide for Danfoss Cooling & Danfoss Power Solution. Created by Rajan Katheeravan Approved by Kumar Sivashanmugam

Migrating from Autodesk Land Desktop to Autodesk Civil 3D CV42-3L

ES11628 AutoCAD P&ID and AutoCAD Plant 3D: Introduction to Your Project Database

Structural Engineering Training courses :

Scan-to-BIM. NEWBIM ApS, Galina Slavova CEO, BIM Specialist

Sample Exam. Advanced Test Automation - Engineer

Trelligence Affinity for ArchiCAD

FAQs Contents 1. General Product Information Support and Training Platform and System Requirements... 6

Building Information Modeling

PBS BIM Export to DWG

Paul Shillcock Transport for London, UK

Autodesk University Step Up Your Game AutoCAD P&ID and SQL: Making Data Work for You Skill Level: All Levels

Suite en It Up with Autodesk ReCap

AS10473 Design Workflow from Concept to Construction Documents Design Workflow from Concept to Construction Documents

Meeting the OMB FY2012 Objective: Experiences, Observations, Lessons-Learned, and Other Thoughts

All In the Family: Creating Parametric Components In Autodesk Revit

LEAP into the New Project Paradigm

Corrientes Piso 3 - Of C1042AAA Buenos Aires - ARGENTINA - Telefax (5411)

Technical training May - August

Switching from AutoCAD Architecture to Revit Architecture: The Right Attitude is Everything AB2885

Reality Capture. Customer Case

Multidiscipline Collaboration

Bentley OpenPlant PowerPID

BIM Diploma content ( included courses) : Training course Course Levels Duration Outputs Revi t Architecture

QM Chapter 1 Database Fundamentals Version 10 th Ed. Prepared by Dr Kamel Rouibah / Dept QM & IS

Autodesk Plant Design Suite. Build on the power and familiarity of AutoCAD with multidiscipline plant design solutions.

Getting Along: Coordinating Architectural and Structural Design with Autodesk Revit Structure

THE SMARTPLANT INSTRUMENTATION VENDOR SUPPLY CHAIN

Welcome Back! Without further delay, let s get started! First Things First. If you haven t done it already, download Turbo Lister from ebay.

BLD How the Implementation of Revit for Rebar Detailing helped us win more business

Migration Made Easy! Speaker: Bud Schroeder, Autodesk Inc.

Autodesk Inventor for Plant Kimberley Hendrix, Solutions Consultant D3 Technologies, LLC Tulsa, OK

AC5379: AutoCAD 2012 Content Explorer: The Complete Office Configuration Guide

that may have a direct effect on your bottom line. The question

The Consulting Engineer s Guide to Implementing Revit Structure

Revit Structure. Autodesk Navisworks

ARC VIEW. Leveraging New Automation Approaches Across the Plant Lifecycle. Keywords. Summary. By Larry O Brien

3D printing Is it Good Enough for Scale Model Boat Builders?

50 years Committed to Service with Integrity

Autodesk Plant Design Suite. Integrated solutions for plant design and whole-project review

AEC Design Technology 2012

More than 85% of our work is either repeat business or referrals from satisfied customers, a statistic that we are very proud of.

The Challenges for Software Developers with Modern App Delivery

Lean Manufacturing II

How to Utilize BIM in Hydronic System Design August 20, 2015 with Guest Speaker Jim Meseke, ENGWorks Q&A Documentation

Unveiling ProjectWise Navigator V8i The Information Rich Review Alternative

Ensuring a Successful DCIM Project. What You Need to Know. Paul Goodison CEO, Cormant Inc.

OG10333-L Behind the Face Tips and Tricks in AutoCAD Plant 3D

Welcome to this IBM Rational podcast, enhanced. development and delivery efficiency by improving initial

IT & Healthcare. Services. Systems

Reaping the Benefits of Migrating to Autodesk Building Systems

Covers Autodesk Advance Steel fundamentals, so you become quickly productive with the software

Trends in Viewing and Distributing Design Data Diane Li, Product Manager Viewers & DWF Autodesk

Get Connected Autodesk Revit MEP Connectors Demystified

How Emerson s I/O on Demand Is Changing the Automation Infrastructure

Autodesk Vault and Data Management Questions and Answers

Managing Markups - AutoCAD and the digital red pen Jim Mays

Lean Value Stream Delivery - MEP Systems Design, Fabrication, Installation & Service

