Scott Ekman BAY AREA OFFICE/CAMPUS PROJECTS

Similar documents
210,000 rsf Typical floorplate 67,549 rsf

Approval of Navy Yard Chiller Joint Development Agreement

Memo to the Planning Commission HEARING DATE: JULY 9, 2015

TRANSIT CENTER DISTRICT PLAN

RFP Information Security/Cybersecurity Services Pre-proposal Conference

SOUTHBRIDGE INNOVATION CENTER PROFILE

REGISTERED LEED GOLD IN STERLING, VA & Woodland Road

Redevelopment Agency of Midvale City

DATE: September 2014 Project Sponsors Rachel Schuett and Transportation Team Transportation Demand Management (TDM) Data Collection

STRATEGIC ADVISORY AND CAPITAL IMPROVEMENT OVERSIGHT

Port of Vancouver USA

MIKE NOVKOV LIC #

Technology Solutions Group Specialized Real Estate Services

Approval to Negotiate and Execute a Term Sheet for the Navy Yard Chiller Site Joint Development

The Summit s location is spot on. We just love it here. Bill Hancock, Executive Director College Football Playoff

10.1 BIBLIOGRAPHY Noise and Vibration Study Yard and

18,000-19,000 square feet. ELEVATORS 16 passenger elevators in three banks 1 dedicated garage shuttle elevator 1 dedicated freight elevator

Reston Town Center North Development. Community Update

of it all. Dane Hooks Managing Director T: F:

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE

Discover Hidden Value

TURN-KEY AND BUILD-TO-SUIT WHOLESALE DATA CENTER SOLUTIONS

SOIL-STRUCTURE INTERACTION ANALYSIS FOR BURIED STRUCTURES IN SOFT, SLOPING SOILS - BART SAN FRANCISCO TRANSITION STRUCTURE

Soil-Structure Interaction for Piled-Raft Foundation

SEAWALL EARTHQUAKE SAFETY & DISASTER PREVENTION PROGRAM

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Project Overview/Update: Advanced Signal System CBOSS PTC

STRATEGY STATEMENT OF QUALIFICATIONS

David Griffin MOCKINGBIRD & I-35 DALLAS, TEXAS

2016 CMU First Destination Outcomes

SUMMIT POINTE OFFICE LEASING

Post Graduation Survey Results 2015 College of Engineering Information Networking Institute INFORMATION NETWORKING Master of Science

MISSION CRITICAL DATA CENTERS STATEMENT OF QUALIFICATIONS STRUCTURAL ENGINEERING SERVICES

Cities, Infrastructure & Industrial Solutions

The East Bay s Premier Office Tower

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

2017 CMU FIRST DESTINATION OUTCOMES Information Networking Institute, Information Networking (M.S.)

DELIVERING SUPERIOR SHAREHOLDER VALUE. PALO VERDE OVERVIEW Randy Edington

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

LEHIGH VALLEY TRADE CENTER AVAILABLE FOR LEASE 123,140 SF. Building A. Building B CLASS A NEW CONSTRUCTION BETHLEHEM, PA

Facilities Strategic Planning. Community Centers Stakeholder Group October 16, 2017 Jeanne Justice

Elite Construction Inc.

ARTS DISTRICT 2018 E. 8 TH STREET, LOS ANGELES, CA

The Summit s location is spot on. We just love it here. Bill Hancock, Executive Director College Football Playoff

Equipment Site Description

The East Bay s Premier Office Tower

October 2001 (June 2002 revision) Greenpoint Tittabawassee River Dioxin Study Area Phase I Sampling Study Report

Newmark Cornish & Carey. Download your free your appstore. barcode app from /17

4800 HARRY HINES BLVD Dallas, TX REDEVELOPMENT OPPORTUNITY in the na on s busiest medical district

BUILDING OWNERS & REAL ESTATE PROFESSIONALS INNOVATIVE, ACCURATE & PROFESSIONAL DESIGN, CAD & CAFM SERVICES PROVIDING ARCHITECTS, ENGINEERS, WITH

Environmental Stewardship and the Modern Landlord: Lincoln Center,

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

VA3 245,000 SQ. FT. 16MW AVAILABLE NOW 2MW AND 4MW CUSTOMIZABLE DEDICATED VAULTS RAGINGWIRE ASHBURN, VA MASSIVE 78 ACRE CAMPUS

Al-Masader Al-Duwaliyah (AMAD) Overview

500,000 SF 500,000 SF THE HOME OF INNOVATION. Corporate Services

MCKAY BUILDING. 100 S. Kentucky Avenue, Lakeland, Fl 33801

OFFICE / WAREHOUSE SPACE

Seattle ITS Resiliency Project. ITS California Jason Cambridge September 19th, 2017

SYMANTEC: SECURITY ADVISORY SERVICES. Symantec Security Advisory Services The World Leader in Information Security

Marc Ward Senior Vice President, Principal LIC #

Capital Planning & Financing

Billings, Montana Facility

GUIDING THE PATH TO GREEN. The Business Case for Green

FOR LEASE CITY CENTRE STREET SW CALGARY, AB.

LEADING THE CHANGE AECOM SPAIN

Stockton Aviation Research & Technology Park

Engineering and Design Services Mechanical HVAC Plumbing Electrical Chemical/Process Structural Instrumentation

Resilience Planning in San Francisco

vision42

Ahead of the CurrentTM

HISTORIC & FLEXIBLE POST INDUSTRIAL HEADQUARTERS

Downtown Denver Partnership Tenant Improvement

DATA MSP RD AVE S MINNEAPOLIS, MN MINNEAPOLIS, MINNESOTA

INDUSTRIAL DRYCLEANER WOES, VERNON, CALIFORNIA Kevin Green R.G., SCS ENGINEERS Darren Ness, R.E.A., SCS ENGINEERS Thomas Dong, R.E.A.

Former Novartis Pharmaceutical Production Campus

TOTAL PROJECT LIST Michael D. McCaffery (Reverse Chronological Order)

City of San José PRT Project. Austin Smith

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA

EXISTING STRUCTURE 2252 THIRD AVENUE

Board of Directors April 25, BART The Next 40 Years BART Metro Vision Update Enhancing Service, Capacity and Coverage

Construct Chiller Plant, Phase I

4400 WEST 78TH STREET, MINNEAPOLIS, MN

High Speed Rail Update

IES CONSULTING FOR LEED

Washington Headquarters Services Defense Facilities Directorate

GATEWAY. Action Plan JULY Gateway Action Plan DRAFT - July Portland Development Commission

2055 E TECHNOLOGY CIRCLE

EMBARGOED UNTIL THURSDAY, 30 NOVEMBER 2017, 9AM (SINGAPORE TIME)

CLASS A MANUFACTURING FACILITY

DELIVERING IN EARLY 2019

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

Setting New. Standards. Skyway access allows you to walk anywhere downtown in just minutes leaving your coat behind.

Final Presentation SUITLAND FEDERAL CENTER. SUITLAND FEDERAL CENTER MASTER PLANNING ULI minitap

Downtown Boise Multimodal Center

FOR SALE 7325 ASPEN LANE

BBVA Interior Design

David Brandenburger CA RE License # Matt Heacox CA RE License #

SMARTATL. A Smart City Overview and Roadmap. Evanta CIO Executive Summit 1

1721 8TH AVENUE NORTH SEATTLE, WA 98109

Transcription:

BAY AREA OFFICE/CAMPUS PROJECTS

BAYSHORE TECHNOLOGY PARK Redwood City California Prudential c/o Harvest Properties Site/Civil Geotechnical Environmental Traditional Surveying The one million-square foot Bayshore Technology Park exemplifies Langan's expertise with landfill redevelopment and the integration of our core engineering disciplines: site/civil geotechnical and environmental. We provide engineering design permitting and bid/construction administration support for various site improvement projects throughout the campus. These site improvements support the flexibility and growth of the Park which touts amenities that go beyond office space: fitness facilities basketball courts walking trails and a Cal Train shuttle among other amenities.

TEXAS INSTRUMENTS CORPORATION Palo Alto & Santa Clara CA & Puyallup WA Texas Instruments Corporation Environmental Site/Civil Langan has worked on various Texas Instruments Corporation sites managing groundwater monitoring programs designing and implementing remedial programs and working with regulatory agencies towards site closures.

EQUINIX DATA CENTERS San Jose CA Equinix Inc. J.T. Magen & Company Inc. Site/Civil Geotechnical Environmental Langan is providing multidiscipline services during construction of the Equinix SV10 development a multi-phased project consisting of two data centers on the 11.5-acre site. The new data center buildings will house computer servers and supporting equipment for private clients as well as associated office uses in environmentally controlled structures.

