DATA CENTRE. JT First Tower Lane. Facility Product Description. Data Centre Services

Similar documents
JT Rue Des Pres DATA CENTRE

DATA CENTRE. JT Five Oaks. Facility Product Description. Data Centre Services

POWERING A CONNECTED ASIA. Pacnet Hong Kong DataSpace1 Technical Specifications. Advanced Data Center Facility for Multi-Site Enterprises

STATE OF THE ART DATA CENTRES

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

Rack Colocation Hosting. Data Centre Solutions Expertly Engineered

DATA CENTRE & COLOCATION

Datacentre Newbridge Data sheet

brightsolid Data Hall 1 Keysource Technical Specifications

Datacentre Reading East 2 Data sheet

Data Centre Solutions. Data Centre Solutions Expertly Engineered

Datacentres & Colocation

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service

Datacentre Milton Keynes Data sheet

Datacentre Milton Keynes Hall C Data sheet

AT&T Enterprise Hosting Services

FACT SHEET: IBM NEW ZEALAND DATA CENTRE

WHITE PAPER. Solutions OnDemand Hosting Overview

Data Center. Tai Po Data Center

Dude Solutions Business Continuity Overview

A next generation Colocation data centre for Birmingham city centre

NTT Communications data center services. Key european data centers

CenturyLink Data Center Services Omaha, Nebraska

Data Centre & Colocation in Birmingham. Flexible. Secure. Accredited.

The Region s Leading Data Center Developer, Manager and Operator

Fact sheet COPENHAGEN DATA CENTRE CAMPUS. Connect, transact and grow

Art and Science of Building NUS Data Centres

The Shared Data Centre Project

SERVICE LEVEL AGREEMENT SERVICE LEVEL AGREEMENT ADDENDUM COLOCATION BIT-1 VERSION

PRODUCTS & SERVICES. colocation services

World Class. Globally Certified. High Availability.

A MESSAGE FROM OUR FOUNDER

Twin Core Data Center Munich

Data Centre In A Box

Thermal management. Thermal management

Fact sheet FRANKFURT DATA CENTRE CAMPUS. Connect, transact and grow

DATACENTER COLOCATION. Flexible, Secure and Connected

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Access UK Ltd. Data centre Security. Data Centre Summary v.2.0 _ December Date: 12 th January Version: 1.1. Parkinson / Daniel Gould

Total Modular Data Centre Solutions

Hosted Testing and Grading

TIER 3+ CARRIER NEUTRAL DATA CENTER TELEPOINT SOFIA EAST THE LATEST ADDITION TO OUR FAST-GROWING DATA CENTER LOCATIONS.

Data Center. Data Centers in Hong Kong

INT 492 : Selected Topic in IT II (Data Center System Design) 3(3-0-6)

Fact sheet BRUSSELS DATA CENTRE CAMPUS. Connect, transact and grow

COLOCATION 1/4 RACK RACK COLD AISLE CONTAINEMENT PRIVATE CAGE PRIVATE SUITE FLEXIBLE PRICING OPTIONS

Fact sheet DUBLIN DATA CENTRE CAMPUS. Connect, transact and grow

Fact sheet VIENNA DATA CENTRE CAMPUS. Connect, transact and grow

JUNXY Series DC Load Banks

C L E A N A G E N T F I R E S U P P R E S S I O N C L E A N A G E N T F I R E S U P P R E S S I O N

STULZ Micro DC. with Chip-to-Atmosphere TM Liquid to Chip Cooling

CenturyLink Data Center Services Herndon, Virginia

Ultrafast Fibre UFB Services Agreement Service Description for Central Office and POI Co-location Service

DATA CENTER SERVICES CONNECTIVITY: THE TRUE DIGITAL TRANSFORMATION

Enterprise Class Data Centre

EDGE LM XLMA Series Data Module

MTS Co-Location Hosting - MILAN

ROOM INTEGRITY TESTING

Innovative. Engineering. Power. structure source. Making the complex, simple. Structure Source PDU s

DATA CENTRE & COLOCATION

A SAFE, DEPENDABLE AND TRUSTWORTHY ENVIRONMENT YOU CAN CALL HOME FOR ALL YOUR BUSINESS NEEDS.

Ultrafast Fibre UFB Services Agreement Service Description for Central Office and POI Co-location Service

DATACENTER RHEIN-NECKAR

A) Differences between Precision and Comfort Cooling Here are the major differences exist between precision air conditioning and comfort systems.