BIM Goes to School AUTODESK REVIT BUILDING INFORMATION MODELING. BIM in the Architectural Curriculum. Savannah College of Art and Design, USA

Using Autodesk Ecotect Analysis and Building Information Modeling

Manual Autocad 2016 Pdf 2010 User

Brochure 2018 SIMPLE LOW PRICE RELIABLE

Architecture Engineering Training courses : Course BIM Architecture Diploma Revit Architecture 3D Max Vasari Navis Works Photoshop For Architects

Sheets and Revisions A Super Duper Click Saver Production

At the end of this. Set sub the main project.

Most as-built information is still manually collected. Today s Design Market

Because After all These Years I Still Don t Get it!

Roundtable: Sell Your First Revit Plug-in on the Revit Exchange Store Saikat Bhattacharya Autodesk Stephen Preston - Autodesk

Introduction to User Stories. CSCI 5828: Foundations of Software Engineering Lecture 05 09/09/2014

Autodesk Revit MEP: Fast Families for Engineers David Butts Gannett Fleming

OPEN. INTELLIGENT. Laser Scanning Software Solutions

System Analysis & design

Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan

ES20821 Digital Craftsmanship of a Half-Size Eiffel Tower Replica

Presentation #: CL01


Contents. AutoCAD P&ID in a Multi-user Environment Page 2

Website Operators Manual

Students must complete all courses with a 70% (C-) or better to complete the program.

Transcription:

November 28 December 1, 2005 Orlando, Florida Multidiscipline CAD Usage at an EPC Company Jimmy Bergmark Pharmadule Emtunga AB / JTB World PD12-1 This case study will discuss CAD usage at Pharmadule Emtunga. They are aiming for project execution using a mix of CAD applications that best suit their needs. AutoCAD, Autodesk Architectural Desktop, PDMS, third-party applications as well as in-house-developed tools are used. An engineering database application is a hub for the information flow. EDM and ERP are also deployed. A data-centric P&ID application is on its way. Topics Covered - Computer-integrated engineering and project execution - AutoCAD integration with PDMS - 2D, 3D, and BIM - P&ID and engineering databases - Customization of AutoCAD About the Speaker: Jimmy is CAD and database development manager at Pharmadule Emtunga AB in Sweden, where he has been working for 8 years. He has also served the company in the position of AEC engineer. Pharmadule Emtunga, an AEC/EPC company, is the world-leading supplier of high-tech modular facilities to the pharmaceutical and biotech industry, living quarters and technical modules to the oil and gas industry, and modules to the telecom sector. Jimmy started to use AutoCAD in 1989. He also owns and operates JTB World, a company that focuses on application development. He has been published in several magazines and writes for his blog http://jtbworld.blogspot.com. Email: jimmy.bergmark@pharmadule-emtunga.com or info@jtbworld.com

Pharmadule Emtunga AB Pharmadule Emtunga with head quarter in Sweden is the worldleading supplier of high-tech modular facilities to the pharmaceutical and biotech industry (Division Pharmadule), living quarters and technical modules for the oil & gas industry (Division Emtunga) and modules to the telecom sector (Division Flexenclosure). We provide high-tech, top quality facilities with short delivery time, at a fixed price. The business concept is to create value for our customers by designing and producing high-tech facilities with short lead-times, that are complete and predictable of high quality at a favorable cost Jimmy Bergmark, employed at Pharmadule Emtunga and works as a CAD and Database Development Manager. Organizational location of our group Engineering Management & Tools is within Plant Engineering that is a line organization supporting the three divisions. Pharmadule Emtunga is an EPC (Engineering, Procurement and Construction) company as well as an ETO (engineering-to-order) company. Pharmadule Emtunga has in-house personnel specialized in the design and engineering of modules, complete plants and facilities for the different industrial segments we are active in. The plant engineering department covers all engineering disciplines necessary for a project execution, such as: structural architectural piping electrical and telecommunication HVAC (Heating Ventilation, Air Conditioning) Instrumentation Our concept of exceptionally fast project delivery, guaranteed quality and cost, demands tight project control. This is achieved by using standardized guidelines for documentation and scheduling. The rational and efficient engineering work is based on computerized tools and work methods. We work with 3D CAD (database) systems for all engineering disciplines. 2

