For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form)

Similar documents
SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Instructions. Interconnection Customer declares its intention to interconnect with the AEP Distribution System.

Midwest Energy, Inc. Distributed Generation Interconnection Expedited & Standard Process Application

Interconnection Application

Legal Name of the Customer (or, if an individual, individual's name):

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

Oncor Application for Interconnection of Distributed Generation

1. Coordination of series-rated devices is permitted where indicated on Drawings.

Project Center User Guide

ENERGY SERVICES. Project Center User Guide. This guide is intended to help customers / contractors operate the

CenterPoint Energy P O Box 1700 Houston, TX

Medium Voltage Metal-Enclosed Thyristor-Switched Harmonic Filter Banks

LONG ISLAND POWER AUTHORITY INTERCONNECTION REQUIREMENTS FOR NEW DISTRIBUTED GENERATION GREATER THAN 300 KVA OPERATING IN PARALLEL WITH LIPA S RADIAL

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Checklist for Submission to Utility

Document C0. Use for:

Superseding REVISED SHEET NO. 34D-8 REVISED SHEET NO. 34D-8 Effective May 27, 2010 Effective December 3, 2011

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS

Power System Network Simulator (PSNsim)

JK Series POWER DISTRIBUTION. Solid State Starters Medium Voltage A

System Protection and Control Subcommittee

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Short-Circuit Calculation Methods

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

PG&E Transmission Interconnection Handbook

ISGS. Intelligent SwitchGear System The Flexible Solution

Features. Application range. Si-TEC Xtend Recip interface. Accumulated data recording of engine running hours, kwatt hours, kvar hours, etc.

WN U-60 Original Sheet No. 152

SR489 SR489. Generator Management Relay. Economical protection, metering, and monitoring functions for small and medium sized generators.

NEW ERA METER. Installation & Operation Guide NE METER

The City of Winnipeg Dry Type Transformers up to 600 V Primary Section Bid Opportunity No Page 1 of 2

reliable company...caterpillar

Free Standing Emergency Department DGL Project No SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL

CASE STUDY : Transient Stability Simulation Package

GUJARAT TECHNOLOGICAL UNIVERSITY

DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

Medium Voltage Metal-Enclosed Harmonic Filter Systems

Medium Voltage Metal-Enclosed Power Capacitor Banks

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

Requirements for Model Validation

Technical Guideline For Interconnection Of Generators To The Distribution System

Minnesota DER Interconnection Process Kristi Robinson, P.E.

Substation Automation Products. Generator protection REG670/650 Relion 670 and 650 series

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM

APPENDIX B-1 TECHNICAL CONNECTION REQUIREMENTS. for GENERATION & INTERCONNECTION FACILITIES

Mitsubishi D700-SC Frequency Inverter. Easy Start Guide. The Mitsubishi D700-SC Frequency Inverter range is available to order from inverterdrive.

Small Generator Interconnection System Impact Study Report. Completed For Q0047

PGC 4000v2 POWER GENERATION CONTROLLER

Green Power Connection Net Energy Metering Online Application Training

SECTION DISTRIBUTION SWITCHBOARDS

GE Power Management. MMII Intelligent MCC Controller

Appendix 1 Interconnection Request INTERCONNECTION REQUEST

Large Embedded Generators Register of Completed Projects

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.

UNITROL 5000 Excitation Systems for Medium and Large Synchronous Machines

CONSCIENCE TECHNOLOGIES A Right Platform For All Engineers... CODE B.TECH EEE MAT LAB PROJECT TITLE

Application Techniques CENTERLINE 2100 Motor Control Centers

U.S. Virgin Islands Water and Power Authority

INTERCONNECTION FACILITIES STUDY REPORT

Collector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co.

Basics of Industrial Electricity and Troubleshooting Electrical Control Circuits

ISO New England Data Modeling Requirements

The PCI Series. Precise power control for complex SCR applications. Phase Angle Fired SCR Power Controls AMPS VAC

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

PUBLIC SERVICE OF NEW HAMPSHIRE. Technical Requirements for Non Utility Generation Interconnecting to the PSNH Distribution System

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

1-Line Load Calculation Software. User s Manual APPROVED. Copyright 2013 Durand & Associates. Page 1

Si-TEC Xtend CGC DATA SHEET. Digital control range for steam turbine generators. Key features. Models. Description

UNITROL F Excitation systems for synchronous machines with and without rotating exciter

PLT. Breaker-based transfer switch open, closed or soft transition amps. Specification sheet

