Schneider Automation Modbus Plus Network Installing Clustered Node Devices Publication: 890 USE Rev. 1.0 Part Number:

Similar documents
LARGE S URGE-PROTECTOR S HELTER

Navigator II INstallatIoN MaNUal For static and PaN/tIlt configurations

INTERCOM AMBULANCE/RESCUE VEHICLE MODEL ICA100 SURFACE MOUNT SERIES MODELS ICA200, ICA300 FLUSH MOUNT SERIES MODELS ICA400, ICA500

HOW TO REPLACE A PARKER INVERTER DRIVE WITH A YASKAWA V1000 INVERTER DRIVE

ISOLATION RELAY RACK ISOLATION KIT 19 RACK MOUNT RELAY RACK ISOLATION KIT, SLOTTED UNEQUAL FLANGE RACK ISOLATION KIT 23 RACK MOUNT

COMPLETE S YSTEM SHELTER

Replacing the Power Supply

TOPJOB S Sensor/Actuator Terminal Blocks with Push-in CAGE CLAMP Reliability

Installing a Power over Ethernet injector

15P0097Q1 SINUS K - PENTA REMOTE MOUNTING THE KEYPAD MOUNTING GUIDE

Field Update Guide. for Raven Viper Pro

E1135C PDU and Pod Upgrade Procedure

INTERCOM SYSTEM Model ICA900

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2

BuffaloLabs WiFi Lantern Assembly guide version 1

TSX SCA 64 connection box

Royal RVV-500 (B) Retrofit Kit

Installation/assembly manual for DCC/Power shield

TOPJOB S Sensor/Actuator Terminal Blocks with Push-in CAGE CLAMP Reliability

EMC Installation Guide

SignBOX II. Retrofit Guide for (X)WS201 and (X)WD201

Instruction Manual. M Pump Motor Controller. For file reference, please record the following data:

BACnet Protocol Converter Kit for Use with Bacharach MultiZone Gas Monitors. Installation Manual

This Datasheet is for the IC693CBL300. I/O Bus Expansion Cables.

IMPORTANT AS YOU REMOVE THE CONNECTORS LABEL THE CONNECTOR WITH THE NAME OF PLUG WITH THE SHARPIE

S Reclosers Kyle Type VXE Electronic Control SCADA Input/Output Board Installation and Operation Instructions

Secured Series: Hub Plus Kit Single Door Controller Package Installation Manual

MS-5000: MiniStar Reader

Modular Terminal Blocks and Terminal Strips with CAGE CLAMP, Series 260 to 262, Side-Entry

SN Series - Part Numbering

Upgrade Instructions. P/N Revision A. October Printer Terminal Holder * *

Power Supply and Fan Module Installation

RMB Peripheral Units Installation Guide

Modicon Modbus Plus Network Planning and Installation Guide

7" Touch Screen Display

Adapter Kit - QSI Electronics to G-Series Meter Installation Instructions

Cardax Prox Plus Mifare Reader

Single cable kit for the FCB1010

VOYAGER II INSTALLATION GUIDE

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

Infinity 1U 19 Converter Shelf Models: J L217 - Individual +24V Inputs Bulk -48V Output L218 - Individual -48V Input Bulk+24V Output

232iLM Keypad Installation and Programming Instructions

DXE Technical Note: Importance of Correct Termination of Shielded Cat5 Networking Cables. By Scott MacDonald, KD8BDX. Parts list:

MCH WIRE HARNESS WITH QUICK DISCONNECT REPLACEMENT Initial Release 1/31/2013

TOPJOB S Sensor/Actuator Terminal Blocks with Push-in CAGE CLAMP Reliability

Install the Shelf and Backplane Cable

SCXI-1345 Shielded Cable

Hydronix Moisture Sensor Electrical Installation Guide

Cat.6/5e UTP Patch Panels with 45 Jack

MS-7000: SuperStar Reader

Plasma Panel Replacement Guide DU-42PX12X

SUBCON 15 HD (High-density) D-Subminiature Connectors

9. NTP-C11 Remove and Replace an Ethernet Card, page 1-13 As needed, complete this procedure to remove and replace an ONS CL Ethernet card.

PANEL ACCESSORIES. Crimping Tools and Ferrules. Wire Cutting and Stripping Tools. Shield Connection System

BACnet Protocol Converter Kit for Use with Bacharach MultiZone Gas Monitors. Installation Manual

LTEC Heat Pump DDC Controller

Zodiac FR100 TM INSTALLATION MANUAL

Installation Manual Rev D MiniProx Readers - Wiegand 5365B and Clock and Data 5368B

DSTHM-2 COMBINED T AND RH DUCT TRANSMITTER. Mounting and operating instructions

MicroTech Series-100 Application Specific Controller

XT-9100 Technical Bulletin

PLC Racks IC697CHS782/783

REMOTE HEAD ADAPTER INSTALLATION GUIDE

The Quality Connection. LEONI QuickLine Class E Cabling Solution

24 Input/8 Output AC Block I/O Module

INSTRUCTION MANUAL RA 59 RACK ADAPTER. 1) This manual is valid for the following Model and associated serial numbers: MODEL SERIAL NO. REV. NO.