A growing company Jimmy has been working at the company since 1997 when he started working with architectural and structural engineering. At that time the company used AutoCAD r13 even though r14 had recently been released. The company was relatively small at that time and the CAD reseller did the CAD support, management and IT work. Over the time Jimmy started to involve more and more in these areas and 1999 the company upgraded to AutoCAD 2000. Everything was still mostly 2D but Jimmy added minor Lisp customizations when there was need for it. A lot of information was handled in Excel and he started to use VBA to improve the work with these lists. Attributes where added to blocks to hold information. The Express Tools commands ATTOUT and ATTIN where used as a starter to save data back and forth. The format of the exchange file was tab separated so it could be handled by Excel. After a while the company started to use the dbconnect functionality instead. Since Excel is not a really good place to store a lot of data in a consistent and secure way Jimmy introduced Access. Jimmy used the VBA functionality in Access to build forms for navigating and entering data as well as creating reports based on queries. During the years since AutoCAD 2000 was released Pharmadule Emtunga have used every released version and now are using AutoCAD 2006. Since year 2000 Jimmy have been involved with Alpha/Beta tests of different Autodesk products. He can really recommend signing up for the Beta and Feedback program at http://myfeedback.autodesk.com/. This has helped a lot by being able to influence the shape of products like AutoCAD based on the company s specific needs. It also has been a great help to easy migrate to newer versions. Pharmadule Emtunga today have two CAD platforms. AutoCAD as one and PDMS is another. On the AutoCAD platform Autodesk Architectural Desktop (ADT) is used for architectural engineering and MagiCAD (from Progman) for HVAC, piping and E/I/T. ProSteel 3D has been used for structural design for some projects. Most projects are engineered fully in 3D as this is more or less required to be able to connect and extract object data to and from our other systems. Our aim is for 100% object oriented systems to ensure 100% consistent project documentation across all used systems. Databases used to handle Information in BIM One thing that I early started to develop was a MC & Commissioning database application supporting the work with Mechanical Completion and Commissioning, i.e. the procedures to test and verify the functionality and quality of our products. It started to be quite data centric because an object is getting a unique tag number that is showed on AutoCAD drawings using dbconnect. One reason for this is that often a dummy tag is given in an early phase or the tag is renamed based on late customer requirements. This way consistency is ensured. The object is also having data that is used to produce information for purchasing. A status is put on the object depending on different criteria s like if it s purchases, mounted, tested, having failed a test and so on. Reports on what objects that has critical punches that has to be fixed before shipping can be extracted from the database. The Engineering and MC and Commissioning database application developed during the years as the demands grow as well as the company. In the beginning both the back-end database and the front-end application was in Access. At one point, a few years ago we migrated the back-end database to SQL Server to gain better performance and stability on the data. About a year ago we also started to work on a completely new front-end application developed using VB.NET 2003. 3

ETO As a ETO firm we depend heavily on engineers and designers inside the order cycle because the facility has to be imagined, then designed and detailed, before it can be built. Long lead items like large complex equipment need to be ordered, sometimes even before the design is complete. Often, engineers are reluctant to release partial designs to manufacturing or vendor items to purchasing when quantities and details can still change. Time considerations usually prohibit a complete release at one time, much as engineering prefers doing just that. Instead, releases have to stream out of the department over the course of several days or weeks. What makes engineers hesitant to release are the inevitable changes that come back from manufacturing and the customer. The engineering department becomes a roadblock. The longer a project languishes in design, the less time for the purchasing department to negotiate prices. The aim here is to move the information from engineering to purchasing quicker and as early as possible. 4

Industrialized production Design and manufacturing departments work together more closely. In many cases product design continues through production (design in process), incorporating several engineering changes along the way. These changes may be driven by the customer or by the manufacturer, necessitating a seamless flow of data between engineering and production. Therefore it s not surprising that an organizational change has been done at our company recently. The departments for engineering, purchasing and production has now a common manager to be able to make the work between the departments more lean. This puts higher demands on the software tools to support the work processes and information flow. The CAD (AutoCAD/ADT/MagiCAD and PDMS) and ERP (Movex) software has to be able to exchange data both ways and handle the engineering changes. As a side note when talking about ETO you might have heard that Autodesk acquired Engineering Intent Corporation in October 2005. Engineering Intent provides Engineer to Order (ETO) software and services. Not sure if and how that will affect Pharmadule Emtunga though. 5