MGE Galaxy /900 kva

Hurricane Electric Internet Services

Chorus UFB Services Agreement Service Description for Central Office and POI Co-location Service

Engineering and Manufacturing Excellence in Data Centre Infrastructure

BME CO-LOCATION SERVICE DESCRIPTION

PT Sigma Cipta Caraka (Telkomsigma)

Open Access. Definitions

NZQA unit standard version 2 Page 1 of 6. Demonstrate knowledge of telecommunications core network systems and services

COLOCATION SERVICE DESCRIPTION

CPS VS UPS FOR POWERING DATA CENTERS

MD-ALPHA DATA CENTER. Hagerstown, Maryland

Introduction. Service and Support

ECOBAY: Closed loop water cooled server cabinet for data centers

Controller Cardax FT Controller The CardaxFT Controller 5000 is the intelligent field controller in the CardaxFT security system.

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

CAPABILITY STATEMENT GLOBAL SWITCH PROPERTY (AUSTRALIA) PTY LTD 400 HARRIS STREET ULTIMO NSW 2007 AUSTRALIA

9.6 MW, Traditional IT and OCP-compatible, Indirect Air Economizer, m 2

Liebert GXT MT kva

QuickSpecs. HP Performance Optimized Datacenter (POD) 20ce. Overview. Retired

BASELAYER CORE PA20 Power Module

Product Specifications

Charles Nolan. Do more with less with your data centre A customer s perspective. Director IT Infrastructure, UNSW. Brought to you by:

NHS IT Strategy - Plan & Support Services

Colocation Checklist Not all data centers are created equal.

DUB4. An innovative data centre. Resilience. Power. Flexibility AT NORTHWEST BUSINESS PARK

SmartCabinet Intelligent, Integrated Containment for IT Infrastructure

Evaporative free air cooling technology Providing evaporative free air cooling solutions.

Rittal LCP T3+ High-availability IT cooling with no compromise

Fact sheet AMSTERDAM DATA CENTRE CAMPUS. Connect, transact and grow

APC by Schneider Electric Elite Data Centre Partner

Dazelidis Thanos - Product Manager Rittal Greece 1

Infrastructure Security Overview

FREEING HPC FROM THE DATACENTRE

5.2 MW, Pod-based build, Chilled Water, ft 2

Liebert. NXC from 10 to 200 kw. Compact and Reliable Power in a Fully Integrated Packaged Solution

SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER

Transcription:

JT First Tower Lane DATA CENTRE Facility Product Description JT s Data Centre Hosting Service provides a secure computer room environment with protected incoming power supplies and a fully resilient network providing the latest IP and networking solutions. Data Centre specification JT s Data Centre provides a secure, environmentally controlled and protected facility, with reliable connectivity providing: Dual fed UPS (10 minutes battery autonomy at full load) Generator backup (24 hour diesel supply) Fully redundant air conditioning system VESDA early warning fire detection Temperature and humidity sensors Water detection sensors FM 200 Gas Suppression Rack specification All racks are lockable and designed to accommodate multi-vendor servers and are compliant with IBM, Compaq, Dell, Hewlett Packard and Sun: Earth continuity Dual power distribution units (2x 32 amp circuits) Dual redundant UPS (10 minutes battery autonomy at full load) Cable management strip per unit 600 x 1000 mm rack space All racks in the Data Centre are connected to a centralised switching environment with 10/100 Mbps/1 gig. Ethernet or fast Ethernet presentation provided. VLANs can also be provided. Contact our Business Solutions team T: 882 345 E: business.solutions@jtglobal.com W: www.jtglobal.com/datahosting

Data Centre - Air conditioning Climate control for the Data Centre is provided by 7x Denco 90 (KW) units and 7x Airedale 85 (KW) units. Each of these units circulates 5.6 cubic metres of air per second. The total cooling for the Data Centre is 1225 (KW). The air conditioning in the Data Centre is retained at an N+2 situation ensuring that if one air conditioning unit fails there is sufficient cooling capacity provided by other air conditioning units. Power room - Air conditioning The power room has its own air conditioning units, which are independent of the cooling system for the Data Centre. To ensure that the UPS is kept in the optimum climate 3 Stulz Comptrol 1002 units have been installed. Electricity JT has its own electricity substation, which is dedicated to providing the power supply to the whole site. The local electricity company has provided this Data Centre with separate 1000KW electrical supplies which are diversely fed from HV network. Data Centre The power to the facility is fed by separate 1 MVA transformers. Each cabinet is supplied with 2x 32 amp single phase supply via separate CPDU s. Provision has been made to accommodate all individual power requests. Generator The Data Centre is supported by five onsite generators which are contained within their individual acoustic housings separate to the Data Centre. Each unit is rated at 400 KW. In the unlikely event of a generator failure these units are configured to N+1 to provide total power resilience. Alarmed components Engine run Engine fail Low fuel Low water Battery charger fail Action taken Monitoring Test Off load Full load Frequency 4 weekly Yearly

Fuel storage Each generator has its own integral 24 hour fuel tank. UPS 2x Chloride 800KVA units, 3 phase in, 3 phase out, full on-line, double conversion UPS units, each supplies 10 minutes battery autonomy with 400 sealed for life batteries. The UPS equipment has been configured with 12 pulse rectifiers and 5% harmonic input distortion filters The UPS units have been configured as a N+N UPS having both static and manual bypass capabilities. In addition there is a further external, total wrap around 800 amp rated by-pass system, complete with its own independent mains supply. The power output of the system is configured as 960 KVA for Data Centre 01 and 930 KVA for Data Centre 02; the run time is 10 minutes per UPS at 98% load, which is variable to the level of applied load. Every 3 months the level of applied load and characteristics are examined on the UPS. Security systems The facility is protected by a Siemens Alarm combined intruder and door access control system, utilising door contacts and dual technology movement detectors, which all report back to a centralised Siemens system with its onward connected signalling. Access is controlled by HID proximity fob readers with entry into the Data Centre by combined individual fob and PIN code. In addition, a digitally recorded CCTV system is installed with cameras viewing all entrances into the Data Centre. All information recorded by the system is downloaded and stored on to a hard disc digital recording system. The systems are maintained by Computer Protec and are checked at six-month intervals. Computer Protec provide JT with reports of maintenance visits detailing the status of the system and highlighting any errors found. As well as CCTV, JT Data Centres have twice nightly security patrols which changes to 4 times per day on Saturday and Sunday. Fire detection Data Centre 02 is protected by a sophisticated particle detection system, the Very Early Smoke Detection Apparatus (VESDA) LaserPLUS system has been installed. This system detects fire at the earliest possible stage by drawing in air through a network of air sampling pipes. The detection chamber uses a Class 1 laser to achieve the optimum response to a vast range of smoke types. Using unique detection principles, the LaserPLUS has a sensitivity range of 0.005-20% obscuration/m. These systems are constantly monitored by our Network Operations Centre (NOC).

Gas suppression In addition to protection provided by the VESDA laser system, the Data Centre is equipped with an FM-200 Fire Suppression agent. FM-200 has zero ozone depleting potential, and is typically deployed where an electrically nonconductive medium is needed, and people compatibility is an overriding factor. FM-200is a colourless, liquefied compressed gas. It is stored as a liquid and dispensed into the hazard as a colourless, electrically nonconductive vapour that is clear and does not obscure vision. It leaves no residue and has acceptable toxicity for use in occupied spaces at design concentration. FM-200 does not displace oxygen and therefore is safer for use in occupied spaces without fear of oxygen deprivation. FM-200 is chosen to protect occupied areas such as computer rooms and the telecommunications market, as it out performs the majority of other gaseous systems in terms of speed of reaction to fire. FM-200 is effective within 10 seconds of initial discharge. Benefits and features Fast and eff ective No significant reduction in oxygen levels Clean gaseous agent leaving no residue Zero ozone depleting potential Short atmospheric life span Electronically non-conductive Safe for use in fully occupied areas Extensively tested, recognised and approved worldwide Telecommunication connectivity Two diverse fibres routed from the North and South of the island to separate redundant ODF s. The facility is connected to the JT network and as such the complete JT portfolio of connectivity services (both Þ bre & copper) is available and includes all types of Private Circuits, ADSL services, telephony lines and Internet Backbone bandwidth services.

Lightning protection Soil resistivity testing was conducted as part of the design to establish the most suitable earthing system for the particular ground conditions. The lighting Protection system complies with BS 6651-1999 Protection of structures against lightning and BS 7430 Earthing. Service Level Agreement A standard Service Level Agreement is included with this service (see JT Colocation Service Level Agreement.) Terms & Conditions The JT Colocation and JT Data available at this facility are provided under and subject to, the JT Colocation and JT Data Terms & Conditions of Service. Customers are strongly advised to read these Terms & Conditions on our website, before applying for the Service. Contact our Business Solutions team T: 882 345 E: business.solutions@jtglobal.com W: www.jtglobal.com/datahosting