CONSOLE CONNECTOR KIT 9501 INSTALLATION INSTRUCTIONS

MASTERLINE Ultimate Hybrid High Voltage 4/12 (MLUH HV 4/12) blunt cut at BTS side

AB-2D AB-2D SPEAKER A,B OR A+B SELECTOR INSTALLATION & OPERATION GUIDE

A-dec 570L Dental Light on a DCS System INSTALLATION GUIDE

PACSystems RX7i IC698CHS009/119

Appendix D. EMC Installation Guidelines. Safety Considerations. Ferrite Absorbers and P-Clips. General Product Philosophy

PoE/FPR Kit for Auto-Sync Time Clock. The Auto-Sync Time Clock is a validated time system with a Web interface and auto discovery.

T7560A1036 Digital Wall Module

MX Voice Gateway Series. Installation Manual

ODU MINI-SNAP PC Product Description. ODU MINI-SNAP PC: The Connector with Push-Pull-Locking in Plastic

MODELS PD230 AND PD1230 Installation Instructions

VL BPC MINI. A configurable industrial computer platform Intel Atom Z510PT CMAT IPC Module Option [I28] AUTOMATION Data Sheet 2930_en_A.

OilCop Component Wiring Installation Manual

Expandable Power Systems

Components. Tools for Setup. Installation Outline

Verizon Wiring Manual PowerShift. 10 January 2018

M204SMB Surface Mount Box Instructions

ELECTRO-MECH SCOREBOARD CO.

5B Series 16 Channel Backplane 5B01 FEATURES APPLICATIONS PRODUCT OVERVIEW FUNCTIONAL BLOCK DIAGRAM

V8-80HS-1 SERIES OF HIGH-SPEED MOTORIZED ZOOM LENSES

ALTAI C1N SUPER WIFI CPE INSTALLATION GUIDE. Version 1.0 Date: September, Altai Technologies Ltd. All rights reserved

Factory Line Accessories FL PLUG RJ FL CRIMPTOOL

Indoor Protected Entrance Terminal 4588 Series

Through/Ground Conductor/Ex and Double-Potential Terminal Blocks 1 (1.5) mm, 2000 Series

WARNING SPECIAL HANDLING REQUIRED!!!

LIFEBUOY RELEASE SYSTEM - TECHNICAL PRODUCT SPECIFICATION AND INSTALLATION MANUAL

Computer Technician. Technicians Tools. Copyright Texas Education Agency, All rights reserved. 1

Instructions for SVC-KIT-0020

HX WCS Indoor DAS Remote Unit Quick Installation Sheet

Basketball Shot Clock Set LX2180 Manual

OMX-CI-RS232 Control Interface

Telephone Accessories

MS-5000 MiniStar Reader. Quick Start Guide MS The MS-5000 MiniStar Reader. 1.0 Specifications

CALRAD 70 series - telephone accessories

Transcription:

Schneider Automation Modbus Plus Network Installing Clustered Node Devices Publication: 890 USE 53 00 Rev..0 Part Number: 3000939 Modbus Plus devices must be installed as specified in a network layout plan, showing each device s mounting location and cable connections. Improper installation can cause problems with the network operation. If you do not have a diagram showing the mounting locations and cabling information, you should obtain one from your network administrator before proceeding with the installation. The Modbus Plus Network Planning and Installation Guide (890 USE 00 00) describes how to prepare a network layout plan. You will need these tools: Wire cutter to cut the cables, and a wire stripper or knife to remove the cable outer jacket. Wire crimper to connect the ground lug to the shield braid of the drop cable. Flat screwdriver for connecting the ground lug to the Tap. Insertion tool for pressing the wires into the wiring terminals. Use of the tool is required. The tool is available from Schneider Automation (part number 043509383), or from AMP Incorporated, P.O. Box 3608, Harrisburg, PA 705 3608 USA (part number 5574-3). The correct tool s shank color is white, indicating that it is designed for installing 4... 8 AWG (0.08... 0. mm) wires. Modbus Plus devices can connect to the network in two ways: as single nodes, or as a group of nodes in a cluster. Schneider Automation provides connectors and cables for each configuration. Each Modbus Plus network has a trunk cable with Taps located at device sites. A drop cable connects each Tap to a single node device, or to a cluster of node devices. Figure shows a typical network configuration with single nodes and two types of clustered nodes. Note how the network is terminated at its two ends: at the last tap for a single node, and at the last clustered node. SINGLE NODES (TRUNK CABLE CONTINUES) (END OF TRUNK CABLE) NETWORK TERMINATION NETWORK TERMINATION NODE NODE NODE NODE NODE NODE NODE NODE Figure Overview: Network with Single Nodes and Clustered Nodes

The network may contain up to 8 clusters, with up to 8 nodes per cluster. Configuration details are on page 4. Two types of cluster configurations are allowed, depending upon how the trunk cable will be routed at the cluster. A. Trunk Cable Continues: If the trunk cable will continue from the cluster, refer to Figure. B. Trunk Cable Ends: If the trunk cable will end at the cluster, refer to Figure 3. A. Trunk Cable Continues from Cluster: Figure shows a pair of clusters with the trunk cable continuing from the cluster. In this configuration the last clustered node must return through a drop cable to the next Tap. (TRUNK CABLE CONTINUES) 3 4 5 6 7 NODE NODE... NODE NODE NODE... NODE Figure Cluster Configuration: Trunk Cable Continues B. Trunk Cable Ends at Cluster: Figure 3 shows a pair of clusters with the trunk cable ending at a cluster. This configuration is used at either end of the trunk cable. In this configuration the last clustered node must have a terminator installed. Note that the terminator is installed at the node, and not in the Tap. (END OF TRUNK CABLE) 3 4 5 6 7 8 NODE NODE NODE NODE NODE NODE...... Figure 3 Cluster Configuration: End of Trunk Cable

Figure 4 illustrates the components used in connecting Modbus Plus node devices in clusters. Refer to Figure and Figure 3 for examples of how the components are used. OPEN LEADS 3 4 6 5 7 8 Figure 4 Modbus Plus Cluster Components Reference Part Number Description Note 990 NAD 30 00 Modbus Plus Tap 70 MCI 0 0 or 70 MCI 00 80 (modified see Note) Drop Cable, RJ45 to Open Leads, 0... 30 ft (3... 0 m) Fabricate this cable as required. Use RJ45/RJ45 cable item 6 or 7. Remove one RJ45 connector. Cut to required drop length, min. 0 ft (3 m), max. 30 ft (0 m). 3 70 XTS 00 00 T Connector, RJ45/RJ45/D9 4 70 MCI 00 0 Cable, RJ45 RJ45, 0 in (5 cm) Connects nodes within a cluster. 5 70 MCI 00 36 Cable, RJ45 RJ45, 36 in (75 cm) Connects nodes within a cluster. 6 70 MCI 0 0 Cable, RJ45 RJ45, 0 ft (3 m) Connects between two clusters. 7 70 MCI 00 80 Cable, RJ45 RJ45, 30 ft (0 m) Connects between two clusters. 8 70 XTS 0 00 Terminator, RJ45 (pack of ) Used if node is at network end. 3

Designing the Network Layout If all nodes are Momentum products, up to 64 node devices may be installed over a total cable length of 500 ft (450 m). If any node device is not a Momentum product, up to 3 node devices may be installed over a total cable length of 500 ft (450 m). The cable length is the combined length of all cables added together, including the trunk cable, drop cables, and cables between nodes in clusters. Modbus Plus Repeater and Bridge products are available for extending the cable length and node count. Refer to the Modbus Plus Planning and Installation Guide (890 USE 00 00) for further information. Installing the Network Terminations Each end of the network must be terminated. If the network ends at a Tap with a drop to a single node device (not a cluster), connect the Tap s internal jumpers to provide termination. If the network ends at a Tap with a drop to a cluster, do not install the Tap s jumpers. Instead, install an RJ45 terminator (70 XTS 0 00) at the T connector on the last node in the cluster. Observing Configuration Limits for Clusters The network may contain no more than 8 clusters, regardless of how many nodes are in each cluster. A single cluster may contain up to 8 node devices maximum. If more than 8 nodes are required, you must add another cluster with an interconnecting cable between the clusters. The interconnecting cable between clusters must be 0 ft (3 m) minimum length. You can install either the 0 ft (3 m) cable or the 30 ft (0 m) cable, part numbers 70 MCI 0 0 or 70 MCI 00 80. Nodes within a cluster are connected using either the 0 in (5 cm) cable or the 36 in (75 cm) cable, part numbers 70 MCI 00 0 or 70 MCI 00 36. Fabricating Drop Cables The minimum allowable drop cable length is 0 ft (3 m). The maximum length is 30 ft (0 m). The drop cable is fabricated from either the 0 ft (3 m) cable or the 30 ft (0 m) cable, part numbers 70 MCI 0 0 or 70 MCI 00 80. To fabricate the drop cable, remove one RJ45 connector from the cable to expose the open leads. Connect the open leads to the Tap, following the wiring diagrams in these installation instructions. 4