Pharmadule Emtunga is now close to a release of the new Engineering Database application. It s developed using VB.NET, VS 2003 and SQL Server 2000. It meets a lot of the needs that a more industrialized way of running the projects puts on the supporting applications. One thing that I think makes the work at Pharmadule Emtunga interesting is that it is an EPC company. It makes it also easier as well as a larger challenge when it comes to the IT tools and applications that has to support the company. As the company matures and grows the applications must follow. The understanding and acceptance by everyone in the organization is important. Therefore we that works with the applications must not run away too far and too quick even though we often have the visions and are pushing things ahead. Engineering, purchasing and construction as well as the divisions with marketing and project leaders has to speak the same language and understand each other. If engineering makes drawings that those that construct doesn t need or doesn t use it s a waste of time and money. PD - Pre-Conceptual Design and CD - Conceptual Design ADT is used for layout and space studies as well as foundation for 3D presentations. 6

BD - Basic Design Discussions starts with the customer regarding delivery and format of documents, drawings and data. PSP (Project Specific Procedures) is created if there are deviations against our preferred engineering tool manuals. Limited engineering is done using primarily the AutoCAD platform if the BD scope is small. If DD should be done in another system and BD is extensive it s preferred to also do BD in the same system. DD - Detail Design When the contract is signed DD starts. The final decision is taken regarding what CAD tools should be used. Engineering of the BIM and generation of drawings and lists. The design review process uses NavisWorks as a tool. Continuously documentation is transferred to the EDM system where all documents are stored and revision handled. Data is transferred to the ERP system for generation of purchase orders and for work orders. The production starts of the steel structure followed by architectural materials and installations. MC and Commissioning for testing and validation to make sure of good quality and that set requirements are followed. Transportation to site. Final installation at the site. IQ (Installation Qualification) is done at site. As Built changes to the model and drawings. Multiple disciplines using AutoCAD and PDMS as CAD platforms For a long time Pharmadule Emtunga used AutoCAD as it s only CAD platform. Engineering was primarily done in 2D. Coordination and usage of each others discipline drawings was all manual work. From time to time there where issues when two or more drawings where compared and the installation engineers noticed that the architectural layout was different. To get around this problem I created a small script file that the architect could use to create xrefs from their model drawing. The script file could be run whenever the architect wanted a layout change to be visible for the other disciplines. A small text with a date and name was also added to the xref in a way that it was always visible on all drawings that used the xref. 2D Environment using AutoCAD 2D Model 2D Xref Sheet drawing This resulted in more control on the usage of xrefs and it was always possible to track what version of the architectural layout that was used. 7

After 2D it was time for 3D. We started using it for the installation disciplines using a 3:rd party MEP application, MagiCAD. I continued on the previous concept. Now there was a 3D model instead and there was a need for both 3D and 2D xrefs. I created a script that now instead created these and that also could be run on a server scheduled every night if the project members so wanted. 3D Environment using AutoCAD 2D Xref Sheet drawing 3D Model 3D xref Used for coordination or attached to other disciplines models. This is still not an optimal way to handle things since it has happened that the engineers forgot to run the script files to update the xrefs resulting in others working with too old data. 8

Mixed 3D environment using AutoCAD and PDMS 2D Xref Sheet drawing AutoCAD 3D Model 3D xref NavisWork used for coordination, clash detection and visualization. 3D xref PDMS 3D Model 2D Xref Sheet drawing Since PDMS handles DGN better than DWG we use MicroStation in the middle of the automated conversion. Some intelligence is achieved by naming convention of xrefs, layers and blocks as well as adding hyperlinks to objects that can be seen both in AutoCAD and NavisWorks. 9

3D reviews using NavisWorks. 10

Contact Information You are welcome to contact me. Jimmy Bergmark JTB World Website: www.jtbworld.com Pharmadule Emtunga Website: www.pharmadule-emtunga.com Blog: http://jtbworld.blogspot.com Email: info@jtbworld.com 11