BRITANNIA COVE AT OYSTER POINT South San Francisco California Project Management Advisors Inc. Architect: DES Architects + Engineers and HCP Geotechnical Britannia Cove at Oyster Point is a massive biotechnology business complex consisting of 884 000-SF of office buildings 20 000-SF of retail space a hotel and 6-story and 2-story parking structures. Located along the Bay the site is underlain by fill and soft clay (Bay Mud). Part of Langan's scope of services included using geophysical methods to detect where foundations and railroad ties from former site uses were buried underground.

THE EXCHANGE San Francisco California Kilroy Realty Corporation Architect: Rios Clementi Hale Geotechnical Earthquake/Seismic Environmental The Exchange reflects urban life and the Mission Bay's rapid revitalization. Targeted for LEED Platinum certification the estimated $485-million development will provide 680 000 SF of office space and parking in four interconnected buildings (two 7-story and two 12-story buildings). Designed for today's workforce The Exchange also offers ground-level retail space a café a lobby bike spa rooftop gardens and waterfront views. Due to our experience in the Mission Bay area we were able to help the client select the most efficient and economical foundation system for the project while mitigating potential seismic hazards. Langan also completed an environmental investigation program and prepared a Site Mitigation Plan.

MAUDE & MATHILDA R&D CAMPUS - LINKEDIN & APPLE Sunnyvale California Kilroy Realty Corporation Environmental Geotechnical Maude & Mathilda Research & Development (R&D) office campus is Class A office space that consists of three mid-rise buildings an amenities building and a five-level parking garage. Apple and LinkedIn occupy the 560 000 SF campus. Langan worked with the project team to evaluate options to mitigate potential volatile organic compound (VOC) vapor intrusion conditions for the site development and to prepare design documents for the selected remedies.

LINCOLN CENTRE LIFE SCIENCES RESEARCH CAMPUS Foster City California BioMed Realty Trust Inc. Architect: HOK Geotechnical Environmental Earthquake/Seismic Located on the Peninsula Lincoln Centre is a 595 000 SF biomedical and life sciences research campus redevelopment. The buildings of the former industrial park were demolished. The development now includes three office/laboratory buildings three parking structures and an amenities building. Langan performed a geotechnical investigation and site-specific seismic studies updated the Phase I Environmental Site Assessment conducted a Limited Environmental Site Characterization and provided construction observation and analytical testing services.

VISA METRO CENTER Foster City California VISA USA Geotechnical Langan provided geotechnical services for the design and construction of VISA's West Coast headquarters in Foster City. The project consisted of two 12-story office towers and adjacent 4-story parking structures. Foundations for the buildings include 125-foot-long 14-inch-square reinforced concrete piles designed for allowable loads of 130 tons. The piles extend through 50 to 60 feet of man-made fill and weak marine deposits taking support in stiff clay and dense sand at depth.

ADOBE SYSTEMS TOWER San Jose California Randy Knox Geotechnical Earthquake/Seismic Langan performed geotechnical investigations for Adobe System's third tower in San Jose. Langan developed geotechnical conclusions and recommendations and provided recommendations for a mat foundation as well as shoring and underpinning recommendations for the adjacent properties. Our team also developed earthquake design criteria and site-specific design spectra.

SALESFORCE TOWER San Francisco California Boston Properties Hines Architect: Pelli Clarke Pelli Architects Kendall/Heaton Associates Partner: Magnusson Klemencic Associates Clark Construction Environmental The new Salesforce Tower is the tallest building in San Francisco's stunning skyline. This 1.4 million SF 60-story high-rise office building contains two to four levels of below-grade parking and many sustainability features. The tower will connect directly to the new Transbay Transit Center and will be linked to a large public park with ample recreational and green space. Langan's environmental team is providing consulting services for this project including soil and groundwater sampling Site Mitigation Plan oversight during excavation activities project management sampling and chemical analysis during soil handling and disposal activities.

5000 SHORELINE South San Francisco California Actelion Pharmaceuticals Jones Lang LaSalle Site/Civil Environmental Langan developed repair plans for the site around the existing building to mitigate differential settlement. The existing building currently occupied by Actelion Pharmaceuticals and managed by Jones Lang LaSalle was constructed over ten years ago on the Sierra Point Landfill. The site experienced significant settlement relative to the pile-supported building resulting in the need for site improvements. Langan also worked with the owner to address concerns on the operation of the existing methane mitigation system.

ORACLE Redwood City California Oracle Architect: Gensler KSH Architects Partner: Nishkian Menninger Webcor Geotechnical Langan performed a geotechnical investigation for the Oracle Headquarters and the adjacent Island Parkway Campus. Langan developed foundation design criteria for several office buildings a recreation center conference center pedestrian bridge and four parking structures.