Before mounting the Tap to a panel, install the supplied grounding screw and nut onto the Tap as shown in Figure 5. Install the Tap at its planned location. Figure 5 shows the Tap s dimensions. 4.4 IN ( MM). IN (56 MM) HOLE DIAM. 0. IN (5 MM) MOUNTING CENTERS 3.6 IN (80. MM) INSTALL GROUNDING SCREW AND NUT BEFORE MOUNTING TAP ON PANEL Figure 5 Tap Dimensions (Cover Open) Preparing the Cable The minimum allowable drop cable length is 0 ft (3 m). The drop cable will have one RJ45 connector and one open end. Fabricate the drop cable from either of the two cluster interconnection cables. Use either the 0 ft (3 m) or 30 ft (0 m) cable, part numbers 70 MCI 0 0 or 70 MCI 00 80. To fabricate the drop cable, cut one RJ45 connector from the cable. Prepare the open end as shown in Figure 6. Strip the cable jacket to a length of 3 inches (75mm) as shown in Figure 6. Make the shield braid into a separate conductor, by separating it away from the wires (see Figure 6). Cut the shield braid to a length of 3 in (75 mm). Install a grounding lug on the end of the shield braid. Locate the Yellow/Grey pair and Red/Grey pair. Cut both of these pairs to a length of in (5 mm). Do not strip these wires. (Note: Do not mix the two Grey wires. Keep them with their correct pair.) Cut the other wires back. Only the Yellow/Grey pair, Red/Grey pair, and shield braid will be used. 5

YELLOW / GREY DO NOT STRIP WIRES RED / GREY INCH (5 MM) 3 INCHES (75 MM) FORM SHIELD BRAID INTO SEPARATE CONDUCTOR CRIMP GROUNDING LUG TO SHIELD BRAID Figure 6 Preparing the Drop Cable Connecting the Wires to the Tap Terminals Figure 7 and Figure 8 show how to connect the drop cable wires to the Tap terminals. Refer to Figure 7 to see how to press each wire into its terminal. Refer to Figure 8 to see how to connect each wire to its correct terminal. Connect the wires as shown in Figure 8. Disregard the wire color information that is printed inside the Tap. Figure 7 shows how to insert each wire into its terminal. (A) Do not strip the wire. Place the wire into the terminal slot so that the end of the wire is flush with the inside of the terminal (see the Top View in Figure 7). (B) Using the insertion tool, press the wire fully into the terminal. (C) Plastic caps are supplied with the Tap. Press a plastic cap down fully into the terminal. EMPTY TERMINAL TOP VIEW A B C Figure 7 Wire Terminal Connection (Detail) Use of the insertion tool is required. Ordering information for the tool is on the first page of these instructions. If you remove a wire after you have connected it, do not try to reconnect the wire at the same point on the wire. Cut the wire back by /8 inch (3 mm), then connect it at a new point on the wire. Connecting the Cable Shield to the Tap Ground You should have already crimped the grounding lug onto the shield braid (see Figure 6). Connect the lug to the Tap s grounding screw as shown in Figure 5. Securing the Cable to the Tap The Tap package includes cable ties. Install the tie as shown in Figure 8 to secure the drop cable to the Tap. 6

SEE DETAIL A SEE DETAIL B NODE NODE... NODE NODE NODE... NODE DETAIL A GND W GREY YELLOW BLK RED/GREY NOT USED CABLE TIE CABLE TIE SHIELD BRAID NOTE CONNECT THE DROP CABLE WIRE COLORS AS SHOWN IN THIS DIAGRAM. DETAIL B DISREGARD WIRE COLORS PRINTED AT TAP TERMINALS. NOT USED RED/GREY GND GREY W YELLOW BLK CABLE TIE CABLE TIE SHIELD BRAID Figure 8 Connecting the Drop Cable to the Tap 7

United States: Schneider Automation, Inc. One High Street North Andover, MA 0845 Tel: () 978 794 0800 Fax: () 978 975 9400 France: Schneider Automation S.A. 45, Route des Lucioles - BP47 F 06903 Sophia - Antipolis Cedex Tel: (33) 9 96 0 00 Fax: (33) 93 65 37 5 8 Germany: Schneider Automation GmbH Steinheimer Strasse 7 D 63500 Seligenstadt Tel: (49) 68 8 584 Fax: (49) 68 8 860