JUNXY Series DC Load Banks

Si-TEC Xtend CGC ET DATA SHEET. Digital control range for extraction steam turbines. Key features. Models. Description

Impact of Leading Power Factor on Data Center Generator Systems

Modular Smart Grid Power Systems Simulators (Utilities)

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

THE INTERCONNECTION HANDBOOK

ETAP PowerStation 4.0

Plats för bild på PST2291 med solpanel och en person

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

Bosch Rexroth EFC3610 Frequency Inverter. Easy Start Guide L1 L2 L3 (+) B U V W

Identify and understand the operation of common bus. After this presentation you will be able to: Identify common bus arrangements

AIR COOLED MODULAR RECTIFIER

Si-TEC Xtend GSM DATA SHEET. Digital control range for grid parallel/bus tie. Key features. Description

Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV Version 3.3

DISTRIBUTED ENERGY RESOURCES NEM PLUS APPLICATION MANUAL

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

MPSC Microprocessor-based protection and metering devices for low voltage power circuit breakers. ABB Power Distribution

ENhanced TEChnology. Solid insulated vacuum recloser for power distrbution system thru 15kV, 27kV, 38kV V 3.1

Entry Level Assessment Blueprint Electrical Occupations

VLT 2800 DRIVE SPECIFICATIONS

Synchronizing Systems

ATV1200A kv kva. Phase-shifting transformer Medium voltage arrestors Cooling fans Human machine interface Plinth (2) Power cells (9)

CURRENT PROTECTION RELAY SMPR-1

A drive dedicated to variable speed control for HVAC applications

ATV1200A kv kva

ATV1200A kv kva

Transcription:

Electrical Company: PacifiCorp For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form) Designated Contact Person: Robin Moore Address (for U.S. Mail Deliveries): P. O. Box 2757 Portland, OR 97208-2757 Address (for All Other Deliveries): 825 NE Multnomah Street, Suite 550 Portland, Or 97232 Telephone Number: (503) 813-6419 Fax: E-Mail Address: Robin.Moore@PacifiCorp.com An Interconnection Request is considered complete when it provides all applicable and correct information required below. Preamble and Instructions An Interconnection Customer who requests an interconnection governed by Chapter 480-108-030 of the Washington Administrative Code must submit this Interconnection Request by hand delivery, mail, e- mail, or fax, as specified above, to the Transmission Provider. By singing this application the Customer Generator acknowledges that they are aware that voltage may be routinely at the upper limits of the range described in WAC 480-100-373, and this may limit the ability of a generating facility to export power to the electric system. Processing Fee: The Interconnection Customer shall submit to the Transmission Provider a fee in accordance with the tier applicable to the request: [ ] Tier 1 - $100 [ ] Tier 2 - $500 [ ] Tier 3 - $1000

Interconnection Customer Information Legal Name of the Interconnection Customer (or, if an individual, individual's name) Name: Contact Person: Mailing Address: City: State: Zip: Facility Location (if different from above): Telephone (Day): Fax: Telephone (Evening): E-Mail Address: Alternative Contact Information (if different from the Interconnection Customer) Contact Name: Title: Address: Telephone (Day): Fax: Application is for: Telephone (Evening): E-Mail Address: New Small Generating Facility Capacity addition to Existing Small Generating Facility If capacity addition to existing facility, please describe: Will the Small Generating Facility be used for any of the following? Net Metering? Yes No To Supply Power to the Interconnection Customer? Yes No To Supply Power to Others? Yes No

For installations at locations with existing electric service to which the proposed Small Generating Facility will interconnect, provide: (Local Electric Service Provider*) (Existing Account Number*) [*To be provided by the Interconnection Customer if the local electric service provider is different from the Transmission Provider] Contact Name: Title: Address: Telephone (Day): Fax: Telephone (Evening): E-Mail Address: Requested Point of Interconnection: Interconnection Customer's Requested In-Service Date: Small Generating Facility Information Data apply only to the Small Generating Facility, not the Interconnection Facilities. Energy Source: Solar Wind Hydro Hydro Type (e.g. Run-of-River): Diesel Natural Gas Fuel Oil Other (state type) Prime Mover: Fuel Cell Recip Engine Gas Turb Steam Turb Microturbine PV Other Type of Generator: Synchronous Induction Inverter Generator Nameplate Rating: kw (Typical) Generator Nameplate kvar: Interconnection Customer or Customer-Site Load: kw (if none, so state) Typical Reactive Load (if known): Maximum Physical Export Capability Requested: kw List components of the Small Generating Facility equipment package that are currently certified:

Equipment Type 1. 2. 3. 4. 5. Certifying Entity Is the prime mover compatible with the certified protective relay package? Yes No Generator (or solar collector) Manufacturer, Model Name & Number: Version Number: Nameplate Output Power Rating in kw: (Summer) (Winter) Nameplate Output Power Rating in kva: (Summer) (Winter) Individual Generator Power Factor Rated Power Factor: Leading: Lagging: Total Number of Generators in wind farm to be interconnected pursuant to this Interconnection Request: Elevation: Single phase Three phase Inverter Manufacturer, Model Name & Number (if used): List of adjustable set points for the protective equipment or software: Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Small Generating Facility Characteristic Data (for inverter-based machines) Max design fault contribution current: Instantaneous or RMS? Harmonics Characteristics: Start-up requirements: Small Generating Facility Characteristic Data (for rotating machines) RPM Frequency: (*) Neutral Grounding Resistor (If Applicable):

Synchronous Generators: Direct Axis Synchronous Reactance, Xd: P.U. Direct Axis Transient Reactance, X' d: P.U. Direct Axis Subtransient Reactance, X" d: P.U. Negative Sequence Reactance, X 2 : P.U. Zero Sequence Reactance, X 0 : P.U. KVA Base: Field Volts: Field Amperes: Induction Generators: Motoring Power (kw): I 2 2 t or K (Heating Time Constant): Rotor Resistance, Rr: Stator Resistance, Rs: Stator Reactance, Xs: Rotor Reactance, Xr: Magnetizing Reactance, Xm: Short Circuit Reactance, Xd'': Exciting Current: Temperature Rise: Frame Size: Design Letter: Reactive Power Required In Vars (No Load): Reactive Power Required In Vars (Full Load): Total Rotating Inertia, H: Per Unit on kva Base Note: Please contact the Transmission Provider prior to submitting the Interconnection Request to determine if the specified information above is required. Excitation and Governor System Data for Synchronous Generators Only Provide appropriate IEEE model block diagram of excitation system, governor system and power system stabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may be determined to be required by applicable studies. A copy of the manufacturer's block diagram may not be substituted. Interconnection Facilities Information Will a transformer be used between the generator and the point of common coupling? Yes No Will the transformer be provided by the Interconnection Customer? Yes No

Transformer Data (If Applicable, for Interconnection Customer-Owned Transformer): Is the transformer: single phase three phase? Transformer Impedance: % on kva Base Size: kva If Three Phase: Transformer Primary: Volts Delta Wye Wye Grounded Transformer Secondary: Volts Delta Wye Wye Grounded Transformer Tertiary: Volts Delta Wye Wye Grounded Transformer Fuse Data (If Applicable, for Interconnection Customer-Owned Fuse): (Attach copy of fuse manufacturer's Minimum Melt and Total Clearing Time-Current Curves) Manufacturer: Type: Size: Speed: Interconnecting Circuit Breaker (if applicable): Manufacturer: Type: Load Rating (Amps): Interrupting Rating (Amps): Trip Speed (Cycles): Interconnection Protective Relays (If Applicable): If Microprocessor-Controlled: List of Functions and Adjustable Setpoints for the protective equipment or software: Setpoint Function Minimum Maximum 1. 2. 3. 4. 5. 6.

If Discrete Components: (Enclose Copy of any Proposed Time-Overcurrent Coordination Curves) Current Transformer Data (If Applicable): (Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves) Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Potential Transformer Data (If Applicable): Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: General Information Enclose copy of site electrical one-line diagram showing the configuration of all Small Generating Facility equipment, current and potential circuits, and protection and control schemes. This one-line diagram must be signed and stamped by a licensed Professional Engineer if the Small Generating Facility is larger than 50 kw. Is One-Line Diagram Enclosed? Yes No Enclose copy of any site documentation that indicates the precise physical location of the proposed Small Generating Facility (e.g., USGS topographic map or other diagram or documentation). Proposed location of protective interface equipment on property (include address if different from the Interconnection Customer's address) Enclose copy of any site documentation that describes and details the operation of the protection and control schemes. Is Available Documentation Enclosed? Yes No

Enclose copies of schematic drawings for all protection and control circuits, relay current circuits, relay potential circuits, and alarm/monitoring circuits (if applicable). Are Schematic Drawings Enclosed? Yes No Applicant Signature I hereby certify that, to the best of my knowledge, all the information provided in this Interconnection Request is true and correct. For Interconnection Customer: Date: